This is Addendum No. 2 to the bidding documents for the Mackinac Island East Bluff Retaining Wall Replacement project, issued by the Michigan Department of Technology, Management and Budget (DTMB) State Facilities Administration on behalf of Mackinac Island State Park Commission. The project involves the removal of an existing retaining wall and fence, clearing and grading, installation of a new modular block retaining wall with associated drainage, backfill, asphalt paving, and restoration work on Mackinac Island, Michigan. The project is divided into two phases: Phase I requires substantial completion by December 19, 2025, and includes all work necessary to reopen the road for winter except Hot Mix Asphalt (HMA) paving; Phase II includes final grading, HMA paving, and final restoration with substantial completion by May 20, 2026, and final completion for both phases by June 19, 2026. The bid opening date is Wednesday, May 21, 2025, at 2:00 PM ET, with a mandatory prebid conference required. A site examination is available prior to bidding. Addendum No. 2 adds Alternate 1 for soils compaction testing to be performed by the contractor, with geotechnical inspection to remain the responsibility of the owner if the alternate is accepted.
Bidders must submit a base bid with specified materials and equipment only, with no substitutions permitted after bid opening except as provided in the General Conditions. A performance bond and payment bond are required for all bids exceeding $50,000, and each bid must include a five percent bid guarantee. Builders risk insurance is required to be provided by the contractor. The bid documents include a Schedule of Alternates and a Schedule of Unit Prices for contingent change orders covering items such as rock excavation, modular blocks of varying types, structural backfill, and earth excavation. Rock excavation quantities that vary from anticipated quantities will be added or subtracted at the unit price; other unit price variations will not result in contract adjustments for this lump sum project, except for additional earth excavation required if unsuitable soils necessitate deeper excavation as determined by the geotechnical engineer. Bids must be submitted electronically through the Michigan SIGMA procurement system.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM NO. 2
DATE: Friday, May 16, 2025
PROJECT: Mackinac Island East Bluff Retaining Wall Replacement
DTMB FILE NO.: 751/23180.ABG
OWNER: MI DTMB / Mackinac Island State Park
BID DATE: Wednesday, MAY 21, 2025 ** THIS ADDENDUM DOES NOT CHANGE THE
BID DATE
The following shall be incorporated into the Contract Documents dated 23 APRIL 2025.
GENERAL
PROJECT MANUAL
See attached revised pages from the Bid Summary for the addition of alternate 1. The alternate has been added for soils compaction testing as required in section 312000 Earth Moving to be by the contractor.
Geotechnical inspection will still be conducted by the owner if this alternate is accepted.
End of Addendum No. 2
Bidding and Contract Document (R 03/25) Mackinac Island East Bluff Retaining Wall Replacement File No. 751/23180.ABG
BID SUMMARY
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
STATE FACILITIES ADMINISTRATION
DESIGN AND CONSTRUCTION DIVISION
3111 W. St. Joseph Street Lansing, Michigan 48917
Bids must be submitted electronically at: https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService
FILE NUMBER
751/23180.ABG
DEPARTMENT/AGENCY
Mackinac Island State Park Commission
CONTRACT TIME(S)
Phase I – December 19, 2025, Substantial Completion Phase II (HMA) – May 20, 2026, Substantial Completion Final Completion for Phase I & II – June 19, 2026
PROJECT NAME
Mackinac Island East Bluff Retaining Wall Replacement
LOCATION
Mackinac Island, MI
BID OPENING DATE
Wednesday, May 21, 2025, at 2:00 pm ET
FOR AN EXAMINATION OF THE SITE CONTACT:
Attend Mandatory Prebid Conference
SEE SECTION 00100 INSTRUCTIONS TO BIDDERS AND SECTION 00700 GENERAL CONDITIONS PROVIDED WITH THE BIDDING DOCUMENTS.
BID: WE PROPOSE TO FURNISH, PERFORM AND COMPLETE THE ENTIRE WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS IN
CONSIDERATION OF THE BID PRICE (S) STATED BELOW.
