751-25468.JLM - Drwg File 4 of 4 - 2026 06 15.pdf

PDF 2 MB Posted

Attached to
751/25468. JLM; Saugatuck Dunes State Park Storage Building
Solicitation number
RFQ 171 260000000356 3
Issued by
Allegan County, Michigan

About this file

This is a drawing file (Drawing File 4 of 4) for the Saugatuck Dunes State Park Storage Building project located in Laketown Township, Allegan County, Michigan, prepared for the State of Michigan Department of Technology, Management and Budget, State Facilities Administration, Design and Construction Division. The project file number is 751/25468.JLM, issued for bid and construction on June 15, 2026. The drawings include comprehensive plumbing, mechanical, and electrical systems for a new storage building facility. The plumbing plans show a complete system including water supply (via well system), hot and cold water distribution, sanitary and storm drainage, with fixtures including one water closet (ADA compliant), one lavatory, one service sink, and one floor drain. The mechanical plans detail HVAC systems including two wall-mounted ductless cooling units (Daikin), one air-source heat pump, toilet exhaust ventilation, electric baseboard heating, and a radiant ceiling heating panel. The electrical plans specify a 150-amp, single-phase service panel with 27 branch circuits, exterior and interior lighting with LED fixtures, emergency lighting, receptacles throughout the facility, and connections for all mechanical equipment.

The project documentation establishes detailed specifications for materials and equipment selections, including acceptable manufacturers and equivalents for all fixtures and equipment. Plumbing equipment includes an A.O. Smith water heater (1650 watts, 8 GPH), Zurn water closet and fixtures, and Elkay sink with specific valve requirements. Mechanical equipment incorporates Daikin ductless units with SEER2 ratings of 21 and Greenheck exhaust fans. Electrical specifications require compliance with local, state, and national codes, with particular attention to grounding requirements (25-ohm resistance or less), surge protection, and emergency battery lighting systems. The contractor must coordinate all trades to avoid conflicts between ductwork, piping, electrical conduit, and structural elements, verify field conditions prior to rough-in, submit detailed shop drawings, and perform testing and balancing. General notes emphasize compliance with Michigan codes, field coordination of actual conditions versus diagrammatic layouts, and that the contractor is responsible for determining equipment lead times and ensuring timely delivery to meet project deadlines.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2x4 V.T.R.

MEZZANINE

GARAGE BELOW

WC-1

L-1

S-1

FD-1 FD-1

2" V

1" CW

¾" COLD WATER ABOVE

¾" HOT WATER PIPING

2" V UP

SC-1

FCO

2" V

2" V

2" V

1" DOMESTIC

WATER SERVICE

WELL SYSTEM

BY OTHER

1"

GARAGE

BREAK ROOM

OFFICE

CLO.

ADA/BF UNISEX TLT.

WH

SEE CIVIL FOR

CONTINUATION

SEE CIVIL FOR

CONTINUATION

1"

4" SAN

4" SAN

4" SAN

4" SAN

4" SAN

1" CW UP

1" INCOMING

WATER SERVICE

9 6

1"

GARAGE

BREAK ROOM

OFFICE

CLO.

3ADA/BF UNISEX TLT.

DRAIN DOWN - SEE

SHEET P2.0 FOR DETAIL

P L

U R

I B

U E

S U

N U

M

C I

R C

U M

S P

I C

E

S I

Q U

E R

E I

S P

E N

I N

S U

L A

M A

M

OE

N A

M

9711 Valparaiso Drive

221 N. LaSalle Street

(219)924-8400

Munster, IN 46321

Chicago, IL 60601 www.milliesengineeringgroup.com

MILLIES

ENGINEERING GROUP

820 Monroe Ave NW Grand Rapids, MI 49503

Copyright © 2026 Millies Engineering Group

S th S tr e e t, P O

B o x

O s h te m o

M

I

(2

-8

S N

A N

O -1

F

IL

E N

O

.J

L M

S H

E E

T

ID

E N

T

IF

IC

A

T

IO

N N

O

IS

S

U E

D F

O R

D A

T E

C o p y ri g h t

S c h le y N el so n A rc h it e ct s, I n c.

C O

N S

T R

U C

T

IO

N

F

IN

A L

R E

C O

R D

P R

E L

IM

R

E V

IE

W

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

A D

A M

P L

A C

H R

A D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N t h

A v e

S a u g a t u c k

D u n e s M I

S a u ga tu ck

D u n es

S ta te

P a r k

S to r a ge

B u il d in g

D ep a r tm en t o f N a tu r a l R es o u r ce s

L a k e t o w n

T o w n s h ip A ll e g a n

C o u n t y M ic h ig a n

P1.0

-1

-2

F O

R B

ID

C O

N S

T R

1/4" = 1'-0"

MEZZANINE PLAN - PLUMBING

1/4" = 1'-0"

FLOOR PLAN - PLUMBING

1/4" = 1'-0"

UNDERFLOOR PLAN - PLUMBING

1. ½" COLD WATER AND 1½" VENT DOWN AND ½"

HOT WATER UP TO LAVATORY.

