This is a Consolidated List of Questions and Answers for Solicitation #75H70126R00018, issued on 02/24/2026, for the Rosebud Lift Station Construction project (GP25RB500Z10, PA#141890). The document does not establish new requirements but clarifies existing solicitation terms through 34 answered questions.
Key technical clarifications include: the performance period has been extended to 240 days; a geotechnical report from a nearby location is available; the precast double box structure dimensions are 84"x84" for both wet well and dry well; pump access doors must be 42"x60"; base course thickness under concrete is 12 inches; fence line posts are 2½ inch nominal diameter SS40 galvanized steel tubing with 11-foot minimum length, while terminal/corner/gate posts are 4 inch nominal diameter with 12 feet 6 inches minimum length; the double swing gate opening is 12 feet; and the Vaughan S3P (not V3V) submersible pump is specified as the brand name or equal. The project requires Buy America compliance, compaction and concrete testing by the contractor, and accepts alternative products including core blue or 304SS bolts, T316 stainless steel bar screen baskets, and LED lighting equivalent to 100W incandescent output. Control specifications clarify use of a PLC alternator (not physical), transducer main control with float backup, Allen-Bradley CompactLogix 5069 Series PLC, and a 480 VAC primary to 120 VAC secondary control power transformer. The licensing requirement referenced in specifications has been removed. Key personnel positions identified are Project Manager, Superintendent, and Safety Officer; resumes are not required but should be addressed in the technical approach narrative.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Consolidated List of Questions and Answers 02/24/2026
Project Title: Rosebud Lift Station Construction, GP25RB500Z10, PA#141890 Solicitation #: 75H70126R00018
Below are the questions received in response to this solicitation and their respective answers:
1. Past Performance. Can a small business offeror use past performance information from an affiliate if it was a small business at the time of project award and completion but has since graduated to large business status? We are seeking clarification on whether such past performance is considered acceptable and relevant under USACE evaluation criteria, particularly when the affiliate maintains a corporate relationship with the offeror and will contribute meaningfully to the performance of the proposed contract. DFARS 215.305(a)(2)(C) allows a small business concern to use relevant past performance information provided by affiliates. However, we would appreciate confirmation on whether the change in the affiliate’s size status affects the eligibility of its past performance for evaluation purposes.
- Answer: Refer to FAR RFO 15.202 (c) Past performance evaluation.
https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-15
Remember that there are other considerations, not related to past performance, that affect the evaluation, such as the rules for Joint Ventures, self-performance, ISBEE rules.
- Refer to M.2, Factor 2. Notice that this RFP will use a LPTA source selection, so the past performance evaluation will be rated as Acceptable/Unacceptable. Ensure the past performance record reflects how the past performance record of the proposed organization applies to this project.
2. Reps and Certs. Could you please confirm whether you would like offerors to include their representations and certifications within the proposal package, or if it is sufficient that our representations and certifications are current and active in SAM.gov?
- Answer: Refer to B01 RFP RLSC 75H70126R00018, page 55, VOLUME II – PRICE PROPOSAL, FACTOR 3: Price, 4. Certifications and Representations.
Offeror’s Certifications and Representations will be obtained from the United States federal government’s System for Award Management (SAM) database, prior to award.
3. Key Personnel. Section H.6 identifies certain positions as Key Personnel and states that these individuals are those “whose résumés were submitted for evaluation of the proposal.”
However, the Section L “What to Submit” instructions do not reference submitting résumés or identifying Key Personnel.
Could you please clarify whether résumés for Key Personnel are required as part of the proposal submission? If so, could you specify which positions you consider Key Personnel for this solicitation?
- Answer: Resumes are not required. The required technical approach narrative is a good place to the offeror’s approach to the key personnel requirement.
H.6.b identifies the following key personnel: (1) Project Manager, (2) Superintendent and the (3) Safety Officer.
- Refer to M.2, Factor 1. Ensure your technical approach is appropriate for this project.
4. Funding. Could you please confirm whether this project has received funding?
- Answer: While the RFO does not explicitly require funds to be available prior to solicitation issuance, the Contracting Officer must ensure compliance with fiscal law and agency funds-control procedures. Accordingly, solicitations are issued only when there is a reasonable expectation that funds will be available for award within the anticipated timeframe, consistent with RFO Part 32 and HHS/IHS policy.
5. Security. Is a full 6’ chain link temp fence required for site security?
- Answer: A 6' chain link temporary fence is not specifically required. Site security is the responsibility of the Contractor and shall be addressed through the Contractor’s means and methods in accordance with applicable safety standards. If excavations or trenches will remain open after work hours, particularly due to the lift station’s proximity to occupied quarters and pedestrian traffic, the Contractor shall provide appropriate protective measures, which may include a 6' chain link fence. If all excavations are backfilled or otherwise secured daily, a standard temporary construction fence may be acceptable.
6. Project Start Date. We were unable to locate a project start date in the documents provided.
Could you please advise if a planned start date has been established?
