B01 Attachment J10 Arch-Suppl-Specs.pdf
PDF 463 KB Posted
- Attached to
- Pine Ridge Multiplex Construction Federal contract opportunity
- Solicitation number
- 75H70126R00009
About this file
This document comprises construction specification sections for the Pine Ridge AE Multiplex Design project, detailing materials, products, and execution requirements across multiple building systems.
Section 047200 (Cast Stone Masonry) specifies cast stone sills and wall cap units complying with ASTM C1364, manufactured using moist curing at specified temperatures and humidity levels. Units must feature sharp arris details, sloped horizontal surfaces at 1:12 for drainage, and acid etching after curing. Accessories include Type 304 stainless steel anchors and dowels per ASTM standards. Mortar mixes must comply with ASTM C270 Type N for both setting and pointing applications. Installation requires full bed mortar with full head joints, with joint pointing in layers not exceeding 3/8 inch, tooled to slightly concave finish when thumbprint hard. Section 068316 (Fiberglass Reinforced Paneling) requires FRP wall panels 0.10 inch thick with smooth white surface, installed via adhesive only with sealant joints and no trim, complying with ASTM D5319 and achieving maximum flame spread index of 25 and smoke developed index of 450 per ASTM E84. Panels from manufacturers including Crane Composites, Marlite, Nudo Products, or Panolam must be stored flat indoors and acclimated 48 hours before installation. Section 072119 (Foamed-In-Place Insulation) specifies closed-cell spray polyurethane foam at ASTM C1029 Type II with minimum density of 1.5 lb/cu. ft. and R-value of 6.2 per inch, from manufacturers such as Carlisle, Enverge, Huntsman, or Johns Manville, achieving flame spread index of 25 or less and smoke developed index of 450 or less, and passing NFPA 276 testing as part of approved assemblies. Installation requires multiple passes not exceeding manufacturer-recommended thicknesses without spraying into rising foam.
Section 087100 (Door Hardware) establishes comprehensive requirements for mechanical and electromechanical door hardware for swinging doors, with preinstallation conference mandatory. Hinges must comply with BHMA A156.1, while continuous geared hinges meet ANSI/BHMA A156.26 Grade 1-600 specifications fabricated from 0.120-inch minimum extruded 6063-T6 aluminum. Electrified quick-connect transfer hinges require standardized Molex plug connectors accommodating up to 12 concealed wires. Mechanical locks and latches include BHMA A156.5 Grade 1 cylinders with 7-pin replaceable BEST cores, 2-3/4 inch backset, and manufacturer-standard ADA levers. Lock cylinders require construction cores replaceable by permanent cores, with 5 construction and 10 permanent master keys provided. Keying systems must be factory registered per BHMA A156.28 with master key systems providing change keys and master keys. Surface closers must comply with BHMA A156.4 rack-and-pinion hydraulic specifications, while door gasketing per BHMA A156.22 limits air leakage to 0.3 cfm/sq. ft. for single doors and 0.50 cfm per ft. for double doors when tested to ASTM E283 at 0.3-inch water gauge pressure. Manufacturer warranty covers three years from Substantial Completion, except exit devices (two years) and manual closers (10 years). Section 323119 (Metal Gates) requires aluminum swing gates fabricated from square extruded-aluminum tubes with 3-by-3 inch outer frames (0.188-inch wall) and 2-by-4 inch inner frames (0.188-inch wall), infilled with 1-inch-by-5½-inch engineered wood slats. Hardware includes latches, hinges, keepers, center stops, and cane bolts, all fabricated from hot-dip galvanized corrosion-resistant materials per ASTM A153/A153M. Aluminum must comply with ASTM B221 (extrusions), ASTM B429/B429M (tubing), and ASTM B26/B26M (castings) specifications, finished with baked enamel or powder coating per AAMA 2603 with minimum 2-mil dry film thickness.
