IDIQ QA 042223.pdf
PDF 483 KB Posted
- Attached to
- International Technical, Operational, and Professional Support Services (ITOPS 4. 0) Federal contract opportunity
- Solicitation number
- 75D30123R63271
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IDIQ
ITOPSS 4.0 IDIQ (Do not list any RFTOP questions on this document)
THIS DOCUMENT IS FOR the IDIQ ONLY!
Q and A
Page Section Question Answer (CDC will answer)
1 4 B.7 Will the Government please consider an Accounting systems that is approved by HHS? Or is the
Government expecting a DCAA approved system?
Yes, an HHS approved accounting is ok to submit.
2 90
L.4
L.6 Line spacing for the technical response is listed as both 1.5 and double spacing. Would the government please confirm what is the correct line spacing for the technical response?
Double spacing and Times New Roman
12-point font.
3 92 L.6(c) This section states “The technical
Proposal shall be comprised of the following elements: 1. Title Page;
(Include Unique Entity ID)
2. Executive Summary;
3. Table of Contents”.
Would the government please confirm that the ‘Executive
Summary” is excluded from the 50-page limitation?
The page limitation has been revised to
“80”. The ‘Executive Summary” is excluded from the 80-page limitation.
However, keep the Executive Summary to no more than 2 pages.
4 2 B Is the Recapitulation Table on page
2 missing RFTOPs? They only include one real Task Order
(Rwanda) and Sample Task Order
Yes, it is missing the other 2 RFTOP’s by mistake. Please include all 4
RFTOPS in the recapitulation table.
(Brazil), but are lacking two other real task orders?
Note that only small businesses complete the information for RFTOP
Brazil.
5 2 B There is not any mention of the
Recapitulation Table within the
IDIQ solicitation. Does the
Government have specific instructions for the use of the
Recapitulation Table?
Take the total costs from each RFTOP and put in this table for its’ specific row.
Note that only small businesses complete the information for RFTOP
Brazil.
6 2, 6 B.1, C.3.1
On page 2, the RFP states, “The
Government intends to award a multiple indefinite delivery, indefinite quantity (IDIQ) contracts from this solicitation.” However, on page 6, the RFP states, “It is the intention of the U.S. Government to award an Indefinite
Delivery/Indefinite Quantity( IDIQ) as a result of this solicitation.”
Can the CDC clarify if the intention is to award a single IDIQ contract or multiple IDIQ contracts?
This will be a single IDIQ contract with multiple awards.
7 4 B.7 Section B.7 requires Contractors to have a “Federal Approved” cost accounting system for Cost
Reimbursable type Orders. Some subcontractors (i.e. 8(a) firms) may not have a Federally-approved cost accounting systems, but are willing to work under “time & materials” type subcontracts. Is a “Federally-approved” accounting system required for small business subcontractors working under a
T&M-type subcontract if the small business subcontractor can produce evidence that they are equipped to accurate manage costs under an awarded task order (e.g. letter from
The Federal Approved contracting system is for cost reimbursement contract task orders, not for “time & materials.”
If the task order is a cost reimbursement type and the subcontractor does not have a Federal
Approved contracting system, then they must include information in L.7(c).
See L.7(c) for exceptions to the
Government approved contracting system.
an auditor or accountant)?
8 12, 44 C.4.5, H.12
The SOW contemplates the eventual issuance of personal services task orders under Section
C.4.5, but Section H.12 states that personal services “shall not be performed” under this contract. It is unclear if an offeror should include a response on their ability to manage of personal services contractors as part of their technical approach response. Should offerors describe their management of personal services personnel vs. non-personal services personnel under the contract?
Each task order will designate if the task order is personal or non-personal.
This IDIQ includes the possibility of both personal and non-personal services. Therefore, there are clauses
(H.12 & H.16) to cover both situations.
As required in L.6(d), you respond appropriately per the instructions.
9 30 H.4 Are contractors required to submit a certification of insurance in the required amounts listed in Section
H.4 with their proposal submission or after award?
It can be submitted after award.
10 89, 96 L.4, L.7 Section L.4 requires contractors to submit a Business Proposal, and
Section L.7 (Business Proposal
Instructions) requires a detailed budget. There do not appear to be any cost elements to price or budget for under the IDIQ portion of the solicitation. Please confirm that a detailed budget is not required for the IDIQ response.
The detail budget is not for the IDIQ. It is for the RFTOPS.
11 90, 92 L.4, L.6 In Section L.4 on page 90, the solicitation says “The written technical proposal for the IDIQ volume is limited to 50 pages with
1.5 line spacing...” However, Section L.6 on page 92 says, The
Technical Proposal is limited to 50 pages with double spacing…”
Early clarification on this item would be appreciated since it
See answer to question 2.
impacts the amount of effort to draft proposal content.
Can the CDC clarify line spacing for the Technical Proposal?
12 91 L.5 Would the Government consider revising this certification to permit the use of consultant support personnel if the offeror certifies
(and/or represents and warranties) that the content of their proposal is an accurate and complete representation of their implementation approach?
The certification will not be revised.
13 92-93, L.6, M.1 In Section L.7 on pages 92-93, the
RFP notes, “All non-small businesses must provide a proposal for all three Real RFTOPS.
However, in Section M.1 on page
107, the following evaluation criteria is noted, “D. 1 Real RFTOP
Rwanda and 1 Sample RFTOP
Brazil. The Offeror’s responses to the technical requirements of the real RFTOP Rwanda and sample
RFTOP Brazil.” Can the CDC clarify how many and which
RFTOP responses will be evaluated for non-small business submissions?
This section is revised to the below to reference all RFTOPS.