2. ½" COLD WATER AND 2" VENT DOWN TO

WATER CLOSET.

3. ½" COLD WATER AND 1½" VENT DOWN AND ½"

HOT WATER UP TO SINK.

4. 1½" SANITARY UP TO LAVATORY.

5. 4" SANITARY UP TO WATER CLOSET.

6. 2" SANITARY UP TO SINK.

7. 4" SANITARY UP TO FLOOR DRAIN.

8. ¾" COLD WATER DOWN TO SILL COCK.

9. 4" SANITARY UP TO FLOOR CLEANOUT.

SHEET NOTES

A. WORK SHALL COMPLY WITH LOCAL, MUNICIPAL, AND STATE PLUMBING CODES.

B. THE SCOPE OF WORK SPECIFIED HEREIN AND IN THE SPECIFICATIONS SHALL BE COORDINATED

WITH THE CONSTRUCTION MANAGER - REFER TO THE SCOPE OF WORK FOR EACH TRADE. ANY

DISCREPANCIES BETWEEN THE CONSTRUCTION DOCUMENTS AND CONSTRUCTION MANAGERS

SCOPE SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEER FOR

CLARIFICATION. THE ARCHITECT/ENGINEER'S DECISION SHALL BE FINAL.

C. LAYOUT IS DIAGRAMMATIC. INSTALL PIPING AND EQUIPMENT TO MEET ACTUAL FIELD

CONDITIONS. REVIEW PROJECT SPECIFICATIONS BEFORE STARTING ANY WORK. SUBMIT SHOP

DRAWINGS OF WORK AS PER SPECIFICATIONS.

D. LAYOUT WORK TO AVOID CONFLICTS BETWEEN DUCTWORK, LIGHTING, CEILINGS, PIPING AND

BUILDING STRUCTURE.

E. VERIFY LOCATION AND ELEVATION OF PLUMBING EQUIPMENT, FIXTURES, PIPING, PANELS, ETC.

EXPOSED WITHIN OCCUPIED SPACES BEFORE THE START OF ANY ROUGH-IN OR INSTALLATION.

F. COORDINATE EQUIPMENT ELECTRICAL REQUIREMENTS (VOLTAGES, PHASE, LOAD, ETC.)

BEFORE ORDERING ANY EQUIPMENT.

G. COORDINATE VENT THROUGH ROOF LOCATIONS WITH OUTDOOR AIR INTAKE LOCATIONS TO

MAINTAIN A MINIMUM SEPARATION OF TEN FEET.

H. PROVIDE A WATERTIGHT SHEET METAL DRIP PAN OVER ELECTRICAL EQUIPMENT INSTALLED

UNDER OR NEAR PIPING SYSTEMS. DRIP PAN TO EXTEND MINIMUM 3" OVER FRONT AND SIDES

OF ELECTRICAL EQUIPMENT AND BE PITCHED AT A MINIMUM 30° ANGLE. SEAL DRIP PAN

WATERTIGHT TO WALL.

I. PROVIDE ROUGH-IN AND FINAL CONNECTIONS TO PLUMBING EQUIPMENT AND FIXTURES. SET FIXTURES/EQUIPMENT AND FURNISH AND INSTALL NECESSARY FITTINGS, TRAPS, STOPS, ETC.

AS REQUIRED.

J. PROVIDE ALL ROUGH-IN AND FINAL SERVICES AND CONNECT ALL WATER LINES, WASTE LINES, INDIRECT PIPING, ETC. FOR FIXTURES. PROVIDE ALL VALVES, STOPS, TRAPS, AND PRESSURE

REGULATORS NECESSARY TO CONNECT LINES.

K. PLUMBING PIPING ROUTING TO BE FIELD COORDINATED WITH NEW HVAC DUCTWORK, HVAC

PIPING, ELECTRICAL AND STRUCTURE TO ENSURE NO CONFLICTS WILL OCCUR DUE TO

INTERFERENCE.

L. PIPING, EQUIPMENT, ETC. SHALL NOT BE SUPPORTED FROM THE BOTTOM CHORD OF

ENGINEERED JOISTS WITHOUT WRITTEN APPROVAL FROM THE STRUCTURAL ENGINEER.

M. INVERT ELEVATIONS SHALL BE FIELD COORDINATED WITH FINAL GRADING PLANS TO ENSURE

PROPER INSTALLATION.