View the file
Other files for this federal contract opportunity
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PINE RIDGE AE MULTIPLEX DESIGN CAST STONE MASONRY
CONSTRUCTION DOCUMENTS 047200 - 1
SECTION 047200
CAST STONE MASONRY
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Cast Stone Sills and Masonry Wall Cap units.
2. Accessories.
1.3 ACTION SUBMITTALS
A. Product Data: For each type of product.
B. Shop Drawings: Show fabrication and installation details for cast stone units. Include dimensions, details of reinforcement and anchorages if any, and indication of finished faces.
C. Samples:
1. For each trim shape required, 6 inches in length.
2. For colored mortar.
1.4 INFORMATIONAL SUBMITTALS
A. Material test reports.
1.5 QUALITY ASSURANCE
A. Manufacturer Qualifications: A qualified manufacturer of cast stone units similar to those indicated for this Project, that has sufficient production capacity to manufacture required units, and is a plant certified by CSI or APA
PART 2 - PRODUCTS
2.1 CAST STONE UNITS
A. Cast Stone Units: Comply with ASTM C1364.
1. Units are manufactured using the manufacturer's selected method.
CONSTRUCTION DOCUMENTS 047200 - 2
2. Trim units including sills and wall caps as indicated on Drawings.
B. Fabricate units with sharp arris and accurately reproduced details, with indicated texture on all exposed surfaces unless otherwise indicated.
1. Slope exposed horizontal surfaces 1:12 to drain unless otherwise indicated.
2. Provide raised fillets at backs of sills and at ends indicated to be built into jambs.
3. Provide drips on projecting elements unless otherwise indicated.
C. Cure Units as Follows:
1. Cure units in enclosed, moist curing room at 95 percent relative humidity and temperature of 100 deg F for 12 hours or 70 deg F for 16 hours.
2. Keep units damp and continue curing to comply with one of the following:
a. No fewer than five days at mean daily temperature of 70 deg F or above.
b. No fewer than seven days at mean daily temperature of 50 deg F or above.
D. Acid etch units after curing to remove cement film from surfaces to be exposed to view.
E. Colors and Textures: As selected by owner’s representative from manufacturer's full range.
2.2 ACCESSORIES
A. Anchors: Type and size indicated, fabricated from Type 304 stainless steel complying with ASTM A240/A240M, ASTM A276/A276M, or ASTM A666
B. Dowels: 1/2-inch diameter round bars, fabricated from Type 304 stainless steel complying with ASTM A240/A240M, ASTM A276/A276M, or ASTM A666
C. Proprietary Acidic Cleaner: Manufacturer's standard-strength cleaner designed for removing mortar/grout stains, efflorescence, and other new construction stains from new masonry without discoloring or damaging masonry surfaces. Use product expressly approved for intended use by cast stone manufacturer and expressly approved by cleaner manufacturer for use on cast stone and adjacent masonry materials.
2.3 MORTAR MIXES
A. Comply with requirements in Section 042613 "Masonry Veneer" for mortar mixes.
B. Comply with ASTM C270, Proportion Specification.
1. For setting mortar, use Type N.
2. For pointing mortar, use Type N.
C. Preblended dry mortar mix complying with ASTM C1714/C1714M and capable of producing mortar strength as indicated in ASTM C270.
1. For setting mortar, use Type N.
2. For pointing mortar, use Type N.
D. Pigmented Mortar: Use colored cement product or select and proportion pigments with other ingredients to produce color required. Do not add pigments to colored cement products.
CONSTRUCTION DOCUMENTS 047200 - 3
PART 3 - EXECUTION
3.1 SETTING CAST STONE IN MORTAR
A. Install cast stone units to comply with requirements in Section 042613 "Masonry Veneer."
B. Set cast stone as indicated on Drawings. Set units accurately in locations indicated, with edges and faces aligned according to established relationships and indicated tolerances.