D.1 Real RFTOP’s Rwanda, Ghana, South Africa and 1 Sample RFTOP
Brazil
The non-small businesses will be evaluated on their proposals for the
3 Real RFTOP’s (Rwanda, Ghana &
South Africa)
14 92 L.6 Can the CDC confirm that the page in the Technical Proposal where we add a comment, “See separate attachment name RFTOP Volume” does not count towards the 50-page limit?
The comment “See separate attachment name RFTOP Volume” is part of 4.d
RFTOPS. It will read like this “d.
RFTOPS - See separate attachment name RFTOP Volume”. It is only listed once.
Therefore, it is part of the page count.
Note that the page count in the IDIQ has been revised.
15 95 L.6 The instructions on the required number of RFTOPs are inconsistent. The header states
“Two (RFTOP’s)”, but the number of required RFTOP responses appears to be defined elsewhere in the solicitation. Can the
Government please clarify the number of required RFTOP responses in Section L.6 of the solicitation?
There are four RFTOPS (1 sample and
3 Real) which are listed below.
1. Sample RFTOP Brazil
2. RFTOP Rwanda
3. RFTOP Ghana
4. RFTOP South Africa
16 93, 95, L.6, M.1
B
In Section L, on page 93, the instructions require the offeror to provide a minimum of 3 examples from the last 5 years of providing relevant services. In Section L, on page 95, the instructions state, “The offeror should include the last 3 contracts completed during the past three years [regardless of scope and relevance]…” Also, Section M on page 106 the RFP indicates, “This portion of the proposal will be evaluated to determine if the
Offeror provided a minimum of three examples of relevant experience and the experience provided was experience within the last five years having the same or similar size, scope, and complexity as this requirement.”
Can the CDC confirm:
a. that offerors can submit examples of relevant experience from within the last five years (and not the last three years);
b. that contracts do not necessarily have to be the last
Your questions have a mixture of both
Relevant Experience (L.6.4.2) and Past
Performance (L.6.d.5). These are two different topics with separate requirements. Keep these separate as they are not the same.
Past performance is separate from
L.6.4.2 Relevant Experience. Past performance will be evaluated to determine Performance Risk as stated in Section M.1.E on page 107.
For past performance, follow the directions in (L.6.d.5) on page 95 which references the last three must be submitted within the past 3 years.
To reduce any burden in Past
Performance (L.6.d.5), for the contracts currently in process don’t submit more than 6 total combined for both the offeror and all proposed major subcontractors
( Example-3 offeror, 3 major subcontractor, or any other combination but don’t exclude the major subcontractor if they have any).
These can be of any relevance.
three contracts completed by the offeror;
c. whether the contract must be complete or if ongoing contracts within the last five years also can be submitted as relevant experience; and
d. whether offerors can submit more than three examples of relevant past performance?
In Section M.1.B Relevant Experience, the correct Section reference in the last sentence is “L.6.d.2”.
See answers below from your questions in a-d.
a. Follow the directions in Section
L.6.d.2 Relevant Experience which references minimum of three examples of relevant experience (within the past 5 years).
b. For Relevant Experience
(L.6.d.2) see the answer to “a” above.
c. It can be complete or ongoing.
However include any that are complete.
d. For Relevant Experience
(L.6.d.2), you can submit more than what is required.
17 95 L.6 The Government notes that it may use CPARS records as the “primary option for reviewing past performance,” and that if an
Offeror has at least 3 records, they will not need to complete certain past performance requirements.
a. Does the Government consider CPARS for only
CDC-funded projects or all
CPARS entries for an offeror?
b. Is the Government
For CPARS, do not confuse Past
Performance with Relevant Experience.
These are two different topics.
The below responses are for Past
Performance (CPARS).
a. All CPARS records.
b. Past Performance will be evaluated to determine
Performance Risk as stated in
Section M.1.E. It does not have to be related to ITOPSS.
c. If you have at least 3 CPARS records, the CPARS system will considering the relevance of the project records to the work being performed under
ITOPSS?
c. If an offeror has more than
3 CPARS records and elects to submit Past Performance information as set out in
Section L.6, would that content be reviewed against
Section M or would the
CPARS record be solely considered?
Are subcontractor CPARs or Past
Performance information required?
be used primarily. Additional submitted information will be reviewed if needed when the past performance is a below satisfactory (High Risk).
d. Only the Prime contract CPARS records will be considered. See
L.6.2.5 (b) for offerors that are newly formed entities without prior contracts.
18 95 L.6 In Section L, on page 95, the instructions state, “The offeror should include the last 3 contracts completed during the past three years and all contracts currently in process for both the offeror and all proposed major subcontractors.”
a. Can the CDC clarify what information or data points they would like for “all contracts currently in process...”?
b. Would the Government like a table or list and with what data points?
c. Can the CDC also clarify what is considered a major subcontractor for an offeror response?
a. It is no different than the awarded contracts. See Section
L.6.d.5 (b) for the list of information (1-11) that must be included for each contract listed.
Note that if you are submitting past performance information because there are not at least 3
CPARS records, then the past performance survey will also have to be completed and sent.
b. See above answer.
c. Any subcontractor with a subcontract agreement with the
Prime contractor.
19 Page 2 Section
B
The Recapitulation Table does not include Ghana or South Africa.
Please confirm both countries should be in the table. If yes, See answer to question 4.
provide updated table.
20 Page 6 Section
C.3.2
Does CDC require that all personnel assigned to Task Orders be employed as a W2 employee?
Are 1099 independent contractor(s) permitted to fulfill Task Order staffing requirements?
The contractor is responsible for this decision, not CDC. CDC will not tell you how to staff your company.
21 Page 2. Section
B.1.
General.
Will the Government indicate how many small business awards and full and open awards it anticipates making as part of this multiple award IDIQ?
No.
22 Page. 9 Section
C.3.2.4.