N. REFER TO ARCHITECTURAL INTERIOR ELEVATIONS FOR FINAL MOUNTING HEIGHTS OF

PLUMBING FIXTURES.

O. PROTECT NEW AND EXISTING DRAIN OPENINGS AND SANITARY LINES DURING CONSTRUCTION

TO PREVENT BLOCKAGE. ROD-OUT EXISTING SANITARY PIPING. PIPING SHALL BE FREE OF

BLOCKAGE.

P. REPAIR AND/OR REPLACE DAMAGED PIPE INSULATION THAT OCCURS AS THE RESULT OF THIS

CONSTRUCTION.

Q. PRIME AND PAINT EXPOSED PIPING IN FINISHED AREAS IN COLOR AS SELECTED BY OWNERS

REPRESENTATIVE.

GENERAL NOTES

ABBREVIATIONS LIST

A AIR

AD AREA DRAIN

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

CB CATCH BASIN

CI CAST IRON

CO CLEANOUT

CTE CONNECT TO EXISTING

CW COLD WATER

DBP DOMESTIC BOOSTER PUMP

DI DUR-IRON

DN DOWN

DS DOWNSPOUT

DT DRAIN TILE

EX. EXISTING

FCO FLOOR CLEANOUT

FD FLOOR DRAIN

FIN. FL. FINISHED FLOOR

FIN, GR. FINISHED GRADE

HB HOSE BIBB

HW HOT WATER

IM ICEMAKER VALVE BOX

INV. EL. INVERT ELEVATION

IWH INSTANTANEOUS WATER HEATER

L LAVATORY

MB MOP BASIN

NIC NOT IN CONTRACT

OSD OPEN SITE DRAIN

PRV PRESSURE REDUCING VALVE

PS PLUMBING STACK

S SINK

SC SILL COCK

TW TEMPERED WATER

V VENT

VIT VITRIFIED HUB TILE

VTR VENT THROUGH ROOF

WC WATER CLOSET

WCO WALL CLEANOUT

WH WATER HEATER

WS WATER SOFTENER

YCO YARD CLEANOUT

YH YARD HYDRANT

SYMBOL LIST

DESCRIPTIONSYMBOL

PIPE PITCHED DOWN IN DIRECTION OF FLOW

CHECK VALVE

DIRECTION OF FLOW

SHUT-OFF VALVE

RELIEF VALVE

HOSE BIBB/SILL COCK

SHEET NOTE TAG

MECHANICAL EQUIPMENT TAG

DRAIN TILE PIPING

TEMPERED WATER PIPING

COMPRESSED AIR PIPINGCA

TW

DT

VENT PIPING

UNDERGROUND STORM SEWER

HOT WATER PIPING

COLD WATER PIPING

HOT WATER RECIRCULATION PIPING

UNDERGROUND SANITARY SEWER

OVERHEAD STORM PIPING

OVERHEAD SANITARY PIPING

ST

T THERMOMETER

P PRESSURE GAUGE

BALANCING COCK/ MANUAL

FLOW CONTROL VALVE

PIPE DOWN

PIPE UP

SAN

V

ST

SAN

NEW PIPING

SHUT-OFF VALVE

TEMPERED WATER VALVE

DIAGRAM

FAUCET

⅜" CW PIPING

⅜"x½" VALVE

⅜" CW PIPING⅜" HW PIPING

TEMPERED

WATER VALVE-

COMPLY WITH

ASSE 1070

⅜" HW PIPING

⅜"x½" VALVE

⅜"

NTS

LAVATORY TEMPERED WATER

VALVE DIAGRAM

NTS

⅜"

FAUCET

⅜" CW PIPING

⅜"x½" VALVE

⅜" CW PIPING⅜" HW PIPING

TEMPERED

WATER VALVE-

COMPLY WITH

ASSE 1070

⅜" HW PIPING

⅜"x½" VALVE

FIRST FLOOR

FLOOR

MEZZANINE

FLOOR

MEZZANINE

ROOF

FIRST FLOOR

FLOOR

MEZZANINE

FLOOR

MEZZANINE

ROOF

RISER DIAGRAM

F C

O

S -1

L -1

F D

-1

F D

-1

W C

-1

W C

-1

L -1

S -1

4"

2"

1½"

1½"

4"

2"

4"

2"

4"

2"

2x4 INCR VTR

2" 2" 2"

2"

WELL SYSTEM

BY OTHERS

¾"

¾"

¾"

½"½"

1"

1" ¾"

1"1"

¾"

¾"½"

½" ½"

½"

WATER HEATER

- SEE DETAIL ON

SHEET P2.0

S C

-1

1½"

