B05 Amdnment A0001-75H70126R00009.pdf
PDF 259 KB Posted
- Attached to
- Pine Ridge Multiplex Construction Federal contract opportunity
- Solicitation number
- 75H70126R00009
About this file
This document is a Standard Form 30 (SF30) Amendment of Solicitation/Modification of Contract for the Indian Health Service (IHS) for the Pine Ridge Multiplex Construction project (Solicitation Number 75H70126R00009). The amendment, designated as A0001 and effective 01/14/2026, includes several key modifications: providing Questions and Answers dated January 14, 2026, adding a Geotechnical Report (Attachment J09), incorporating two new Federal Acquisition Regulation (FAR) clauses in Section I related to responsibility matters and biobased products, and replacing references to the Northern Cheyenne Tribe with the Oglala Sioux Tribe in Section H. The amendment maintains all other terms and conditions of the original solicitation unchanged, and contractors are not required to sign and return the document. The solicitation is for a construction project located at Pine Ridge, with specific tribal requirements and technical specifications to be detailed in the full Request for Proposal (RFP) document.
View the file
Other files for this federal contract opportunity
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
A0001
Andrew Hart, Contracting Officer
See next page.
Indian Health Service - DES Seattle 701 5th Avenue, Suite 1600 Seattle, WA 98104
75H70126R00009
1 3
01/14/2026
01/05/2026
SF30 Continuation Page
A. The purpose of this amendment is for the followings;
1. Provide a Q&As as of January 14, 2026.
2. Provide B01 Attachment J09 Geotech Report.
3. Add following FAR Clauses in Section I.
52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters (DEVIATION) (RFO
AUG 2025)
52.223-2 Reporting of Biobased Products Under Service and Construction Contracts (DEVIATION) (RFO
NOV 2025)
4. Replace Northern Cheyenne Tribe with Oglala Sioux Tribe in Section H. Para H.48. Tribe Requirements.
B. See attached B01 RFP 75H70126R00009 Pine Ridge Multiplex Construction Amended by A0001 for fully updated
RFP.
C. All other terms and conditions of this solicitation remain unchanged.
Amend No.
Item
Date Submitted
Question Type
(Technical or Admin)
Question Response Date Response Responded By
EXAMPLE 0 11/23/2020 Technical Please provide drawings or plans for ??? 11/23/2020 IHS Response IHS POC
A0001 1 1/12/2026 Admin
Please confirm that the RFP reference on page 32 of 54, Section H, H.48, (c), is correct and not a misprint. We are assuming the Northern Cheyenne Tribe that is referenced is in Montana. 01/14/2026
It was changed from Northern Cheyenne Tribe to Oglala Sioux Tribe.
IHS CS
A0001 2 1/12/2026 Technical
The project documents state a Geotech Report would be attached but we cannot locate it. Would you please release this document?
01/14/2026
The Geotech Report is being provided by Amendment A0001
IHS COR
| ADP5903.tmp |
| SF30 Continuation Page |
| A. The purpose of this amendment is for the followings; |
| 1. Provide a Q&As as of January 14, 2026. |
| 2. Provide B01 Attachment J09 Geotech Report. |
| 3. Add following FAR Clauses in Section I. |
| 4. Replace Northern Cheyenne Tribe with Oglala Sioux Tribe in Section H. Para H.48. Tribe Requirements. |
| B. See attached B01 RFP 75H70126R00009 Pine Ridge Multiplex Construction Amended by A0001 for fully updated RFP. |
| C. All other terms and conditions of this solicitation remain unchanged. |
| ADPF9AA.tmp |
| PPI Log |
| ADP155D.tmp |
| PPI Log |
File details come from the government source that posted it. Updated .