- Answer: No, as of today, there is no official planned start date. With that said, the offers are due in the beginning of March; the Government has 60 days to accept the proposal unilaterally, placing us at the beginning of May; then there will be some post-award admin tasks (post-award conference, kick-off meeting, etc.) so, I expect the actual construction phase to start around the beginning of June.
7. Price Schedule. Is there a bid schedule or what is the preferred way to estimate this project?
- Answer: It is up to each contractor to provide quantity and price of each item with the information given of the project (SOW, Plans, Technical Specifications, etc.). After award, the Contractor will provide a schedule of values per G.5, G.6, H.13, and H.14.
8. Testing. Are compaction and concrete testing performed by the owner or the contractor?
- Answer: Performed by the contractor.
9. Performance Period. Considering the time required for approvals and anticipated equipment lead times, the current performance period appears very tight. Would the Government consider extending the performance period to 240 days?
- Answer: A POP change to 240 days is included as part of this amendment.
10. Geotechnical Information. Is a geotechnical report available for the project site or for nearby comparable locations?
- Answer: The hospital does have a geotechnical report that was performed approximately 300’ away in the old solar array/new maintenance shop area. This report is included as part of this amendment.
11. Paving Material. For the small pavement restoration area (approximately 16 square feet) shown on Sheet 4, would the Government permit the use of concrete in lieu of asphalt?
- Answer: The primary difference between these sections of hard surface is that one is the hospital quarters (concrete) and the other is a tribal road (asphalt). Replacing material with like material will minimize future discussions if the condition of the tribal road dilapidates significantly around where the concrete patch extends into the road.
The concrete patch will only need to be joined with adjacent concrete via rebar tie-in to reduce concrete patch floating vertically from the existing road. No connection via rebar tie-in is necessary for the asphalt.
12. Consolidated Amendment. Will the Government release all offeror questions and corresponding responses in a single, consolidated amendment?
- Answer: All the questions and answers are included in this amendment.
13. Base Course Thickness. The drawings indicate both 12 inches and 24 inches of base course beneath the concrete. Could the Government confirm which thickness is correct?
- Answer: 12-inches of base course underneath the concrete pad is sufficient.
14. Key Personnel – Superintendent, SSHO, and Quality Control Manager Roles. The solicitation outlines the requirements for the Job Site Superintendent, SSHO, and Quality Control Manager. Will the Government allow one individual to serve in more than one key role (e.g., Superintendent also serving as SSHO and/or Quality Control Manager), or does the Government require these positions to be filled by separate personnel?
- Answer: Refer to M.2, Factor 1. Ensure your technical approach is appropriate for this project. The Government has no additional requirements other than what is stated in the solicitation.
15. Per Section 02538 – Community Lift Station Part 2.4 we plan to bid a Model #### as an equal to the specified Vaughan Model V3V/V3VR Chopper pump. I have attached the datasheets for this pump. I wanted to seek your approval as this pump would deviate from the Vaughan.
- Answer: This amendment includes an addition to Section C to add paragraph I Notes on the Vaughan Model V3V/V3VR brand name or equal requirement.
- You may propose this alternative as part of your offer and the Government may then decide to do a deeper assessment if yours is the lowest offer being evaluated;
remember that this is an LPTA solicitation. In your offer, I suggest you address the stated requirements to ensure your offered product is fully compatible.
16. I am bidding out the fence portion of Rosebud lift station project. Are there any size specs for the terminal posts and line posts for this project? Also, I just want to confirm that the double gate opening is 12'. The detailed part for the fence shows it at 15'.
- Answer:
A. Section 02821, Page 2, Section 2.1.C & E specifies the following:
1. C. Line Posts.
1. 2 ½ inch nominal diameter SS40 galvanized steel tubing.
2. Drive type.
3. Minimum outside diameter: 2.375 inch.
4. Minimum weight: 3.12 pounds per foot.
5. Minimum bending strength: 338 pounds
6. Minimum length: 11 feet.
2. Terminal, Corner, Gate, and Pull Posts.
1. 4” nominal diameter SS40 galvanized steel tubing.
2. Minimum outside diameter: 4.0 inch.
3. Minimum weight: 6.56 pounds per foot.
4. Minimum bending strength: 1187 pounds
5. Minimum length: 12 feet 6 inches.
6. Supplied with Galvanized post tops.
B. Section 02821, Page 3, Section 2.6.A & B indicate a 12-foot swing gate or a 15-foot rolling cantilever gate. Based upon this information and comparing it to the plan details on sheet 12 of 12 use 12’ for the total length of the double swing gate.
17. Does this job have Buy America requirements?
This project does have “Buy America” requirements.
- Answer: Yes.
18. Do you want core blue bolts or 304SS bolts on the force main line for the fittings?
- Answer: Both are acceptable.
19. Are there any 4” gate valves on the force main line?
- Answer: Within the existing dry-well there are 2-4” Gate Valves however, the existing lift station plans do not indicate another gate valve until a “line-vault” approximately half a mile away from the lift station. Will include the original plans for this question.
20. Where can I find the dimensions of the precast double box structure on the plans? I see the elevations, but would like to know length and width.
