Project Manual Summary: Muskallonge Lake State Park Universal Access Path

This is a project manual and contract documents package for a construction project managed by the State of Michigan Department of Technology, Management and Budget (DTMB) and the Department of Natural Resources (MDNR). The project involves the demolition of an existing stairway to Lake Superior and construction of a new universal access path at Muskallonge Lake State Park located at 29881 County Road 407, Newberry, Michigan 49868. The work includes installation of concrete and helical foundations, new boardwalk, ADA gravel path, ADA parking space, new vault toilet, new site furnishings, site fencing, rehabilitation of existing gravel access drive, and site restoration. A mandatory pre-bid walk-through inspection is scheduled for Thursday, May 16, 2024, at 10:00 a.m. at the project site. Sealed bids are due on Wednesday, June 12, 2024, at 2:00 p.m. Eastern time via the SIGMA VSS electronic bidding system. The contract time for substantial completion is June 20, 2025, with final completion by July 18, 2025. Bids must remain valid for acceptance for sixty calendar days after the bid opening date. Construction operations are limited to Monday through Friday, 8:00 a.m. to 7:00 p.m., with the existing stairway and viewing platform available for public use from Friday evening through Monday morning.

The contract is structured as a single prime contract with a base bid of $50,000.00 as an allowance item, supplemented by unit price work for various foundation types and an add alternate for removal of the existing stairway and slope restoration. Bidders must submit a five percent (5%) bid security in the form of a certified check, money order, or bid bond. The contract requires performance and payment bonds for all bids over $50,000.00, along with comprehensive liability insurance, builder's risk insurance, and pollution liability insurance. Michigan prevailing wage rates apply, with federal Davis-Bacon Act requirements applicable if federal funding is utilized. The project is subject to Michigan soil erosion and sedimentation control regulations under 1994 PA 451, Part 91, and the contractor must submit an implementation plan to DTMB's Soil Erosion and Sedimentation Control Program prior to commencing earthwork. Additional requirements include compliance with Michigan residency provisions for fifty percent of employees, asbestos and lead abatement procedures if applicable, waste management planning with recycling objectives, and coordination with park operations to minimize public disruption. Liquidated damages are assessed at $500.00 per calendar day for failure to meet substantial completion and final completion dates.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT MANUAL

MUSKALLONGE LAKE

STATE PARK

UNIVERSAL ACCESS PATH

DEPARTMENT OF TECHNOLOGY,

MANAGEMENT AND BUDGET

DTMB FILE NO. 751/22438.ABG

PROJECT NO. 7136-22-0120

Date: April 25, 2024

DTMB-0415 (R 10/22)

PROJECT ADVERTISEMENT

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

STATE FACILITIES ADMINISTRATION

DESIGN & CONSTRUCTION DIVISION

This form is required for the advertisement of all construction projects. (1984 PA 431)

DTMB FILE NO. 751/22438.ABG

DATE

April 25, 2024

ADVERTISEMENT DATE

April 25, 2024

BID DUE DATE

Wednesday, June 12, 2024, @ 2:00 p.m.

EASTERN time

PROJECT NAME AND LOCATION (INCLUDE STREET ADDRESS)

Muskallonge Lake State Park Universal Access Path 29881 Co Rd 407 Newberry, MI 49868

WALK-THROUGH INSPECTION DATE, TIME, AND LOCATION

Thursday, May 16, 2024, at 10:00 am

Muskallonge Lake State Park 29881 Co Rd 407 Newberry, MI 49868

Mandatory Yes No

NOTE: An individual is only permitted to represent one bidder at a mandatory walk-through.

DESCRIPTION OF WORK: The project consists of demolition of the existing stairway to Lake Superior, construction of a new universal access path to Lake Superior including, but not limited to new boardwalk and ADA gravel path, new ADA parking, a new vault toilet, relocation of existing site furnishings and installation of new site furnishings, and other associated work as indicated in the Contract Documents.

Please NOTE:

• Bid responses and bid attachments MUST be uploaded to SIGMA VSS.

• Contractors should only submit a maximum of two (2) attachments (both being less than 6 MB) for bid responses. One attachment is to be bid documents (Bid Summary, Bid Schedule, Bid Bond, Certification forms, Signature Authority, etc.) and if applicable, the other attachment should be Qualified Disabled Veteran (QDV) information (DD214, Proof of 51% Ownership and Proof of Service-Connected Disability)

•• Do not wait until just before the 2:00 p.m. solicitation deadline to submit your bid response.

SIGMA VSS will not allow a proposal to be submitted after 2:00 p.m., even if a portion of the bid response has been uploaded.

