This is a Standard Form 30 (SF 30) Amendment of Solicitation/Modification of Contract issued by the Department of Health and Human Services, Food and Drug Administration, Office of Acquisition and Grants Services (DHHS/FDA/OAGS/DAP). The amendment, numbered 00002 with an effective date of August 6, 2026, modifies contract number 75F40126Q00178 and is administered by Iris M. Johnson, Contracting Officer. The project number is CVM-2026-134067.
The primary purpose of this amendment is to reduce the quantity of Biological Safety Cabinets (BSCs) from seven (7) to two (2). All questions regarding this amendment are due by August 10, 2026 at 12:00 pm, and responses to the amendment are due by August 12, 2026 at 2:00 pm Eastern Time. All interested parties are instructed to carefully review the solicitation and supporting documentation. The contractor is not required to sign and return this document to the issuing office. The amendment does not extend the hour and date specified for receipt of offers, and except as provided in this modification, all terms and conditions of the referenced contract remain unchanged and in full force and effect.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment00002_CSS-CVM-2026-134067.docx | DOCX document | |
| 52.225-2 - Buy American Certificate_CVM-2026-134067.docx | DOCX document | |
| SF30_A01_CVM-2026-134067.pdf | ||
| CSS-CVM-2026-134067.docx | DOCX document | |
| CSS-CVM-2026-134067.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
INSTRUCTIONS (Back Page):
Instructions for items other than those that are self-explanatory, are as follows:
Item 1 (Contract ID Code). Insert the contract type identification code that appears in the title block of the contract being modified.
Item 3 (Effective date).
(1)
(2)
(3)
(4)
(5)
For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.
For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.
For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.
For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.
For a modification confirming the contracting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.
(a)
(b)
(c)
(d)
(e)
(f)
Item 6 (Issued By). Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.
Item 8 (Name and Address of Contractor). For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.
Items 9, (Amendment of Solicitation Number - Dated), and 10, (Modification of Contract/Order Number - Dated). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.
Item 12 (Accounting and Appropriation Data).
When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries:
(2) Accounting classification Net decrease $
Include subject matter or short title of solicitation/contract where feasible.
Item 16B. The contracting officer's signature is not required on solicitation amendments. The contracting officer's signature is normally affixed last on supplemental agreements.
(i)
NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".
Item 13. Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)
Item 14 (Description of Amendment/Modification).
Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document.
Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:
(i) Total contract price increased by $
(ii) Total contract price decreased by $
(iii) Total contract price unchanged.
State reason for modification.
When removing, reinstating, or adding funds, identify the contract items and accounting classifications.
(g)
(h)
When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --
(i) A reference to the letter determination; and
(ii) A statement of the net amount determined to be due in settlement of the contract.
(1)
(2)
(3)
(4)
(5)
(6)
STANDARD FORM 30 (REV. 11/2016) BACK
(1) Accounting classification Net increase $
Solicitation No. 75F40126Q00178— Draft Amendment (Questions and Answers)
DRAFT AMENDMENT TO SOLICITATION
Questions and Answers
Solicitation No.:
75F40126Q00178
Title:
Bio Safety Cabinets
Amendment No.:
Effective Date:
07/31/2026
Issued By:
U.S. Food and Drug Administration — Contract Specialist: Reagan Davis, Reagan.davis@fda.hhs.gov, 301-796-0910
Purpose:
This amendment is issued to provide answers to questions submitted by prospective offerors in accordance with Section B (Offer Submission) of the solicitation. Except as provided in this amendment, all terms, conditions, and requirements of the solicitation remain unchanged.
Q#
Question Received
Government Response
Solicitation Reference
Status
Questions Received — Submission 1
The solicitation requires the biosafety cabinets to meet NSF/ANSI 49 requirements and includes delivery, installation, and NSF/ANSI certification. Could you please clarify whether the proposed biosafety cabinets are required to be manufacturer-certified to NSF/ANSI 49 at the time of delivery, or whether field certification following installation is sufficient to meet this requirement?
We only require delivery of the biosafety cabinets,no installation. The requirement is for the biosafety cabinets to be manufacture-certified at the time of delivery. All cabinets will be tested by the program office on arrival
Section 6
Answered
The solicitation specifies that the units shall be constructed from 16 or 18-gauge Type 304 stainless steel, forming a monolithic, sealed structure. If a proposed biosafety cabinet has a Type 316 stainless steel work surface, while the remainder of the cabinet is constructed from Type 304 stainless steel, would this configuration be considered acceptable, or is Type 304 stainless steel required for all stainless steel components?
The configuration with Type 316 steel is also acceptable.
NA
Answered
Decommissioning and Removal: Is the Contractor responsible for the decommissioning, uninstallation, or physical removal of the legacy biosafety cabinets from the laboratory space?
We do not require the vendor to provide any of those services. The old equipment will be taken care of separately by the program office.
NA
Answered
Decontamination: If removal or handling of the legacy cabinets is required by the Contractor, will the Government perform and certify the necessary gaseous decontamination (e.g., hydrogen peroxide vapor) prior to Contractor handling, or is the Contractor expected to include decontamination services within their quote?
We do not require the vendor to provide any of those services. The old equipment will be taken care of separately by the program office services requested from the prime contractor
NA
Answered
Disposal: Will the Government retain ownership and handle the final disposal/surplus of the old cabinets, or must the Contractor factor in hazardous/laboratory equipment disposal fees?
We do not require the vendor to provide any of those services. The old equipment will be taken care of separately by the program office.
NA
Answered
Could you please confirm whether your facility has a loading dock and a service elevator?
Yes there isa elevator and loading dock.