SEE CIVIL FOR

CONTINUATION

SEE CIVIL FOR

CONTINUATION

DRAIN DOWN

VALVE - NC

TO FD

TO FD

COMPRESSED AIR

BLOW DOWN VALVE

FOR WINTER DRAIN

DOWN

COMPRESSED AIR BLOW

DOWN VALVE FOR

WINTER DRAIN DOWN

WH-1

WATER HEATER DIAGRAM

THERMOMETER

DRAIN VALVE-ROUTE TO FLOOR DRAIN

RELIEF PIPE-FULL SIZE OF DISCHARGE

OPENING - ROUTE TO FLOOR DRAIN

A.S.M.E. APPROVED TEMPERATURE &

PRESSURE RELIEF VALVE

AMTROL #ST-5 THERM-X-TROL

THERMAL EXPANSION TANK

HOT WATER

COLD WATER

WATER HEATER TO BE MOUNTED

ON "HOLDRITE #40-SWHP-WM"

SHELF LOCATED AS HIGH AS

POSSIBLE ABOVE FLOOR

WALL

ROUTE PIPING FROM PAN DRAIN

DOWN TO FLOOR DRAIN

VACUUM RELIEF VALVE

HEAT TRAP

HEAT TRAP

EXTERIOR DRAIN DOWN DETAIL

BUTT WELD

BUILDING SHUT-OFF

& CURB BOX (BRASS)

NEW UNDERGROUND

WATER SERVICE

MINIMUM 5' COVER

WALL ANCHOR AND THRUST

RESTRAINT REQUIRED AT

ALL BUILDING CONNECTIONS

FINISH GRADE LINE

CONCRETE PAD

9"x21"x4" THICK

½" COPPER CAPPED AIR BLOW-OFF

LINE WITH AIR SNIFTER.

VALVE IN 5¼" C.I. UPPER SECTION.

VALVE BOX WITH COVER.

CURB BOX

EXTERIOR

BUILDING WALL

P L

U R

I B

U E

S U

N U

M

C I

R C

U M

S P

I C

E

S I

Q U

E R

E I

S P

E N

I N

S U

L A

M A

M

OE

N A

M

9711 Valparaiso Drive

221 N. LaSalle Street

(219)924-8400

Munster, IN 46321

Chicago, IL 60601 www.milliesengineeringgroup.com

MILLIES

ENGINEERING GROUP

820 Monroe Ave NW Grand Rapids, MI 49503

Copyright © 2026 Millies Engineering Group

S th S tr e e t, P O

B o x

O s h te m o

M

I

(2

-8

S N

A N

O -1

F

IL

E N

O

.J

L M

S H

E E

T

ID

E N

T

IF

IC

A

T

IO

N N

O

IS

S

U E

D F

O R

D A

T E

C o p y ri g h t

S c h le y N el so n A rc h it e ct s, I n c.

C O

N S

T R

U C

T

IO

N

F

IN

A L

R E

C O

R D

P R

E L

IM

R

E V

IE

W

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

A D

A M

P L

A C

H R

A D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N t h

A v e

S a u g a t u c k

D u n e s M I

S a u ga tu ck

D u n es

S ta te

P a r k

S to r a ge

B u il d in g

D ep a r tm en t o f N a tu r a l R es o u r ce s

L a k e t o w n

T o w n s h ip A ll e g a n

C o u n t y M ic h ig a n

P2.0

-1

-2

F O

R B

ID

C O

N S

T R

PLUMBING EQUIPMENT SCHEDULE

TAG TYPE DESCRIPTION MANUFACTURER MODEL NO. ACCEPTABLE MANUF. ACCESSORIES/REMARKS (SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION)

ELECTRICAL DATA

LOAD

VOLT PHASE HZ HP MCA FLA MOCP

WH-1 WATER HEATER 1650 WATT, 8 GPH @ 90F., 6 GAL. STORAGE A.O. SMITH EJC-6 NOTE #1 TEMP. RELIEF VALVE, DRAIN VALVE PIPED TO SERVICE SINK 13.75 120 V 1 60 Hz

PLUMBING FIXTURE SCHEDULE

TAG

FIXTURE / EQUIPMENT

TYPE

FIXTURE / EQUIPMENT FIXTURE / EQUIPMENT DATA FIXTURE VALVE / FAUCET DATA TEMPERED WATER VALVES

ACCESSORIES/REMARKS (SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION)DESCRIPTION MANUFACTURER AND MODEL NO. ACCEPTABLE MANUF. TYPE MANUFACTURER AND MODEL NO. ACCEPTABLE MANUF. MANUFACTURER AND MODEL NO. ACCEPTABLE MANUF.

