This is an Engineer's Estimate for the Coeur d'Alene Tribe project PO-24-D28, prepared by Marquette Hendrickx. The estimate comprises three bid schedules totaling $0.00, indicating this is a template document with placeholder pricing awaiting contractor input. Base Bid Schedule A covers connection to City of Spokane Water infrastructure and includes eleven line items: mobilization/demobilization, sawcut asphalt (50 LF), asphalt removal and disposal, water main exposure, excavation and backfill to 5-foot depth (50 LF), pressure regulating valve installation, 1-inch curb stop and box, road section replacement to city standards (16 SY), 1-inch HDPE water service line installation (200 LF), existing well abandonment, and site restoration. Each item carries a 10% contingency allocation.

Base Bid Schedule B itemizes five City of Spokane fees related to water service connection: water tap and meter application, 1-inch water tap, water main tie-in, 3/4-inch water meter installation in concrete box, and meter box installation. Additive Alternate Bid Schedule 1 addresses excavation work with three items: standard excavation (55 CY), loose rock excavation (15 CY), and solid rock excavation (15 CY), each with 10% contingency. The document specifies that sales tax shall be incorporated into individual line items as appropriate, and line items consisting only of sales tax shall not be approved. The estimate explicitly excludes Guaranteed Fixed Costs (GFC) from the final total.

View the file

Other files

File Type Posted
Addendum 1.pdf PDF
75H70126Q00032-A00001.pdf PDF
2 - Statement of Work - M Hendrickx.pdf PDF
1 - Draft Addendum Items - 24-D28A.pdf PDF
4 - US DOL WD WA20260095 Dated 5-18-2026.pdf PDF
B01 75H70126Q00032 - Rev.pdf PDF
1 - SOW.pdf PDF
3 - Aerial Views.pdf PDF
2 - Technical Provisions.pdf PDF
A11 Pre-Solicitation SAM Notice.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Marquette Hendrickx

COEUR D'ALENE TRIBE

PO-24-D28

ITEM DESCRIPTION EST

QTY UNIT ESTIMATED

UNIT PRICE

ESTIMATED

TOTAL PRICE

1. Mobilization/Demobilization 1 LS $ 0.00 $ 0.00

2. Sawcut Asphalt 50 LF $ 0.00 $ 0.00

3. Asphalt Removal & Disposal 1 LS $ 0.00 $ 0.00

4. Expose Water Main for City of Spokane 1 LS $ 0.00 $ 0.00

5. Excavate, Backfill, & Compact (5' depth in right-of-way) 50 LF $ 0.00 $ 0.00

6. Pressure Regulating Valve 1 EA $ 0.00 $ 0.00

7. 1" Curb Stop & Box 1 EA $ 0.00 $ 0.00

8. Replace Road Section to City Standards 16 SY $ 0.00 $ 0.00

9. 1" HDPE Water Service Line 200 LF $ 0.00 $ 0.00

10. Abandon Existing Well 1 EA $ 0.00 $ 0.00

11. Site Restoration 1 LS $ 0.00 $ 0.00

Construction Subtotal $ 0.00 Contingency, approximately 10% $ 0.00

Base Bid Schedule B - City of Spokane Fees:

1. Water Tap & Meter Application Fee - City of Spokane 1 EA $ 0.00 $ 0.00

2. 1" Water Tap - City of Spokane 1 EA $ 0.00 $ 0.00

3. Water Main Tie In 1 EA $ 0.00 $ 0.00

4. 3/4" Water Meter in Concrete Box - City of Spokane 1 EA $ 0.00 $ 0.00

5. Meter Box Install - City of Spokane 1 EA $ 0.00 $ 0.00

City Fee Subtotal $ 0.00

1. Excavation 55 CY $ 0.00 $ 0.00

2. Loose Rock Excavation 15 CY $ 0.00 $ 0.00

3. Solid Rock Excavation 15 CY $ 0.00 $ 0.00

Construction Subtotal $ 0.00 Contingency, approximately 10% $ 0.00

(Does not include GFC) TOTAL $ 0.00

Date

Additive Alternate Bid Schedule 1 - Excavation

Base Bid Schedule A - Connection to City of Spokane Water

ENGINEER'S ESTIMATE

*SALES TAX SHALL BE INCORPORATED INTO EACH LINE ITEM AS APPROPRIATE. LINE ITEMS CONSISTING ONLY OF SALES TAX

SHALL NOT BE APPROVED*