C. Set units in full bed of mortar with full head joints unless otherwise indicated.
1. Fill dowel holes and anchor slots with mortar.
2. Fill collar joints solid as units are set.
3. Build concealed flashing into mortar joints as units are set.
D. Point mortar joints by placing and compacting mortar in layers not greater than 3/8 inch Compact each layer thoroughly and allow it to become thumbprint hard before applying next layer.
E. Tool exposed joints slightly concave when thumbprint hard. Use a smooth plastic jointer larger than joint thickness.
F. Provide sealant joints at head joints of copings and other horizontal surfaces; at expansion, control, and pressure-relieving joints; and at locations indicated.
1. Keep joints free of mortar and other rigid materials.
2. Prepare and apply sealant of type and at locations indicated to comply with applicable requirements in Section 079200 "Joint Sealants."
3.2 SETTING ANCHORED CAST STONE WITH SEALANT-FILLED JOINTS
A. Set cast stone as indicated on Drawings. Set units accurately in locations indicated, with edges and faces aligned according to established relationships and indicated tolerances.
1. Install anchors, supports, fasteners, and other attachments indicated or necessary to secure units in place.
2. Shim and adjust anchors, supports, and accessories to set cast stone in locations indicated with uniform joints.
B. Fill anchor holes with sealant.
1. Where dowel holes occur at pressure-relieving joints, provide compressible material at ends of dowels.
C. Set cast stone supported on clip or continuous angles on resilient setting shims. Use material of thickness required to maintain uniform joint widths. Hold shims back from face of cast stone a distance at least equal to width of joint.
D. Prepare and apply sealant of type and at locations indicated to comply with applicable requirements in Section 079200 "Joint Sealants."
CONSTRUCTION DOCUMENTS 047200 - 4
3.3 ADJUSTING AND CLEANING
A. Remove and replace stained and otherwise damaged units and units not matching approved Samples. Cast stone may be repaired if methods and results are approved by Architect.
B. Replace units in a manner that results in cast stone matching approved Samples, complying with other requirements, and showing no evidence of replacement.
C. In-Progress Cleaning: Clean cast stone as work progresses.
1. Remove mortar fins and smears before tooling joints.
2. Remove excess sealant immediately, including spills, smears, and spatter.
D. Final Cleaning: After mortar is thoroughly set and cured, clean exposed cast stone as follows:
1. Remove large mortar particles by hand with wooden paddles and nonmetallic scrape hoes or chisels.
2. Test cleaning methods on sample; leave one sample uncleaned for comparison purposes. Obtain Government's approval of sample cleaning before proceeding with cleaning of cast stone.
3. Clean cast stone by methods described in Cast Stone Institute Technical Bulletin #39.
END OF SECTION 047200
PINE RIDGE AE MULTIPLEX DESIGN FIBERGLASS REINFORCED PANELING
CONSTRUCTION DOCUMENTS 068316 - 1
SECTION 068316
FIBERGLASS REINFORCED PANELING
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Fiberglass reinforced plastic panels.
1.02 REFERENCE STANDARDS
A. ASTM D5319 - Standard Specification for Glass-Fiber Reinforced Polyester Wall and Ceiling Panels; 2022.
B. ASTM E84 - Standard Test Method for Surface Burning Characteristics of Building Materials;
2024.
C. FM 4880 - Examination Standard for Class 1 Fire Rating of Building Panels or Interior Finish Materials; 2022.
1.03 SUBMITTALS
A. See Section 013000 - Administrative Requirements, for submittal procedures.
B. Product Data: Provide data on specified products, describing physical and performance characteristics; including sizes, patterns and colors available; and installation instructions.
C. Maintenance Materials: Furnish maintenance materials the for Owner's maintenance of project.
1.04 DELIVERY, STORAGE, AND HANDLING
A. Store panels flat, indoors, on a clean, dry surface. Remove packaging and allow panels to acclimate to room temperature for 48 hours prior to installation.