WC-1

WATER CLOSET VITREOUS CHINA, FLOOR MOUNTED, TANK TYPE, ADA, 1.6 GPF ZURN Z5551-K NOTE #1 - - - - BEMIS 1500EC-000

L-1 LAVATORY VITREOUS CHINA, WALL MOUNTED, 20"x18" ADA ZURN Z5344 NOTE #1 0.5 GPM-SINGLE LEVER HANDLE, 4"

CENTERS

ZURN Z7440-XL-FC NOTE #4 BRADLEY S59-4000A NOTE #6 MCGUIRE PW2150WC 1-1/2" PROWRAP, MCQUIRE LFH2167CCLK , LAVATORY CHAIR

CARRIER EQUIVILENT TO ZURN Z1231EZ

S-1 SINK 1-COMPARTMENT STAINLESS STEEL SINK, 15"x15"x6-1/8" ELKAY BLR 15601 NOTE #2 TWO HANDLE, 4" GOOSENECK, 1.5

GPM

ELKAY LK406GN04T4 NOTE #5 BRADLEY S59-4000A NOTE #6 ELKAY LK35 STRAINER, MCGUIRE B8912CSDF P-TRAP, MCGUIRE LFH2167CCLK

FD-1

FLOOR DRAIN CAST IRON BODY, ADJUSTABLE 6"x6" NICKEL BRONZE TOP ZURN Z415S-VP NOTE #3 - - - - VANDALPROOF SCREWS, ZURN Z1072 BARRIER TRAP SEAL

NOTE 1: AMERICAN STANDARD, KOHLER, ZURN, SLOAN, TOTO

NOTE 2: ELKAY, JUST, KOHLER, ACORN, FRANKE

NOTE 3: ZURN, JOSAM, J.R. SMITH, MIFAB, WADE, WATTS

NOTE 4: ZURN, DELTA, SLOAN, CHICAGO FAUCET CO., AMERICAN STANDARD, KOHLER, T&S BRASS

NOTE 5: ELKAY, ZURN, DELTA, SLOAN, CHICAGO FAUCET CO., AMERICAN STANDARD, KOHLER, T&S BRASS

NOTE 6: LEONARD, POWERS, LAWLER, BRADLEY, SYMMONS

NOTE 1: STATE, LOCHINVAR, A.O. SMITH, BOCK, BRADFORD WHITE

T

T

T

T

T

MOUNTED ON WALL

MIN. 24" A.F.G.

TERMINATE ¾" PVC

CD IN FLOOR DRAIN

6"ø EXH

6"/6" EXH DN.

EBB

EBB

RCP

1TEF

BJA

UD

GARAGE

BREAK ROOM

OFFICE

ADA/BF UNISEX TLT.

CLO.

REFRIGERANT PIPING THRU

WALL 7'-2" A.F.F. SLEEVE AND

SEAL WALL PENETRATION

WEATHERTIGHT.

TERMINATE 6"Ø EXH DUCT

WITH GREENHECK MODEL#

WC-6 HOODED WALL CAP

OR EQUIVALENT

6"ø

EXH

HP

1AC

AC

EBB

3/4"

REFRIGERANT AND ¾" CD

PIPING TO AC-1

3/4"

CD

C D

REFRIGERANT AND ¾" CD

PIPING TO AC-2

L /S

L/S

P L

U R

I B

U E

S U

N U

M

C I

R C

U M

S P

I C

E

S I

Q U

E R

E I

S P

E N

I N

S U

L A

M A

M

OE

N A

M

9711 Valparaiso Drive

221 N. LaSalle Street

(219)924-8400

Munster, IN 46321

Chicago, IL 60601 www.milliesengineeringgroup.com

MILLIES

ENGINEERING GROUP

820 Monroe Ave NW Grand Rapids, MI 49503

Copyright © 2026 Millies Engineering Group

S th S tr e e t, P O

B o x

O s h te m o

M

I

(2

-8

S N

A N

O -1

F

IL

E N

O

.J

L M

S H

E E

T

ID

E N

T

IF

IC

A

T

IO

N N

O

IS

S

U E

D F

O R

D A

T E

C o p y ri g h t

S c h le y N el so n A rc h it e ct s, I n c.

C O

N S

T R

U C

T

IO

N

F

IN

A L

R E

C O

R D

P R

E L

IM

R

E V

IE

W

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

A D

A M

P L

A C

H R

A D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N t h

A v e

S a u g a t u c k

D u n e s M I

S a u ga tu ck

D u n es

S ta te

P a r k

S to r a ge

B u il d in g

D ep a r tm en t o f N a tu r a l R es o u r ce s

L a k e t o w n

T o w n s h ip A ll e g a n

C o u n t y M ic h ig a n

M1.0

-1

-2

F O

R B

ID

C O

N S

T R

1/4" = 1'-0"

FLOOR PLAN - MECHANICAL HVAC

NOTE:

NATURAL VENTILATION - MINIMUM OPERABLE WINDOW

AREA IN BREAKROOM: 5.68 SQ.FT.