•• If you experience issues or have questions regarding your electronic submission, you must contact the SIGMA Help Desk for assistance prior to the 2:00 p.m., solicitation deadline. You may contact the SIGMA Help Desk by telephone at 517.284.0540 or toll-free at 888.734.9749. You may also email the SIGMA Help Desk at sigma-procurement-helpdesk@michigan.gov

• Please email the Design and Construction Contract Specialists if you are having SIGMA VSS issues. Please include your SIGMA ticket number and any supporting documentation (i.e., screenshots) to Anne Watros (WatrosA@michigan.gov) and Don Klein (KleinD4@michigan.gov).

• You may be asked by our contract specialists to email your bid response. Emailed submissions will require DCD approval and will be handled on a case-by-case basis.

mailto:sigma-procurement-helpdesk@michigan.gov mailto:WatrosA@michigan.gov mailto:KleinD4@michigan.gov

• Approved emailed submissions MUST be received prior to 2:00 p.m. deadline to be considered responsive and responsible.

• Bid Responses should not be emailed to the Project Director.

5% Bid Security:

Required

Not Required

NIGP CODES: 90924, 90976, 91200, 91240, 91244, 91427, 91430, 91479, 91275

ACCEPTING QUESTIONS UNTIL: Wednesday, June 5, 2024

Please do not submit online questions via SIGMA VSS. ALL questions should be emailed to Zane Hyrkas at zane.hyrkas@ohm-advisors.com no later than 2:00 p.m., Eastern on Wednesday, June 5, 2024.

Documents may be obtained from:

https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfServi ce

PSC/Agency: OHM Advisors

Address: 424 Hancock, Street, Hancock, MI 49930

Phone: 906-482-0535

Email: courtney.babcock@ohm-advisors.com

Approved by:

mailto:zane.hyrkas@ohm-advisors.com https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService mailto:courtney.babcock@ohm-advisors.com

This is a Cover Sheet to the State’s Owner and Contractor Standard Construction Contract, known as the MICHSPEC Division 0

Specifications. The MICHSPEC Division 0 Specifications have been developed from the FORMSPEC Michigan Model, 1997 Edition. Although the State’s 2008 Version of the Division 0 Specifications are written as simply as practical, it is nonetheless advisable to consult with companion Guide to Specifiers when preparing specifications for a specific project. These Division 0 Specifications were developed by incorporating provisions and requirements furnished by the State into the FORMSPEC Michigan Model. These Division 0 Specifications have undergone detailed technical reviews by Department of Technology, Management and Budget, State Facilities Administration representatives and detailed legal reviews by the Department of the Attorney General for the State of Michigan. Specifiers are encouraged to consult with a Division 0 specifications specialist or an attorney knowledgeable in public contracts when preparing specifications for a specific project.

STATE OF MICHIGAN

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

STATE FACILITIES ADMINISTRATION

MICHSPEC 2008 VERSION, OWNER AND CONTRACTOR

STANDARD CONTRACT FORMS AND CONDITIONS OF THE CONTRACT

MICHSPEC No. 97.0820 − 00020 THROUGH 97.0820 − 00440

RELEASED ON NOVEMBER 1, 1997.

Developed from

Contract Forms and Conditions of the Contract

FORMSPEC Michigan Model and suggested for use with

Bidding Requirements

751/22438.ABG

DTMB/MDNR

UNIVERSAL ACCESS PATH

April 25, 2024

1997 Edition/R 02/24 Version

STATE OF MICHIGAN (OWNER & CONTRACTOR) TABLE OF CONTENTS

MICHSPEC DTMB 00010 − 1 (R 02/24)

SECTION 00010 TABLE OF CONTENTS

SECTION/PAGE NO.

SUBJECT INDEX

SECTION 00020 GLOSSARY ............................................................................................................................................. 00020 - 1

SECTION 00030 ADVERTISEMENT .................................................................................................................................. 00030 - 1

SECTION 00100 INSTRUCTIONS TO BIDDERS ............................................................................................................... 00100 - 1

ARTICLE 1 BIDDING DOCUMENT INTERPRETATIONS .................................................................................................. 00100 - 1

ARTICLE 2 QUALIFICATIONS OF BIDDERS ..................................................................................................................... 00100 - 1

ARTICLE 3 BIDDING DOCUMENTS; SITE CONDITIONS; SAFETY REQUIREMENTS; LAWS ....................................... 00100 - 2

ARTICLE 4 INTERPRETATIONS; ADDENDA .................................................................................................................... 00100 - 3

ARTICLE 5 BID SECURITY ................................................................................................................................................ 00100 - 3

ARTICLE 6 CONTRACT TIME; LIQUIDATED DAMAGES .................................................................................................. 00100 - 4

ARTICLE 7 MATERIALS AND EQUIPMENT ...................................................................................................................... 00100 - 4

ARTICLE 8 SUBCONTRACTORS ...................................................................................................................................... 00100 - 5

ARTICLE 9 BID FORM AND BID FORM ATTACHMENTS ................................................................................................. 00100 - 5

ARTICLE 10 PREPARATION AND SUBMISSION OF BIDS.................................................................................................. 00100 - 6