Manage ment
Support
Services.
Using the example identified by the
Government, it is likely that an individual RFTOP could be for assisting with staffing continuity in-country, where administration of an extramural program could be required, including grants, cooperative agreements, etc could be required.
If an ITOPPS IDIQ holder is also a holder of a cooperative agreement, or a sub-recipient of a cooperative agreement for the same country, how does the Government intend to mitigate conflict of interest, or is the ITOPPS IDIQ holder restricted from bidding on a RFTOP in a country where they are already performing work for CDC under a different vehicle?
The are no restrictions keeping an IDIQ awardee from providing a proposal to
RFTOP in a country where they are also cooperative agreement holder.
However, every RFTOP proposal, has an evaluation criteria sub-item that includes identifying any potential challenges of which would delay performance starting as required in the country and identify solutions and/or alternatives for mitigating such challenges.
Therefore, each offeror responding to a
RFTOP will have to demonstrate they can successfully complete the requirements per the instructions in that solicitation.
23 Page. 9 Section
C.3.2.4.
Manage ment
Support
Services.
If an ITOPPS IDIQ holder implements a RFTOP where a position includes assisting in-country technical staff on staffing plans, position descriptions, and documentation for future proposals
– does that work preclude the same
IDIQ holder from submitting a
See answer to question 22.
future proposal for work in the same country?
24 Page 47. Section
H.15.CD
C100_00
7.
Within this section, a number of trainings are referenced that contractor staff must undertake before travelling OCONUS, including in-person FACT training for OCONUS travel longer than 89 cumulative days. Medical assessment and clearance are also required.
Will the Government clarify if these training and medical assessments are to be performed at the Contractor’s expense or are reimbursable as part of the contract?
These trainings will be required at the task order level, not the IDIQ.
It is not possible for the Government to determine which will require the contractor to pay at their own expense.
However, if any of these required trainings require the contractor to pay, then those expenses will be reimbursable under the task order.
25 Page 63. Section
H.21.
Issuance/
Award of Task
Order.
Subsection B indicates that contractors are not required to respond to each RFTOP over the duration of the IDIQ.
Is there a requirement to respond to a minimum number of RFTOPs per year or over the duration of the contract?
No.
26 Page 90 Section
L.4.
CDCA_
L011
General
Instructi ons (c)
Please clarify if the ‘four separate parts’ of the proposal equates to four separate electronic files for purposes of proposal submission?
How does the Government desire the Business Volume to be submitted? Should all RFTOP pricing be included in a single
Excel file?
If yes, confirm labeling tabs by
RFTOP country name is sufficient to differentiate pricing worksheets.
If no, please provide specific instructions for submission of
Yes, four separate documents (e-files).
We understand that the size may require separate emails.
However, for the RFTOP’s, don’t include all in one volume document.
Each RFTOP should be a separate document in itself.
For the business volume, each RFTOP should have its own single Excel file document.
RFTOP pricing Excel file(s).
27 Page 90. Section
L.4.
CDCA_
L011
General
Instructi ons (d)
This section states that the written technical proposal for the IDIQ is limited to 50 pages with 1.5 line spacing, and 12-point font. Section
L.6 states that the technical proposal is limited to 50 pages with double spacing and Times New
Roman 12-point font.
Will the Government please clarify which statement is correct?
See answer to question 2 for line spacing and 3 for page count.
28 Page 90. Section
L.4.
CDCA_
L011
General
Instructi ons (d)
Is a sans serif font acceptable for proposal narrative and graphics, tables and call out boxes?
No.
29 Page 95. Section
L.6.
CDC0.L
018. Past
Perform ance
Informat ion (May
2020).
Subsection (d)(5) states that the offeror should include the last three contracts completed during the past three years and all contracts currently in process for both the offeror and all proposed major subcontractors.
How is the government defining
‘major subcontractor’ for this procurement?
Any subcontractor with a subcontract agreement with the Prime contractor
30 Page 95. Section
L.6.
CDC0.L
018. Past
Perform ance
Informat ion (May
2020).
Please confirm the Government will also accept relevant
Cooperative Agreement past performance from offerors.
Yes, for Section L.6.d.5 Past
Performance.
31 Page 92. Section
L.6
CDC0_L
Within subsection C, two RFTOPs are referenced, yet subsequent section reference RFTOPs for
See answer to question 15.
Informat ion in
Technica l
Proposal
(Jul
2017).
Brazil, Rwanda, Ghana and South
Africa. Will the Government please clarify.
32 Page 93. Section
L.6
CDC0_L
Informat ion in
Technica l
Proposal
(Jul
2017).
Within subsection D.2. it is stated that examples of relevant experience may be either contracts or grants for international services.
Will the Government confirm that cooperative agreements may also be used for relevant experience?
No.
33 Page
Section
M.1
Proposal
Evaluati on
Criteria
The table in M.1 does not include
‘Relative Importance’ ranking or description for (1) RFTOP’s and (4)
Organization’s Management Plan.
Will the Government provide this missing information?
Above the table, it states “The following technical evaluation criteria in Table A are shown in descending order of importance.”
In the table, the column to the right shows “Relative importance”.
No other information is required.
34 Page
106.
Section
M.1
Proposal
Evaluati on
Criteria.
Subsection A indicates that the portion of the proposal will be evaluated to determine how well the proposal demonstrates the
Offeror’s overall understanding of the requirement and technical approach as addressed in Section
L.7(d)(1) and listed in Scope of
Work Section C.3. Section L.7
(d)(1) does not appear to exist, Section L.7 (d) refers to an accounting system.
Will the Government clarify the
For Section M.1 A, B and C. the correct section reference at the end of the sentence is “L.6”
M.1.A = L.6(d)(1)
M.2.B = L.6(d)(2)
M.3.C = L.6(d)(3) reference should be to Section L.6?