NATURAL VENTILATION - MINIMUM OPERABLE WINDOW

AREAMINIMUM WINDOW AREA IN OFFICE: 2 SQ.FT.

A. WORK SHALL COMPLY WITH LOCAL, MUNICIPAL, AND STATE HVAC CODES.

B. LAYOUT IS DIAGRAMMATIC AND CONTRACTOR SHALL INSTALL DUCTWORK, PIPING AND

EQUIPMENT TO MEET ACTUAL FIELD CONDITIONS. REVIEW PROJECT SPECIFICATIONS

BEFORE STARTING ANY WORK. SUBMIT SHOP DRAWINGS OF WORK AS PER

SPECIFICATIONS.

C. LAYOUT WORK TO AVOID CONFLICTS BETWEEN DUCTWORK, LIGHTING, CEILINGS, PIPING

AND BUILDING STRUCTURE.

D. COORDINATE EQUIPMENT ELECTRICAL REQUIREMENTS (VOLTAGES, PHASE, LOAD, ETC.)

BEFORE ORDERING ANY EQUIPMENT.

E. COORDINATE EXACT LOCATION OF CEILING REGISTERS, GRILLES AND DIFFUSERS WITH

LIGHTING LAYOUT, SPRINKLER HEADS, AND CEILING GRID. SEE ARCHITECTURAL

REFLECTED CEILING PLAN. VERIFY EXACT LOCATION IN FIELD PRIOR TO INSTALLATION.

VERIFY CEILING STYLES AND TYPES BEFORE ORDERING REGISTERS, GRILLES AND

DIFFUSERS. PROVIDE APPROPRIATE FRAME STYLES AS REQUIRED TO MATCH CEILING

STYLE AND TYPES. SET ADJUSTABLE BLADES AS REQUIRED FOR OPTIMUM AIR PATTERN

AND TO PREVENT DRAFTS. THE MINIMUM DISTANCE BETWEEN SUPPLY

DIFFUSERS/REGISTERS AND SMOKE OR HEAT DETECTORS IS TO BE A MINIMUM OF 3‘.

COORDINATE WITH FIRE ALARM SYSTEM AS REQUIRED.

F. ROUTE DUCTWORK AS HIGH AS POSSIBLE TO AVOID CONFLICTS WITH OTHER TRADES.

ROUTE DUCTWORK BETWEEN AND THROUGH JOIST SPACES AND BETWEEN LIGHT

FIXTURES AS REQUIRED. VERIFY CONDITIONS AND DUCTWORK ROUTING IN FIELD PRIOR

TO INSTALLATION.

G. DUCTWORK, PIPING, EQUIPMENT, ETC. SHALL NOT BE SUPPORTED FROM THE BOTTOM

CHORD OF ENGINEERED JOISTS WITHOUT WRITTEN APPROVAL FROM THE STRUCTURAL

ENGINEER.

H. PROVIDE MANUAL BALANCING DAMPERS AT EACH LOW PRESSURE SUPPLY AIR, RETURN

AIR AND EXHAUST DUCTWORK TAKE-OFF INCLUDING TAKEOFFS TO EACH AIR

DISTRIBUTION DEVICE. DAMPERS SHALL HAVE LOCKING QUADRANT REGULATORS WITH

SPRING LOADED END BEARING. INSTALLATION SHALL BE RATTLE FREE. BE

RESPONSIBLE FOR LOCATING BALANCING DEVICES AND COORDINATE LOCATIONS FOR

TESTING AND BALANCING.

I. BAROMETRIC RELIEF DAMPERS TO BE EQUIVALENT TO AMERICAN WARMING MODEL

BD-52 LOW LEAKAGE DAMPERS SET AT 0.05” SP.

L. VERIFY EXACT THERMOSTAT AND SENSOR LOCATIONS IN FIELD PRIOR TO ROUGH-IN OR

INSTALLATION. CONTROL WIRING TO BE ROUTED IN CONDUIT.

M. REFRIGERANT PIPING INSTALLATION INCLUDING SIZING IS TO BE AS PER

MANUFACTURER'S RECOMMENDATIONS FOR THE ACTUAL FIELD ROUTING AND FOR THE

EQUIPMENT PROVIDED. PROVIDE ALL SUCTION LINE TRAPS, SOLENOID VALVES, SIGHT

GLASSES AND FILTER/DRIERS AS PER EQUIPMENT MANUFACTURER'S

RECOMMENDATIONS.

N. REPAIR AND/OR REPLACE DAMAGED PIPE INSULATION THAT OCCURS AS THE RESULT

OF THIS CONSTRUCTION.

