MB01-A05 Pump-Offers Due Date.pdf
PDF 186 KB Posted
- Attached to
- Cancelled Rosebud Lift Station Construction
- Solicitation number
- 75H70126R00018
About this file
This is an Amendment of Solicitation (Amendment A00005) for Solicitation 75H70126R00018, issued by the Indian Health Service (IHS), Division of Engineering Services (DES) in Seattle, Washington for the Rosebud Lift Station Construction project. The amendment is effective January 24, 2026, and was signed by Contracting Officer Daniel Cotto on January 30, 2026.
The amendment serves two primary purposes: extending the offers due date by one week to March 16, 2026, and correcting a pump specification error. The original solicitation incorrectly identified the Vaughan V3V as a submersible pump when it is actually a vertical pump model. The amendment deletes the reference to the "Vaughan V3V" submersible pump and replaces it with the "Vaughan S3P" as the brand name or equal submissible pump model. Offerors must base their proposals on the corrected pump specification provided in this amendment. All other terms and conditions of the original solicitation remain unchanged. Offerors are required to acknowledge receipt of this amendment by completing items 8 and 15 on the Standard Form 30 (SF-30), acknowledging receipt on each copy of the offer submitted, or by separate letter or electronic communication referencing the solicitation and amendment numbers, with acknowledgment received prior to the new offer due date of March 16, 2026.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
A00005
Daniel Cotto
Read the continuation sheet.
Indian Health Service (IHS) Division of Engineering Services (DES) - Seattle 701 5th Ave, Suite 1650 Seattle, WA 98104
75H70126R00018
GP25RB500Z10, PA#141
1 2
Same as 16C
01/24/2026
1/30/2026
Rosebud Lift Station Construction Solicitation: 75H70126R00018
1. The purpose of this solicitation amendment A05 is to:
a. Extend the offers due date.
b. Change the pump description.
2. The offers due date is extended by one week to 03/16/2026.
3. The solicitation identified the Vaughan V3V pump as a submersible pump. A bidder notified the Government that this designation is incorrect. The Vaughan V3V is a vertical pump, not a submersible model. The solicitation is hereby amended as follows:
- DELETE: Reference to the “Vaughan V3V” pump as a submersible pump.
- REPLACE WITH: “Vaughan S3P” as the brand name or equal submersible pump model for this requirement.
This correction aligns the specification with the Government’s intended pump type for the project. Offerors shall base their proposals on the corrected pump specification provided in this amendment.
4. Remember to acknowledge all amendments. Block 11 of the SF-30 provides instructions for acknowledging amendments; it is acceptable to acknowledge on block 19 of the SF-1442.
5. All other terms and conditions remain unchanged.
End of Continuation Sheet.
File details come from the government source that posted it. Updated .