ARTICLE 11 BID WITHDRAWAL; BID MODIFICATION ........................................................................................................ 00100 - 6

ARTICLE 12 BID OPENING; OBJECTION TO THE AWARD ................................................................................................ 00100 - 7

ARTICLE 13 BIDS TO REMAIN OPEN .................................................................................................................................. 00100 - 7

ARTICLE 14 AWARD OF THE CONTRACT .......................................................................................................................... 00100 - 7

ARTICLE 15 EXECUTION OF THE AGREEMENT ................................................................................................................ 00100 - 9

ARTICLE 16 MOBILIZATION PAY ITEM ............................................................................................................................. 00100 -10 ARTICLE 17 SOIL EROSION AND SEDIMENTATION CONTROL–FINE FOR NON-COMPLIANCE .................................. 00100 -10 ATTACHMENT A TO SECTION 00100: BIDDER'S CHECK LIST........................................................................................ 00110 - 1

SECTION 00120 SUPPLEMENTARY INSTRUCTIONS ..................................................................................................... 00120 - 1

SECTION 00210 INFORMATION FOR BIDDERS .............................................................................................................. 00210 - 1

SECTION 00300 BID SUMMARY ...................................................................................................................... 00300 - SUMMARY

SECTION 00300 BID FORM ............................................................................................................................................... 00300 - 1

ARTICLE 1 THIS BID IS SUBMITTED TO THE STATE OF MICHIGAN ("THE OWNER"). ................................................. 00300 - 1

ARTICLE 2 THE BIDDER'S REPRESENTATIONS................................................................................................................ 00300 - 1

ARTICLE 3 TIME OF COMPLETION ..................................................................................................................................... 00300 - 2

ARTICLE 4 ATTACHMENTS INCLUDED WITH THIS BID .................................................................................................... 00300 - 2

ARTICLE 5 DEFINED TERMS ............................................................................................................................................... 00300 - 2

ARTICLE 6 BID SCHEDULE .................................................................................................................................................. 00300 - 3

ARTICLE 7 SCHEDULE OF CHANGE ORDER PRICES ...................................................................................................... 00300 - 5

ARTICLE 8 BID SUBMITTED ON ......................................................................................................................................... 00300 - 6

SECTION 00310 BID BOND ............................................................................................................................................... 00310 - 1

SECTION 00320 NONCOLLUSION AFFIDAVIT ................................................................................................................ 00320 - 1

SECTION 00410 BID BREAKDOWN ................................................................................................................................. 00410 - 1

SECTION 00420 QUESTIONNAIRE ................................................................................................................................... 00420 - 1

ARTICLE 1 ORGANIZATION ............................................................................................................................................... 00420 - 1

ARTICLE 2 SPECIALTY CONTRACTOR LICENSES .......................................................................................................... 00420 - 1

ARTICLE 3 EXPERIENCE ................................................................................................................................................... 00420 - 1

ARTICLE 4 ADDITIONAL QUALIFICATIONS ...................................................................................................................... 00420 - 2

ARTICLE 5 REFERENCES .................................................................................................................................................. 00420 - 2 REFERENCES ATTACHMENT ......................................................................................................................... 00420 - 3

SECTION 00430 LIST OF SUBCONTRACTORS ............................................................................................................... 00430 - 1

SECTION 00440 SCHEDULE OF MATERIALS AND EQUIPMENT .................................................................................. 00440 - 1

ARTICLE 1 BID MATERIALS AND EQUIPMENT −LISTED (NAMED OR SPECIFIED) ITEMS ........................................... 00440 - 1

ARTICLE 2 BID MATERIALS AND EQUIPMENT − OPEN SPECIFICATIONS .................................................................... 00440 - 3

SECTION 00500 AGREEMENT .......................................................................................................................................... 00500 - 1

ARTICLE 1 THE CONTRACT; THE PROJECT; THE WORK .............................................................................................. 00500 - 1

ARTICLE 2 CONTRACT DOCUMENTS .............................................................................................................................. 00500 - 1

ARTICLE 3 CONTRACT PRICE ........................................................................................................................................... 00500 - 2

ARTICLE 4 CONTRACT TIME; LIQUIDATED DAMAGES ................................................................................................... 00500 - 2

ARTICLE 5 PAYMENTS TO CONTRACTOR ...................................................................................................................... 00500 - 3

MICHSPEC DTMB 00010 − 2 (R 02/24)

ARTICLE 6 THE PROFESSIONAL SERVICES CONTRACTOR ......................................................................................... 00500 - 3

ARTICLE 7 CONTRACTOR'S REPRESENTATIONS .......................................................................................................... 00500 - 3

ARTICLE 8 MISCELLANEOUS ............................................................................................................................................ 00500 - 3

ARTICLE 9 NOTICE AND SERVICE .................................................................................................................................... 00500 - 4

