B05 Amendment 3.pdf

PDF 179 KB Posted

Attached to
Pine Ridge Multi Phase Door Replacement
Solicitation number
75H70126R00003
Issued by

About this file

This document is an Amendment of Solicitation (Standard Form 30) for a federal contract issued by the Indian Health Service - DES Seattle, solicitation number 75H70126R00003. The amendment, dated 12/10/2025, provides a detailed Questions and Answers (Q&A) document specifically addressing door-related technical specifications for a renovation or construction project.

The Q&A covers multiple door openings, including modifications to door hardware, frame replacements, door leaf reuse, armor plating, and specific functional requirements for various doors. Key details include instructions to use 1 ¾" thick solid wood core doors matching the existing facility veneer color, no specified door manufacturer, and contractor responsibility for verifying hardware needs. Questions addressed door modifications for openings 571, 572, 612, 606, 138, 148, 631, 632, 633, 640, 641, 226, 240, 750, 647, 670, with responses providing specific guidance on hardware, frame, and door treatments. The amendment indicates the contractor must determine exact hardware requirements based on the provided functional specifications.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

A00003

Thupten Tsering

The purpose of amendment 3 to solicitation 75H70126R00003 is the following:

1. Provide Q&As as of Dec 10, 2025. See Next Page.

2. All other terms and conditions of this solicitation remain unchanged.

Indian Health Service - DES Seattle 701 5th Avenue, Suite 1600 Seattle, WA 98104

See Item 6

75H70126R00003

GP23PR402H10

1 1

12/10/2025

10/29/2025

Amend No.

Item

Date Submitted

Question Type

(Technical or Admin)

Question Response Date Response Responded By

EXAMPLE 0 11/23/2020 Technical Please provide drawings or plans for ??? 11/23/2020 IHS Response IHS POC

A0002 1 11/26/2025 Technical

Openings 571 and 572 (Plan Page A402, Keynote 8-01): The keynote states, “This door to have vision panel.” These two openings are for the men’s and women’s restrooms, and vision panels are not recommended for these locations. Please confirm that these are intended to be flush doors.

12/01/2025

See revised drawings. Doors 571 and 572 do not need vision panels and no longer need to be 20min fire rated.

IHS COR

A0002 2 11/26/2025 Technical

Opening 612: Per our walkthrough on November 12th, this opening is to be removed from the scope of work. Please verify that this is correct.

12/02/2025

Door 612 removed from project.

IHS COR

A0002 3 11/26/2025 Technical

Opening 606: The keynote indicates “install new door.” Based on our walkthrough on November 12th, this door is to remain in place, with only the hardware being replaced. Please confirm. 12/03/2025

See revised drawings. Door 606 leaf is to be re-used. Replace all hardware on door and install armor plating on existing door.

IHS COR

A0002 4 11/26/2025 Technical

Openings 138, 148, 631, 632, 633, 640, and 641: These doors are in generally good condition. It was discussed that we may wrap the lower 34 inches with stainless steel rather than replace the openings entirely.

Please confirm whether this approach is acceptable.

12/04/2025

See revised drawings. Doors 138, 148, 631, 632, 633, 640, and 641 can have their leafs re-used but still wrap with armor plate. Yes the approach is acceptable. IHS COR

A0002 5 11/26/2025 Technical

Opening 226 (Keynote 8-16): The keynote states, “Install self-latching hardware that coordinates with power closers.” The opening currently has maglocks on push/pull hardware with an automatic operator and does not latch. The opening is not fire-rated and may not require latching. Please verify the required door function and overall operational intent for this opening.

12/05/2025

This door needs automatic operator and self latching because it is a door in a suite separation. It is not fire-rated but does require self latching. The operators should be tied to a button on the wall.

IHS COR

A0002 6 11/26/2025 Technical

Opening 240: Per our walkthrough on November 12th, this opening was noted to be removed from the scope of work. Please confirm.

12/06/2025

Door 240 removed from project.

IHS COR

A0002 7 11/26/2025 Technical

Opening 750: The keynote calls for installing an automatic door closer and linking it to a new handicap button, with the button to be installed on the wall near the door. In order for this to function properly, a release mechanism (such as an electric strike or electrified lock) will be required.

The door is typically kept locked. Will card access be added to this opening? Without a release mechanism, the handicap button would allow unrestricted entry. Please advise on how to proceed.

12/07/2025

This door must remain secure from the corridor. Replace the frame and door so the door swings toward the corridor and is an egress door towards the corridor with a panic bar on the inside. The exterior will have a punch pad (Not PIV card access) that will open the door with the operator. An electric strike will be needed. IHS COR

A0002 8 11/26/2025 Technical

Opening 647: The keynote states to provide and install new door leaves, same size as existing, wood core wrapped in stainless steel, using existing hardware. Per our walkthrough on November 12th, it was noted to reuse the existing door and install a new continuous hinge, weatherstrip, threshold, and sweep. The existing lock and closer will be reused. Please confirm that this revision is acceptable.

12/08/2025

This door is to have a new door leaf with armor plating, reuse hardware. No change from original request on this door.

IHS COR

A0002 9 11/26/2025 Technical

Opening 670: The keynote calls for reusing existing hardware with a new door leaf. Per the November 12th walkthrough, the existing door is to remain in place. General maintenance will be performed, including adjusting weatherstripping, threshold, and sweep, to properly weatherize the door. The existing door and frame will remain. Please confirm.

12/09/2025

General Maintenance on this door is acceptable. No new frame or leaf but new weatherstripping, threshold and sweep.

IHS COR

A0003 10 12/9/2025 Technical

After reviewing this project, I am not seeing a door manufacturer called out or a hardware schedule. Do you have that or will that be coming out soon?

12/10/2025

We did not specify a door manufacturer. The doors just need to be solid wood core doors 1 ¾” thick and match the existing facility veneer color.

We also did not create a hardware schedule as it is in the contractor to verify the hardware needed for each door in the project. We listed out the functionalities of each door assembly and which doors are to have hardware replaced.

IHS COR