This document is Amendment 00002 to Solicitation 75H70126R00019, issued by the Division of Engineering Services Seattle on April 1, 2026, with an effective date of April 17, 2026. The amendment serves solely to provide answers to vendor questions regarding the project.
The Q&A section addresses technical clarifications about foundation work at the Lame Deer Health Clinic, specifically regarding grade beam installation, location, and scope. Key clarifications include: grade beams span from Grid F to Grid G (not F to F.5); the ambulance bay is located on the north side of the clinic adjacent to the heliport with new grade beams installed in locations of existing (to be removed) grade beams; several grade beams are identified as new installations (Lines N between 5.5-6, M between 4-4.5, and N between 4-4.5), while Line 6 between M and N is an existing grade beam to remain; the project requires removal and remediation of existing grade beams, floor trusses, and concrete slabs at the ambulance entrance and loading dock locations; and as-constructed plans of the Lame Deer Clinic were provided in Amendment 01. Contractors must acknowledge receipt of this amendment prior to the specified hour and date by completing the form items and returning copies, acknowledging receipt on offer copies, or submitting a separate letter or electronic communication referencing the solicitation and amendment numbers. Failure to acknowledge receipt at the designated location prior to the deadline may result in offer rejection.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
A00002
The reason for this amendment on this solicitation is to answer questions from vendors.
See Q&A below.
Division of Eng. Services Seattle 701 Fifth Avenue, Suite 1600 Seattle WA 98104
See block 6
75H70126R00019
BI25NC201C06
1 2
04/17/2026
04/01/2026
Solicitation: 75H70126R00019 Amendment 00002
QUESTIONS AND ANSWERS
Q1. Reference page S101. Detail 1 on S101. Grade Beam on Gride line 11: Is it spanning from Grid F to
F.5? And another one needed from F.5 to G? Please clarify intent of design.
A1. Grade beam spans from Grid F to Grid G. This is future depicted on S2.1 – Pile and Precast Grade
Beam Plan of Lame Deer As‐Constructed Drawings that have been requested by the Contractor.
Q2. Sheet S101 ambulance entrance foundation plan. Where is this located on the project? Are the new grade beams installed outside of the existing structure?
A2. Ambulance bay is located on north side of Health Clinic adjacent to heliport. New grade beams are to be installed in location of existing (to be removed) grade beams.
Q3. Where it shows the contractor installing new grade beams on existing pile cap is there an existing building over those grade beams?
A3. Yes. Sheet S501 indicates existing structure to be removed and replaced as needed to perform foundation work.
Q4. Sheet S101is this a new grade beam Line N between 5.5 and 6?
A4. Yes. GB = New Grade Beam. Existing GB = Existing Grade Beam to remain.
Q5. Sheet S101is this a new grade beam Line 6 between M and N?
A5. No. GB = New Grade Beam. Existing GB = Existing Grade Beam to remain.
Q6. Sheet S101is this a new grade beam Line M between 4 and 4.5?
A6. Yes. GB = New Grade Beam. Existing GB = Existing Grade Beam to remain.
Q7. Sheet S101is this a new grade beam Line N between 4 and 4.5?
A7. Yes. GB = New Grade Beam. Existing GB = Existing Grade Beam to remain.
Q8. Which slabs are interior and exterior slabs?
A8. Loading Dock, Ambulance Bay Line 5.5 to 6 between Line N and O, Ambulance Entrance Line 4 to 4.5 between Line M and N.
Q9. Sheet S101 shows new grade beams and new Concrete topping slab for the ambulance entrance and loading dock. There is no drawing of existing site conditions at these locations. Is there existing structures to be demolished at these locations or is it just grass?
A9. Government provided As‐Constructed Plans of Lame Deer Clinic in Amendment 01. The project entails the removal and remediation of existing grade beams, floor trusses and concrete slabs.
Therefore, no vegetation exists at these locations.