NA
Answered
Except as amended herein, all terms and conditions of solicitation FDA-RFQ-134723 remain unchanged and in full force and effect.
1.2
C:\PERFORM\FORMS\S30.FRP
Forms Management
C:PERFORMFORMSS30.FRP
Acrobat PDFWriter 2.01 for Windows D:19971010095222 D:19990614133004
C:PERFORMFORMSS30.FRP
Standard Form 30 - Amendment of Solicitation/Modification of Contract Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER
3. EFFECTIVE DATE
4. REQUISITION/PURCHASE REQUISITION NUMBER
5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6)
CODE
STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended.
is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY
CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer) Previous edition unusable INSTRUCTIONS (Back Page):
Instructions for items other than those that are self-explanatory, are as follows:
Item 1 (Contract ID Code). Insert the contract type identification code that appears in the title block of the contract being modified.
Item 3 (Effective date).
(1) (2) (3) (4) (5) For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.
For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.
For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.
For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.
For a modification confirming the contracting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.
(a) (b) (c) (d) (e) (f) Item 6 (Issued By). Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.
Item 8 (Name and Address of Contractor). For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.
Items 9, (Amendment of Solicitation Number - Dated), and 10, (Modification of Contract/Order Number - Dated). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.
Item 12 (Accounting and Appropriation Data). When appropriate, indicate the impact of themodification on each affected accounting classification by inserting one of the following entries:
(2) Accounting classification Net decrease $ Include subject matter or short title of solicitation/contract where feasible.
Item 16B. The contracting officer's signature is not required on solicitation amendments. The contracting officer's signature is normally affixed last on supplemental agreements.
(i) NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".
Item 13. Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)
Item 14 (Description of Amendment/Modification).
Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document.
Indicate the impact of the modification on the overall total contract price by inserting one ofthe following entries:
(i) Total contract price increased by $
(ii) Total contract price decreased by $
(iii) Total contract price unchanged.
State reason for modification.
When removing, reinstating, or adding funds, identify the contract items and accounting classifications.
(g) (h) When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --
(i) A reference to the letter determination; and
(ii) A statement of the net amount determinedto be due in settlement of the contract.
(1) (2) (3) (4) (5) (6)
STANDARD FORM 30 (REV. 11/2016) BACK
(1) Accounting classification Net increase $
| 9A. AMENDMENT OF SOLICITATION NUMBER: 00002 |
| 7. CODE: |
| 12. ACCOUNTING AND APPROPRIATION DATA (If required): |
| 13A. THIS CHANGE ORDER IS ISSUED PURSUANT TO. Specify authority. THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NUMBER IN ITEM 10A.: |
| 13C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF: |
| 13D. OTHER. Specify type of modification and authority.: |
| 15A. NAME AND TITLE OF SIGNER. Type or print.: |
| 16A. NAME AND TITLE OF CONTRACTING OFFICER. Type or print.: Iris M. Johnson |
| 14. DESCRIPTION OF AMENDMENT OR MODIFICATION (Organized by UCF section headings, including solicitation or contract subject matter where feasible.): |
The purpose of this amendment is to reduce the quantity of BSC from seven (7) to two (2). All questions are due August 10, 2026 at 12pm responses to this amendment are due by August 12, 2026, 2:00 pm. Eastern Time (ET).
All interested parties should carefully review the solicitation and supporting documentation.
| FACILITY CODE: |
| 6. ISSUED BY: DHHS/FDA/OAGS/DAP |
ATTN: Iris Johnson, Contracting Officer
| 8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code): |
| 7. ADMINISTERED BY (If other than Item 6): |
| 1. CONTRACT ID CODE: |
| 4. REQUISITION/PURCHASE REQUISITION NUMBER: |
| 10A. MODIFICATION OF CONTRACT/ORDER NUMBER: 75F40126Q00178 |
| 5. PROJECT NUMBER. If applicable.: CVM-2026-134067 |
| PAGE: 1 |
| PAGES: |
| 3. EFFECTIVE DATE. Enter 2 digit month, 2 digit day and 4 digit year.: 2026-08-06 |
| 9B. DATED. SEE ITEM 11. Enter 2 digit month, 2 digit day and 4 digit year.: |
| 10B. DATED. SEE ITEM 13. Enter 2 digit month, 2 digit day and 4 digit year.: |
| 9A. AMENDMENT OF SOLICITATION NUMBER: 0 |
| 10A. MODIFICATION OF CONTRACT/ORDER NUMBER: 1 |
| 11. The above numbered solicitation is amended as set forth in Item 14. : 1 |
| 13A. THIS CHANGE ORDER IS ISSUED PURSUANT TO. Specify authority. THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NUMBER IN ITEM 10A.: 0 |
| 13B. THE ABOVE NUMBERED CONTRACT OR ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES. Such as changes in paying office, appropriation date, etc. SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103b.: 0 |
| 13C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF: 0 |
| 13D. OTHER Specify type of modification and authority.: 0 |
| 13E. IMPORTANT: Contractor is not required to sign this document and return copies to the issuing office.: 0 |
| 13E. IMPORTANT: Contractor is required to sign this document and return copies to the issuing office.: 1 |
| 11. The hour and date specified for receipt of Offers is extended : 1 |
| 11. The hour and date specified for receipt of Offers is not extended : 0 |
| 15B. CONTRACTOR OR OFFEROR. Signature of person authorized to sign. Digital Signature.: |
| 16C. DATE SIGNED. Enter 2 digit month, 2 digit day and 4 digit year.: |
| number of copies: 1.00000000 |
| number of copies: 1.00000000 |
| Enter the total (in dollars) the contract price increased. : |
File details come from the government source that posted it. Updated .