J01 SOW.pdf
PDF 200 KB Posted
- Attached to
- Roof Repairs at Northern Navajo Medical Center (NNMC) located in Shiprock, New Mexico, San Juan County
- Solicitation number
- 75H701-24-R-00011
About this file
This scope of work document outlines the requirements for a roof repair project at Northern Navajo Medical Center in Shiprock, New Mexico. The contractor will be responsible for installing a new roofing system over the existing roof to prevent leaks, as well as repairing stucco parapet walls. The contractor must complete the work within 104 calendar days of notice to proceed, and is responsible for demolition, construction of a new flat roof system, installation of lightning protection, and project closeout. The contractor must protect existing facilities, coordinate with facility occupants, and is restricted to working hours of 8am to 5pm Monday through Friday. The contractor must also provide submittals, deliverables, and a 10% attic stock of roofing materials.
The related federal contract opportunity is a solicitation for roof repairs at Northern Navajo Medical Center with a magnitude between $1 million to $5 million. A site visit is required and the contract type is firm fixed price. The opportunity is reserved for small businesses with average annual revenue under $19 million. The period of performance is 104 calendar days from notice to proceed.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK
Northern Navajo Medical Center Roof Repair Project Shiprock Service Unit Shiprock, New Mexico
1. EXECUTIVE SUMMARY:
Northern Navajo Medical Center (NNMC) has been experiencing roof deficiencies. Roof pooling issues have led to leaks and worn areas are at risk to leaking. The existing roof membrane has begun to split and/or crack in various areas. Leaking has damaged interior acoustic tile and other materials present within the facility and has led to swelling and delamination of sections of the roofing system. Due to the magnitude of the splitting and areas of pooling, the existing membrane is insufficient and requires overlay to ensure proper moisture protection.
2. DESCRIPTION:
2.1. The contractor shall install a new roofing material system to encapsulate existing worn roofing system to prevent any leaking and repair stucco parapet walls to prevent further degradation and leaking.
3. Services to be Provided:
3.1. Project Requirements:
3.1.1. The contractor will be responsible for providing the following services and items including but not limited to all necessary labor, materials, equipment, transportation and warranties to complete the project.
3.1.1.1. All work shall be in full accordance with the following latest published editions codes: IHS 2016 A/E Design Guidelines, National Fire Protection Association (NFPA) Life Safety Code, National Electrical Code (NEC), International Building Code (IBC), Uniform Plumbing Code (UPC), Uniform Mechanical Code (UMC), International Energy Conservation Code (IECC), and other Federal, State and Local governing code including references to Facilities Guideline Institute 2022 Edition.
3.1.1.2. The material that will be installed shall have a favorable energy characteristics such as having a minimum thermal emittance of greater or equal to 80% after three years, and have a solar reflectance of greater than or equal to 60% after three years.
3.1.1.3. Be held liable for any damage that may occur during the construction. Any damages caused during construction of this project must be fixed immediately and notify Shiprock Maintenance Staff immediately.
3.1.1.4. Comply with all applicable federal regulations.
3.1.1.5. Perform a site visit to confirm dimensions and scope of work prior to design/construction.
3.1.1.6. Ensure that no installation occurs during inclement weather that may compromise the building(s).
3.1.1.6.1. Contractor to make sure that insulation or the building surface is not wet during installation. A wet insulation will reduce thermal protection capacity.
3.1.1.7. Except for items or materials indicated to be recycled, reused, salvaged, reinstalled, or otherwise indicated to remain Government's property, remove demolished materials from Project site and legally dispose of them in an EPA approved landfill.
3.1.1.7.1. Do not allow demolished materials to accumulate on-site.
3.1.1.7.2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.
3.1.1.7.3. Remove debris from elevated portions of building by chute, hoist, or other device that will convey debris to grade level in a controlled descent.
3.1.1.8. ALL Contractor personnel MUST check-in and check-out with the Points of Contact [to be identified after award] before and after conducting any work on hospital premises.
3.1.1.9. Contractor must make every effort to ensure NNMC operations and patients care services continue uninterrupted before, during and after this project’s work; this means some of the construction work will need to occur after 5PM and on weekends if needed.
3.1.1.10. IT, satellite, and radio equipment shall not be disrupted during construction. If during any time, any equipment that has to be moved/relocated, Contractor to coordinate with Facilities Manager and service provider to present best solution to minimize disruption to any of the equipment on the roof top.
3.1.1.11. Selected contractor MUST continue to keep NNMC operational at all times during this repair and/or construction period. (Work before 8:00 AM and after 5:00 PM is permitted to minimize disturbances to Patients Services.)
3.1.1.11.1. Weekly construction progress meetings are mandatory to ensure all existing patient care operations continue uninterrupted and to minimize impact on patient care services as much as possible.
3.1.1.11.2. Selected contractor MUST continue to keep surrounding buildings operational at all times during this repair and/or construction period. (Work before 8:00 AM and after 5:00 PM is permitted to minimize disturbances to Patients Services.)
