B05 Amendment No. A00010.pdf

PDF 448 KB Posted

Attached to
Lawton Indian Hospital Emergency Department, Imaging Services & Laboratory Expansion & Renovation
Solicitation number
75H701-23-R-00014
Issued by

View the file

Other files

File Type Posted
B01 Attachment J02 - Vol 2 spcs_revised 09_06_2023.pdf PDF
B05 Amendment No. A00011.pdf PDF
B05 A11-1 Pre-Proposal Inquiries 1-43.pdf PDF
B05 A10-1 Pre-Proposal Inquiries 1-42.pdf PDF
B05 Amendment No. A00009.pdf PDF
B01 Attachment J15 - Abatement Areas.pdf PDF
B01 Attachment J14 - Investigative Study Final report.pdf PDF
B05 A8-1 Pre-Proposal Inquiries 1-41.pdf PDF
B01 Attachment J04 - Wage Determination OK20230043 08_11_2023.pdf PDF
B05 Amendment No. A00008.pdf PDF
B01 Attachment J09 - Price Breakdown_revised 8_23_2023.xls XLS spreadsheet
B01 RFP 75H701-23-R-00014_revised_8_23_2023.pdf PDF
B05 Amendment No. A00007.pdf PDF
B05 Amendment No. A00006.pdf PDF
B05 A6-1 Pre-Proposal Inquiries 1-40.pdf PDF
B05 Amendment No. A00005.pdf PDF
B05 A5-1 Pre-Proposal Inquiries 1-38.pdf PDF
B05 A4-1 Pre-Proposal Inquiries 1-30.pdf PDF
B05 Amendment No. A00004.pdf PDF
B05 Amendment No. A00003.pdf PDF
B01 Attachment J04 - Wage Determination OK20230043 06_09_2023.pdf PDF
B01 Attachment J10 - Physicist Report.pdf PDF
B01 Attachment J13 - Geotechnical Report.pdf PDF
B05 A3-1 Pre-Proposal Inquiries 1-24.pdf PDF
B01 Attachment J11 - MRI manufacturer.pdf PDF
B01 Attachment J12 - CT Layout.pdf PDF
B01 Attachment J05 - Subcontracting Plan.docx DOCX document
B05 A2-1 Pre-Proposal Inquiries 1-11.pdf PDF
B05 Amendment No. A00002.pdf PDF
B05 Amendment No. A00001.pdf PDF
B05 A1-1 Pre-Proposal Inquiries 1-8.pdf PDF
B01 Attachment J05 - Subcontracting Plan.pdf PDF
B01 RFP 75H701-23-R-00014.pdf PDF
B01 Attachment J06 - Company Specialized Experience Form.pdf PDF
B01 Attachment J03 - Construction Drawings.pdf PDF
B01 Attachment J01 - Vol 1 spcs..pdf PDF
B01 Attachment J09- Price Breakdown.xls XLS spreadsheet
B01 Attachment J02 - Vol 2 spcs..pdf PDF
B01 Attachment J08 - Past Performance Questionnare (PPQ).pdf PDF
B01 Attachment J07- Key Personnel Resume Form.pdf PDF
B01 Attachment J04 - Wage Determination OK20230043 02102023.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

A00010

See Summary of Changes

Indian Health Service (IHS) Division of Engineering Services (DES) - Dallas 1301 Young Street, Suite 840 Dallas, TX 75202

See Item 6

75H701-23-R-00014

OK9LAA01H4

1 2

09/01/2023

05/11/2023

SF30 CONTINUATION OF BLOCK NARRATIVE

SUMMARY OF CHANGES

The solicitation is hereby amended to address the following:

1) Issue the Pre-proposal site visit meeting agenda and sign-in sheet.

2) Answer questions from prospective offerors (See B05 A10-1 Pre-proposal Inquiries).

The proposal due date/time remains the same, September 07, 2023 2:00PM CT.

As stated in the solicitation, questions are to be sent in writing to the Contacting Officer at Jenny.Scroggins@ihs,gov and Contract Specialist at Shaukat.syed@ihs.gov and must be received no later than 14 days prior to proposal receipt date to allow time for response. Therefore, no further questions are guaranteed to be answered.

NOTICE TO OFFERORS: Offerors must acknowledge receipt of any and all amendments by number and date on their cover letter in their offer or by submitting a signed copy of the SF30. All other terms and conditions remain unchanged.