SECTION 00520 ATTACHMENT “A” TO AGREEMENT ................................................................................................... 00520 - 1

SECTION 00610 PERFORMANCE BOND ........................................................................................................................ 00610 - 1

SECTION 00620 PAYMENT BOND ................................................................................................................................... 00620 - 1

SECTION 00700 GENERAL CONDITIONS ........................................................................................................................ 00700 - 1

ARTICLE 1 INTERPRETATIONS ........................................................................................................................................... 00700 - 1

1.1 Section 00020 Glossary:............................................................................................................................................... 00700 - 1

1.2 Intent of the Contract Documents: ................................................................................................................................ 00700 - 1

1.3 Priority of the Contract Documents: .............................................................................................................................. 00700 - 2

1.4 Interpretation of Indemnification Provisions: ................................................................................................................. 00700 - 2

1.5 Additional Interpretations: ............................................................................................................................................. 00700 - 2

1.6 Ownership and Use of the Contract Documents: .......................................................................................................... 00700 - 3

1.7 Copies of the Contract Documents: ............................................................................................................................... 00700 - 3

ARTICLE 2 THE OWNER−GENERAL PROVISIONS .......................................................................................................... 00700 - 3

2.1 Availability of Lands, Areas, Properties and Facilities: ................................................................................................. 00700 - 3

2.2 Reference Points; Base Lines and Benchmarks: .......................................................................................................... 00700 - 3

2.3 Stop Work Order: .......................................................................................................................................................... 00700 - 3

2.4 Limitations on the Owner’s Responsibilities: ................................................................................................................ 00700 - 4

2.5 Additional General Provisions: ...................................................................................................................................... 00700 - 4

2.6 Partnering Charter: ....................................................................................................................................................... 00700 - 4

ARTICLE 3 THE PROFESSIONAL − GENERAL PROVISIONS .......................................................................................... 00700 - 4

3.1 Owner’s Representative: ............................................................................................................................................. 00700 - 4

3.2 Clarifications and Interpretations: ................................................................................................................................. 00700 - 4

3.3 Minor Variations and No-Cost Changes; Minor Delays:................................................................................................ 00700 - 5

3.4 Determinations by the Professional: ........................................................................................................................... 00700 - 5

3.5 Limitations on the Professional’s Responsibilities: ....................................................................................................... 00700 - 5

ARTICLE 4 CONTROL OF WORK − GENERAL PROVISIONS ........................................................................................... 00700 - 5

4.1 Review of the Contract Documents: ............................................................................................................................. 00700 - 5

4.2 Management, Supervision, and Personnel: .................................................................................................................. 00700 - 5

4.3 Materials and Equipment: ............................................................................................................................................. 00700 - 6

4.4 Concerning Control of Work: ........................................................................................................................................ 00700 - 6

4.5 Patent Fees and Royalties: ........................................................................................................................................... 00700 - 7

4.6 Use of Premises: .......................................................................................................................................................... 00700 - 7

4.7 Record Documents: ...................................................................................................................................................... 00700 - 7

4.8 Emergencies: ................................................................................................................................................................ 00700 - 8

4.9 Indemnification: ............................................................................................................................................................ 00700 - 8

ARTICLE 5 SUBCONTRACTORS AND SUPPLIERS .......................................................................................................... 00700 - 8

5.1 Employment of Subcontractors: .................................................................................................................................... 00700 - 8

5.2 "Or Equal" and Substitute Materials and Equipment:.................................................................................................... 00700 - 9

5.3 The Contractor’s Continuing Responsibilities: ............................................................................................................ 00700 - 9

ARTICLE 6 SUBMITTALS .................................................................................................................................................... 00700 - 9

6.1 Shop Drawing, Sample and Other Technical Submittals: ............................................................................................. 00700 - 9

6.2 Review and Return of Technical Submittals: .............................................................................................................. 00700 - 10

6.3 Progress Schedule Submittals: ................................................................................................................................... 00700 - 10

6.4 Review and Return of Progress Schedule Submittals: ............................................................................................... 00700 - 10

6.5 Additional Provisions Concerning Submittals: ............................................................................................................ 00700 - 10

ARTICLE 7 LEGAL REQUIREMENTS; INSURANCE ........................................................................................................ 00700 - 11

7.1 Laws; Permits (Which Include Approvals and Licenses): ........................................................................................... 00700 - 11

7.2 Sales and Use Tax and Other Similar Taxes: ............................................................................................................. 00700 - 12

7.3 Safety and Protection: ................................................................................................................................................ 00700 - 12

7.4 Bonds and Insurance - General Requirements: .......................................................................................................... 00700 - 12

7.5 The Contractor’s Liability Insurance: ........................................................................................................................ 00700 - 12

7.6 Pollution Liability Insurance: ....................................................................................................................................... 00700 - 13

7.7 Property Insurance (Builder's All Risk Insurance): ...................................................................................................... 00700 - 13