PART 2 PRODUCTS
2.01 MANUFACTURERS
A. Fiberglass Reinforced Plastic Panels:
1. Crane Composites, Inc: www.cranecomposites.com
2. Marlite, Inc: www.marlite.com
3. Nudo Products, Inc; FiberLite FRP: www.nudo.com
4. Panolam Industries International, Inc: www.panolam.com
5. Substitutions: See Section 01 6000 - Product Requirements.
2.02 PANEL SYSTEMS
A. Wall Panels:
1. Panel Size: Sized to produce minimum number of seams
2. Panel Thickness: 0.10 inch
3. Surface Design: Smooth.
4. Color: White.
5. Attachment Method: Adhesive only, sealant joints, no trim.
2.03 MATERIALS
A. Panels: Fiberglass reinforced plastic (FRP), complying with ASTM D5319.
PINE RIDGE AE MULTIPLEX DESIGN FIBERGLASS REINFORCED PANELING
CONSTRUCTION DOCUMENTS 068316 - 2
1. Surface Burning Characteristics: Maximum flame spread index of 25 and smoke developed index of 450; when system tested in accordance with ASTM E84.
B. Trim: Vinyl; color coordinating with panel.
C. Sealant: Type recommended by panel manufacturer; white.
PART 3 EXECUTION
3.01 EXAMINATION
A. Verify existing conditions and substrate flatness before starting work.
B. Verify that substrate conditions are ready to receive the work of this section.
3.02 INSTALLATION - WALLS
A. Install panels in accordance with manufacturer's instructions.
B. Cut and drill panels with carbide tipped saw blades, drill bits, or snips.
C. Apply adhesive to the back side of the panel using trowel as recommended by adhesive manufacturer.
D. Apply panels to wall with seams plumb and pattern aligned with adjoining panels.
E. Install panels with manufacturers’ recommended gap for panel field and corner joints.
F. Seal gaps at floor, fixtures, and between panels with applicable sealant to prevent moisture intrusion.
G. Remove excess sealant after paneling is installed and prior to curing.
END OF SECTION 068316
PINE RIDGE AE MULTIPLEX DESIGN FOAMED-IN-PLACE INSULATION
CONSTRUCTION DOCUMENTS 072119 - 1
SECTION 072119
FOAMED-IN-PLACE INSULATION
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Closed-cell spray polyurethane foam.
1.2 ACTION SUBMITTALS
A. Product Data:
1. Closed-cell spray polyurethane foam.
1.3 INFORMATIONAL SUBMITTALS
A. Product test reports.
B. Research reports.
1.4 QUALITY ASSURANCE
A. Manufacturer Qualifications: A company specializing in manufacturing urethane foam products and systems of this section with a minimum of ten years documented experience.
B. Installer Qualifications: A manufacturer qualified applicator specializing in performing work of this section with minimum three
PART 2 - PRODUCTS
2.1 CLOSED-CELL SPRAY POLYURETHANE FOAM AT ROOF
A. Closed-Cell Spray Polyurethane Foam: ASTM C1029, Type II, minimum density of [1.5 lb/cu. ft.
and minimum aged R-value at 1-inch thickness of 6.2 deg F x h x sq. ft./Btu at 75 deg F.
1. Manufacturers:
a. Carlisle
b. Enverge
c. Huntsman
d. Johns Manville
e. Or approved equal
PINE RIDGE AE MULTIPLEX DESIGN FOAMED-IN-PLACE INSULATION
CONSTRUCTION DOCUMENTS 072119 - 2
2. Surface-Burning Characteristics: Comply with ASTM E84; testing by a qualified testing agency. Identify products with appropriate markings of applicable testing agency.
a. Flame-Spread Index: 25 or less.
b. Smoke-Developed Index: 450 or less.
3. Fire Propagation Characteristics: Passes NFPA 276 testing as part of an approved assembly.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Comply with insulation manufacturer's written instructions applicable to products and applications.
B. Spray insulation to envelop entire area to be insulated and fill voids.
C. Apply in multiple passes to not exceed maximum thicknesses recommended by manufacturer.
Do not spray into rising foam.
