This is an addendum to contract documents for the Mackinac Island East Bluff Retaining Wall Replacement project, issued by the Michigan Department of Technology, Management and Budget (DTMB) on behalf of Mackinac Island State Park. The addendum was issued on May 16, 2025, and does not change the bid date of Wednesday, May 21, 2025. The document incorporates revisions to the Bid Summary to add Alternate 1 for soils compaction testing, which will be performed by the contractor, while geotechnical inspection remains the responsibility of the owner if the alternate is accepted. Additionally, the addendum clarifies that the Asbestos Abatement Attestation form should be submitted with the bid proposal despite the project containing no asbestos abatement work, and the form may be left blank.
The addendum provides updated requirements for certified payroll submissions under State Prevailing Wages provisions. Contractors and subcontractors must submit certified payrolls no later than 10 days after the end of each pay period, initially to DTMB via email at DTMB-DCDCertPay@michigan.gov following a specific naming convention and file size limit of 20 megabytes. Beginning on or about April 2, 2026, certified payroll submissions will transition to the Department of Labor and Economic Opportunity database through the Online Certified Payroll Submission process in accordance with 2023 PA 10, as amended (MCL 408.1122). After the transition date, certified payrolls are no longer to be submitted to DTMB via email, though they will continue to be required as attachments to regular contractor payment requests.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM NO. 2
DATE: Friday, May 16, 2025
PROJECT: Mackinac Island East Bluff Retaining Wall Replacement
DTMB FILE NO.: 751/23180.ABG
OWNER: MI DTMB / Mackinac Island State Park
BID DATE: Wednesday, MAY 21, 2025 ** THIS ADDENDUM DOES NOT CHANGE THE
BID DATE
The following shall be incorporated into the Contract Documents dated 23 APRIL 2025.
GENERAL
PROJECT MANUAL
See attached revised pages from the Bid Summary for the addition of alternate 1. The alternate has been added for soils compaction testing as required in section 312000 Earth Moving to be by the contractor.
Geotechnical inspection will still be conducted by the owner if this alternate is accepted.
End of Addendum No. 2
GoschkaA Text Box Monday, May 19, 2025
GoschkaA Text Box See attached revised Asbestos Abatement Attestation form which notes that the project does not contain asbestos abatement and the form can be left blank, but still needs to be submitted with the bid proposal.
Update to Section 00700 General Conditions, 2.5.1 Prevailing Wages, State Prevailing Wages:
Replace portion of 00700-2.5.1:
Contractor must submit certified payrolls for both Contractor and subcontractors not later than 10 days after the end of a pay period to DTMB via email at DTMB-DCDCertPay@michigan.gov. Files are to be 20mb or less and follow the naming convention provided by the Project Director to include the following information:
[CP###] [CH]-[Client]-[Vendor] [CN] [SFN] [ProjectID] - [County],pdf CP###: A 3-digit ID of the Certified Payroll and the sequential order that it is for this specific project CH: Contract Holder - this would be `DTMB'.
Client: Acronym of the agency the project is for Vendor: Abbreviated Contractor name CN: DTMB Contract Number - Y##### SFN: The 4th through 8th number of this project file number ###/#####.AAA ProjectID: Project name or abbreviated description County: The county the work is taking place
Contractor will cease the submitting process of Certified Payroll to DTMB via the email on or about April 2, 2026, when the Department of Labor and Economic Opportunity requires that all certified payrolls be submitted directly to the Department of Labor and Economic Opportunity database via the internet, 2023 PA 10 as amended, MCL 408.1122. Certified Payroll will continue to be required to be submitted to DTMB as an attachment to the Contractor's regular payment request.
With:
Contractor is to submit certified payrolls, including contractor and subcontractor, not later than 10-days after the end of a pay period to the Department of Labor and Economic Opportunity database via the internet through the Online Certified Payroll Submission process the Contractor signed up for to receive their State Project Registration, 2023 PA 10 as amended, MCL 408.1122. State certified payroll is not to be submitted to DTMB at any time.
End of Addendum No. 3