O. PROVIDE CONCRETE EQUIPMENT PADS FOR EQUIPMENT INDICATED ON DRAWINGS.

COORDINATE LOCATIONS BEFORE INSTALLATION. PADS ARE TO BE DESIGNED WITH

REINFORCEMENT TO HANDLE THE WEIGHT OF THE EQUIPMENT BEING SUPPORTED.

EXTERIOR CONCRETE PADS TO BE PROVIDED WITH FROST WALLS (MINIMUM OF 48”

BELOW GRADE).

P. PROVIDE CONDENSATE PUMPS, RECEIVERS, PIPING AND ELECTRICAL CONNECTIONS AS

REQUIRED AT EQUIPMENT WHERE EQUIPMENT DRAINS CANNOT BE DRAINED BY

GRAVITY DUE TO FIELD CONDITIONS.

Q. PROVIDE APPURTENANCES (I.E. EXPANSION COMPENSATORS, FLEXIBLE CONNECTIONS,

EXPANSION LOOPS, JUNCTION BOXES, ETC.) NECESSARY TO CROSS EXPANSION JOINTS

IN BUILDING CONSTRUCTION WITH CONDUIT, PIPING, DUCTWORK, ETC. REFER TO

ARCHITECTURAL DRAWINGS FOR LOCATION AND QUANTITY OF EXPANSION JOINTS.

R. PROVIDE RELIEF VENT PIPING FOR REFRIGERATION EQUIPMENT. PIPING TO BE ROUTED

TO THE EXTERIOR OF BUILDING AS REQUIRED. MULTIPLE RELIEFS ARE TO BE PIPED

INDIVIDUALLY, NOT GROUPED TOGETHER IN A COMMON HEADER. THE PIPING IS TO BE

SAME SIZE AS RELIEF CONNECTION TO EQUIPMENT. TERMINATION LOCATION TO MEET

CODE REQUIREMENTS AND BE APPROVED BY ARCHITECT.

S. PIPING ENCLOSURES SHALL BE PROVIDED FOR HVAC PIPING (INCLUDING CONDENSATE)

THAT IS TO BE MOUNTED BELOW 9'-0" ABOVE FINISHED FLOOR. SUBMIT DETAILED SHOP

DRAWINGS PRIOR TO FABRICATION. ENCLOSURES TO BE ONE (1) PIECE 14 GAUGE

STEEL WITH ONE (1) PRIME COAT AND TWO (2) FINISH COATS OF ENAMEL; CUSTOM

COLOR AS SELECTED BY ARCHITECT. PROPERLY SECURE TO EXISTING CONSTRUCTION

WITH CONCEALED FASTENERS AS REQUIRED TO PROVIDE A COMPLETE AND PROPER

FINISHED INSTALLATION. ENCLOSURES SHALL BE REMOVABLE.