END OF SECTION 072119
PINE RIDGE AE MULTIPLEX DESIGN DOOR HARDWARE
CONSTRUCTION DOCUMENTS 087100 - 1
SECTION 087100
DOOR HARDWARE
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Mechanical door hardware for the following:
a. Swinging doors.
2. Cylinders for door hardware specified in other Sections
B. Door hardware includes, but is not necessarily limited to, the following:
1. Mechanical door hardware.
2. Electromechanical door hardware
1.2 PREINSTALLATION MEETINGS
A. Preinstallation Conference: Conduct conference at Project site.
1.3 ACTION SUBMITTALS
A. Product Data: For each type of product.
B. Samples: For each exposed product in each finish specified.
C. Door hardware schedule.
D. Keying schedule.
1.4 INFORMATIONAL SUBMITTALS
A. Sample warranty.
B. Shop Drawings: Details of electrified access control hardware indicating the following:
1. Wiring Diagrams: Upon receipt of approved schedules, submit detailed system wiring diagrams for power, signaling, monitoring, communication, and control of the access control system electrified hardware. Differentiate between manufacturer-installed and field-installed wiring. Include the following:
CONSTRUCTION DOCUMENTS 087100 - 2
a. Elevation diagram of each unique access-controlled opening showing location and interconnection of major system components with respect to their placement in the respective door openings.
b. Complete (risers, point-to-point) access control system block wiring diagrams.
c. Wiring instructions for each electronic component scheduled herein.
2. Electrical Coordination: Coordinate with related sections the voltages and wiring details required at electrically controlled and operated hardware openings.
1.5 CLOSEOUT SUBMITTALS
A. Maintenance data.
1.6 QUALITY ASSURANCE
A. Installer Qualifications: Supplier of products and an employer of workers trained and approved by product manufacturers and of an Architectural Hardware Consultant who is available during the course of the Work to consult Contractor and Government about door hardware and keying.
1. Scheduling Responsibility: Preparation of door hardware and keying schedule.
1.7 COORDINATION
A. Templates: Obtain and distribute to the parties involved templates for doors, frames, and other work specified to be factory prepared for installing standard and electrified hardware. Check Shop Drawings of other work to confirm that adequate provisions are made for locating and installing hardware to comply with indicated requirements.
B. Door Hardware and Electrical Connections: Coordinate the layout and installation of scheduled electrified door hardware and related access control equipment with required connections to source power junction boxes, low voltage power supplies, detection and monitoring hardware, and fire and detection alarm systems.
C. Door and Frame Preparation: Doors and corresponding frames are to be prepared, reinforced and pre-wired (if applicable) to receive the installation of the specified electrified, monitoring, signaling and access control system hardware without additional in-field modifications.
1.8 WARRANTY
A. Special Warranty: Manufacturer agrees to repair or replace components of door hardware that fail in materials or workmanship within specified warranty period.
1. Warranty Period: Three years from date of Substantial Completion unless otherwise indicated below:
a. Exit Devices: Two years from date of Substantial Completion.
b. Manual Closers: 10 years from date of Substantial Completion.
CONSTRUCTION DOCUMENTS 087100 - 3
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Fire-Rated Door Assemblies: Where fire-rated doors are indicated, provide door hardware complying with NFPA 80 that is listed and labeled by a qualified testing agency, for fire-protection ratings indicated, based on testing at positive pressure according to NFPA 252 or
UL 10C.
B. Means of Egress Doors: Latches do not require more than 15 lbf to release the latch. Locks do not require use of a key, tool, or special knowledge for operation.
C. Accessibility Requirements: For door hardware on doors in an accessible route, comply with the USDOJ's "2010 ADA Standards for Accessible Design" AND ICC A117.1.
2.2 HINGES
A. Hinges: BHMA A156.1.
1. Subject to requirements, provide door hinges by the following manufacturers:
a. See schedule on drawings.