35 Page
106.
Section
M.1
Proposal
Evaluati on
Criteria.
Subsection B references Section
L.7 (d)(2), but this RFP section does not appear to exist.
See answer to question 34.
36 Page
107.
Section
M.1
Proposal
Evaluati on
Criteria.
Subsection C references Section
L.7 (d)(3), but this RFP section does not appear to exist.
See answer to question 34.
37 Page
107.
Section
M.1
Proposal
Evaluati on
Criteria.
Subsection D.1. indicates that the offerors responses to the technical requirements of the real RFTOP
Rwanda and sample RFTOP Brazil are part of the technical evaluation criteria but does not mention
RFTOP Ghana and RFTOP South
Africa.
Will the government clarify within this section that these RFTOPs are also part of the evaluation criteria?
Yes. See answer to question 15.
38 Page
108.
M.4
Basis for
Award.
RFP states that the price from the real RFTOP Rwanda, and sample
RFTOP Brazil will be the price factor for the IDIQ award(s) decision.
Will the Government confirm that
RFTOP Ghana and RFTOP South
Africa will also be considered in price evaluation?
Yes. See answer to question 15.
39 Page
108.
M.4
Basis for
Award.
Refers to B.1 for determination of number of awards, but Section B.1 does not indicate the number of awards.
Will the Government please state the intended number of awards?
No. The Government will not disclose this information.
40 General Proposal The Government originally The Government will add additional
Due Date requested proposal submission 30 days from release of the RFP.
Will the Government please extend due dates for proposals to 30 days after the date questions are answered to enable offerors to fully incorporate answers in proposal preparation.
time to the due date to account for the time we took to answer the questions.
This will be stated in SAM when the
Q&A are uploaded by CDC.
41 91 L4 Does the CRM have to be 1.5 spacing?
No. Use double spacing.
42 91 L4 Where should the CRM be placed in the proposal?
Appendix.
43 91 L5 Where should attachment 5 be placed in the proposal?
Appendix.
44 90 and
L6 Should text be doubled spaced or should it follow 1.5 spacing?
There is conflicting instructions on the pages identified.
See answer to question 2.
45 92 and
L6 Item 4 on page 95 references two
RFTOPs while Item D references one small business RFTOP and three real RFTOPS open to all.
Please clarify.
See answer to question 15.
46 General How many small business task orders are anticipated on this vehicle?
This information is not known.
47 General How many small business task orders were awarded during the last iteration of this contract?
ITOPSS 3.0 did not have a small business set aside.
48 General How many awards are anticipated? The Government will not reveal this information.
49 Business
Proposal
Spreads heet
All the labor categories listed in the
RFTOPs are Service Letter A. How does the contractor differentiate between Service Letter labor categories in the IDIQ spreadsheet?
The Service Letters will be listed in the each RFTOP.
50 Business
Proposal
Spreads
Please define Service Letter. This is the labor category listed in the
RFTOP.
heet
51 Business
Proposal
Spreads heet
Will the government provide a plug number for travel?
The travel amount is listed in each
RFTOP. This listed travel amount is the plug figure.
Offerors are not to add their own travel figure.
52 1 – RFP
and
RFTOPs
Cover
Page
The solicitation number on the
IDIQ RFP (75D30123R63271) is not consistent with the number provided on the RFTOPS
(75D30122R63271). Can the CDC confirm that the solicitation numbers are intentionally different and that contractors should include the RFP solicitation number in the
Subject Line of the Submission email, per section L.4 on page 90?
The solicitation number is
75D30123R63271.
Offerors are to submit their proposal via email as stated in Section L.4.d
53 16 C.9 “Contractor employees are required to receive Level 1/NACI security/background checks prior to contract performance. The security process is initiated when contracting organization provides contractor employee’s NACI results to the Office of Safety, Security and
Asset Management personnel and personal identifying information to the Headquarters Contracting
Officer Representative.” - Ghana, Rwanda, and South Africa RFTOPs require a Level 5 NACI security/background checks. Can the government please confirm if contractors should abide by each
RFTOPs requirements for Level of
NACI security/ background checks?
See the RFTOPS for the correct NACI
Level.
54 16 C.9 “Security Background
Requirements
The RFTOPS contain the correct NACI level and all incumbents must adhere to
Contractor employees are required to receive Level 1/NACI security/background checks prior to contract performance. The security process is initiated when contracting organization provides contractor employee’s NACI results to the Office of Safety, Security and
Asset Management personnel and personal identifying information to the Headquarters Contracting
Officer Representative.” - Can the government please confirm the following is not applicable to current incumbent staff.
it.
55 16 C.9 “Security Background
Requirements
Contractor employees are required to receive Level 1/NACI security/background checks prior to contract performance. The security process is initiated when contracting organization provides contractor employee’s NACI results to the Office of Safety, Security and
Asset Management personnel and personal identifying information to the Headquarters Contracting
Officer Representative.” - Can the government please confirm if this will be a billable cost?
If the contractor is required to pay this cost, it will be a billable to the task order, not the IDIQ.
56 47 H.15 - A.
Training
Requirements for Contractor
Performance or Travel OCONUS -can the government please confirm the training requirements under this section do not apply to existing incumbents or staff already in-country?
Clause H.15 is specific to the contract not the individual. Therefore, this clause will apply to all existing incumbents or staff who will be identified on the RFTOPS Service
Letters (labor categories) because they will be new to ITOPSS 4.0 task orders.
57 48 Section Section H.15. B.2 Medical See answer to question 56.
H.15. B.2
Medical
Clearanc e
Clearance states: “Documentation of medical clearance must be provided within 30 days of contract award and prior to any OCONUS travel. If contract employees performing under this contract are
OCONUS-based, documentation of their medical clearance must be provided prior to the start of any performance under this contract.”