END OF SUMMARY OF CHANGES

mailto:Jenny.Scroggins@ihs,gov mailto:Shaukat.syed@ihs.gov

AGENDA

Pre-Proposal Site Visit Meeting

Solicitation No. 75H701-23-R-00014 Project Name: Lawton Indian Hospital Emergency Department, Imaging Services & Laboratory

Expansion & Renovation (Project # OK9LAA01H4) Location: 1515 NE Tatum Road, Lawton, OK 73507-3002.

Date: Wednesday, August 30, 2023, 2:00PM CT

1. Welcome and Introduction of Government Team:

• Jennifer J. Scroggins, Contracting Officer

• Shaukat Syed, Contract Specialist

• Joseph Jones, Contracting Officer’s Representative

• Dominic Moreau, Facility Engineer

2. Purpose: The purpose of this site visit is a walkthrough of the jobsite.

3. Bidding & Contract Requirements

a. Solicitation No. 75H701-23-R-00014

b. Solicitation Issued: Thursday, May 11, 2023

c. Proposals Due: Thursday, September 07, 2023, 2PM CT

d. Project Funded by I.H.S.

e. Instruction to Offerors

• All questions are to be submitted in writing for an official response to the Contracting Officer at Jenny.Scroggins@ihs.gov and to the Contract Specialist at Shaukat.Syed@ihs.gov .

• Verbal responses at the pre-proposal conference will not be binding.

4. Contract Overview:

a. Solicitation issued as Full and Open Competition.

b. Basis for Award: Best Value Trade-Off (Section M of the RFP).

c. Construction contract will be between the Indian Health Service and the successful Contractor.

d. Period of Performance: 500 calendar days from issuance of NTP.

e. No Tribal Taxes or TERO fees

f. Items to be submitted with proposal - all documents featured in Section L of the RFP.

g. Daily Reports and Logs – Contractor is required to maintain and submit throughout the entire course of the project.

h. Direct all formal inquiries regarding the bidding documents and technical clarifications in writing to Contracting Officer.

mailto:Jenny.Scroggins@ihs.gov mailto:Shaukat.Syed@ihs.gov

i. Contracting Officer will transmit to all prospective Offerors of record such amendment necessary in response to questions arising at the conference. Oral statements may not be relied upon and will not be binding. Questions must be submitted in writing to be formally answered in an amendment.

j. All inquiries are due no later than 14 days prior to proposal due date (September 07, 2023).

Therefore, no further questions are guaranteed to be answered.

k. Amendments to date: 9

5. Project Scope:

The contractor shall furnish all labor, equipment, materials, supplies, supervision, and transportation necessary and incidentals for the expansion and renovation of the existing Emergency Department at the Lawton Indian Hospital. Renovation consists of approximately 8,500 gross square feet of new expansion and 11,700 gross square feet of renovation for a total of 20,200 gross square feet. The Emergency Department will remain functional throughout length of construction. The renovation and addition include three primary departments: 1) Emergency Department 2) Laboratory and 3) Imaging Services, in addition to, exterior site work comprised of a new Emergency Department entrance, parking lot, and heliport. The overall improvements will improve efficiency of the hospital and provide better access to care for the patients.

6. Technical Information/Requirements (Highlights Only)

a. Safety – The successful Contractor will be required to assign a competent person to ensure that construction is performed in accordance with all OSHA safety requirements.

b. Permits – Contractor shall obtain all required permits, insurance, fees, etc. required to work in

Comache County, Oklahoma. Any cost associated with third party inspection of electrical, mechanical, plumbing, etc. that may be required by the County or State will be the responsibility of the Contractor.

c. Testing & Deliverables - Test & Certification & Commissioning: Prior to acceptance of the project, the contractor shall test all systems to insure proper operation and complete the commissioning process. The COR shall be advised of all testing 48 hours in advance to allow representation during the testing.

d. Record Drawings (STP 4.0) – The Contractor shall provide two reproducible sets of As- Constructed Drawings (aka Red-Lines)

7. Utility Coordination: Coordinate utility connections with the applicable utility provider. The Contractor shall be responsible for payment of tapping or connection fees. The Contractor shall install utilities as designed and with the approval of the utility provider.

File details come from the government source that posted it. Updated .