2.3 CONTINUOUS HINGES
A. Continuous Geared Hinges: ANSI/BHMA A156.26 Grade 1-600 continuous geared hinge. with minimum 0.120-inch thick extruded 6063-T6 aluminum alloy hinge leaves and a minimum overall width of 4 inches. Hinges are non-handed, reversible and fabricated to template screw locations. Factory trim hinges to suit door height and prepare for electrical cut-outs.
1. Manufacturers:
a. See schedule on drawings.
2.4 POWER TRANSFER DEVICES
A. Electrified Quick Connect Continuous Geared Transfer Hinges: Provide electrified transfer continuous geared hinges with a removable service panel cutout accessible without de-mounting door from the frame. Furnish with Molex™ standardized plug connectors with sufficient number of concealed wires (up to 12) to accommodate the electrified functions specified in the Door Hardware Sets. Connectors plug directly to through-door wiring harnesses for connection to electric locking devices and power supplies. Wire nut connections are not acceptable.
1. Manufacturers:
a. See schedule on drawings
B. Electric Door Wire Harnesses: Provide electric/data transfer wiring harnesses with standardized plug connectors to accommodate up to twelve (12) wires. Connectors plug directly to through-door wiring harnesses for connection to electric locking devices and power supplies. Provide sufficient number and type of concealed wires to accommodate electric function of specified
CONSTRUCTION DOCUMENTS 087100 - 4
hardware. Provide a connector for through-door electronic locking devices and from hinge to junction box above the opening. Wire nut connections are not acceptable. Determine the length required for each electrified hardware component for the door type, size and construction, minimum of two per electrified opening.
1. Provide one each of the following tools as part of the base bid contract:
a. McKinney (MK) - Electrical Connecting Kit: QC-R001.
b. McKinney (MK) - Connector Hand Tool: QC-R003.
2. Manufacturers:
a. Hager Companies (HA) - Quick Connect.
b. McKinney (MK) - QC-C Series.
2.5 MECHANICAL LOCKS AND LATCHES
A. Lock Functions: As indicated in door hardware schedule.
B. Lock Backset: 2-3/4 inches unless otherwise indicated.
C. Lock Trim:
1. Description: Manufacturer’s standard lock trim.
2. Levers: Manufacturer’s standard ADA lever for lockset model number indicated.
3. Escutcheons (Roses): Manufacturer’s standard for lockset model number indicted.
4. Dummy Trim: Match lever lock trim and escutcheons.
D. Strikes: Provide manufacturer's standard strike for each lock bolt or latchbolt complying with requirements indicated for applicable lock or latch and with strike box and curved lip extended to protect frame; finished to match lock or latch.
1. Flat-Lip Strikes: For locks with three-piece antifriction latchbolts, as recommended by manufacturer.
2. Extra-Long-Lip Strikes: For locks used on frames with applied wood casing trim.
3. Aluminum-Frame Strike Box: Manufacturer's special strike box fabricated for aluminum framing.
4. Rabbet Front and Strike: Provide on locksets for rabbeted meeting stiles.
2.6 LOCK CYLINDERS
A. Standard Lock Cylinders: BHMA A156.5; Grade 1 permanent cores; face finished to match lockset.
1. Core Type: Basis of Design: 7-pin replaceable BEST core.
B. Construction Master Keys: Provide cylinders with feature that permits voiding of construction keys without cylinder removal. Provide 5 construction master keys.
C. Construction Cores: Provide construction cores that are replaceable by permanent cores.
Provide 10 construction master keys.
CONSTRUCTION DOCUMENTS 087100 - 5
2.7 KEYING
A. Keying System: Factory registered, complying with guidelines in BHMA A156.28, appendix.
Provide three extra key blanks for each lock. Incorporate decisions made in keying conference.
1. Master Key System: Change keys and a master key operate cylinders.
a. Provide three cylinder change keys and five master keys.
