B05 Amdnment A0003-75H70126R00001 TIPCAP.pdf
PDF 291 KB Posted
- Solicitation number
- 75H70126R00001
About this file
This is a Standard Form 30 (SF-30) Amendment of Solicitation/Modification of Contract for a Tribal Injury Prevention Cooperative Agreements and Projects (TIPCAP) contract issued by the Indian Health Service (IHS) in Seattle, Washington. The amendment (A0003) updates several sections of the Request for Proposal (RFP) 75H70126R00001, including: clarifying key personnel requirements for Project Director and Researcher/Technical Advisor, updating HHSAR Clauses 352.209-1 & 352.209-2 to Deviation 2025-02, modifying Section L.2 font size requirements, moving a Notice of Indian Small Business Economic Enterprise Set-Aside clause, and providing a Questions and Answers document dated October 15, 2025. The current incumbent is the University of Colorado, and the contract is an Indian Small Business Economic Enterprise (ISBEE) Set-Aside, requiring that no less than 50 percent of personnel costs be performed by the Prime Contractor and/or similarly situated entities.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
A0003
Andrew Hart, Contracting Officer
See next page.
Indian Health Service - DES Seattle 701 5th Avenue, Suite 1600 Seattle, WA 98104
75H70126R00001
1 4
10/15/2025
09/26/2025
SF30 Continuation Page
A. The purpose of this amendment is for the followings;
1. Section G.3. has been updated with Project Director and Researcher/Techinical Advisor for consistency with the requirements outlined in Section L.3.3.
2. Change HHSAR Clauses 352.209-1 & 352.209-2 from HHSAR Deviation 2025-01 to HHSAR Deviation 2025-02.
3. Update Section L.2. font size requirement.
4. Move HHSAR 352-226-4 Notice of Indian Small Business Economic Enterprise Set-Aside (Mar 2022) from
Section I to Section L.7.
5. Provide a Q&A as of October 15, 2025.
B. See attached B01 RFP 75H70125R00001 TIPCAP Amended by A0003 for fully updated RFP.
C. All other terms and conditions of this solicitation remain unchanged.
Amend No.
Item
Date Submitted
Question Type
(Technical or Admin)
Question Response Date Response Responded By
EXAMPLE 0 11/23/2020 Technical Please provide drawings or plans for ??? 11/23/2020 IHS Response IHS POC
A0001 1 9/30/2025 Technical
Solicitation Page #6 / Section C.3. / Title Organization Page 6, Section C.3 states: “For Part I – Injury Prevention Program cooperative agreements, Tribal programs are required to hire a full-time program coordinator.
For Part II – Injury Prevention Program Projects, the tribal project coordinator may be a staff member from a Tribe or Tribal organization.”
Please clarify whether this requirement applies to TIPCAP grantees only, or if the contractor must also provide a program coordinator as part of its proposed staffing.
09/30/2025
The TIPCAP coordinator position applies to TIPCAP grantees only.
The contractor does not provide and is not involved in the grantee staffing and they do not need to provide the program coordinators as part of their staffing.
IHS RA Rep
A0002 2 10/2/2025 Admin
Under C.6. Tasks, Deliverables, and Reporting, X. Other details Contractor Qualifications for a Project Director and Research/Technical Advisor. Can you tell me if these personnel are required to be employed directly by the contract recipient or if they are allowed to subcontract out for these staff person(s)?
10/06/2025
This decision is at the discretion of the Offeror.
However, Offerors are reminded that for service contracts under this ISBEE Set-Aside, the Prime Contractor must ensure that no less than 50 percent of the cost of contract performance incurred for personnel is performed by the Prime and/or “similarly situated entities.”
Accordingly, if these positions are subcontracted, they must be accounted for within the self-performance calculation to ensure compliance with 13 CFR §125.6 and FAR 52.219-14 (Limitations on Subcontracting).
IHS CS
A0003 3 10/14/2025 Admin
Is IHS' contract with the active incumbent (the University of Colorado) still actively working on the project?
10/15/2025
Yes.
IHS CS
A0003 4 10/14/2025 Admin
Can the government provide the historical level of effort on the incumbent contract, including, by year, the labor categories utilized, number of hours in each labor category, and any other direct costs included in the budget?
10/15/2025
The Government does not have historical level-of-effort (LOE) data available in a format suitable for release under this solicitation.
Additionally, certain information contained in the incumbent contract may be proprietary to the current contractor and therefore cannot be disclosed under the Federal Acquisition Regulation (FAR) Part 3.104 and FAR 15.201(f).
Offerors are advised to develop their proposed staffing and cost approaches based on their independent assessment of the requirements described in the Performance Work Statement (PWS) and other solicitation documents. Any assumptions made regarding historical workload or level of effort should be clearly identified in the proposal submission.
The Government will not release any additional cost or labor data related to the incumbent contract.
IHS CS
A0003 5 10/14/2025 Technical
RFP Page 8 / Section C.5 / Government Furnished Property Can the government confirm that contractors are to provide all computing equipment for its team members? 10/15/2025
The contractors are to provide all computing equipment for their work.