- Answer: On sheet 5 of 12 of the plans the profile view labeled, “PROPOSED LIFT STATION PROFILE STA 0+00 to 1+23” Indicates that the wet well and dry well are both 84”x84” with a center wall separating them.
21. Do you know if the pump access doors need to be 36” x 60” or 42” x 60”? The drawing and spec are contradictory.
- Answer: 42”x60” is the correct size.
22. We cannot do a punched bar screen basket for a 12” influent pipe. Would it be ok to quote our standard bar screen basket in T316 SS to fit a 12” influent pipe?
- Answer: This is acceptable given the influent size being 12”.
23. I see on the plans the line posts are driven 5' down with no concrete. Could that be changed to just drilling holes and fastening them in concrete like the terminal posts will be?
- Answer: This is acceptable.
24. One of our employees was advised by the South Dakota Plumbing Commission that an Individual and Small On-Site Wastewater System Installer License is required for this scope of work. Could you please confirm whether this specific license meets IHS requirements and expectations for the project?
- Answer: The solicitation is amended to remove the licensing requirement.
Typically, we like to have licensed plumbers to install septic systems but, on the Reservation, the state rules do not govern. Local or state health districts cannot require a permit for systems on the reservation nor govern how they are installed. The only body that governs on site systems on the reservation is EPA and there really is nothing from oversight from EPA. DSFC does don't require this licensure when within the Reservation boundaries.
25. The solicitation identified the Vaughan V3V pump as a submersible pump. A bidder notified the Government that this designation is incorrect. The Vaughan V3V is a vertical pump, not a submersible model. The solicitation is hereby amended as follows:
- DELETE: Reference to the “Vaughan V3V” pump as a submersible pump.
- REPLACE WITH: “Vaughan S3P” as the brand name or equal submersible pump model for this requirement.
This correction aligns the specification with the Government’s intended pump type for the project. Offerors shall base their proposals on the corrected pump specification provided in this amendment.
26. I was looking to bid this job and just had a question on sheet 10 it says to bring a conduit to the onsite generator. Is this pipe just stubbed out as a spare or is there a generator onsite?
- Answer: The documents indicate a conduit connection to a generator; however, the existing power configuration for the lift station is not currently confirmed. At the start of construction, the contractor shall verify the existing power source serving the lift station and provide the necessary means and methods to establish electrical service to the new lift station.
27. D.5 - Calls out an alternating relay J.9. Called out alternation on SCADA system - do they want a physical alternator or a PLC alternator - can't have both.
- Answer: PLC Alternator
28. K. Level Transmitter - calls out a level transmitter to the PLC, but I. says level control based on floats. Do they want level control based on floats or a transducer? Usually, we do a level transducer as the main control with floats as backup. They would be wired to the same PLC
- Answer: Transducer Main and Float back-up.
29. J. - SCADA System. The SCADA system called out is a Sensaphone SCADA 3000. I would change this to an Allen Bradley CompactLogix 5069 series PLC. More systems use this platform and brand of PLC. This will give them more options for support. Also would use Cloud 9 SCADA as the application for the SCADA system. This will allow Dakota Pump remote access for help troubleshooting the system remotely as well as give the operators access and alarm call-outs. This cloud 9 system would be supplied with a Cellular modem, which would include SCADA access, alarm call-outs and cellular data for the system. If we go this route, we could get rid of section L. Telephone communication.
- Answer: The Allen-Bradley CompactLogix 5069 Series PLC would be a suitable modification for this application, offering a more widely supported control platform that improves long-term serviceability, integration capability, and technical support options for the Service Unit.
30. K. Would like to use a Dwyer 4-20 PBLT2 transducer. 0-15 PSI with 60' of cable.
- Answer: This is fine.
31. D. & F. - Pilot devices. Would use Siemens 22MM devices. Oil-tight NEMA 4 rated on the inside of the panel on the dead front door. All pilot devices and lights would be 22MM and Siemens brand.
- Answer: This is fine.
32. My controls and Scada team is going through the specifications and they are not finding page 13 in the plans that is referenced in the picture attached. Was this page not published? It appears there are only 12 pages of plans.
- Answer: Actually, should refer to sheet 10.
33. The plans mention a 100 W incandescent light. Incandescent lights aren’t typically allowed, but there are exceptions.
- Answer: The specification reference to a 100 W incandescent light appears to describe the approximate illumination level required for the exterior flood light. Incandescent lamps are not required. LED fixtures providing equivalent illumination output may be used
- The contractor may provide an LED fixture with lumen output approximately equivalent to a 100 W incandescent lamp (approximately 1,500–1,700 lumens) suitable for wet-location installation.
34. The specs mention a 120 VAC input to 120 VAC transformer.
- Answer: Section G of the specifications identifies the pumping station electrical characteristics as 480 volts, three-phase, 60 Hz. The new lift station control panel will tie into the existing 480 V power currently serving the lift station pumps that are being decommissioned.
- The control power transformer specified in Section 2.8.C.6 is intended to provide control voltage for panel controls and accessory components. Therefore, the transformer should be 480 VAC primary and 120 VAC secondary, sized as required for the control circuit loads.
- The reference to 120 VAC input and output appears to be an error in the specifications.