2. Keyed Alike: Key all cylinders to same change key.
B. Keys: Brass.
1. Stamping: Permanently inscribe each key with a visual key control number and include the following notation:
a. Notation: Information to be furnished by Government.
2.8 OPERATING TRIM
A. Operating Trim: BHMA A156.6; stainless steel unless otherwise indicated.
2.9 ACCESSORIES FOR PAIRS OF DOORS
A. Coordinators: BHMA A156.3; consisting of active-leaf, hold-open lever and inactive-leaf release trigger; fabricated from steel with nylon-coated strike plates; with built-in, adjustable safety release; and with internal override.
B. Astragals: BHMA A156.22.
2.10 SURFACE CLOSERS
A. Surface Closers: BHMA A156.4; rack-and-pinion hydraulic type with adjustable sweep and latch speeds controlled by key-operated valves and forged-steel main arm. Comply with manufacturer's written instructions for size of door closers depending on size of door, exposure to weather, and anticipated frequency of use. Provide factory-sized closers, adjustable to meet field conditions and requirements for opening force.
1. Subject to requirements, provide surface closers by the following manufacturers:
a. See schedule on drawings
2.11 WALL AND FLOOR STOPS
A. Wall- and Floor-Mounted Stops: BHMA A156.16.
1. Subject to requirements, provide wall and floor stops by the following manufacturers:
a. See schedule on drawings.
CONSTRUCTION DOCUMENTS 087100 - 6
2.12 OVERHEAD STOPS AND HOLDERS
A. Overhead Stops and Holders: BHMA A156.8.
1. Subject to requirements, provide overhead stops and holders by the following manufacturers:
a. See schedule on drawings.
2.13 DOOR GASKETING
A. Door Gasketing: BHMA A156.22; with resilient or flexible seal strips that are easily replaceable and readily available from stocks maintained by manufacturer.
B. Maximum Air Leakage: When tested according to ASTM E283 with tested pressure differential of 0.3-inch wg, as follows:
1. Smoke-Rated Gasketing: 0.3 cfm/sq. ft. of door opening.
2. Gasketing on Single Doors: 0.3 cfm/sq. ft. of door opening.
3. Gasketing on Double Doors: 0.50 cfm per ft. of door opening.
C. Subject to requirements, provide door gasketing by the door and frame manufacturer.
2.14 FINISHES
A. Provide finishes complying with BHMA A156.18 as indicated in door hardware schedule on drawings.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Mounting Heights: Mount door hardware units at heights to comply with the following unless otherwise indicated or required to comply with governing regulations.
1. Standard Steel Doors and Frames: ANSI/SDI A250.8.
2. Custom Steel Doors and Frames: HMMA 831.
3. Wood Doors: DHI's "Recommended Locations for Architectural Hardware for Wood Flush
Doors."
B. Install each door hardware item to comply with manufacturer's written instructions. Where cutting and fitting are required to install door hardware onto or into surfaces that are later to be painted or finished in another way, coordinate removal, storage, and reinstallation of surface protective trim units with finishing work. Do not install surface-mounted items until finishes have been completed on substrates involved.
C. Hinges: Install types and in quantities indicated in door hardware schedule, but not fewer than the number recommended by manufacturer for application indicated or one hinge for every 30 inches of door height, whichever is more stringent, unless other equivalent means of support for door, such as spring hinges or pivots, are provided.
CONSTRUCTION DOCUMENTS 087100 - 7
D. Lock Cylinders: Install construction cores to secure building and areas during construction period.
1. Replace construction cores with permanent cores as directed by Government.
2. Furnish permanent cores to Government for installation.
E. Boxed Power Supplies: Locate power supplies as indicated or, if not indicated, above accessible ceilings. Verify location with Government.
1. Configuration: Provide least number of power supplies required to adequately serve doors with electrified door hardware.
F. Thresholds: Set thresholds for exterior doors and other doors indicated in full bed of sealant complying with requirements specified in Section 079200 "Joint Sealants."