FIRM NAME AND COMPLETE ADDRESS TELEPHONE NUMBER and E-MAIL ADDRESS
□ Qualified Disabled Veteran
SIGMA VENDOR NUMBER
(protected information required for processing payments)
BIDDER'S SIGNATURE AND TITLE DATE
WITNESS' SIGNATURE DATE
By signing this bid above, bidder certifies their enclosed Qualified Disabled Veteran and Michigan-Based Business Certifications.
BASE BID FROM BID SCHEDULE (Include specified Allowances):
____________________________________________________________________________Dollars $____________________ (use words) (in figures)
Alternate 1: (Add/Subtract) ______________________________________________________Dollars $____________________ (use words) (in figures)
A PERFORMANCE BOND AND A PAYMENT BOND ARE REQUIRED FOR ALL BIDS OVER $50,000.00. EACH BID MUST BE ACCOMPANIED BY A FIVE (5) PERCENT BID GUARANTEE. BUILDERS RISK INSURANCE IS REQUIRED TO BE PROVIDED BY THE
CONTRACTOR UNLESS OTHERWISE INDICATED IN THE BID DOCUMENTS.
BIDDERS ARE ALSO CAUTIONED TO FAMILIARIZE THEMSELVES WITH ALL OF THE OTHER CONDITIONS OF THE CONTRACT.
Project Scope of Work: The project includes but not limited to: protecting existing utilities, clearing, removal of existing retaining wall, removal of existing fence, removal asphalt, adjusting structures, providing footing for new modular block retaining wall, constructing retaining wall, installing drainage, backfill, grading, placing asphalt, restoration and associated SESC measures as noted in the plans and indicated in the Contract Documents. Phase I will include all work necessary to reopen the road for the winter other than Hot Mix Asphalt (HMA) paving, including supplemental gravel and grading as necessary to make the road satisfactory to the owner. Phase II will include final grading, gravel removal or supplementation, HMA paving, and final restoration.
The Bidder must figure its Base Bid on the specified, or Addendum-approved, materials and equipment only. No “or equal” or substitution proposals will be permitted after Bid opening, except as provided in the General Conditions.
Addenda: Bidder acknowledges receipt of Addenda: No. ___ dated: ________, No. ___ dated: ________ No. ___ dated:
Bidding and Contract Document (R 03/25) Mackinac Island East Bluff Retaining Wall Replacement File No. 751/23180.ABG
Schedule of Alternates - The Bidder will complete (or deduct from the Contract) the parts of the Work designated by the Alternates that follow and accept in full payment (or allow in full credit) for those parts of the Work the following Item Bid Prices:
Alternate Item No.
Bid Quantity
Description
Unit Price
Item Bid
1 Soils Compaction Testing
The Bidder further acknowledges and agrees that the separate prices bid on this “Schedule of Alternates,” where they are applicable and deemed acceptable by the Owner, will be used if incorporated into the Contract when the Owner issues the Notice of Award.
Schedule of Unit Prices or Contingent Change Order Prices - The Bidder shall use this “Schedule” to quote unit prices identified in the bid documents or propose other contingent Change Order prices. The proposed Unit Prices or contingent Change Order prices set forth in this schedule, at the sole discretion of the Owner, may, or may not be incorporated into the Contract Documents. The Owner reserves the right to negotiate Unit Prices or contingent Change Order prices set forth herein prior to their possible incorporation into the Contract Documents.
Item No. Bid Quantity
Description
Unit
1 Per CYD Excavation, Rock
2 Per Each Modular Block, R-41
3 Per Each Modular Block, R-60
4 Per Each Modular Block, FS-T
5 Per CYD Backfill, Structure, CIP
6 Per CYD Excavation, Earth
Refer to the plans for anticipated quantities. They are included to assist you in developing unit prices and a total lump sum bid, but remain for reference only. Final measured rock excavation quantity that varies from the anticipated quantity on the plans will be added or subtracted from the contract at the unit price. For the other unit prices, if the retaining wall is installed to the size shown on the plans, since it is a lump sum project, slight variations in the quantities for those items will not be added to or subtracted from the contract. Additional “Excavation, Earth” will only be paid for if the planned bottom of excavation as it is currently shown on the plans is determined to have unsuitable soils and the Geotechnical Engineer requires them to be removed to create a suitable bearing surface.
See sections 31 20 00 Earth Moving and 32 32 23 Segmental Retaining Walls for further details on measurement requirements of each unit priced item.