Could CDC kindly confirm that this requirement does not apply to incumbents or personnel already located in-country?
58 48 Section
H.15. B.2
Medical
Clearanc e
Section H.15. B.2 Medical
Clearance states: “Documentation of medical clearance must be provided within 30 days of contract award and prior to any OCONUS travel. If contract employees performing under this contract are
OCONUS-based, documentation of their medical clearance must be provided prior to the start of any performance under this contract.”
Can the government please confirm whether costs related to medical clearances are billable to the contract.
Any cost related to this are billable to the task order contract, not the IDIQ.
59 50 H.15 - D.
Safety and
Security
(3) (b)
“The communications plan and list of equipment that will be provided by the Contractor to contractor employees performing or traveling
OCONUS under this contract. At a minimum, the Contractor must provide two communication devices with international service or local internet access.
Communication devices may include cell phone, radio, satellite
Any cost related to this are billable to the specific task order contract, not the
IDIQ.
phone, laptop, or pad/tablet.” As this was not a requirement in the previous contract, can the government please confirm if the two communication devices are billable.
60 50 H.15 - D.
Safety and
Security
(3) (b)
“The communications plan and list of equipment that will be provided by the Contractor to contractor employees performing or traveling
OCONUS under this contract. At a minimum, the Contractor must provide two communication devices with international service or local internet access.
Communication devices may include cell phone, radio, satellite phone, laptop, or pad/tablet.” - Can the government please confirm if this is a requirement for all staff or on an as needed basis?
Any cost related to this are billable to the task order contract, not the IDIQ.
61 51 H.16 "Personal services shall be performed under this contract”.
However, page 44, section H.12 states, “Personal services shall not be performed under this contract” and section C.4.3 on p.11 states
“CDC may utilize this contract to award both personal services and non-personal services task orders, if needed.” Can CDC confirm whether personal services shall be performed under this contract?
This will be defined in the each
RFTOP.
62 68 Section I Under page 68, Section I, the solicitation lists 52.215-20 and
52.215-21: Requirements for
Certified Cost or Pricing Data and
Data Other than Certified Cost or
Pricing Data / Modifications. Per
FAR 15.403-1(b)(1), as adequate price competition is anticipated for
This data is not required for this IDIQ solicitation.
However, the clauses will remain in the
IDIQ solicitation and awarded contract because these flow down to the each
RFTOP. It is possible that when this solicitation, we respectfully request that the highlighted Section
I clauses be removed.
RFTOPS are issued, after with IDIQ is awarded, there may be only 1 offeror response.
63 90 L.4 “The written technical proposal for the IDIQ volume is limited to 50 pages with 1.5 line spacing”.
However, section L.6 on page 92 states the following “The Technical
Proposal is limited to 50 pages with double spacing Times New Roman
12 point font.” Can CDC confirm that the contractor may use 1.5 spacing when preparing the written technical proposal?
See answer to question 2.
64 90 L. 4 L.4 CDCA_L011 GENERAL
INSTRUCTIONS, Table of
Contents. May the offeror include a list of acronyms and abbreviations that does not count against the 50-page limit?
Yes.
65 90 L. 4 L.4 CDCA_L011 GENERAL
INSTRUCTIONS, Table of
Contents. May the offeror include a
Cover Letter that does not count against the 50-page limit?
Yes, but it should not be longer than 1 page.
66 90 L.4 L.4 CDCA_L011 GENERAL
INSTRUCTIONS, includes guidance on the Cross Reference
Matrix: “The Offeror shall submit a
Cross Reference Matrix (CRM) for the Technical Volume, similar to the example below, to help ensure that all solicitation requirements are addressed and to facilitate the technical evaluators' review of the
Offeror's technical proposal.” Can
Appendix
CDC confirm the preferred placement for the CRM in the
Technical proposal?
67 91 L.5 L.5 Proposal Preparation in
Response to this Solicitation - As part of what volume, Technical or
Business should bidders include
Attachment 7 Preparation
Certification?
Appendix
68 95 L.5.5 The Past Performance Section indicates that it must be a separate proposal. ‘(b) Offerors shall submit the past performance information as part of a separate proposal. The offeror should include the last 3 contracts completed during the past three years and all contracts currently in process for both the offeror and all proposed major subcontractors.’ Can CDC confirm whether this is a separate requirement from the Past
Performance Surveys provided?
And if so, could CDC kindly provide detailed instructions for this separate past performance requirement?
If you do not have at least 3 records in the CPARS system, then the Past performance Survey is required as part of L.6.d.5.
Use it for each of the past performance information you will submit ( last 3 contracts completed during the past three years and no more than 3 of those currently in process.)
69 95 L.5.5 The Past Performance Section indicates that CPARS may be used in lieu of a Past Performance
Proposal:
“Note- The Government will use past performance information located in the Contractor
Performance Assessment Reporting
System (CPARS) as the primary option for reviewing past performance.
If you have at least three (3)
CPARS records, then you do not have to complete any of the
The past performance required in
Section L.6.d.5 is not a combination with CPARS.
If you do not have at least 3 CPARS records, then follow the directions in
L.6.d.5.
The past performance survey will be used for each of the last 3 contracts completed during the past three years and no more than 3 of those currently remaining information below for this topic section.
If you do not have at least three (3)
CPARS records, then complete the remaining information below in this topic section.” Can CDC confirm that the Past Performance Proposal can be a combination of CPARS and Past Performance Surveys (for those projects that do not have available CPARS) to total 3 references?
in process.