7.8 Waiver of Rights: ........................................................................................................................................................ 00700 - 13

7.9 Receipt and Application of Proceeds: ......................................................................................................................... 00700 - 13

MICHSPEC DTMB 00010 − 3 (R 02/24)

7.10 Unfair Labor Practice: ................................................................................................................................................. 00700 - 13

7.11 Michigan Right-To-Know Law: .................................................................................................................................... 00700 - 13

7.12 Nondiscrimination: ...................................................................................................................................................... 00700 - 14

7.13 Michigan Residency for Employees: .......................................................................................................................... 00700 – 14

7.14 Prevailing Wages: ...................................................................................................................................................... 00700 – 14

ARTICLE 8 PROSECUTION; SUBSTANTIAL COMPLETION ........................................................................................... 00700 - 15

8.1 Starting the Work: ....................................................................................................................................................... 00700 - 15

8.2 Revision 0 (Rev. 0) Schedule and Cost Submittals: ................................................................................................... 00700 - 15

8.3 Compliance with Contract Time Requirements: .......................................................................................................... 00700 - 15

8.4 Substantial Completion: .............................................................................................................................................. 00700 - 15

8.5 Partial Use: ................................................................................................................................................................. 00700 - 16

8.6 Division of Responsibilities: ........................................................................................................................................ 00700 - 16

8.7 Suspension of Work: .................................................................................................................................................. 00700 - 16

8.8 Sharing of Total Float on Non-Critical Paths: .............................................................................................................. 00700 - 16

ARTICLE 9 WARRANTY; TESTS, INSPECTIONS, AND

APPROVALS; CORRECTION OF WORK ....................................................................................................... 00700 - 17

9.1 Warranty: ................................................................................................................................................................... 00700 - 17

9.2 Tests, Inspections and Approvals: ............................................................................................................................. 00700 - 17

9.3 Uncovering Work: ...................................................................................................................................................... 00700 - 17

9.4 Correction of Work: .................................................................................................................................................... 00700 - 17

9.5 Special Correction Period Requirements: .................................................................................................................. 00700 - 18

9.6 Special Maintenance Requirements: ......................................................................................................................... 00700 - 18

ARTICLE 10 CHANGES ..................................................................................................................................................... 00700 - 19

10.1 Changes in the Work: ................................................................................................................................................ 00700 - 19

10.2 Differing Subsurface or Physical Site Conditions: ...................................................................................................... 00700 - 19

10.3 Responsibilities for Underground Utilities: ................................................................................................................. 00700 - 20

10.4 Hazardous Material Conditions: ................................................................................................................................. 00700 - 20

10.5 Incidents with Archaeological Features: .................................................................................................................... 00700 - 20

10.6 Unit Price Work: ......................................................................................................................................................... 00700 - 21

10.7 Cash Allowances; Provisionary Allowances: ............................................................................................................. 00700 - 21

10.8 Change Orders; Change Authorizations: ................................................................................................................... 00700 - 21

ARTICLE 11 CHANGES IN CONTRACT PRICE; CHANGES IN

CONTRACT TIME ......................................................................................................................................... 00700 - 22

11.1 General Provisions: ................................................................................................................................................... 00700 - 22

11.2 Changes in Contract Time: ........................................................................................................................................ 00700 - 22

11.3 Methods for Making Adjustments in Contract Price: .................................................................................................. 00700 - 22

11.4 Labor, Subcontract and Material/Equipment Costs: .................................................................................................. 00700 - 23

11.5 Construction Equipment Costs: ................................................................................................................................. 00700 - 23

11.6 Rented or Leased Construction Equipment: .............................................................................................................. 00700 - 23

11.7 Owned Construction Equipment: ............................................................................................................................... 00700 - 24

11.8 General Conditions Costs: ......................................................................................................................................... 00700 - 24

11.9 Limitations on Allowable Costs: ................................................................................................................................. 00700 - 24

11.10 Costs Covered by the Fee for the Work Involved (and not Allowable as Cost of the Work Involved): ........................ 00700 - 24

11.11 Limits on the Fee for the Work Involved: .................................................................................................................... 00700 - 25

11.12 Fee for Unabsorbed Home Office Overhead: ............................................................................................................. 00700 - 25

11.13 Changes in Contract Time for Early Completion: ........................................................................................................ 00700 - 25

11.14 Access to Records: ..................................................................................................................................................... 00700 - 26

11.15 Price Reduction for Defective Cost and Pricing Data: ................................................................................................ 00700 - 26

ARTICLE 12 PROGRESS PAYMENTS; FINAL PAYMENT ............................................................................................... 00700 - 26

12.1. Schedule of Values: ................................................................................................................................................... 00700 - 26

12.2 Requests for Payment: .............................................................................................................................................. 00700 - 27

12.3 Review of Request for Payment; Intent of Review: .................................................................................................... 00700 - 27

12.4 Refusal to Make or to Recommend Payment: .......................................................................................................... 00700 - 27.