IHS RA Rep
A0003 6 10/14/2025 Technical
RFP Page 8 / Section C.5 / Government Furnished Property Can the government provide information on the systems that contractor staff will need to access? 10/15/2025
If interpreted correctly, the contractors will need basic computer programs and the ability to obtain additional types of services based on the data and information collected throughout the contract. IHS RA Rep
A0003 7 10/14/2025 Technical
RFP Page 8 / Section C.5 / Government Furnished Property Can the Will the government provide access to any necessary systems to complete the work? 10/15/2025
No. The contractor is responsible for basic computer software and functionality.
IHS RA Rep
A0003 8 10/14/2025 Technical
RFP Page 8 / Section C.5 / Government Furnished Property Can the government clarify whether any information is to be maintained in systems not controlled by the government? 10/15/2025
Contractor can use existing and secure external websites created by the incumbent or develop a shared system that meets the requirements of C.6, II. IHS RA Rep
A0003 9 10/14/2025 Admin
RFP Page 17 & 36 / Section G3 & L.3.3 / G3 - Key Personnel & L.3.3 Key Personnel and Management Approach In Section G.3 - Key Personnel, the solicitation lists "Managing Director" "Project Directors/Manager" and "Research/Technical Advisor" as key personnel. In Section L.3.3 - Factor 3: Key Personnel and Management Approach, the solicitation lists "Project Director" and Researcher/Technical Advisor" as the key personnel. Can the government clarify the key personnel requirements.
10/15/2025
RFP Section G.3. has been updated with Project Director and Researcher/Techinical Advisor for consistency with the requirements outlined in Section L.3.3.
IHS CS
A0003 10 10/14/2025 Admin
RFP Page 23-24 / Section I / Contract Clauses The solicitation lists multiple Indian Preference Program Clauses (52.226- 1 - Utilization of Indian Organizations and Indian-Owned Economic Enterprises Jun 2000; 352.226-1 - Indian Preference [HHSAR DEVIATION 2025-01 (Mar 2025)] Dec 2015; and 352.226-2 - Indian Preference Program Dec 2015). Can the government clarify which of these are applicable to this contract?
10/15/2025
All of those clauses are applicable to this contract.
IHS CS
A0003 11 10/14/2025 Admin
RFP Page 24 / Section I / Contract Clauses Regarding clause: 352.209-1 Contractor Compliance with Defending Woman and Protecting Children Requirements – Certification [HHSAR DEVIATION 2025-01 (Mar 2025)] and clause 352-209-2 Contractor Compliance with Defending Woman and Protecting Children Requirements [HHSAR DEVIATION 2025-01 (Mar 2025)]. We believe that these should be HHSAR Deviation 2025-02. Please clarify.
10/15/2025
HHSAR clauses 352.209-1 & 352.209-2 are updatedas HHSAR Deviation 2025-02 (Mar 2025).
IHS CS
A0003 12 10/14/2025 Admin
RFP Page 34 / Section L.2 / Proposal Instructions Can offers use a 10 point arial or arial narrow for tables, graphics, and figures? 10/15/2025
Yes. Section L.2. has been updated. See attached B01 RFP 75H70126R00001 TIPCAP Amended by A0003. IHS CS
A0003 13 10/14/2025 Admin
RFP Page 4 / Section B / Table 1: Schedule of Items The RFP indicates in Section B, "Travel-Not-to Exceed (actual cost for all travel will be paid in accordance with the Federal Travel Regulations, and no G&A, overhead, or profit may be applied)," G&A is considered cost and part of cost recovery consistent with Total Cost Input (TCI) accounting systems as defined in and applied consistently per FAR CAS 9904.403, Allocation of Shared Services Expenses to Segments and 9904.410, Allocation of Business Unit General and Administrative Expense to Final Cost Objective. This is considered to be allowable cost recovery under the JTR, FAR, and CAS. Will the government consider changing this section and remove the word “G&A” and leave only Fees?
10/15/2025
The language in Section B of the RFP stating that “no G&A, overhead, or profit may be applied” to travel costs is intentional and reflects the Government’s position on this procurement.
While we acknowledge that G&A can be an allowable indirect cost under CAS and FAR, for the purposes of this solicitation, travel costs will be reimbursed at actual cost in accordance with the Federal Travel Regulations (FTR), and no indirect costs (including G&A) or fee may be applied. This approach is consistent with internal agency policy and cost control measures.
As such, the Government will not revise the clause and will maintain the current restriction on applying G&A to travel.
IHS CS
| ADPC1D8.tmp |
| SF30 Continuation Page |
| A. The purpose of this amendment is for the followings; |
| 1. Section G.3. has been updated with Project Director and Researcher/Techinical Advisor for consistency with the requirements outlined in Section L.3.3. |
| 2. Change HHSAR Clauses 352.209-1 & 352.209-2 from HHSAR Deviation 2025-01 to HHSAR Deviation 2025-02. |
| 3. Update Section L.2. font size requirement. |
| 4. Move HHSAR 352-226-4 Notice of Indian Small Business Economic Enterprise Set-Aside (Mar 2022) from Section I to Section L.7. |
| 5. Provide a Q&A as of October 15, 2025. |
| B. See attached B01 RFP 75H70125R00001 TIPCAP Amended by A0003 for fully updated RFP. |
| C. All other terms and conditions of this solicitation remain unchanged. |
| ADPB47.tmp |
| PPI Log |
File details come from the government source that posted it. Updated .