70 97 L.7 (b)
(1)
In this section the governemt states:
“1) Direct Labor: Provide a time-phased (e.g., monthly, quarterly, annually, etc.) breakdown of labor hours, rates” however in the
Rwanda, SA, and Ghana RTOPS, it states “(1) Direct Labor: Provide a weekly breakdown of labor hours, rates”. Will the government allow contractors to establish direct labor based on annual hours vs. weekly breakdown?
This language has been revised. The business instructions in the RFTOPS have been removed. There is a comment to refer to the business instructions in the IDIQ.
This is being done because these
RFTOPS will have the same business instructions and having one set will reduce redundancy.
See the explanation in L.7.b.1 for breakdown format explanation.
71 84 Section L Section L reference FAR 52.216-29
Time-and-Materials/Labor-Hour
Proposal Requirements—Non-
Commercial Item Acquisition with
Adequate Price Competition (Nov
2021). This says:
“a) The Government contemplates award of a
Time-and-Materials or
Labor-Hour type of contract resulting from this solicitation.
b) The offeror must specify fixed hourly rates in its offer…”
Given that the RFP Section B.2 of
This clause is part of the IDIQ and will allow the CO to issue a RFTOP as a
Time and Materials Labor hour.
Therefore, this clause will remain as it.
Each RFTOP will contain the type of contact it will be issued as.
The three RFTOPS that will be awarded with this IDIQ will be Cost and are identified as such.
https://www.acquisition.gov/far/52.216-29 the IDIQ (page 3) says that the CO reserves the right to solicit and award TOs as FFP/TTM, we kindly ask that this be removed. If not removed, please provide instructions.
72 84 Section L The RFP references FAR 52.222-46
- Evaluation of Compensation for
Professional Employees (Feb
1993). Can the CDC please clarify if this is about compensation at the
IDIQ level or for each separate
RFTOP?
RFTOP.
73 Recapitu lation
Sample
Business
Proposal
Spreadsh eet
The recapitulation table provided in the Sample Business Proposal
Spreadsheet lists CLINS 0001, 2001, 3001, and 4001. Can the
Government please specify whether this was a typo and CLIN 1001 should be included in the recapitulation table.
This is a mistake. CLIN 1001 should be included. Please add it on your copy.
N/A N/A
Would the government consider a 1 week extension?
See answer to question 40.
90 L.4
What resumes are required for the
IDIQ proposal response?
None. Resumes are required for labor sources (Service Letters) required in the RFTOPS.
96 L.7
Can the government confirm that a business/cost proposal is not required for the IDIQ proposal response?
It is only required for the RFTOPS.
77 92, 93 L.6.(b), L.6.(d).4
Number of Task Order Proposals –
L.6(b), second paragraph refers to
“two Task Order proposals”. Could the CDC please confirm that this should state “three Task Order
Proposals” for the full/open competition – referencing the
Rwanda, Ghana and South Africa
RFTOPs? The reference to two task order proposals is repeated again in https://www.acquisition.gov/far/52.222-46
L.6.(d).4 on page 93.
78 90
L.4.C
L.6
L.4.(c) mentions the IDIQ technical proposal is “…limited to 50 pages with 1.5 line spacing…”
L.6 mentions the IDIQ technical proposal is “...limited to 50 pages with double spacing…”
Could CDC please clarify the discrepancy and confirm whether the line spacing should be 1.5 or 2 for the IDIQ technical proposal?
See answer to question 2.
79 90-91, L.4.(g) &
L.6.(c)
On page 90-91, L.4.(g), it is stated that Offerors must submit a Cross
Reference Matrix (CRM) for the
Technical Volume. However, this
CRM is not included among the technical proposal elements listed under L.6.(c) on page 92. Could
CDC please confirm where in the technical proposal should the CRM be inserted?
Appendix
80 92 L.6.(c) Proposal Organization - The technical proposal submission elements presented on page 92 helpfully clarifies how CDC expects the IDIQ technical proposal to be organized. Could CDC please provide additional guidance/instruction on how the overall proposal package should be organized and submitted– i.e., IDIQ
Technical Proposal, Task Order
Proposals, Business Proposal (and elements within each Proposal)?
See L.6 (d) for the specific elements required in the IDIQ.
For the task orders, see section L in each RFTOP for the information required in those four.
For the business instructions, see L.7 in the RFP.
81 46, Rwanda
RFP
L.3.(1)
L.7
In what detail should offerors present their Direct Labor costs?
The Rwanda RFTOP (page 46) states “Weekly breakdown of labor hours, rates, and costs by
See answer to question 70.
96, IDIQ
RFP
appropriate category, and furnish basis for estimates”, while the IDIQ
RFP (page 96, Direct Labor) states
“Provide a time-phased (e.g., monthly, quarterly, annually, etc.)
breakdown Page 97 of 108 of labor hours, rates, and cost by appropriate category, and furnish basis for labor hour and labor rate estimates.”
Would the CDC please clarify what is required?
82 96, IDIQ
RFP
L.7(b).1
Business
Proposal
Instructio ns, Cost
Data
This section requires submission of cost data to include labor, fringe, materials, subcontracts, travel, and so on. Since there is no activity under the IDIQ, could CDC clarify if the contractor needs to submit all detailed costs for each cost category because most of the elements would be incurred under individual task orders instead of the IDIQ?
Also, does CDC expect offerors to propose labor categories based on their approach because this is a performance work statement (PWS) and the RFP does not specify any labor category or position titles?
This section L.7 is the instructions for the RFTOP business.
All cost information will be done for the RFTOP’s not the IDIQ.
For the IDIQ, there are no labor categories required.
Labor categories are only required for the RFTOP’s. CDC has stated the required labor categories and the minimum qualifications in each
RFTOP. No other labor category is required to do the work in the
RFTOPS.
83 95 L.6.(d).5( b)
L.6.(d).5(b) refers to major subcontractors. Could CDC please clarify what minimum percentage share of work constitutes a major subcontractor (i.e. those who will receive a minimum of 20% work)?