12.5 Final Request for Payment: ....................................................................................................................................... 00700 - 27

12.6 Final Payment and Acceptance: ................................................................................................................................ 00700 - 28

12.7 Contractor’s Continuing Obligation: ......................................................................................................................... 00700 - 28

12.8 Waiver of Claims: ...................................................................................................................................................... 00700 - 28

ARTICLE 13 OTHER WORK .............................................................................................................................................. 00700 - 28

13.1 Related Work at Site: ................................................................................................................................................. 00700 - 28

13.2 Coordination Requirements: ...................................................................................................................................... 00700 - 29

13.3 Claims Between the Contractor and Other Parties: ................................................................................................. 00700 - 29

MICHSPEC DTMB 00010 − 4 (R 02/24)

ARTICLE 14 TERMINATION .............................................................................................................................................. 00700 - 29

14.1 Notice Requiring Assurance of Due Performance: .................................................................................................... 00700 - 29

14.2 Contractor Default and Termination for Cause: ........................................................................................................ 00700 - 30

14.3 Surety Default: ........................................................................................................................................................... 00700 - 31

14.4 Termination for Convenience of the Owner: .............................................................................................................. 00700 - 31

14.5 The Contractor May Suspend Work: ....................................................................................................................... 00700 – 31

ARTICLE 15 DISPUTES .................................................................................................................................................... 00700 - 31

15.1 Claims Under This Article: ......................................................................................................................................... 00700 - 31

15.2 Requirement for Certification of Contractor Claims: ................................................................................................. 00700 - 32

15.3 Recommendations or Decisions from the Professional: ........................................................................................... 00700 - 32

15.4 Determinations by the Director-DCD: ....................................................................................................................... 00700 - 32

15.5 Supplements to AAA Arbitration: ............................................................................................................................... 00700 - 33

15.6 Interest on a Judgment; Payment of Judgment: ........................................................................................................ 00700 - 33

15.7 Venue; Flow-Through Provision: ............................................................................................................................... 00700 - 33

SECTION 00800 SUPPLEMENTARY CONDITIONS ....................................................................................................... 00800 - 1

SUMMARY 011000

UNIT PRICE 012200

ALTERNATES 012300

SUBSTIUTION PROCEDURES 012500

PROJECT MANAGEMENT AND COORDINATION 013100

SUBMITTAL PROCEDURES 013300

QUALITY REQUIREMENTS 014000

TEMPORARY FACILITIES AND CONTROLS 015000

TEMPORARY TREE AND PLAN PROTECTION 015639

PRODUCT REQUIREMENTS 016000

EXECUTION 017300

CLOSEOUT PROCEDURES 017700

PROJECT RECORD DOCUMENTS 017839

SECTION 01310 PROGRESS SCHEDULE ...................................................................................................................... 01310 - 1

APPENDIX I: SPECIAL WORKING CONDITIONS

APPENDIX II: SPECIAL PROJECT PROCEDURES

APPENDIX III: WAGE RATE SCHEDULES

APPENDIX IV: PRE-DEMOLITION ASBESTOS AND LIMITED LEAD_CONTAINING PAINT SURVEY

APPENDIX V: PERMITS

CLOSEOUT DOCUMENTS

Contractor Closeout Checklist

Project Final Completion Checklist

Guarantee and Indebtedness Statement

Certificate of Substantial Completion

DRAWINGS - BOUND SEPARATELY SHEETS THRU

COVER DT

NOTES & LEGEND C-001

OVERALL MAP C-010

SOIL BORINGS C-090

SOIL BORINGS C-091

SOIL BORINGS C-092

REMOVAL PLAN C-120

REMOVAL PLAN C-121

CONSTRUCTION PLAN C-130

CONSTRUCTION PLAN C-131

GRADING PLAN C-170

MICHSPEC DTMB 00010 − 5 (R 02/24)

BOARDWALK DETAILS C-501

TYPICAL SITE DETAILS C-502

NOTES S-001

FOUNDATIONS S-101

STRUCTURAL DETAILS S-501

OVERPASS ELEVATION S-502

TECHNICAL SPECIFICATIONS

STRUCTURAL DEMOLITION 024116

SELECTIVE DEMOLITION 024119

CONCRETE FORMING AND ACCESSORIES 031000

CONCRETE REINFORCING 032000

CAST-IN-PLACE CONCRETE 033000

PRECAST STRUCTURAL CONCRETE 034100

METAL RAILINGS 055200

EXTERIOR ROUGH CARPENTRY 061063

FIBERGLASS REINFORCED GRATINGS 067413

SITE CLEARING 311000

EARTH MOVING 312000

STEEL HELICAL PILES 316216.11

CONCRETE PAVING 321313

PAVEMENT MARKINGS 321723

SITE FURNISHINGS 323300

TURF AND GRASSES 329200

CONCRETE VAULTS AND CHAMBERS 330563

STATE OF MICHIGAN (OWNER AND CONTRACTOR) GLOSSARY

MICHSPEC DTMB 00020 - 1 (R 02/24)

SECTION 00020 GLOSSARY

1.1 Defined Terms:

1.1.1. The following terms or relative pronouns used in

Division 0 of the Specifications have these intent and meanings:

Activity− An element in the Progress Schedule establishing a requisite step, or the time and resources required, for completing the part of the Work associated with that Activity.

Addenda− Written instruments that are used by the Owner and/or Professional to incorporate interpretations or clarifications, modifications, and other information into the Bidding Documents. An Addendum issued after Bid opening to those Bidders who submitted a Bid, for the purpose of rebidding the Work without readvertising, is referred to as a post-Bid Addendum.

Agreement− The written agreement between the Owner and Contractor covering the Work to be furnished and performed.

Alternate− Refers to Work specified in the Bidding Documents for which the Bidder shall bid a Bid Price in the space provided in the Schedule of Alternates in Section 00300 Bid Form.

Apparent Low Bidder:- Those Bidders whose Base Bid, when added to those specific Alternates the Owner intends to accept, yields the three lowest sums of Base Bid and Alternates. Additional Bidders may be considered Apparent Low Bidders if their Base Bid, when added to those specific Alternates the Owner intends to accept, yields a sum within 10% of the lowest of the Apparent Low Bidder’s sum. If a qualified disabled veteran meets the requirements of the contract solicitation and with the veteran’s preference is the lowest Bidder is considered the Apparent Low Bidder.

Archaeological Feature− Any prehistoric or historic deposit of archaeological value, as determined by a representative of a State agency that is duly authorized to evaluate such findings and render such judgments. An Archaeological Feature deposit may include, but is not limited to Indian habitations, ceremonial sites, abandoned settlements, treasure trove, artifacts, or other objects with intrinsic archaeological value and that relate to the history and culture of the State of Michigan.

As-Planned Schedule− The Contractor’s Revision 0 Progress Schedule returned to the Contractor as "Resubmittal Not Required," with or without comments or objections noted.

Authorized Technical Data− Information and data contained in a report of exploration and tests of subsurface conditions that are expressly designated in paragraph 2.0 of Section 00210 Information for Bidders. Also, any physical data (dimension, location, conditions, etc.) contained in those drawings of physical conditions of existing surface and subsurface facilities identified in paragraph 3.0 of Section 00210 Information for Bidders.

Bar Chart Schedule− Activity schedule, in a bar chart format, that accounts for the entire Work at a level of detail commensurate with the Progress Schedule requirements of the Contract Documents.

STATE OF MICHIGAN MODEL

Developed from FORMSPEC Michigan Model.

Bid− Written offer by a Bidder for the Work, as specified, which designates the Bidder’s Base Bid and Bid Prices for all Alternates. The term Bid includes a Rebid.

Bidder− The Person acting directly, or through an authorized representative, who submits a Bid directly to the Owner.

Bidding Documents− The proposed Contract Documents as advertised, and all Addenda issued before Bid opening, and after Bid opening, if the Work is rebid without readvertising.

Bid Price− The Bidder's price for a lump sum item of Work, or the product of the Bidder's unit price for an item of Unit Price Work times the quantity given on the Bid Form for that item.

Bid Security− A security serving as a guarantee that the Bidder will conform to all conditions requisite for its return or as liquidated damages in the event of failure or refusal to conform.

Bidding Requirements− The Advertisement, Instructions to Bidders (including Attachment A), Supplementary Instructions, Information for Bidders, Bid Form, Bid Form Attachments and Qualification Submittals, as advertised and as modified by Addenda, and any other Section included within Division 0 of the Bidding Documents for the purpose of governing bidding and award of the Contract.

*AD Board− The Administrative Board of the State of Michigan.

Bonds− Section 00310 Bid Bond, Section 00610 Performance Bond and Section 00620 Payment Bond are security furnished by the Contractor, as required by the Contract Documents.

Business Day− Any Day except Saturdays, Sundays and holidays observed by the Owner.

Bulletin− A standard DTMB or other PSC form used by the PSC & Owner to describe a change in the Work under consideration by the Owner and to request the Contractor to submit a proposal for the corresponding adjustment in Contract Price and/or Contract Time, if any.

Calendar Day− Every day shown on the calendar, Saturdays, Sundays, and holidays included.

Cash Allowance− An Owner-specified sum included within the Contract Price to reimburse the Contractor for the actual purchase/furnished cost of materials and/or equipment or other designated items, as specifically provided in the Contract Documents. Although the scope (e.g., the required quantity) of any Work covered by a Cash Allowance is sufficiently

MICHSPEC DTMB 00020 - 2 (R 02/24)

detailed in the Contract Documents for the purposes of bidding the required labor costs, Subcontract costs, construction equipment costs and general conditions costs and Fee, it is understood that the required materials, equipment or other designated items are of uncertain purchase cost at the time of Bid or are yet to be specified in more detail by the Professional as to quality, appearance, durability, finish and such other necessary features affecting purchase price.

Change Authorization− A written order issued and signed by the Professional, which directs changes in the Work that require no adjustment in Contract Price or Contract Time, or which allows for variations in the quantities of Unit Price Work.

Change Order− A written order issued and signed by the Owner, which amends the Contract Documents for changes in the Work or an adjustment in Contract Price and/or Contract Time, or both.

Construction Mechanic− A skilled or unskilled mechanic, laborer, worker, helper, assistant, or apprentice working on a state project but shall not include executive, administrative, professional, office, or custodial employees

Contact Person− Individual in the employ of the Professional or the Owner who is designated as the sole point of contact for prospective Bidders for requests or inquiries concerning the Work and/or the Bidding Documents.

Contract− Refer to the definition in paragraph 1.1 of Section 00500 Agreement. The term “Contract” encompasses the legal obligations of the Owner and Contractor, as defined by the Contract Documents.

Contract Award− The official action of the Board, the Director-SFA or the Director-DCD awarding the Contract to the Contractor.

Contract Documents− Those documents itemized or designated in paragraphs 2.2 through 2.4 of Section 00500 Agreement.

Contract Float− Calendar Days between the Contractor's anticipated date for early completion of the Work, or of a specified portion of the Work, if any, and the corresponding Contract Time.

Contract Price− The Contract price for the Work, or a designated portion of the Work, as designated in Section 00500 Agreement or elsewhere in the Contract Documents, is the total compensation, including authorized adjustments, payable by the Owner to the Contractor (subject to provisions for Unit Price Work).

Contract Times− The Contract Times for the entire Work are the periods allowed, including authorized adjustments, for Substantial Completion and final completion of the Work. The Contract Times for a designated portion of the Work are the periods allowed for Substantial Completion and final completion of any such portion of the Work, as specified in the Contract Documents.

Contractor− Person named "the Contractor" in Section 00500 Agreement with whom the Owner has entered into the Contract.

Correction Period− The period during which the Contractor shall, in accordance with the Contract Documents, (a) correct or, if rejected, remove, and replace Defective Work, and (b) maintain warranties for materials and equipment in full force and effect.

Cost of the Work Involved− The sum of all costs that would be, or were, necessarily incurred by the Contractor in providing any Work Involved with the related change, less the costs that would be, or would have been, incurred by the Contractor to provide such Work without the related change.

CPM Schedule− Computerized, Activity-based Progress Schedule, using Critical Path Method (CPM) techniques, and accounting for the entire Work at a level of detail commensurate with the Progress Schedule requirements of the Contract Documents.

Critical Path Method (CPM)− The Critical Path Method of planning and scheduling. The term “Critical Path” denotes a sequence of Activities controlling achievement of a specified Contract Time.

Date of Commencement of the Contract Time− The date when the Contract Time starts to run.

Defective− An adjective which when referring to or when applied to the term “Work” refers to (a) Work not conforming to the Contract Documents or not meeting the requirements of any inspection, test, or approval, or (b) Work itemized in a Punch List which the Contractor fails to complete or correct within a reasonable time after issuance of the Punch List by the Professional.

Defective Work/Non-Compliance Notice – A DTMB-0499 form or equivalent issued to identify defective or non-compliant conditions requiring response and remedy by the Contractor.

Delay− Any act or omission or other event that in any manner adversely affects or alters the schedule, progress or completion of all or any part of the Work. Delay is a generic term intended to include deferral, stoppage, slow down, interruption and extended performance, and all related hindrance, rescheduling, disruption, interference, inefficiency and productivity and production losses.

*Department (DTMB)− Department of Technology, Management and Budget of the State of Michigan. Director is the Director of the Department.

Director-SFA- The Director of DTMB State Facilities Administration.

Director-DCD- The Director of DTMB State Facilities Administration, Design and Construction Division

Division− Each of the numbered, distinct parts (starting with Division 0) into which the Specifications are divided.

MICHSPEC DTMB 00020 - 3 (R 02/24)

Drawings− Part of the Contract Documents showing the Work.

Drawings shall neither serve nor be used as Shop Drawings.

Early (Late) Dates− Early (late) times of performance for the Activities.

Emergency− A condition affecting the safety or protection of persons, or the Work, or property at or adjacent to the site.

Fee for the Work Involved (Fee)− A negotiated, percentage mark-up on the Cost of the Work Involved which is allowed to the Contractor for (a) reasonable administrative costs, and (b) negotiated, reasonable profit on the Cost of the Work Involved.

General Requirements− Division 1 of the Specifications.

Hazardous Material− Asbestos, ACBMs, PCBs,…