This document is an Amendment of Solicitation/Modification of Contract (Standard Form 30) for the Indian Health Service (IHS) Solicitation Number 75H70126R00003. The amendment (A0002) is dated 12/01/2025 and provides clarifications and revisions to the Statement of Work (SOW), specifically addressing multiple technical questions about door installations and modifications.
The amendment includes detailed responses to nine technical questions regarding specific door openings, such as removing certain doors from the project scope, confirming door hardware replacements, discussing door functionality (including automatic operators and security mechanisms), and specifying modifications like armor plating, weatherstripping, and threshold replacements. Key changes include removing doors 612 and 240 from the project, modifying door 750 to be an egress door with a punch pad and electric strike, and providing guidance on reusing or replacing door leaves and hardware for various openings. The responses are dated between 12/01/2025 and 12/09/2025 and were provided by the IHS Contracting Officer's Representative (COR).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B05 Amendment 4.pdf | ||
| B05 Amendment 3.pdf | ||
| Attachment 2 SOW Revised by A0002.pdf | ||
| B05 Amendment 1.pdf | ||
| Attachment 3 Self Performed Calculation Sheet.docx | DOCX document | |
| Attachment 4 Company Specialized Experience Form.docx | DOCX document | |
| B01 26R00003.pdf | ||
| Attachment 2 SOW.pdf | ||
| Attachment 6 IHS IEE Representation Form.pdf | ||
| Attachment 7 WH347 Payroll (1).pdf | ||
| Attachment 1 Wage Determination SD20250003.pdf | ||
| Attachment 8 Release of Claims.pdf | ||
| Attachment 5 Past Performance Questionnaire.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
A00002
Thupten Tsering
The purpose of amendment 2 to solicitation 75H70126R00003 is the following:
1. Provide Q&As as of Dec 1, 2025. See Next Page.
2. Provide a revised Attachment 2 SOW with Appendix A Quote Schedule revised by A0002, and Appendix B Construction Drawings revised by A0002. Please find the attached Attachment 2 SOW Revised by A0002.
3. All other terms and conditions of this solicitation remain unchanged.
Indian Health Service - DES Seattle 701 5th Avenue, Suite 1600 Seattle, WA 98104
See Item 6
75H70126R00003
GP23PR402H10
1 2
12/01/2025
10/29/2025
Amend No.
Item
Date Submitted
Question Type
(Technical or Admin)
Question Response Date Response Responded By
EXAMPLE 0 11/23/2020 Technical Please provide drawings or plans for ??? 11/23/2020 IHS Response IHS POC
A0002 1 11/26/2025 Technical
Openings 571 and 572 (Plan Page A402, Keynote 8-01): The keynote states, “This door to have vision panel.” These two openings are for the men’s and women’s restrooms, and vision panels are not recommended for these locations. Please confirm that these are intended to be flush doors.
12/01/2025
See revised drawings. Doors 571 and 572 do not need vision panels and no longer need to be 20min fire rated.
IHS COR
A0002 2 11/26/2025 Technical
Opening 612: Per our walkthrough on November 12th, this opening is to be removed from the scope of work. Please verify that this is correct.
12/02/2025
Door 612 removed from project.
IHS COR
A0002 3 11/26/2025 Technical
Opening 606: The keynote indicates “install new door.” Based on our walkthrough on November 12th, this door is to remain in place, with only the hardware being replaced. Please confirm. 12/03/2025
See revised drawings. Door 606 leaf is to be re-used. Replace all hardware on door and install armor plating on existing door.
IHS COR
A0002 4 11/26/2025 Technical
Openings 138, 148, 631, 632, 633, 640, and 641: These doors are in generally good condition. It was discussed that we may wrap the lower 34 inches with stainless steel rather than replace the openings entirely.
Please confirm whether this approach is acceptable.
12/04/2025
See revised drawings. Doors 138, 148, 631, 632, 633, 640, and 641 can have their leafs re-used but still wrap with armor plate. Yes the approach is acceptable. IHS COR
A0002 5 11/26/2025 Technical
Opening 226 (Keynote 8-16): The keynote states, “Install self-latching hardware that coordinates with power closers.” The opening currently has maglocks on push/pull hardware with an automatic operator and does not latch. The opening is not fire-rated and may not require latching. Please verify the required door function and overall operational intent for this opening.
12/05/2025
This door needs automatic operator and self latching because it is a door in a suite separation. It is not fire-rated but does require self latching. The operators should be tied to a button on the wall.
IHS COR
A0002 6 11/26/2025 Technical
Opening 240: Per our walkthrough on November 12th, this opening was noted to be removed from the scope of work. Please confirm.
12/06/2025
Door 240 removed from project.
IHS COR
A0002 7 11/26/2025 Technical
Opening 750: The keynote calls for installing an automatic door closer and linking it to a new handicap button, with the button to be installed on the wall near the door. In order for this to function properly, a release mechanism (such as an electric strike or electrified lock) will be required.
The door is typically kept locked. Will card access be added to this opening? Without a release mechanism, the handicap button would allow unrestricted entry. Please advise on how to proceed.
12/07/2025
This door must remain secure from the corridor. Replace the frame and door so the door swings toward the corridor and is an egress door towards the corridor with a panic bar on the inside. The exterior will have a punch pad (Not PIV card access) that will open the door with the operator. An electric strike will be needed. IHS COR
A0002 8 11/26/2025 Technical
Opening 647: The keynote states to provide and install new door leaves, same size as existing, wood core wrapped in stainless steel, using existing hardware. Per our walkthrough on November 12th, it was noted to reuse the existing door and install a new continuous hinge, weatherstrip, threshold, and sweep. The existing lock and closer will be reused. Please confirm that this revision is acceptable.
12/08/2025
This door is to have a new door leaf with armor plating, reuse hardware. No change from original request on this door.
IHS COR
A0002 9 11/26/2025 Technical
Opening 670: The keynote calls for reusing existing hardware with a new door leaf. Per the November 12th walkthrough, the existing door is to remain in place. General maintenance will be performed, including adjusting weatherstripping, threshold, and sweep, to properly weatherize the door. The existing door and frame will remain. Please confirm.
12/09/2025
General Maintenance on this door is acceptable. No new frame or leaf but new weatherstripping, threshold and sweep.
IHS COR
| ADPFB18.tmp |