Also, what specific supporting documentation is needed for each subcontractor?
See answer to question 29. There is no minimum percentage.
The major subcontractor supporting documentation would the information identified in items 1-10 of L.6.(d).5(b).
84 76-83 Section K Can CDC clarify whether the It can be included once as part of the completed/signed “Section K -
Representations, Certifications, And Other Statements Of
Offerors” must be included in each
RFTOP proposal or whether it may be included once as part of the
IDIQ Technical Volume. Please clarify where this element of the submission should be inserted.
IDIQ Technical Volume.
85 95 L.6.(d).5 L.6.(d).5 states that “the
Government will use past performance information located in the Contractor Performance
Assessment Reporting System
(CPARS) as the primary option for reviewing past performance” and that “if you have at least three (3)
CPARS records, then you do not have to complete any of the remaining information below for this topic section”.
The instructions then continue in
L.6.(d).5.d stating “The offeror should include the last 3 contracts completed during the past three years and all contracts currently in process for both the offeror and all proposed major subcontractors.”
Can CDC please clarify what must be submitted for the Past
Performance Information Section?
Specifically, can CDC confirm that if at least 3 CPARS are provided, no further information on past performance must be submitted in this section?
If you have at least 3 records in the
CPARS system, you do not have to complete any of the remaining information this topic section.
If you do not have at least 3 records in the CPARS system, then you must complete the rest of the information required.
86 89–90 L.4, L.6
The solicitation states—L.4
CDCA_L011 GENERAL
INSTRUCTIONS (NEGOTIATED)
(Jan 2000) - The written technical proposal for the IDIQ volume is limited to 50 pages with
1.5 line spacing, 12-point font, and
1” margin (excluding the cover page, table of contents and appendices). And the solicitation states—Section L.6 CDC0_L012
Information in Technical Proposal
(Jul 2017) - The Technical
Proposal is limited to 50 pages with double spacing Times New Roman
12 point font, and 1” margins
(excluding the cover page, table of contents and appendices).
QUESTION: What is the correct spacing—1.5 or double spacing?
87 95, 107 L.6, (d), M.1,D.1
The solicitation states: Information in Technical Proposal (Jul 2017) -
4. Two (RFTOP’s): The
Government will evaluate the offeror’s proposal submitted for the
RFTOP. The attached RFTOPs will contain the specific information to submit. Each RFTOP will also have its own evaluation criteria. Also, on page 107 the solicitation states:
"Section M - Evaluation Factors
For Award D. 1 Real RFTOP
Rwanda and 1 Sample RFTOP
Brazil The Offeror’s responses to the technical requirements of the real RFTOP Rwanda and sample
RFTOP Brazil."
QUESTION: Does the
Government mean it will evaluate
“Three” RFTOPS (Rwanda, Ghana, South Africa), instead of just
“Two” RFTOPS or will only
“Two” RFTOPs” be evaluated—
Rwanda and Brazil?
See answer to question 15.
88 2 B Solicitation states in Section B -
Supplies Or Services And
Prices/Costs – Recapitulation: Only reference Sample Tasks for Brazil
& Rwanda. QUESTION: Are
Ghana and South Africa to also be included?
89 N/A N/A QUESTION: Will the 3
RFTOPS—Rwanda, Ghana, and
South Africa—be awarded to 3 different Offerors?
The RFTOPS will be awarded in accordance to the evaluation section
M.1 in each task order.
Therefore, no one specific offeror is guaranteed any task order.
90 N/A N/A QUESTION: Will the government grant an extension of the April 17, 2023 due date in order for Offerors to address the government’s responses to the questions submitted for the IDIQ and the 4
RFTOPS?
See answer to question 40.
91 93, 95 L.6., (d), 2, L.6., (d), Solicitation section L.6
CDC0_L012 Information in
Technical Proposal (Jul 2017) - 2.
Relevant Experience states: The
Offeror shall provide a minimum of three examples of relevant experience (within the past 5 years) in providing international technical, operational, and professional support services as outlined in Section C.3 of the solicitation. On page 95, solicitation section
CDC0.L018. Past Performance
Information (May 2020) – 5.b states: Offerors shall submit the past performance information as part of a separate proposal. The offeror should include the last 3 contracts completed during the past three years and all contracts currently in process for both the offeror and all proposed major subcontractors. QUESTION:
Would the government accept both relevant experience and past performance information within the
No.
last 5 years?
92 60 H.19, A., D.
In section H.19. Information
Security and/or Physical Access
Security, A. Baseline Security
Requirements, D. Position
Sensitivity Designations it specifies
Position Sensitivity Designations for all contractor and subcontractor employees.
QUESTION: Does this mean all employees for all Task Orders must be US citizens and non-citizens that meet the specified criteria, as stated in all four RFTOPS (Brazil, Rwanda, Ghana, and South Africa) in their respective Minimum
Qualifications and/or Certifications sections for personnel to be hired ?
Can the Offeror hire in-country staff native to and residing in the country?
You must follow the information listed in each RFTOP.
This information is listed in the
Minimum Qualifications and/or
Certifications area of each RFTOP.
An in-country staff native to the country would meet the definition or an
Ordinarily Resident which is not allowed per the RFTOP’s.
93 92 L.6, (c), 4,, d., i.
QUESTION: Can an Offeror who is a small business select only 1 or
2 of the 3 RFTOPS (Rwanda, Ghana, South Africa) to respond to in addition the required Brazil
RFTOP? In other words, must a small business Offeror reply to the required Brazil FRTOP and ALL 3 of the other RFTOPS (Rwanda, Ghana, South Africa)?
Small businesses are not required to provide a proposal to the 3 Real
RFTOPS.