3.1.1.12. The contractor is responsible for conducting a Pre-construction Meeting before starting with any work including mobilization and provides specific details regarding the date, time, and location of the meeting, any need for attendance by subcontractors, and information regarding the agenda items to be discussed.
3.1.1.13. Survey: Before any work is started, the Contractor shall make a thorough survey with the COR and Facilities Manager of areas in which alterations occur and areas which are anticipated routes of access and furnish a clear construction schedule with specific start and finish dates for each task.
3.1.1.14. 120 hours (5 Business Days) prior notice must be given to COR and Facilities Manager before conducting any work (to coordinate for security badges, parking and staging areas for equipment).
3.1.1.15. The contractor shall inform Facilities Management personnel daily of the exact locations of work being performed.
3.1.1.16. A safety plan is to be presented by the contractor before the start of the project.
3.1.1.17. Patients, staff rooms and office windows are to be covered for privacy if necessary.
3.1.1.18. Contractor shall develop and maintain a comprehensive safety program. All contractors’ personnel onsite must use Personal Protective Equipment (PPE) that meets OSHA requirements.
3.1.1.19. Contractor shall comply with Hospital’s Interim Life Safety Measure (ILSM) while doing business on IHS property. All work areas shall be maintained in a clean and orderly condition with NO piling of demolished materials.
3.1.1.20. All workmanship shall be of high standard.
3.1.1.21. Any major repairs or any shutdowns are to be approved by COR and Facilities Manager at least 5 business days in advance.
3.1.1.22. Inspection is to be made for final approval of the project; by COR and Facilities Manager.
3.1.1.23. All contractors’ personnel will be accompanied by IHS employee(s) from Maintenance.
3.2. Demolition Procedure
3.2.1. Roofing: If any roofing material will need to be removed. Contractor shall remove no more existing roofing than what can be covered in one day by new roofing, so that building interior remains watertight and weathertight.
3.2.1.1. Remove existing roof system, flashings, copings, and roof accessories.
3.2.1.2. Remove existing roofing system down to substrate.
3.2.2. Hazardous Material: Hazardous material shall be removed by certified personal and shall be disposed of to appropriate waste site.
3.3. Construction Requirements
3.3.1. Flat Roof System
3.3.1.1. Perform a site visit to confirm dimensions and scope of work prior to design/construction.
3.3.1.2. Conduct an investigation of each unit’s roofing system and equipment prior to construction.
3.3.1.3. Record and submit any deficiencies that require replacement/repair prior to construction.
3.3.1.4. Entire roof area shall be cleaned and prepared per manufacturer’s specification prior to installation. The flat roof area shall have a 0.60 mil overlay material mechanically fastened over ½” fanfold insulation that is installed over the existing roofing system. Overlay system shall be sloped to allow surface drainage to existing roof drainage inlets. Utility lines shall be placed on new pipe supports.
3.3.1.5. Select a roofing product with solar reflectivity ≥ 60%. Higher reflectivity will help to reflect off heat from the assembly leading to lower cooling cost.
3.3.1.6. Select a roofing product with thermal emissivity ≥ 80%. Higher emissivity will help faster radiation and reduced flux of heat from the assembly leading to lower cooling cost.
3.3.1.7. Parapet walls shall have metal caps and flashings or equivalent sealing system to prevent any moisture intrusion.
3.3.1.8. Remove and dispose of existing gutters, leaders, trim, and associated flashing material.
3.3.1.9. Contractor shall place walkway pads on top of finished overlay material from mechanical equipment to access points.
3.3.1.10. Existing lightning protection system (LPS) shall remain in place. If contractor needs to move LPS, the LPS shall be returned to existing conditions.
3.3.1.11. Replace trace heating cables at roof drain areas. Heating cables to match or exceed current specifications that are currently on roof top. Cables must be UL listed.
3.3.1.12. Ensure final installation of roofs have the adequate slope and drainage with no ponding of any kind. Ponding shall not void roof warranty.
3.3.1.13. All roof equipment must remain operational during construction.
3.3.1.14. Contractor shall verify all measurements in field from plans provided.
3.3.1.15. Contractor shall provide shop drawings for approval. Drawings shall show slopes with positive drainage to drainage system. Details for terminating membrane to ensure waterproof.
Shall also include walk pads to mechanical systems.
4. SCHEDULE:
4.1. All work required under this scope of work shall be completed within 104 calendar days from the notice to proceed.
Preconstruction Meeting 10 calendar days after Notice of Award Product Submission and Approval Government Review and comment Mobilization and product procurement Roof Renovation Installation of Lightening Protection Inspection of finished work Address punch list Close out
14 calendar days 10 calendar days 20 calendar days 60 calendar days 05 calendar days 01 calendar days 07 calendar days 07 calendar days
Total 134 calendar days*
*Note: Although this schedule outlines the total amount of days needed to complete these work elements, some of these elements can be completed concurrently and the selected vendor shall incorporate where feasible.
5. SUBMITTALS:
5.1. The contractor will provide a complete schedule in detail.
5.2. The contractor shall provide product data for review and approval to the COR prior to procurement or installation.
5.3. The Contractor shall submit a pay application schedule in detail as acceptable to the COR prior to the start of any work onsite.
5.4. The Contractor shall provide an Operations and Maintenance (O&M) manual, complete with all warranties, contact names and phone numbers in two hard bound notebooks and on thumb drive in Adobe PDF format.
6. DELIVERABLES:
6.1. Provide detailed technical specifications and owner’s manuals of all installed materials and equipment [if applicable]; technical specifications shall be submitted 30 days after final inspection.
6.1.1. Operation Manuals: 3 copies plus digital PDF version via secure file transfer.
6.2. Train and provide recommendations to Shiprock Maintenance Staff on the best solutions to continuously maintain buildings in excellent conditions.
6.3. Contractor shall provide 10% roof square footage of overlay material to the service unit for attic stock for future use.
7. PROTECTION OF SITE:
7.1. The Contractor (including any and all sub-contractors) shall protect all fences, structures, walks, curbs, pavement, landscaping, etc. during the progress of work and shall remove all debris and trash daily and place in Contractor’s dumpster. All loaded dumpsters shall be disposed of regularly and off site in full accord with Federal, State and Local regulations.
7.2. Upon completion of all work the Contractor shall restore to its original condition as nearly as possible including the replacement, at Contractor’s expense, of any damaged item, which shall include but not be limited to grounds, site concrete, asphalt paving, fencing, utility appurtenances, existing building, etc.
7.3. On-site personnel shall complete infection control briefing prior to work commencing.
8. ACCESS TO THE SITE:
8.1. General: Contractor shall have limited use of project site for construction operations and will coordinate with the COR for the project. Adjacent areas shall not be disturbed.
8.2. Safety and security of the contractor’s equipment will be by maintaining a security fence and be the responsibility of the contractor.
8.2.1. Limits: Confine construction operations to areas of construction.
8.2.2. Driveways, Walkways and Entrances: Keep driveways loading areas and entrances serving premises clear and available to Owner, Owner’s employees, and emergency vehicles at all times.
Do not use these areas for parking or storage of materials.
8.2.2.1. Schedule deliveries to minimize use of driveways and entrances by construction operations.
8.2.2.2. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.
9. COORDINATION WITH OCCUPANTS:
9.1. Full Owner Occupancy: Owner will occupy site and adjacent building(s) during entire construction period. Coordination shall go through the COR during construction operations to minimize conflicts and facilitate Owner usage. Perform the work so as not to interfere with Owner’s day-to-day operations. Maintain existing exits unless otherwise indicated.
9.2. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from COR and approval of authorities having jurisdiction.
9.3. Notify the COR not less than 72 hours in advance of activities that will affect Owner’s operations.
9.4. Contractor shall comply with Hospital’s Interim Life Safety Measure (ILSM) and Infection Control
Risk Assessments (ICRA) while doing business on IHS property. All work areas shall be maintained in a clean and orderly condition with NO piling of demolished materials.
10. WORK RESTRICTIONS:
10.1. Work Restrictions, General: Comply with restrictions on construction operations.
10.1.1. Comply with limitations on use of public streets and with other requirements of authorities having jurisdiction.
10.2. On-Site Work Hours: Limit work in the existing building to normal business working hours of 8:00 AM to 5:00 PM, Monday through Friday, unless otherwise indicated. Any deviation from these working hours shall be made in writing to the COR.
10.3. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Owner or others unless permitted under the following conditions and then only after providing temporary utility services according to requirements indicated:
10.3.1. Notify COR not less than two (2) days in advance of proposed utility interruptions. Obtain COR written permission before proceeding with utility interruptions.
10.4. Noise, Vibration, and Odors: Coordinate operations that may result in high levels of noise and vibrations, odors, or other disruption to COR.
10.4.1. Notify COR not less than two (2) days in advance of proposed disruptive operations. Obtain COR written permission before proceeding with disruptive operations.
10.5. Nonsmoking Building: Smoking is not permitted on the project site.
10.6. Controlled Substances: Use of tobacco products and other controlled substances on project site is not permitted.
10.7. On-site personnel shall complete brief infection control presentation prior to any work commencing.
Presentation shall be complete on-site.
11. EXHIBITS:
11.1. Supplemental Information to include SF of building and additional measurements.
11.2. A4.01 Composite Roof Plan-NNMC
11.3. A4.02 Composite Roof Plan-Maintenance Area
11.4. A7.12 Details
11.5. A7.31 Details
11.6. S2.5 Roof Level Area A Frame Plan
11.7. S2.6 Roof Level Area B Frame Plan
11.8. S2.7 Roof Level Area C Frame Plan
11.9. S2.8 Roof Level Area D Frame Plan
END OF S.O.W.
File details come from the government source that posted it. Updated .