G. Stops: Provide floor stops for doors unless wall or other type stops are indicated in door hardware schedule. Do not mount floor stops where they will impede traffic.
H. Perimeter Gasketing: Apply to head and jamb, forming seal between door and frame.
1. Do not notch perimeter gasketing to install other surface-applied hardware.
I. Meeting Stile Gasketing: Fasten to meeting stiles, forming seal when doors are closed.
J. Door Bottoms: Apply to bottom of door, forming seal with threshold when door is closed.
3.2 ADJUSTING
A. Adjust and check each operating item of door hardware and each door to ensure proper operation or function of every unit. Replace units that cannot be adjusted to operate as intended. Adjust door control devices to compensate for final operation of heating and ventilating equipment and to comply with referenced accessibility requirements.
3.3 DOOR HARDWARE SCHEDULE
A. See Sheet A601 – DOOR AND FINISH SCHEDULES
END OF SECTION 087100
PINE RIDGE AE MULTIPLEX DESIGN METAL GATES
CONSTRUCTION DOCUMENTS 323119 - 1
SECTION 323119
METAL GATES
1.1 SUMMARY
A. Section Includes:
1. Aluminum Swing gates.
1.2 PREINSTALLATION MEETINGS
A. Preinstallation Conference: Conduct conference at project site
1.3 ACTION SUBMITTALS
A. Shop Drawings: For gate and hardware.
1. Include plans, elevations, sections, and attachment details.
B. Samples: For each fence material and for each color specified.
1.4 CLOSEOUT SUBMITTALS
A. Maintenance data.
1.5 QUALITY ASSURANCE
A. Installer Qualifications: Fabricator of products.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Wind Loading: Comply with ASCE/SEI 7 requirements for gate height, wind exposure, design wind speed, and design wind pressure.
2.2 SWING GATES
A. Aluminum Swing Gates: Gates made from aluminum tubes.
B. Outer Aluminum Panel Frames: Fabricate members from square extruded-aluminum tubes 3 by 3 inches with 0.188-inch wall thickness.
C. Inner Aluminum Gate Leaf Frames: Fabricate members from square extruded-aluminum tubes 2 by 4 inches with 0.188-inch wall thickness
PINE RIDGE AE MULTIPLEX DESIGN METAL GATES
CONSTRUCTION DOCUMENTS 323119 - 2
D. Horizontal Leaf Infill: 1"x5 1/2" Engineered Wood Infill Slats
E. Hardware: Latches permitting operation from both sides of gate, hinges, and keepers for each gate leaf more than 5 feet wide. Provide center gate stops and cane bolts for pairs of gates.
Fabricate latches with integral eye openings for padlocking.
F. Fasteners: Manufacturer's standard tamperproof, corrosion-resistant, color-coated fasteners matching fence components with resilient polymer washers.
G. Fabrication: Assemble gate sections by fastening Slats to Frames.
H. Galvanizing: For hardware items, hot-dip galvanize to comply with ASTM A153/A153M.
I. Aluminum Finish: Baked enamel or powder coating.
2.3 ALUMINUM
A. Extrusions: ASTM B221, Alloy 6063-T5.
B. Tubing: ASTM B429/B429M, Alloy 6063-T6.
C. Castings: ASTM B26/B26M, Alloy A356.0-T6.
D. Baked-Enamel or Powder-Coat Finish: AAMA 2603 except with a minimum dry film thickness of 2 mils. Comply with coating manufacturer's written instructions for cleaning, conversion coating, and applying and baking finish.
1. Color and Gloss: As selected by Owner’s Representative from manufacturer's full range.
PART 3 - EXECUTION
3.1 GATE INSTALLATION
A. Install gates according to manufacturer's written instructions, level, plumb, and secure for full opening without interference. Attach hardware using tamper-resistant or concealed means.
Install ground-set items in concrete for anchorage. Adjust hardware for smooth operation and lubricate where necessary.
END OF SECTION 323119