However, small business can provide a proposal for this three Real RFTOPS
(Rwanda, Ghana & South Africa).
If so, you must provide a proposal for
ALL three Real RFTOPS (Rwanda, Ghana & South Africa).
94 15 C.5 The solicitation states in C.5 Any task order under $500,000 will be set aside for small business only.
What percentages of task orders for
Rwanda, Ghana, and South Africa are expected to be set aside for small business?
There is no set percentage. The
Government is unable to predict how many task orders will fall under
$500,000.
95 N/A N/A The live proposal period spans a See answer to question 40.
time with multiple holidays, including Ramadan, Eid al-Fitr, Passover, and Easter, as well as spring break, adversely impacting
Offerors’ availability to respond.
Would CDC kindly consider extending the deadline for applications by two weeks, to the
30th, to allow Offerors sufficient time to compile compliant and high quality proposals?
96 N/A N/A Does the government expect a separate IDIQ budget be submitted, in addition to the RFTOP budgets?
No.
97 N/A N/A Should 8a Certified Small
Businesses, applying for the small business set aside portion
(Operational Support Services), also include qualifications and technical content which highlights their experience in the other technical areas (i.e. Management
Support Services, Epidemiology
Support Services, etc.)
There is no separate instructions for 8a
Small business.
Follow the directions listed in the IDIQ and each RFTOP.
98 Pg 90 &
L.4
CDCA_
L011
GENER
AL
INSTRU
CTIONS
(NEGOT
IATED)
The line spacing requirements are
1.5" on page 90 and 2" on page 92.
Could CDC kindly confirm that
1.5" spacing is the correct format
Offerors should use when responding to the solicitation?
See answer to question 2.
99 14, 16 C.4.10 The quarterly conference call requirements state, “The discussion from the conference call must be documented in the monthly report of which the call was held.” A monthly report is not listed in the
Performance based matrix. For the
This has been revised to remove
“monthly report”.
monthly report, could the government clarify these requirements?
100 8 C.2.A Can Small Business offerors respond to all technical areas or only Operational Support Services?
See answer to question 93 for this solicitation.
After the IDIQ is awarded, small businesses can provide a proposal for any task order, not just the set asides.
101 Page 97 L.7.b.7 The RFP states "Include these analyses as part of your own cost submissions for subcontracts"-could CDC please confirm if this also includes a detailed budget from subcontractors?
We do not need your subcontractor detailed budget unless they do not want to submit it to you.
102 Pg 95 CDC0.L0
18 Past
Performa nce
Informati on
Does the government expect all current contracts to be included in the past performance, or only those of similar scope and size?
To reduce any burden, for the contracts currently in process don’t submit more than 6 total combined for both the offeror and all proposed major subcontractors
(Example-3 offeror, 3 major subcontractor, or any other combination but don’t exclude the major subcontractor if they have any).
These can be of any relevance.
103 Pg 96 CDC0.L0
18 Past
Performa nce
Informati on
Number 11, requires that a Past
Performance Evaluation be included for each contract listed.
Can the government please clarify what this Evaluation is?
This item has been replaced with a Past
Performance Survey.
104 Pg 90 L.4
CDCA_L
GENER
AL
INSTRU
CTIONS
(NEGOT
“An electronic copy of your entire proposal shall be emailed to krz3@cdc.gov. The electronic copy shall be in MS Word.doc (or .docx) and a pdf version except the Past
Performance Volume.”
Can the government please clarify
For the Past performance Volume, it still needs to be submitted electronically but only in PDF format.
It will be submitted as a separate mailto:krz3@cdc.gov
IATED) the instructions above. Should the
Past Performance be submitted with the proposal, but in a separate document (for those without
CPARS)?
105 Pg 107 Past
Performa nce Risk
Rating
In this section, the government mentions the Past Performance
Survey, but instructions are not included in the solicitation. Could the government please clarify when the Past Performance Survey should be used? Should it be completed by all contracts included in the Past Performance volume?
The past performance survey will be used for each of the last 3 contracts completed during the past three years and no more than 3 of those currently in process. Don’t submit more than 6.
106 Pg 107
Past
Performa nce Risk
Rating
Should copies of the Past
Performance Surveys be included in the Past Performance Volume or just submitted directly to the government?
Submitted directly to the Government via the same email the proposals are submitted.
In the subject line of the email, put “
RFP 75D30123R63271 ITOPSS 4.0”.
In the body of the email, state it is a past performance survey and the name of the vendor it is for.
107 Pg 90 L.4
General
Instructio ns
The RFP states that Offerors can use up to 10-point font for call-out boxes. Could CDC confirm that
Offerors can use up to 10-point font for tables, graphics, and charts as well?
Yes, but make sure it is legible.
108 Pg 92 L.4
General
Instructio ns
The RFP states “The Two Request for Task Order Proposals (RFTOP) will have their own page count listed in inside each document that will not count against the IDIQ limit.” There are additional
RFTOPs that we must respond to.
Can CDC confirm that all RFTOPs have their own page count that will not count against the IDIQ limit?
All RFTOPs have their own page count that will not count against the IDIQ limit?
109 Pg 92 L.4
General
Would CDC allow the Table of
Contents to be included exclusive of the page limits?
Yes.
110 Pg 92 L.4
General
Where would the CDC prefer that
Offerors provide the Cross
Reference Matrix? Should it fall after the Table of Contents?
Appendix
111 Pg 93 L.4
General
Instructio ns, Past
Performa nce
The RFP states “The Offeror shall provide a minimum of three examples of relevant experience
(within the past 5 years) in providing international technical, operational, and professional support services as outlined in
Section C.3 of the solicitation.” Can the CDC confirm that the prime offeror and its consortium members can provide a minimum of three examples of relevant…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .