751.22438.ABG - MLSP ARPA II&M - A.1 Universal Access Path - Plans 1.pdf
PDF 6 MB Posted
- Solicitation number
- RFQ 171 240000000410 3
- Issued by
- Livingston County, Michigan
About this file
This is a set of civil construction plans prepared by OHM Advisors for the Michigan Department of Natural Resources and the Department of Technology, Management and Budget for the Muskallonge Lake State Park Universal Access Path project located at 29881 County Road 407, Newberry, Michigan. The project involves renovating and improving universal access to the park's beach area through construction of a boardwalk system, accessible pathways, and associated site improvements. The scope of work includes removal of existing staircase and foundations, installation of approximately 92 feet of boardwalk with both wood decking and fiberglass grating sections, construction of concrete sidewalks, creation of accessible gravel paths with geocell stabilization, installation of ADA-compliant viewing rails and ramps, benches, signage, and a vault toilet facility. The construction plan identifies Alternate #1 as a removal-only option and Alternate #2 as an expanded scope including concrete sidewalk, ADA parking space, grill, and vault toilet work. General construction notes specify use of low ground pressure equipment not exceeding 8,000 pounds gross weight and 10 PSI ground pressure during initial phases, with hand construction only after material delivery and footing installation to minimize ground disturbance.
The plans require compliance with Michigan Department of Transportation Standard Specifications for Construction (2020 Edition), AASHTO geometric design standards, and the Michigan Manual of Uniform Traffic Control Devices. Concrete specifications require MDOT Grade P1 with minimum cement content of 526 pounds per cubic yard. Contractors must secure all permits and bonds prior to construction, call Miss Dig (800-482-7171) at least three working days before excavation, and implement soil erosion and sedimentation control measures within one acre or 500 feet of waters of the state. Permanent erosion control measures must be completed within five calendar days of final grading. The project engineer is Zane Hyrkas, PE at OHM Advisors (906-482-0535), and the project contact is at Muskallonge Lake State Park. Utility coordination is required with Cloverland Electric and Hiawatha Telephone. The bid set date is April 25, 2024, and construction is marked as preliminary and not for construction.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AREA LOCATION
MAP
CHICAGO
MILWAUKEE LAKE
MICHIGAN
DETROIT
LAKE
HURON
SAULT
STE
MARIE
MARQUETTE
HOUGHTON
LAKE
SUPERIOR
DULUTH
MINNEAPOLIS
GREEN BAY
ESCANABA
TRAVERSE
CITY
GRAND RAPIDS
LANSING
PROJECT
LOCATION
CHAMPION
AREA LOCATION
MAP
GENERAL NOTES:
I Certify That The Civil Plans Were Prepared Under My Direct Supervision
PROJECT LOCATION MAP
OHM PROJECT No.
DATE:
DTMB File No.
7136-22-0120 04/25/2024
BID SET
751.22438.ABG
OWNER:
MUSKALLONGE STATE PARK
29881 CO RD 407,
NEWBERRY, MI 49868
ARCHITECT/ENGINEER:
OHM ADVISORS
424 HANCOCK STREET
HANCOCK, MI 49930
906.482.0535
PROJECT CONTACT
ZANE HYRKAS, PE
MUSKALLONGE LAKE STATE PARK UNIVERSAL ACCESS PATH
29881 CO RD 407
NEWBERRY, MI 49868
1. GENERAL NOTES APPLY TO ALL DRAWINGS.
2. EXCEPT WHERE OTHERWISE INDICATED ON THESE PLANS, OR IN THE CONTRACT DOCUMENTS
AND SPECIFICATIONS CONTAINED HEREIN, ALL MATERIALS AND WORKMANSHIP SHALL BE
ACCORDING TO THE MICHIGAN DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS
FOR CONSTRUCTION, 2020 EDITION.
3. DO NOT SCALE DRAWINGS. ANY DIMENSIONAL INFORMATION REQUIRED WHICH IS NOT
INDICATED ON DRAWING DIMENSION STRINGS SHALL BE OBTAINED FROM THE ENGINEER.
4. CONTRACTOR SHALL VERIFY ALL EXISTING DIMENSIONS AND CONDITIONS. IF DISCREPANCIES
ARE FOUND, NOTIFY ENGINEER BEFORE PROCEEDING WITH WORK.
5. CONTRACTOR SHALL PAY ALL PERMIT FEES AND FEE REQUIRED FOR ANY PERMIT EXTENSIONS
6. CONTRACTOR SHALL MAINTAIN THE IMMEDIATE CONSTRUCTION SITE IN A SECURE, CLEAN AND
SAFE MANNER.
7. PROTECTION: CONTRACTORS SHALL BE SOLELY RESPONSIBLE FOR TAKING ALL STEPS
NECESSARY TO PROTECT THE PUBLIC FROM INJURY AND ADJACENT PROPERTY FROM DAMAGE
DURING CONSTRUCTION AS REQUIRED BY LOCAL CODES.
8. REPAIR ALL EXISTING CONSTRUCTION AFFECTED BY NEW WORK TO ITS ORIGINAL CONDITION.
9. THE LOCATION OF ALL PUBLIC UTILITIES SHOWN ON THESE PLANS IS TAKEN FROM THE BEST
AVAILABLE DATA. PURSUANT TO ACT 174 OF THE P.A. OF 2013, AS A CONDITION OF THIS
CONTRACT, NOTICE SHALL BE GIVEN TO MISS DIG PRIOR TO UNDERGROUND WORK TO BE
PERFORMED IN ACCORDANCE WITH THIS CONTRACT. PHONE (800) 482-7171.
MUSKALLONGE STATE PARK
UNIVERSAL ACCESS PATH
PROJECT LOCATION LAKE SUPERIOR
I Certify That The Structural Plans Were Prepared Under My Direct Supervision
P:\7
_72 00\
0_M usk allo nge _St ate _Pa rk\A 1_R eno vat e S tair wa y\D raw ing s\S ite\
She ets
\A1 _22
0C
OV
.dw g Ap r 25 , 2
- 1
:19 pm
D R
A W
IN
G
P A
TH
OHM-ADVISORS.COM
ARCHITECTS ENGINEERS PLANNERS
CO
PY
RI
G
HT
O
HM
A
DV
IS
O
RS
. A
LL
D
RA
W
IN
G
S
AN
D W
RI
TT
EN
M
AT
ER
IA
LS
A
PP
EA
RI
NG
H
ER
EI
N
CO
NS
TI
TU
TE
T
HE
O
RI
G
IN
AL
A
ND
U
NP
UB
LI
SH
ED
W
O
RK
O F
O
HM
A
DV
IS
O
RS
A
ND
T
HE
S
AM
E
M
AY
N O
T
BE
D
UP
LI
CA
TE
D, D
IS
TR
IB
UT
ED
, O R
DI
SC
LO
SE
D W
IT
HO
UT
P
RI
O
R W
RI
TT
EN
C
O
NS
EN
T
O F
O
HM
A
DV
IS
O
RS
R
CL
IE
NT
P
RO
J N
O
RE
VI
SI
ON
DA
TE
DE
SC
RI
PT
IO
N
DI
SC
IP
LIN
E
LE
AD
PM
PR
OJ
EC
T
NU
MB
ER
IS
SU
ED
F
OR
M
IC
H
IG
A N
D E
P A
R
TM
E N
T O
F N
A
TU
R A
L R
E S
O U
R C
E S
M U
S K
A
LL
O N
G E
L A
K E
S P
U N
IV
E
R S
A L
A C
C E
S S
P A
TH
1 C
O
RD
7 N
EW
BE
RR
Y, M I 4
CO
VE
R
DT
-2 2-
ZH
ZH
1/2
.A
BG
/25
/20
BI
D
SE
T
PL
U
RI
BU
E S
U N
U M
C I
R C
U M
S P
I C
E
S I
Q U
ER
EI
S
PE
NI
NS
U L
A M
A
MO
E N
A M
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O F
M
IC
H
IG
A N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
Sheet List Table Sheet Number Sheet Title
MUSKALLONGE LAKE
MUSKALLONGE LAKE STATE PARK
http://www.ohm-advisors.com
GENERAL NOTES
1. IT IS THE CONTRACTOR'S RESPONSIBILITY TO SECURE ALL PERMITS AND POST ALL BONDS PRIOR
TO CONSTRUCTION, OR ENSURE THAT ALL REQUIRED PERMITS AND BONDS HAVE BEEN OBTAINED
PRIOR TO CONSTRUCTION.
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING CORNERS WHEN WORKING WITHIN
THE ROW OF MDOT.
3. CONTRACTOR SHALL KEEP ALL PUBLIC STREETS ADJACENT TO THE SITE FREE OF CONSTRUCTION DEBRIS AND SEDIMENT. DUST SHALL BE CONTROLLED ON SITE AT ALL TIMES BY WATERING OR
OTHER NECESSARY MEANS.
4. THE CONTRACTOR SHALL REPAIR ANY DAMAGE TO STREETS, SIDEWALKS OTHER STRUCTURES AND
ADJACENT AREAS CAUSED BY DEMOLITION, HAULING, OR OTHER PERFORMANCE OF THE WORK.
5. THE CONTRACTOR SHALL TAKE ALL NECESSARY ACTIONS TO ENSURE WORKER SAFETY AND
COMPLIANCE WITH MI-OSHA GUIDELINES.
6. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING ALL DIMENSIONS PRIOR TO CONSTRUCTION.
ADJUST WORK AS REQUIRED TO MEET FIELD DIMENSIONS AT NO ADDITIONAL COST TO THE OWNER.
DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER AS SOON AS POSSIBLE.
7. THE IMPROVEMENTS COVERED BY THESE PLANS SHALL BE DONE IN ACCORDANCE WITH THE
ACCOMPANYING SPECIFICATIONS FOR THIS PROJECT INCLUDING THE 2020 MDOT STANDARD
SPECIFICATIONS FOR CONSTRUCTION, AASHTO'S 2011 POLICY ON GEOMETRIC DESIGN OF
HIGHWAYS AND STREETS AND THE 2011 MICHIGAN MANUAL OF UNIFORM TRAFFIC CONTROL
DEVICES.
8. THE CONTRACTOR SHALL CONDUCT OPERATIONS IN SUCH A MANNER AS TO COMPLY WITH ALL
FEDERAL, STATE, AND LOCAL CODES FOR NOISE LEVELS, HOURS OF OPERATION FOR
CONSTRUCTION ACTIVITY, VIBRATIONS, OR ANY OTHER RESTRICTIONS. NO ADDITIONAL
COMPENSATION WILL BE DUE TO THE CONTRACTOR FOR ANY WINTER PROTECTION MEASURES
THAT MAY BE REQUIRED TO COMPLY WITH THE CONTRACT DOCUMENTS.
9. COORDINATION BY THE CONTRACTOR; NO ADDITIONAL COMPENSATION SHALL BE PAID TO THE CONTRACTOR FOR ANY DELAY OR INCONVENIENCE DUE TO MATERIAL SHORTAGES OR DELAYS DUE TO THE OPERATIONS OF SUCH OTHER PARTIES DOING WORK INDICATED OR SHOWN ON THE PLANS
OR IN THE PROPOSAL OR FOR ANY DELAYS IN CONSTRUCTION DUE TO THE ENCOUNTERING OF
EXISTING UTILITIES THAT MAY OR MAY NOT BE SHOWN ON THE PLANS.
10. ANY QUANTITIES AND DIMENSIONS SHOWN IN PLANS ARE PROVIDED FOR INFORMATION ONLY, CONTRACTOR SHALL FIELD VERIFY PRIOR TO CONSTRUCTION.
REMOVAL
1. ALL TEMPORARY SOIL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE IN PLACE PRIOR
TO STARTING REMOVALS.
2. REMOVALS SHALL BE DONE AS SHOWN ON THE PLANS OR AS DIRECTED BY THE ENGINEER.
3. SAW CUTTING FOR PAVEMENT REMOVAL AS SHOWN ON THE PLANS OR AS DIRECTED BY THE
ENGINEER SHALL BE TO THE DEPTH REQUIRED FOR NEAT REMOVAL OF PAVEMENT OR CONCRETE. DO
NOT OVERCUT PAST ENDS OR CORNERS. REPAIR/RESTORE ALL DAMAGED AREAS.
4. SAW CUTTING DEPTH SHALL BE ADEQUATE TO PREVENT SPALLING, CHIPPING, OR DAMAGE TO
EXISTING PAVEMENT EDGES LEFT IN PLACE AS DIRECTED.
5. CLEARING OF ALL VEGETATION WHERE PROPOSED CONSTRUCTION WARRANTS SHALL BE PAID FOR BY
CLEARING THE BRUSH AND TREES LESS THAN 30" IN DIAMETER. CONTRACTOR SHALL REVIEW
CLEARING LIMITS WITH THE ENGINEER PRIOR TO THE CLEARING OPERATION.
6. ANY ADDITIONAL TREE REMOVALS, CLEARING, GRADING, ETC. NEEDED FOR THE CONTRACTOR'S STAGING AND/OR WORK OPERATIONS SHALL BE RESTORED TO THE SATISFACTION OF THE OWNER
WITHOUT ADDITIONAL COMPENSATION AND SUBJECT TO OWNER APPROVAL.
7. ADDITIONAL WORK OUTSIDE OF THE LIMITS AS SHOWN ON THE PLAN SHALL BE SUBMITTED TO THE
ENGINEER FOR APPROVAL PRIOR TO STARTING THE ADDITIONAL WORK.
8. MATERIALS REMOVED SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND BE PROPERLY
DISPOSED OF AT AN OFF SITE LOCATION.
EARTHWORK, GRADING & RESTORATION
1. THE CONTRACTOR SHALL RESTORE ALL ADJACENT AREAS UPON COMPLETION OF THE PROJECT.
2. ALL DISTURBED AREAS SHALL BE BROUGHT TO FINAL GRADE AND STABILIZED AS SOON AS POSSIBLE AFTER BEING DISTURBED. PERMANENT SOIL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL
BE INSTALLED WITHIN FIVE CALENDAR DAYS OF COMPLETING FINAL GRADING.
3. CONTRACTOR SHALL PLACE SALVAGED AND ADDITIONAL TOPSOIL, SEED AND MULCH ON ALL DISTURBED AREAS NOT UNDER PAVEMENT OR OTHERWISE LABELED, AS DIRECTED BY THE ENGINEER TO PROVIDE A MINIMUM 3" THICKNESS. SEED MIX DESIGN AND TOPSOIL FOR ALL SLOPE RESTORATION SHALL BE PER TABLE 816-1 & 917-1 OF THE MICHIGAN DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS
FOR CONSTRUCTION.
4. ALL FILL SHALL BE CLEAN INERT MATERIAL.
5. ALL EXCAVATIONS UNDER OR WITHIN 3 FEET OF PUBLIC PAVEMENT, EXISTING OR PROPOSED, SHALL BE
BACKFILLED AND COMPACTED WITH SAND (MDOT CLASS II).
6. SURPLUS EXCAVATED MATERIAL MAY BE USED TO FLATTEN FILL SLOPES AS DIRECTED BY THE ENGINEER.
ANY SURPLUS OR UNSUITABLE MATERIAL, INCLUDING PEAT EXCAVATION, UNABLE TO BE USED SHALL
BECOME THE PROPERTY OF THE CONTRACTOR FOR DISPOSAL.
7. CONTRACTOR SHALL SUBMIT LOCATIONS OF MATERIAL STOCKPILES TO THE ENGINEER FOR APPROVAL.
PROTECT ADJACENT AREAS WITH SILT FENCE AS REQUIRED.
MAINTENANCE OF TRAFFIC
1. CONTRACTOR TO PROVIDE NECESSARY SIGNAGE, BARRICADES, AND OTHER DEVICES FOR PROTECTION
OF THE PUBLIC AND CONSTRUCTION WORKERS PRIOR TO PERFORMING ANY WORK.
2. CONTRACTOR SHALL COORDINATE STAGING AND ACCESSIBILITY WITH OWNER.
3. TRAFFIC SHALL BE MAINTAINED IN ACCORDANCE WITH THE 2011 MICHIGAN MANUAL ON UNIFORM TRAFFIC
CONTROL DEVICES AND MDOT MAINTAINING TRAFFIC TYPICAL PLANS.
ABAND ABANDONED
ADJ ADJUST
APPROX APPROXIMATELY
ASPH ASPHALT
AVE AVENUE
B/BANK BOTTOM OF BANK
BLD BUILDING
CB CATCH BASIN
CONC CONCRETE
CPP CORRUGATE PLASTIC PIPE
CT CURB TRANSITION
C&G CURB AND GUTTER
CVT CITY, VILLAGE, TOWNSHIP
DIA DIAMETER
DW DOMESTIC WATER
EA EDGE OF ASPHALT
ECW EDGE OF CONC WALK
ELEC ELECTRIC
ELEV ELEVATION
EX EXISTING
F/C FACE OF CURB
FF FINISH FLOOR
FG FINISHED GRADE
FT FEET
FP FORCE PROTECTION
GRAV GRAVEL
HDCP HANDICAP
INV INVERT ELEVATION
MH MAN HOLE
OB OBSERVATION WELL
OBS OBSERVED
OH OVERHEAD
OT OVER TOPPING
PROP PROPOSED
R RADIUS
RD ROAD
RES RESET
RIM TOP OF UTILITY/DRAINAGE STRUCTURE
ROW RIGHT-OF-WAY
SAN SANITARY
SP SPRING WATER
SQ SQUARE
SQFT SQUARE FEET
STM STORM
SYD SQUARE YARD
TC TOP OF CURB
T/CAST TOP OF CASTING
TELE TELEPHONE
TP TRAVERSE POINT
TS&M TOPSOIL, SEED & MULCH
TYP TYPICAL
T/BANK TOP OF BANK
UG UNDER GROUND
UNO UNLESS NOTED OTHERWISE
WEL WELL LINES
W# WELL LINE
WM WATER MAIN
WTR WATER
YBT YELLOW BENCH TIE
D50 RIPRAP SIZE WHERE 50% OF STONES
ARE LARGER
DMAX MAX STONE SIZE/AVG DEPTH OF RIPRAP
ABBREVIATIONS:
P
L
UR
IB
U E
S U
N
UM
C
I
R C
U M
S P
I C
E
SI
Q
UE
RE
IS
PE
NI
NS
UL
AM
AM
OE
NAM
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O F
M
IC
H
IG
A N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
P:
\7
1_
\7
0_
M us ka llo ng e_
St at e_ Pa rk \A
1_ R en ov at e
St ai rw ay
\D ra w in gs \S ite \S he et s\ A1
_2
0N
O T.
dw g
A pr
5,
- 1 0:
am
D R
AW
IN
G P
AT
H
OHM-ADVISORS.COM
ARCHITECTS ENGINEERS PLANNERS
CO
PY
RI
G
HT
O
HM
A
DV
IS
O
RS
. A
LL
D
RA
W
IN
G
S
AN
D W
RI
TT
EN
M
AT
ER
IA
LS
A
PP
EA
RI
NG
H
ER
EI
N
CO
NS
TI
TU
TE
T
HE
O
RI
G
IN
AL
A
ND
U
NP
UB
LI
SH
ED
W
O
RK
O F
O
HM
A
DV
IS
O
RS
A
ND
T
HE
S
AM
E
M
AY
N O
T
BE
D
UP
LI
CA
TE
D, D
IS
TR
IB
UT
ED
, O R
DI
SC
LO
SE
D W
IT
HO
UT
P
RI
O
R W
RI
TT
EN
C
O
NS
EN
T
O F
O
HM
A
DV
I
R
CL
IEN
T P
RO
J N O
RE
VIS
ION
DA
TE
DE
SC
RIP
TIO
N
DIS
CIP
LIN
E L
EA
D
PM
PR
OJ
EC
T N
UM
BE
R
ISS
UE
D F
OR
MI
CH
IG
AN
D
EP
AR
TM
EN
T
OF
N
AT
UR
AL
R
ES
OU
RC
ES
MU
SK
AL
LO
NG
E
LA
KE
S P
UN
IV
ER
SA
L A
CC
ES
S
PA
TH
1 C O
RD
7 N
EW
BE
RR
Y, M
I 4
NO
TE
S
LE
GE
ND
C-001
-2 2-
ZH
ZH
1.2
.A
BG
/25
/20
BI
D
SE
T
STEWARDSHIP / ARTIFACT NOTE
1. IF ANY ARTIFACTS ARE DISCOVERED DURING THE CONSTRUCTION PROCESS, ALL WORK IS TO STOP
AND THE OWNER'S REPRESENTATIVE/PROJECT MANAGER SHALL BE NOTIFIED. ARTIFACTS OR
ARCHEOLOGICAL MATERIALS ARE DEFINED AS: ABORIGINAL ANTIQUITIES AND OTHER RECORDS ON ANTIQUITY, INCLUDING MOUNDS, MINES, EARTHWORKS, VILLAGE SITES, CAMP SITES, BURIALS, HUMAN OR OTHER BONES, SHELLS, STONE IMPLEMENTS, BONE OR COPPER IMPLEMENTS, POTTERY, OR SHARD OF POTTER, OR OTHER OBJECTS RELATING TO NATIVE AMERICAN OCCUPATION: AND
MODERN ARTIFACTS, SUCH AS FORTS, RELICS, AND OTHER ARTIFACTS RELATING TO THE HISTORIC, COLONIAL, TERRITORIAL AND EARLY STATEHOOD PERIODS.
ACCESS ROUTE / TRACKED VEHICLES
1. CONTRACTOR SHALL LIMIT THE USE OF TRACKED MACHINES ON EXISTING PAVEMENT SURFACES TO
LIMIT THE PAVEMENT DISTURBANCES. ACCESS ROUTES HAVE BEEN NOTED TO LIMIT POTENTIAL FOR DISRUPTION OF EX. ROADWAYS WITHIN THE PARK TO HEAVY CONSTRUCTION TRAFFIC. CONTRACTORS ARE ALSO REQUIRED TO LIMIT TRANSPORT ACROSS GREENBELT AREAS THAT ARE NOT WITHIN THE
WORK ZONES.
2. CONTRACTOR IS RESPONSIBLE FOR THE REMOVAL AND DISPOSAL OF THE LOOSE DIRT/SOIL FROM
ASPHALT DAILY.
DTMB: SOIL EROSION AND SEDIMENTATION CONTROL
1. ALL WORK SHALL COMPLY WITH THE APPLICABLE SOIL EROSION AND SEDIMENTATION CONTROL (SESC)
RULES AND REGULATIONS (SOIL EROSION AND SEDIMENTATION CONTROL - 1994 PA 451, PART 91, AS
AMENDED, MCL 324.9101 ET SEQ.).
2. ALL EARTH CHANGES OF ONE ACRE OR MORE OR WITHIN 500 FEET OF WATERS OF THE STATE REQUIRE A SESC PERMIT. IF A SESC PERMIT IS REQUIRED THE PROFESSIONAL SERVICES CONTRACTOR (DESIGN CONSULTANT) SHALL PREPARE AN SESC PLAN. THE SESC PLAN SHALL ADDRESS BOTH WIND AND WATER
EROSION AND SEDIMENTATION.
3. THE CONTRACTOR SHALL REVIEW THE DESIGN CONSULTANT'S SESC PLAN IN ORDER TO PREPARE AND ISSUE FOR APPROVAL AN “SESC IMPLEMENTATION PLAN”, WHICH INDICATES THE CONTRACTOR'S
INTENDED IMPLEMENTATION OF THE SESC PLAN FOR THE PROJECT, INCLUDING A SCHEDULE.
4. THE DTMB SESC PROGRAM, UPON APPROVAL OF THE IMPLEMENTATION PLAN, WILL ISSUE THE CONTRACTOR AN “AUTHORIZATION TO PROCEED WITH EARTH CHANGE”, WHICH IS TO BE POSTED AT THE JOB SITE. THIS DOCUMENT IS ISSUED IN LIEU OF A PERMIT FROM THE COUNTY OR OTHER LOCAL
ENFORCING AGENCY.
5. THE CONTRACTOR SHALL IMPLEMENT SOIL EROSION AND SEDIMENTATION CONTROL MEASURES AS REQUIRED BY THE PROJECT'S SESC PLAN, SESC IMPLEMENTATION PLAN, DTMB'S SOIL EROSION AND SEDIMENTATION CONTROL GUIDEBOOK, DATED JULY 2019, AND AS DIRECTED BY THE PROFESSIONAL SERVICES CONTRACTOR, DTMB SESC INSPECTOR, AND/OR DTMB PROJECT DIRECTOR. THE DTMB SESC
INSPECTOR SHALL INSPECT THE SITE WEEKLY AND AFTER SIGNIFICANT RAIN EVENTS.
6. THE CONTRACTOR SHALL INSTALL TEMPORARY EROSION AND SEDIMENTATION CONTROL MEASURES
PRIOR TO OR UPON COMMENCEMENT OF EARTHWORK ACTIVITIES.
7. THE CONTRACTOR WILL PERFORM SWEEPING AS NEEDED TO REMOVE ANY SEDIMENT TRACKED OFF SITE.
FREQUENCY OF SWEEPING WILL BE BASED ON SITE CONDITIONS.
8. THE CONTRACTOR WILL PERFORM DUST CONTROL AS NEEDED BASED ON SITE CONDITIONS.
9. DISTURBED AREAS THAT WILL REMAIN IDLE DURING CONSTRUCTION MUST BE TEMPORARILY STABILIZED, INCLUDING SOIL STOCKPILES, USING DTMB SESC BEST MANAGEMENT PRACTICES.
10. THE CONTRACTOR SHALL MAINTAIN AND INSPECT SESC MEASURES THROUGHOUT THE COURSE OF THE PROJECT. THE DTMB RECOMMENDS INSPECTING AND MAINTAINING EROSION AND SEDIMENTATION CONTROLS ON A DAILY BASIS. AT A MINIMUM, THE CONTRACTOR SHALL INSPECT AND MAINTAIN SESC
MEASURES ONCE A WEEK AND AFTER RAIN EVENTS.
11. THE CONTRACTOR SHALL CORRECT NON-CONFORMING SESC MEASURES WITHIN 24 HOURS, IF WATERS OF THE STATE ARE BEING IMPACTED, OR, WITHIN 48 HOURS FOR ROUTINE MAINTENANCE ITEMS. OTHER SESC MAINTENANCE SHALL BE COMPLETED AS SOON AS POSSIBLE BUT NEVER MORE THAN FIVE (5) DAYS AFTER DETECTION. NON COMPLIANCE COULD RESULT IN $500/DAY FINES BY THE AGENCY AND ASSESSMENT OF
ACTUAL DAMAGE COSTS.
12. THE CONTRACTOR SHALL COMPLETE PERMANENT SOIL EROSION CONTROL MEASURES FOR ANY DISTURBED LAND AREA WITHIN 5 CALENDAR DAYS AFTER FINAL GRADING OR THE FINAL EARTH CHANGE HAS BEEN COMPLETED. THE CONTRACTOR SHALL MAINTAIN TEMPORARY CONTROL MEASURES UNTIL
PERMANENT SOIL EROSION CONTROL MEASURES ARE IN PLACE AND THE AREA IS STABILIZED.
13. THE CONTRACTOR SHALL REMOVE TEMPORARY EROSION CONTROL MEASURES AFTER PERMANENT SOIL EROSION MEASURES ARE IN PLACE AND THE AREA IS STABILIZED. CARE SHALL BE TAKEN DURING REMOVAL
TO PREVENT SOIL EROSION AND SEDIMENTATION.
14. AFTER THE COMPLETION OF THE PROJECT, PERMANENT SESC MEASURES WILL BE MAINTAINED BY THE
PROPERTY OWNER.
FLAMMABLE MATERIAL
HAZARDOUS OR
MISCELLANEOUS UTILITY SYMBOLS
SOIL BORING
TRAVERSE POINT
UTILITY POLE
MISCELLANEOUS SYMBOLS
BENCHMARK
USED WITH UNDERGROUND GAS &
ELECTRICAL LINES
USED WITH TELEPHONE &
UNDERGROUND UTILITY
CAUTION - CRITICAL
FIBER OPTIC LINES
REMOVAL LEGEND
AGGREGATE
UTILITY PATTERN
ELECTRICAL *
FIBER OPTIC *
TOPO PATTERN
FENCE
CABLE/TELEPHONE *
EXISTING CONTOURS
DECIDUOUS TREE
DEAD TREE
DECIDUOUS TREE
STUMP
TREE, REM
CONSTRUCTION LIMITS
LAYDOWN AREA
UTILITY NOTES
1. THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR THE LOCATION AND PROTECTION OF ALL
EXISTING UTILITIES. THE CONTRACTOR SHALL VERIFY ALL UTILITY LOCATIONS PRIOR TO
CONSTRUCTION BY CALLING MISS-DIG (811) AT LEAST 3 WORKING DAYS PRIOR TO EXCAVATION.
2. THE UTILITY LOCATIONS ARE BASED ON FIELD OBSERVATIONS AND A CAREFUL REVIEW OF UTILITY RECORDS. HOWEVER, IT IS NOT POSSIBLE TO DETERMINE THE PRECISE SIZE, LOCATION, DEPTH, PRESSURE, OR ANY OTHER CHARACTERISTICS OF UNDERGROUND UTILITIES, TANKS OR SEPTIC
FIELDS WITHOUT EXCAVATION. THEREFORE, WE CANNOT GUARANTEE THE ACCURACY OR
COMPLETENESS OF THE BURIED UTILITY INFORMATION HEREON SHOWN. THE CONTRACTOR SHALL HIRE A PRIVATE UTILITY LOCATOR TO LOCATE UTILITIES ON SITE. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THESE UTILITY LOCATIONS PRIOR TO CONSTRUCTION AND MAKE
EVERY EFFORT TO PROTECT AND/OR RELOCATE THEM AS REQUIRED. THE CONTRACTOR SHALL
NOTIFY THE ENGINEER/SURVEYOR AS SOON AS POSSIBLE IN THE EVENT A DISCREPANCY IS FOUND.
3. THE CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR THE PROTECTION OF ALL EXISTING
UTILITIES DURING CONSTRUCTION. ALL UTILITIES DAMAGED DURING CONSTRUCTION SHALL BE REPAIRED WITH LIKE MATERIAL. THE EXACT LOCATION OF EXISTING UTILITIES SHALL BE LOCATED
BY HAND DIGGING.
CLOVERLAND ELECTRIC
2916 W M-28 DAFTER, MI 49724
SIMON MEILSTRUP
906.235.2200
SMEILSTRUP@CLOVERLAND.COM
HIAWATHA TELEPHONE
108 W SUPERIOR ST. MUNISING, MI 49862
DON RUSHFORD
906.387.9935
DRUSHFORD@JAMADOTS.NET
CONCRETE CONSTRUCTION
1. CONCRETE USED FOR CURB AND SIDEWALK SHALL MEET THE REQUIREMENTS OF SECTION 1004 OF THE
2020 MDOT STANDARD SPECIFICATIONS FOR CONSTRUCTION AND SHALL BE MDOT GRADE P1 WITH A
MINIMUM CEMENT CONTENT OF 526 LB/CYD OR AS APPROVED BY THE ENGINEER.
2. CONCRETE PAVEMENT CONSTRUCTION SHALL BE DONE IN ACCORDANCE WITH SECTION 602 OF THE 2020
MDOT STANDARD SPECIFICATIONS FOR CONSTRUCTION.
3. CONCRETE SIDEWALKS SHALL BE CONSTRUCTED ACCORDING TO MDOT STANDARD DETAIL R-29 SERIES.
4. EXPANSION JOINTS WITH EXPANSION FILLER SHALL BE PLACED WHERE THE CONCRETE PAVEMENT ABUTS
AN EXISTING PAVED SURFACE OR BUILDING OR AS DIRECTED BY THE ENGINEER.
5. PROPOSED SIDEWALK CUT JOINTS SHALL BE CONSTRUCTED TO DIVIDE THE SIDEWALK INTO
APPROXIMATELY 25 SQUARE FOOT AREAS OR AS DIRECTED BY THE ENGINEER.
6. ALL SIDEWALKS AND BARRIER FREE RAMPS SHALL BE CONSTRUCTED WITH A MAXIMUM 1:48 CROSS-SLOPE
AND A MAXIMUM 1:12 LONGITUDINAL SLOPE.
7. ALL SIDEWALKS EXCEEDING THE MAXIMUM LONGITUDINAL SLOPE SHALL BE PROVIDED WITH HAND RAILS
ON BOTH SIDES AS DIRECTED BY THE ENGINEER.
8. SIDEWALK CURB RAMPS SHALL BE CONSTRUCTED IN ACCORDANCE WITH MDOT STANDARD PLAN R-28
SERIES.
9. CONCRETE PLACEMENT AND PROTECTION CONFORMING TO ACI 117 301, 305R, 306.1, AND 308.1, CURRENT
EDITIONS IS REQUIRED.
10. PLACE ANCHOR BOLTS SET IN CONCRETE TO RECEIVE STRUCTURAL STEEL WITHIN TOLERANCES SPECIFIED IN AISC "CODE OF STANDARD PRACTICE FOR STEEL BUILDINGS AND BRIDGES" IN LIEU OF
TOLERANCES SPECIFIED IN ACI "STANDARD SPECIFICATIONS FOR TOLERANCES FOR CONCRETE
CONSTRUCTION AND MATERIALS".
11. REINFORCING STEEL CONFORMING TO ASTM-615, GRADE 60 IS REQUIRED. PLACE REINFORCING STEEL IN
CONFORMANCE WITH CRSI MANUAL OF STANDARD PRACTICE.
12. CONFORM TO ASTM A706/A706M, GRADE 60 FOR REINFORCING STEEL TO BE WELDED. PLACE REINFORCING STEEL IN CONFORMANCE WITH CRSI MANUAL OF STANDARD PRACTICE. WELD SUCH REINFORCED STEEL IN CONFORMANCE WITH THE STRUCTURAL WELDING CODE - REINFORCING STEEL (AWS D1.4) PUBLISHED BY THE AMERICAN WELDING SOCIETY. PERFORM WELDING BY CERTIFIED WELDERS. USE E70XX ELECTRODES.
13. REINFORCED STEEL SHALL HAVE A CONCRETE COVER AS LISTED BELOW UNLESS OTHERWISE NOTED.
A. CONCRETE CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH: 3"
B. CONCRETE CAST AGAINST FORMS BUT EXPOSED TO EARTH OR WEATHER
1. NO.5 OR SMALLER 1 1/2"
2. GREATER THAN NO. 5 2"
C. SLAB ON GRADE: 2" FROM T/SLAB
14. POST INSTALLED ANCHORS ON REBAR SHALL BE ANCHORED INTO CONCRETE WITH DEWALT AC100+GOLD EPOXY INJECTION ADHESIVE, OR AN APPROVED EQUAL. REFER TO MANUFACTURER'S RECOMMENDATIONS
FOR INSTALLATIONS INSTRUCTIONS. SEE DETAILS FOR MINIMUM EMBEDMENT.
AGGREGATE SURFACE CONSTRUCTION
1. NEW AGGREGATE MATERIAL FOR ROAD AND TRAIL SURFACE SHALL MEET THE REQUIREMENTS OF SECTION
902 OF THE 2020 MDOT STANDARD SPECIFICATIONS FOR CONSTRUCTION AND SHALL BE MDOT CLASS 23A
OR AS APPROVED BY THE ENGINEER.
2. AGGREGATE MATERIAL FOR ROAD AND TRAIL SURFACE SHALL BE CONSTRUCTED PER SECTION 306 OF THE
2020 MDOT STANDARD SPECIFICATIONS FOR CONSTRUCTION.
CONCRETE
SLOPE RESTORATION
Know what'sbelow.
before you dig.Call
R
PL
U
RI
BU
E
S
U
N
U
M
C I
R
C U
M S
P
I C
E
S I
Q U
ER
EI
S
PE
NI
NS
UL
AM
AM
OEN
AM
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O F
M
IC
H
IG
A N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
PRELIM
INARY - N
OT
FOR CONSTRUCTIO
N
P:\7
_72 00\
0_M usk allo nge _St ate _Pa rk\A 1_R eno vat e S tair wa y\D raw ing s\S ite\
She ets
\A1 _22
0R
EM
.dw g Ap r 25 , 2
- 1
1:0 0am
D R
AW
IN
G P
AT
H
OHM-ADVISORS.COM
ARCHITECTS ENGINEERS PLANNERS
CO
PY
RI
G
HT
O
HM
A
DV
IS
O
RS
. A
LL
D
RA
W
IN
G
S
AN
D W
RI
TT
EN
M
AT
ER
IA
LS
A
PP
EA
RI
NG
H
ER
EI
N
CO
NS
TI
TU
TE
T
HE
O
RI
G
IN
AL
A
ND
U
NP
UB
LI
SH
ED
W
O
RK
O F
O
HM
A
DV
IS
O
RS
A
ND
T
HE
S
AM
E
M
AY
N O
T
BE
D
UP
LI
CA
TE
D, D
IS
TR
IB
UT
ED
, O R
DI
SC
LO
SE
D W
IT
HO
UT
P
RI
O
R W
RI
TT
EN
C
O
NS
EN
T
O F
O
HM
A
DV
I
R
CL
IEN
T P
RO
J N O
RE
VIS
ION
DA
TE
DE
SC
RIP
TIO
N
DIS
CIP
LIN
E L
EA
D
PM
PR
OJ
EC
T N
UM
BE
R
ISS
UE
D F
OR
MI
CH
IG
AN
D
EP
AR
TM
EN
T
OF
N
AT
UR
AL
R
ES
OU
RC
ES
MU
SK
AL
LO
NG
E
LA
KE
S P
UN
IV
ER
SA
L A
CC
ES
S
PA
TH
1 C O
RD
7 N
EW
BE
RR
Y, M
I 4
OV
ER
AL
L M
AP
C-010
-2 2-
ZH
ZH
1.2
.A
BG
/25
/20
BI
D
SE
T
CONSTRUCTION LIMITS
PROPOSED UNIVERSAL ACCESS
PATH SEE SHEETS C-130 & S-101
CONSTRUCTION LIMITS
DAY USE AREA
MUSKALLONGE LAKE STATE PARK ENTRANCE
EXISTING STAIRCASE
SEE SHEETS C-121 & C-131 FOR PROPOSED WORK
feetGRAPHIC SCALE: FULL feetHALF
2401608040
CONSTRUCTION LAYDOWN AREA
EDGE OF WATER
EDGE OF WATER
PL
U
RI
B
U
E
S
UN
U
M
C I
R C
U M
S P
I C
E
SI
Q U
ER
EI
S
PE
NI
NS
ULA
M
AM
OENA
M
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O F
M
IC
H
IG
A N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
PRELIM
INARY - N
OT
FOR CONSTRUCTIO
N
P:\7
_72 00\
0_M usk allo nge _St ate _Pa rk\A 1_R eno vat e S tair wa y\D raw ing s\S ite\
She ets
\A1 _22
0BO
R.d wg
Apr
, 2
- 1
1:0 0am
D R
AW
IN
G P
AT
H
OHM-ADVISORS.COM
ARCHITECTS ENGINEERS PLANNERS
CO
PY
RI
G
HT
O
HM
A
DV
IS
O
RS
. A
LL
D
RA
W
IN
G
S
AN
D W
RI
TT
EN
M
AT
ER
IA
LS
A
PP
EA
RI
NG
H
ER
EI
N
CO
NS
TI
TU
TE
T
HE
O
RI
G
IN
AL
A
ND
U
NP
UB
LI
SH
ED
W
O
RK
O F
O
HM
A
DV
IS
O
RS
A
ND
T
HE
S
AM
E
M
AY
N O
T
BE
D
UP
LI
CA
TE
D, D
IS
TR
IB
UT
ED
, O R
DI
SC
LO
SE
D W
IT
HO
UT
P
RI
O
R W
RI
TT
EN
C
O
NS
EN
T
O F
O
HM
A
DV
I
R
CL
IEN
T P
RO
J N O
RE
VIS
ION
DA
TE
DE
SC
RIP
TIO
N
DIS
CIP
LIN
E L
EA
D
PM
PR
OJ
EC
T N
UM
BE
R
ISS
UE
D F
OR
MI
CH
IG
AN
D
EP
AR
TM
EN
T
OF
N
AT
UR
AL
R
ES
OU
RC
ES
MU
SK
AL
LO
NG
E
LA
KE
S P
UN
IV
ER
SA
L A
CC
ES
S
PA
TH
1 C O
RD
7 N
EW
BE
RR
Y, M
I 4
SO
IL
BO
RI
NG
S
C-090
-2 2-
ZH
ZH
1.2
.A
BG
/25
/20
BI
D
SE
T
RI
B
U
E
S
UN
U
M
C I
R C
U M
S P
I C
E
SI
Q U
ER
EI
S
PE
NI
NS
ULA
M
AM
OENA
M
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O F
M
IC
H
IG
A N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
PRELIM
INARY - N
OT
FOR CONSTRUCTIO
N
P:\7
_72 00\
0_M usk allo nge _St ate _Pa rk\A 1_R eno vat e S tair wa y\D raw ing s\S ite\
She ets
\A1 _22
0BO
, 2
- 1
1:0 0am
D R
AW
IN
G P
AT
H
OHM-ADVISORS.COM
ARCHITECTS ENGINEERS PLANNERS
CO
PY
RI
G
HT
O
HM
A
DV
IS
O
RS
. A
LL
D
RA
W
IN
G
S
AN
D W
RI
TT
EN
M
AT
ER
IA
LS
A
PP
EA
RI
NG
H
ER
EI
N
CO
NS
TI
TU
TE
T
HE
O
RI
G
IN
AL
A
ND
U
NP
UB
LI
SH
ED
W
O
RK
O F
O
HM
A
DV
IS
O
RS
A
ND
T
HE
S
AM
E
M
AY
N O
T
BE
D
UP
LI
CA
TE
D, D
IS
TR
IB
UT
ED
, O R
DI
SC
LO
SE
D W
IT
HO
UT
P
RI
O
R W
RI
TT
EN
C
O
NS
EN
T
O F
O
HM
A
DV
I
R
CL
IEN
T P
RO
J N O
RE
VIS
ION
DA
TE
DE
SC
RIP
TIO
N
DIS
CIP
LIN
E L
EA
D
PM
PR
OJ
EC
T N
UM
BE
R
ISS
UE
D F
OR
MI
CH
IG
AN
D
EP
AR
TM
EN
T
OF
N
AT
UR
AL
R
ES
OU
RC
ES
MU
SK
AL
LO
NG
E
LA
KE
S P
UN
IV
ER
SA
L A
CC
ES
S
PA
TH
1 C O
RD
7 N
EW
BE
RR
Y, M
I 4
SO
IL
BO
RI
NG
S
C-091
-2 2-
ZH
ZH
1.2
.A
BG
/25
/20
BI
D
SE
T
RI
B U
E
S U
NU
M
C I
R C
U M
S
P I
C E
SI
QU
ER
EI
S P
EN
IN
SU
LAM
AM
OEN
A
M
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O F
M
IC
H
IG
A N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
PRELIM
INARY - N
OT
FOR CONSTRUCTIO
N
P:\7
_72 00\
0_M usk allo nge _St ate _Pa rk\A 1_R eno vat e S tair wa y\D raw ing s\S ite\
She ets
\A1 _22
0BO
, 2
- 1
1:0 0am
D R
AW
IN
G P
AT
H
OHM-ADVISORS.COM
ARCHITECTS ENGINEERS PLANNERS
CO
PY
RI
G
HT
O
HM
A
DV
IS
O
RS
. A
LL
D
RA
W
IN
G
S
AN
D W
RI
TT
EN
M
AT
ER
IA
LS
A
PP
EA
RI
NG
H
ER
EI
N
CO
NS
TI
TU
TE
T
HE
O
RI
G
IN
AL
A
ND
U
NP
UB
LI
SH
ED
W
O
RK
O F
O
HM
A
DV
IS
O
RS
A
ND
T
HE
S
AM
E
M
AY
N O
T
BE
D
UP
LI
CA
TE
D, D
IS
TR
IB
UT
ED
, O R
DI
SC
LO
SE
D W
IT
HO
UT
P
RI
O
R W
RI
TT
EN
C
O
NS
EN
T
O F
O
HM
A
DV
I
R
CL
IEN
T P
RO
J N O
RE
VIS
ION
DA
TE
DE
SC
RIP
TIO
N
DIS
CIP
LIN
E L
EA
D
PM
PR
OJ
EC
T N
UM
BE
R
ISS
UE
D F
OR
MI
CH
IG
AN
D
EP
AR
TM
EN
T
OF
N
AT
UR
AL
R
ES
OU
RC
ES
MU
SK
AL
LO
NG
E
LA
KE
S P
UN
IV
ER
SA
L A
CC
ES
S
PA
TH
1 C O
RD
7 N
EW
BE
RR
Y, M
I 4
SO
IL
BO
RI
NG
S
C-092
-2 2-
ZH
ZH
1.2
.A
BG
/25
/20
BI
D
SE
T
SF
SF
SF
Know what'sbelow.
before you dig.Call
R
PL
U
RI
B
U
E
S
UN
U
M
C I
R C
U M
S P
I C
E
SI
Q U
ER
EI
S
PE
NI
NS
ULA
M
AM
OENA
M
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O F
M
IC
H
IG
A N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
PRELIM
INARY - N
OT
FOR CONSTRUCTIO
N
P:\7
_72 00\
0_M usk allo nge _St ate _Pa rk\A 1_R eno vat e S tair wa y\D raw ing s\S ite\
She ets
\A1 _22
0R
EM
.dw g Ap r 25 , 2
- 1
1:0 0am
D R
AW
IN
G P
AT
H
OHM-ADVISORS.COM
ARCHITECTS ENGINEERS PLANNERS
CO
PY
RI
G
HT
O
HM
A
DV
IS
O
RS
. A
LL
D
RA
W
IN
G
S
AN
D W
RI
TT
EN
M
AT
ER
IA
LS
A
PP
EA
RI
NG
H
ER
EI
N
CO
NS
TI
TU
TE
T
HE
O
RI
G
IN
AL
A
ND
U
NP
UB
LI
SH
ED
W
O
RK
O F
O
HM
A
DV
IS
O
RS
A
ND
T
HE
S
AM
E
M
AY
N O
T
BE
D
UP
LI
CA
TE
D, D
IS
TR
IB
UT
ED
, O R
DI
SC
LO
SE
D W
IT
HO
UT
P
RI
O
R W
RI
TT
EN
C
O
NS
EN
T
O F
O
HM
A
DV
I
R
CL
IEN
T P
RO
J N O
RE
VIS
ION
DA
TE
DE
SC
RIP
TIO
N
DIS
CIP
LIN
E L
EA
D
PM
PR
OJ
EC
T N
UM
BE
R
ISS
UE
D F
OR
MI
CH
IG
AN
D
EP
AR
TM
EN
T
OF
N
AT
UR
AL
R
ES
OU
RC
ES
MU
SK
AL
LO
NG
E
LA
KE
S P
UN
IV
ER
SA
L A
CC
ES
S
PA
TH
1 C O
RD
7 N
EW
BE
RR
Y, M
I 4
RE
MO
VA
L P
LA
N
C-120
-2 2-
ZH
ZH
1.2
.A
BG
/25
/20
BI
D
SE
T
TREE REM, TYP
feetGRAPHIC SCALE: FULL feetHALF
60402010
CONSTRUCTION LIMITS
FENCE, REM
TREE TRIMMING AS NEEDED FOR DRIVEWAY
PROPOSED LAYDOWN AREA
EXPOSE EXISTING
CONCRETE FOR NEW TRAIL
NOTE:
1. CONSTRUCTION REMOVAL AND PROPOSED EFFORTS SHALL BE
COMPLETED WITH LOW GROUND PRESSURE EQUIPMENT NOT
EXCEEDING 8000 LBS GROSS WEIGHT AND HAVING NOT MORE
THAN A 10 PSI GROUND PRESSURE. EQUIPMENT MAY BE UTILIZED
TO PERFORM AUGER EXCAVATIONS FOR NEW FOOTINGS,
DELIVERY OF LARGE TIMBERS AND AGGREGATE PATH
INSTALLATION. ONCE TIMBERS ARE DELIVERED AND FOOTINGS
INSTALLED, CONSTRUCTION SHALL BE LIMITED TO HAND
CONSTRUCTION ONLY WITH NO LARGE EQUIPMENT. GROUND
DISTURBANCE SHALL BE REDUCED AS MUCH AS POSSIBLE.
2. EXISTING PARKING LOT TO BE CLOSED TO PUBLIC ACCESS.
REMOVE AND SALVAGE GRILL
UNDERGROUND UTILITY
CAUTION - CRITICAL
CONTRACTOR SHALL RESTABLISH A
NEW BENCHMARK FOR CONSTRUCTION
SILT FENCE
FILTER SOCK UNDER PLATFORM
TYPE III BARRICADE, TYP
REMOVALS FOR CONCRETE
SIDEWALK, ADA PARKING SPACE,
GRILL, AND VAULT TOILET ARE
INCLUDED IN ALTERNATE #2
R
PL
U
RI
B
U
E
S
U
NU
M
C I
R C
U M
S
P I
C E
SI
QU
ER
EI
S
PE
NI
NS
UL
AM
AM
OEN
A
M
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O F
M
IC
H
IG
A N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
PRELIM
INARY - N
OT
FOR CONSTRUCTIO
N
P:\7
_72 00\
0_M usk allo nge _St ate _Pa rk\A 1_R eno vat e S tair wa y\D raw ing s\S ite\
She ets
\A1 _22
0R
EM
.dw g Ap r 25 , 2
- 1
1:0 0am
D R
AW
IN
G P
AT
H
OHM-ADVISORS.COM
ARCHITECTS ENGINEERS PLANNERS
CO
PY
RI
G
HT
O
HM
A
DV
IS
O
RS
. A
LL
D
RA
W
IN
G
S
AN
D W
RI
TT
EN
M
AT
ER
IA
LS
A
PP
EA
RI
NG
H
ER
EI
N
CO
NS
TI
TU
TE
T
HE
O
RI
G
IN
AL
A
ND
U
NP
UB
LI
SH
ED
W
O
RK
O F
O
HM
A
DV
IS
O
RS
A
ND
T
HE
S
AM
E
M
AY
N O
T
BE
D
UP
LI
CA
TE
D, D
IS
TR
IB
UT
ED
, O R
DI
SC
LO
SE
D W
IT
HO
UT
P
RI
O
R W
RI
TT
EN
C
O
NS
EN
T
O F
O
HM
A
DV
I
R
CL
IEN
T P
RO
J N O
RE
VIS
ION
DA
TE
DE
SC
RIP
TIO
N
DIS
CIP
LIN
E L
EA
D
PM
PR
OJ
EC
T N
UM
BE
R
ISS
UE
D F
OR
MI
CH
IG
AN
D
EP
AR
TM
EN
T
OF
N
AT
UR
AL
R
ES
OU
RC
ES
MU
SK
AL
LO
NG
E
LA
KE
S P
UN
IV
ER
SA
L A
CC
ES
S
PA
TH
1 C O
RD
7 N
EW
BE
RR
Y, M
I 4
RE
MO
VA
L P
LA
N
AL
TE
RN
AT
E
#1
C-121
-2 2-
ZH
ZH
1.2
.A
BG
/25
/20
BI
D
SE
T
REMOVE EXISTING STAIRCASE/LANDINGS
feetGRAPHIC SCALE: FULL feetHALF
60402010
40REMOVE EXISTING FOUNDATIONS, TYP
CONTRACTOR SHALL USE CABLE WINCH
SYSTEM TO REMOVE BOARDWALK
FOUNDATIONS AND LUMBER FROM BEACH
7.0
BACKFILL AFTER REMOVAL OF EXISTING FOUNDATIONS
R
P
L
UR
I
BU
E
S U
N U M
C I
R C
U M
S P
I C
E
SI
Q
UE
RE
I S
PE
NI
NS
UL
AM
AM
OE
NAM
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O F
M
IC
H
IG
A N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
PRELIM
INARY - N
OT
FOR CONSTRUCTIO
N
P:\7
_72 00\
0_M usk allo nge _St ate _Pa rk\A 1_R eno vat e S tair wa y\D raw ing s\S ite\
She ets
\A1 _22
0C
ON
.dw g Ap r 25 , 2
- 1
1:0 0am
D R
AW
IN
G P
AT
H
OHM-ADVISORS.COM
ARCHITECTS ENGINEERS PLANNERS
CO
PY
RI
G
HT
O
HM
A
DV
IS
O
RS
. A
LL
D
RA
W
IN
G
S
AN
D W
RI
TT
EN
M
AT
ER
IA
LS
A
PP
EA
RI
NG
H
ER
EI
N
CO
NS
TI
TU
TE
T
HE
O
RI
G
IN
AL
A
ND
U
NP
UB
LI
SH
ED
W
O
RK
O F
O
HM
A
DV
IS
O
RS
A
ND
T
HE
S
AM
E
M
AY
N O
T
BE
D
UP
LI
CA
TE
D, D
IS
TR
IB
UT
ED
, O R
DI
SC
LO
SE
D W
IT
HO
UT
P
RI
O
R W
RI
TT
EN
C
O
NS
EN
T
O F
O
HM
A
DV
I
R
CL
IEN
T P
RO
J N O
RE
VIS
ION
DA
TE
DE
SC
RIP
TIO
N
DIS
CIP
LIN
E L
EA
D
PM
PR
OJ
EC
T N
UM
BE
R
ISS
UE
D F
OR
MI
CH
IG
AN
D
EP
AR
TM
EN
T
OF
N
AT
UR
AL
R
ES
OU
RC
ES
MU
SK
AL
LO
NG
E
LA
KE
S P
UN
IV
ER
SA
L A
CC
ES
S
PA
TH
1 C O
RD
7 N
EW
BE
RR
Y, M
I 4
CO
NS
TR
UC
TI
ON
P
LA
N
C-130
-2 2-
ZH
ZH
1.2
.A
BG
/25
/20
BI
D
SE
T feetGRAPHIC SCALE: FULL feetHALF
60402010
16' X 18'
6' BOARDWALK WITH
2x6 DECKING SEE
DETAIL SHEET S-501
SLOPE RESTORATION, TYP
GRAVEL PATH
SEE 2/C-501
TIE INTO EXISTING CONCRETE
TIE INTO CONCRETE SIDEWALK
SEE 5/C-501
FILL IN SWALES AND INSTALL
GEOCELL WITH AGGREGATE FOR
TRAIL STABILIZATION
SEE 6/C-501
END OF BOARDWALK TERMINATION
SEE 4/C-501
8' BENCH (TYP)
SEE C/C-501
INSTALL NEW FENCE FROM OVERLOOK
PLATFORM TO BOARDWALK SEE 6/C-501
6' BENCH
SEE 3/C-501
PROPOSED GRILL LOCATION
ADA VIEWING RAIL
SYSTEM AT LANDINGS
ADA VIEWING RAIL SYSTEM
W12-2 SIGN
SEE C/C-502
8' BENCH (TYP)
SEE 3/C-501
LOW PROFILE BOARDWALK SEE
11/S-501
LOW PROFILE BOARDWALK
WITH FIBERGLASS GRATING
SEE 11/S501
92.4'
22.4'
20.2'
29.8'
71.4'42.9'
30.0' 82.8'
33.3'
28.0'
5.0
5.0'
.0' 6.4
.1'
5.7' 40.5'
6.0
MDOT 22A
ADA SIGN (R7-8b)
ADA SIGN (R7-8)
SLOPE RESTORATION, TYP
14.4'
3.4'
5.0'
12.7' 8.7'
PROPOSED VAULT TOILET. TOILET VAULT SHALL BE
FURNISHED AND INSTALLED BY CONTRACTOR.
MDNR WILL FURNISH TOILET FLOOR AND TOILET
BUILDING FOR CONTRACTOR TO PLACE. SEE SHEET
C-502 AND PROJECT MANUAL FOR DETAILS.
CONTRACTOR SHALL INCLUDE ASSEMBLY OF THE
VAULT TOILET PARTS AND PIECES AS DESCRIBED IN
THE PROJECT MANUAL.
11.0'
PROPOSED WORK FOR
CONCRETE SIDEWALK, ADA
PARKING SPACE, GRILL, AND
VAULT TOILET IS INCLUDED IN
ALTERNATE #2
NOTE:
1. CONSTRUCTION REMOVAL AND PROPOSED EFFORTS SHALL BE
COMPLETED WITH LOW GROUND PRESSURE EQUIPMENT NOT
EXCEEDING 8000 LBS GROSS WEIGHT AND HAVING NOT MORE
THAN A 10 PSI GROUND PRESSURE. EQUIPMENT MAY BE UTILIZED
TO PERFORM AUGER EXCAVATIONS FOR NEW FOOTINGS,
DELIVERY OF LARGE TIMBERS AND AGGREGATE PATH
INSTALLATION. ONCE TIMBERS ARE DELIVERED AND FOOTINGS
INSTALLED, CONSTRUCTION SHALL BE LIMITED TO HAND
CONSTRUCTION ONLY WITH NO LARGE EQUIPMENT. GROUND
DISTURBANCE SHALL BE REDUCED AS MUCH AS POSSIBLE.
2. EXISTING PARKING LOT TO BE CLOSED TO PUBLIC ACCESS.
SIDEWALK REPLACEMENT AS
NEEDED, SEE UNIT PRICES
LEGEND
FIBERGLASS GRATING
WOOD DECKING
R
P L
UR
I
BU
E
S
U N
U M
C I
R
C
U M
S P
I C
E
SI
Q
UE
RE
IS
PE
NI
NS
UL
AM
AM
OE
NA
M
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O F
M
IC
H
IG
A N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
PRELIM
INARY - N
OT
FOR CONSTRUCTIO
N
P:\7
_72 00\
0_M usk allo nge _St ate _Pa rk\A 1_R eno vat e S tair wa y\D raw ing s\S ite\
She ets
\A1 _22
0C
ON
.dw g Ap r 25 , 2
- 1
1:0 0am
D R
AW
IN
G P
AT
H
OHM-ADVISORS.COM
ARCHITECTS ENGINEERS PLANNERS
CO
PY
RI
G
HT
O
HM
A
DV
IS
O
RS
. A
LL
D
RA
W
IN
G
S
AN
D W
RI
TT
EN
M
AT
ER
IA
LS
A
PP
EA
RI
NG
H
ER
EI
N
CO
NS
TI
TU
TE
T
HE
O
RI
G
IN
AL
A
ND
U
NP
UB
LI
SH
ED
W
O
RK
O F
O
HM
A
DV
IS
O
RS
A
ND
T
HE
S
AM
E
M
AY
N O
T
BE
D
UP
LI
CA
TE
D, D
IS
TR
IB
UT
ED
, O R
DI
SC
LO
SE
D W
IT
HO
UT
P
RI
O
R W
RI
TT
EN
C
O
NS
EN
T
O F
O
HM
A
DV
I
R
CL
IEN
T P
RO
J N O
RE
VIS
ION
DA
TE
DE
SC
RIP
TIO
N
DIS
CIP
LIN
E L
EA
D
PM
PR
OJ
EC
T N
UM
BE
R
ISS
UE
D F
OR
MI
CH
IG
AN
D
EP
AR
TM
EN
T
OF
N
AT
UR
AL
R
ES
OU
RC
ES
MU
SK
AL
LO
NG
E
LA
KE
S P
UN
IV
ER
SA
L A
CC
ES
S
PA
TH
1 C O
RD
7 N
EW
BE
RR
Y, M
I 4
CO
NS
TR
UC
TI
ON
P
LA
N
AL
TE
RN
AT
E #1
C-131
-2 2-
ZH
ZH
1.2
.A
BG
/25
/20
BI
D
SE
T feetGRAPHIC SCALE: FULL feetHALF
60402010
SLOPE RESTORATION
10.0'
0.9
.8'
EBW641.03
EBW640.97
EBW638.36
EBW638.26 EBW638.30
EBW636.31
EBW636.21
EBW636.26
EBW631.19
EBW631.10
EBW631.14
EBW628.12
EBW628.12
EBW628.12
EBW628.12
EBW628.12 EBW619.97
EBW619.93 EBW619.88
EBW618.08
EBW617.98
EBW618.03
EBW615.50
EBW615.50
FG 614.79
FG 614.90
FG 613.63
FG 613.63
ECW611.84 ECW611.86
FG 609.99 FG 609.99
8.30%
-8.20%
-8.20%
-8.20%
-8.20%
-8.20%
-8.20%
-8.20% -8.20% -8.20%
-8.17%
-8.19%
EBW640.93
-8.20%
-8.20%
ECW644.20
ECW644.13
ECW644.89
ECW644.89
ECW644.38
ECW644.38
ECW644.18
ECW644.39
ECW644.34ECW644.46
ECW644.51
ECW644.49 ECW644.23
ECW644.05
ECW644.05
644.23
MATCH EX
MATCH EX
644.11
MATCH EX
644.07
MATCH EX
643.97
MATCH EX
643.88
MATCH EX
644.27
MATCH EX
644.25
MATCH EX
EBW625.97
EBW625.87
EBW639.57
EBW639.62
EBW639.52
-8.20%
-8.20%
Know what'sbelow.
before you dig.Call
R feetGRAPHIC SCALE: FULL feetHALF
60402010
P
L
UR
I
BU
E
S U
N U M
C I
R C
U M
S P
I C
E
SI
Q
UE
RE
I S
PE
NI
NS
UL
AM
AM
OE
NAM
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O F
M
IC
H
IG
A N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
PRELIM
INARY - N
OT
FOR CONSTRUCTIO
N
P:\7
_72 00\
0_M usk allo nge _St ate _Pa rk\A 1_R eno vat e S tair wa y\D raw ing s\S ite\
She ets
\A1 _22
0G
RD
.dw g Ap r 25 , 2
- 1
1:0 1am
D R
AW
IN
G P
AT
H
OHM-ADVISORS.COM
ARCHITECTS ENGINEERS PLANNERS
CO
PY
RI
G
HT
O
HM
A
DV
IS
O
RS
. A
LL
D
RA
W
IN
G
S
AN
D W
RI
TT
EN
M
AT
ER
IA
LS
A
PP
EA
RI
NG
H
ER
EI
N
CO
NS
TI
TU
TE
T
HE
O
RI
G
IN
AL
A
ND
U
NP
UB
LI
SH
ED
W
O
RK
O F
O
HM
A
DV
IS
O
RS
A
ND
T
HE
S
AM
E
M
AY
N O
T
BE
D
UP
LI
CA
TE
D, D
IS
TR
IB
UT
ED
, O R
DI
SC
LO
SE
D W
IT
HO
UT
P
RI
O
R W
RI
TT
EN
C
O
NS
EN
T
O F
O
HM
A
DV
I
R
CL
IEN
T P
RO
J N O
RE
VIS
ION
DA
TE
DE
SC
RIP
TIO
N
DIS
CIP
LIN
E L
EA
D
PM
PR
OJ
EC
T N
UM
BE
R
ISS
UE
D F
OR
MI
CH
IG
AN
D
EP
AR
TM
EN
T
OF
N
AT
UR
AL
R
ES
OU
RC
ES
MU
SK
AL
LO
NG
E
LA
KE
S P
UN
IV
ER
SA
L A
CC
ES
S
PA
TH
1 C O
RD
7 N
EW
BE
RR
Y, M
I 4
GR
AD
IN
G
PL
AN
C-170
-2 2-
ZH
ZH
1.2
.A
BG
/25
/20
BI
D
SE
T
BOARDWALK WITH SLOPES < 2%
SET VAULT TOILET TO MEET ADA
GRADES AND THRESHOLD
REQUIREMENTS WITH ADJACENT WALK
RI
B U
E S
UN
U
M
C I
R C
U M
S
P
I C
E
SI
QU
ER
EI
S
PE
N
IN
SU
LA
M
AM
OEN
A
M
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O F
M
IC
H
IG
A N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
P:
\7
1_
\7
0_
M us ka llo ng e_
St at e_ Pa rk \A
1_ R en ov at e
St ai rw ay
\D ra w in gs \S ite \S he et s\ A1
_2
0D
ET
.d w
5,
- 1 1:
am
D R
AW
IN
G P
AT
H
OHM-ADVISORS.COM
ARCHITECTS ENGINEERS PLANNERS
CO
PY
RI
G
HT
O
HM
A
DV
IS
O
RS
. A
LL
D
RA
W
IN
G
S
AN
D W
RI
TT
EN
M
AT
ER
IA
LS
A
PP
EA
RI
NG
H
ER
EI
N
CO
NS
TI
TU
TE
T
HE
O
RI
G
IN
AL
A
ND
U
NP
UB
LI
SH
ED
W
O
RK
O F
O
HM
A
DV
IS
O
RS
A
ND
T
HE
S
AM
E
M
AY
N O
T
BE
D
UP
LI
CA
TE
D, D
IS
TR
IB
UT
ED
, O R
DI
SC
LO
SE
D W
IT
HO
UT
P
RI
O
R W
RI
TT
EN
C
O
NS
EN
T
O F
O
HM
A
DV
I
R
CL
IEN
T P
RO
J N O
RE
VIS
ION
DA
TE
DE
SC
RIP
TIO
N
DIS
CIP
LIN
E L
EA
D
PM
PR
OJ
EC
T N
UM
BE
R
ISS
UE
D F
OR
MI
CH
IG
AN
D
EP
AR
TM
EN
T
OF
N
AT
UR
AL
R
ES
OU
RC
ES
MU
SK
AL
LO
NG
E
LA
KE
S P
UN
IV
ER
SA
L A
CC
ES
S
PA
TH
1 C O
RD
7 N
EW
BE
RR
Y, M
I 4
BO
AR
DW
AL
K
DE
TA
ILS
C-501
-2 2-
ZH
ZH
1.2
.A
BG
/25
/20
BI
D
SE
T
CRZ CALCULATION
CRZ RADIUS = DRIP LINE OF TREE OR DIAMETER
OF TREE X 12 (INCHES), WHICHEVER IS GREATER
CRITICAL ROOT ZONE (CRZ)
TRENCHING / FENCING SECTION
BOTTOM OF BOARDWALK TERMINATION DETAIL4
BENCH DETAIL WITH ANCHORS3
FOR USE OUTSIDE OF BOARDWALK
FOR USE ON BOARDWALK
SILT FENCE JOINTSECTION A-A
FRONT VIEW
PLAN VIEW
SECTION B-B
SPACING 6' MAX.
6" A
NC
HO
R
TR
EN
CH
1'
MI
N.
1'
MI
N.
SHEET
FLOW
UNDISTURBED
VEGETATION
GEOTEXTITLE
FILTER FABRIC
FABRIC TO BE WRAPPED
AROUND FENCE POST
SILT
FENCE
B
SILT
FENCE
A
SILT FENCE JOINT
SECTION B-B
A
A
FENCE POST
GEOTEXTILE FILTER FABRIC
COMPACTED
EARTH
SUPPORT FENCE
FENCE POST DRIVEN 1'
INTO GROUND
UNDISRUPTED
VEGETATION
SUPPORT
FENCE
GEOTEXTILE FILTER FABRIC
FASTENED TO UPHILL SIDE
TOWARDS EARTH DISRUPTION
RIDGE OF COMPACTED EARTH
ON FILTER FABRIC
6"x6"
SHEET
FLOW
FLOW
COUPLER
SILT FENCE DETAIL2
2x10 PT STRINGERS
18"x23" TURFSTONE FILL
WITH AGGREGATE
GRAVEL PATH 2x8 PT, TRIM AS
REQUIRED
EXISTING GRADE
MAXIMUM SLOPE
VARIES BY LOCATION1
2" STEEL PLATE
8"1.0'
6X6 WOOD RAILING POST
EXISTING GROUND
PT 2X6 WOOD TOP RAIL
EXISTING FENCE
FENCE DETAIL6
TREE PROTECTION DETAIL1
5.0'
TOP OF BOARDWALK TERMINATION DETAIL5
CONC SIDEWALK
2x8 PT, TRIM AS
REQUIRED
2" STEEL PLATEADA SQUARE GRID
FIBERGLASS GRATING2x10 PT STRINGERS
18"x23" TURFSTONE FILL
WITH AGGREGATE
EXISTING GRADE
ANGLE BRACKET
SEE DETAIL 7
PT 4X4 RAILING
ATTACH POST WITH ANGLE BRACKET
ANGLE DETAIL7
2"
4" 11
4"
13 4"
NOTE: ANGLE SHALL BE HOT DIPPED GALVANIZED AFTER
FABRICATION
4"
11 4" 11 4"31 2"
COUNTERSUNK HOLE FOR #10
FH WOOD SCREW AT 2" FROM
END OF ∠
COUNTERSUNK HOLE FOR
#10 FH WOOD SCREW
⅊ 1 4"X31
2"X31 2"
∠ 31 2"X31
2"X1 4"X23
4"
" M
IN
D
IR
EC
T
BU
RY
D
EP
TH
ADA SQUARE GRID
FIBERGLASS GRATING
MDOT 22A
4" BLUE PAVEMENT MARKING, TYP
11' 5'
PL
U
RI
B U
E S
U N U
M
C I
R C
U M
S P
I C
E
SI
QU
ER
E IS
PE
N
IN
SU
LA
M
AM
OEN
A M
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O F
M
IC
H
IG
A N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
P:
\7
1_
\7
0_
M us ka llo ng e_
St at e_ Pa rk \A
1_ R en ov at e
St ai rw ay
\D ra w in gs \S ite \S he et s\ A1
_2
0D
ET
.d w
5,
- 1 1:
am
D R
AW
IN
G P
AT
H
OHM-ADVISORS.COM
ARCHITECTS ENGINEERS PLANNERS
CO
PY
RI
G
HT
O
HM
A
DV
IS
O
RS
. A
LL
D
RA
W
IN
G
S
AN
D W
RI
TT
EN
M
AT
ER
IA
LS
A
PP
EA
RI
NG
H
ER
EI
N
CO
NS
TI
TU
TE
T
HE
O
RI
G
IN
AL
A
ND
U
NP
UB
LI
SH
ED
W
O
RK
O F
O
HM
A
DV
IS
O
RS
A
ND
T
HE
S
AM
E
M
AY
N O
T
BE
D
UP
LI
CA
TE
D, D
IS
TR
IB
UT
ED
, O R
DI
SC
LO
SE
D W
IT
HO
UT
P
RI
O
R W
RI
TT
EN
C
O
NS
EN
T
O F
O
HM
A
DV
I
R
CL
IEN
T P
RO
J N O
RE
VIS
ION
DA
TE
DE
SC
RIP
TIO
N
DIS
CIP
LIN
E L
EA
D
PM
PR
OJ
EC
T N
UM
BE
R
ISS
UE
D F
OR
MI
CH
IG
AN
D
EP
AR
TM
EN
T
OF
N
AT
UR
AL
R
ES
OU
RC
ES
MU
SK
AL
LO
NG
E
LA
KE
S P
UN
IV
ER
SA
L A
CC
ES
S
PA
TH
1 C O
RD
7 N
EW
BE
RR
Y, M
I 4
TY
PC
IA
L S
IT
E
DE
TA
ILS
C-502
-2 2-
ZH
ZH
1.2
.A
BG
/25
/20
BI
D
SE
T
ADA GRAVEL
COMPACTED TO 97%SUITABLE SUBGRADE
COMPACTED TO 95%
TYPICAL GRAVEL PATH SECTION1
5.0'
TOPSOIL, SEED AND MULCH
2.0' TYP
MAX 2%
SUITABLE SUBGRADE MATERIAL
COMPACTED TO 95%
8" MDOT 22A (COMPACTED TO 95%)
6" CONC WITH 6"X6" REINFORCING MESH
W1.4xW1.4 WWF
TYPICAL CONCRETE SIDEWALK SECTION2
4" 23A AGGREGATE WITH GEOCELL GRID
COMPACTED TO 95%
GEOTEXTILE, NON-WOVEN 8 OZ
SLOPE RESTORATION
SUITABLE SUBGRADE
COMPACTED TO 95%
WIDTH VARIES
CL II SAND COMPACTED TO 95%
GRAVEL ROAD DETAIL4
MAX 2%
DEPTH VARIES
W-12-2 SIGN3
2 C
2 C
3 6
1.5 C
3.94 4.12
3.94
1.5
1.13 9.87
8.5
7.00'
" M
IN
R7-8
3 LBS STEEL POST
1.5 1.5C
4.1 3.8
0.51C
2 8
4.1
1.5
R7-8b
NOTE: USE R7-8b ONLY WHERE SPECIFIED ON PLANS
HANDICAP PARKING SIGN DETAIL5
HANDICAP PARKING SPACE STRIPING DETAIL6
NOTE: GRAVEL PATH SHALL HAVE A MAXIMUM 5% SLOPE IN THE
DIRECTION OF TRAVEL
PRECAST CONCRETE VAULT NOTE
CONTRACTOR SHALL FURNISH AND INSTALL A
PRECAST CONCRETE TOILET VAULT WITH 1,000
GALLON (MIN) CAPACITY CONSTRUCTED AT THE
DIMENSIONS REQUIRED FOR PLACEMENT OF
PRECAST CONCRETE FLOOR. VAULT SHALL BE BY
BICHLER CONCRETE AND GRAVEL (PHONE:
906.786.0343) OR APPROVED EQUAL. VAULT SHALL
BE DESIGNED TO WORK WITH PRECAST FLOOR
DETAIL.
PRECAST CONCRETE FLOOR AND
BUILDING NOTE:
MDNR WILL FURNISH A PRECAST CONCRETE
FLOOR AN TOILET BUILDING. CONTRACTOR SHALL
UNLOAD FLOOR TOILET BUILDING AN INSTALL ON
CONCRETE VAULT WITH MDNR TOILET BUILDING.
CONCRETE FLOOR AND TOILET BUILDING CAN BE
UNLOADED AND PLACE ON VAUILT WITH A
MEDIUM-DUTY BACKHOE. THE ESTIMATED WEIGHT
OF THE CONCRETE FLOOR AND TOILET BUILDING
ARE 1,000 LBS AND 500 LBS RESPECTIVELY.
VAULT TOILET DETAILS7
PLAN
SECTION
4"
1,000 GALLON MIN.
CONCRETE VAULT
12" CLASS II SAND SUBBASE
COMPACTED TO 95% MODIFIED
PROCTOR MIN. COMPACTION
| Sheets and Views |
| DT COVER |
| C-001 NOTES & LEGEND |
| C-010 OVERALL MAP |
| C-090 SOIL BORINGS |
| C-091 SOIL BORINGS |
| C-092 SOIL BORINGS |
| C-120 REMOVAL PLAN |
| C-121 REMOVAL PLAN ALTERNATE #1 |
| C-130 CONSTRUCTION PLAN |
| C-131 CONSTRUCTION PLAN ALTERNATE #1 |
| C-170 GRADING PLAN |
| C-501 BOARDWALK DETAILS |
| C-502 TYPCIAL SITE DETAILS |
| S-001 NOTES |
| S-101 FOUNDATIONS |
| S-501 STRUCTURAL DETAILS |
| S-502 OVERPASS ELEVATION |
File details come from the government source that posted it. Updated .