GENERAL NOTES

AD AUTOMATIC (MOTORIZED) DAMPER

AC AIR CONDITIONING

AFF ABOVE FINISHED FLOOR

AH AIR HANDLING UNIT

BJA BETWEEN JOIST ABOVE

BO BLANK OFF

BRD BAROMETRIC RELIEF DAMPER

CAI COMBUSTION AIR INTAKE

CAT CONDENSING AIR TEMPERATURE

CD CONDENSATE DRAIN

CH CABINET HEATER

CTE CONNECT TO EXISTING

CU CONDENSING UNIT

CW COLD WATER

DN. DOWN

DS DISCONNECT SWITCH

DV DRAIN VALVE

DX DIRECT EXPANSION

EAT ENTERING AIR TEMPERATURE

EC ELECTRICAL CONTRACTOR

EDB ENTERING DRY BULB TEMPERATURE

ESP EXTERNAL STATIC PRESSURE

EWB ENTERING WET BULB TEMPERATURE

EWT ENTERING WATER TEMPERATURE

EX EXISTING

EXH EXHAUST

F FURNACE

FC FLEXIBLE CONNECTION

FD FIRE DAMPER

FPM FEET PER MINUTE

FMS FACILITY MANAGEMENT SYSTEM

FVNR FULL VOLTAGE, NON-REVERSING STARTER

G NATURAL GAS

GPM GALLONS PER MINUTE

HP HORSE POWER

HZ HERTZ

IH OUTSIDE AIR INTAKE HOOD

L LIQUID

LAT LEAVING AIR TEMPERATURE

LB/HR POUNDS PER HOUR

LDB LEAVING DRY BULB TEMPERATURE

LV LOUVER

LWB LEAVING WET BULB TEMPERATURE

LWT LEAVING WATER TEMPERATURE

M/A MIXED AIR

MBH 1,000 BTU/HOUR

MC MECHANICAL CONTRACTOR

MD MANUAL DAMPER

MOD MODULATING

MV MANUAL AIR VENT

NC NORMALLY CLOSED

NK NECK

NO NORMALLY OPEN

NTS NOT TO SCALE

O/A OUTSIDE AIR

OAI OUTSIDE AIR INTAKE

OBD OPPOSED BLADE DAMPER

PC PLUMBING CONTRACTOR

PS PRESSURE SENSOR

PSI POUNDS PER SQUARE INCH

R/A RETURN AIR

RH RELATIVE HUMIDITY

RPM REVOLUTIONS PER MINUTE

S SUCTION

S/A SUPPLY AIR

SFD SMOKE-FIRE DAMPER

SHC SENSIBLE HEAT CAPACITY

SM SMOKE

TC TEMPERATURE CONTROL

TEF TOILET EXHAUST FAN

TJA THRU JOIST ABOVE

TSP TOTAL STATIC PRESSURE

TYP TYPICAL

UD UNDERCUT DOOR

UH UNIT HEATER

V VENT

VAV VARIABLE AIR VOLUME

VFD VARIABLE FREQUENCY DRIVE

WC WATER COLUMN

WPD WATER PRESSURE DROP

ABBREVIATIONS LISTSYMBOL LIST

DESCRIPTIONSYMBOL

UNION

PIPE TURNED DOWN

PIPE TURNED UP

SHUT-OFF VALVE

PIPING SLOPED DOWN

COLD WATER

CONDENSATE DRAINCD

CW

DESCRIPTIONSYMBOL

PIPE EXPANSION ANCHOR

AN

PIPE EXPANSION GUIDE

EC

REFRIGERANT PIPE

RETURN OR EXHAUST REGISTER

SUPPLY AIR DIFFUSER

SUPPLY OR OUTSIDE AIR DUCT DOWN

SUPPLY OR OUTSIDE AIR DUCT UP

RETURN OR EXHAUST OR RELIEF DUCT DOWN

RETURN OR EXHAUST OR RELIEF DUCT UP

AUTOMATIC (MOTORIZED) DAMPER

DUCT TRANSITION

NEW DUCTWORK

SQUARE TO ROUND TRANSITION

FLEXIBLE DUCTWORK

FIRE DAMPER

SMOKE DAMPER

FIRE/SMOKE DAMPER

FD

L/S

DUCTWORK INSULATION

DUCTWORK LINING

SM

SFD

AD

FLEXIBLE CONNECTION

SUPPLY AIR DIFFUSER

(SHADING INDICATES BLANK-OFF SIDE)

SHEET NOTE

SEE SCHEDULES

MOTOR STARTERMS

THERMOSTAT - ADJUSTABLET

P L

U R

I B

U E

S U

N U

M

C I

R C

U M

S P

I C

E

S I

Q U

E R

E I

S P

E N

I N

S U

L A

M A

M

OE

N A

M

9711 Valparaiso Drive

221 N. LaSalle Street

(219)924-8400

Munster, IN 46321

Chicago, IL 60601 www.milliesengineeringgroup.com

MILLIES

ENGINEERING GROUP

820 Monroe Ave NW Grand Rapids, MI 49503

Copyright © 2026 Millies Engineering Group

S th S tr e e t, P O

B o x

O s h te m o

M

I

(2

-8

S N

A N

O -1

F

IL

E N

O

.J

L M

S H

E E

T

ID

E N

T

IF

IC

A

T

IO

N N

O

IS

S

U E

D F

O R

D A

T E

C o p y ri g h t

S c h le y N el so n A rc h it e ct s, I n c.

C O

N S

T R

U C

T

IO

N

F

IN

A L

R E

C O

R D

P R

E L

IM

R

E V

IE

W

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

A D

A M

P L

A C

H R

A D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N t h

A v e

S a u g a t u c k

D u n e s M I

S a u ga tu ck

D u n es

S ta te

P a r k

S to r a ge

B u il d in g

D ep a r tm en t o f N a tu r a l R es o u r ce s

L a k e t o w n

T o w n s h ip A ll e g a n

C o u n t y M ic h ig a n

M2.0

-1

-2

F O

R B

ID

C O

N S

T R

MECHANICAL EQUIPMENT SCHEDULE

TAG MANUFACTURER MODEL DESCRIPTION EFFICIENCY

FAN MOTOR DATA EXHAUST FANS DX COOLING EQUIPMENT/COIL DATA DX HEATING DATA ELECTRIC HEATING EQUIP./COIL DATA ELECTRICAL DATA

UNITS

CONTROLLED BY

EQUIPMENT

WEIGHT REMARKSCFM

MIN.

OAI

TSP ESP BHP HP RPM CFM ESP BHP HP RPM MBH SHC EDB EWB LDB LWB CAT STAGES MBH EDB STAGES MBH KW EAT LAT STEPS

LOAD

VOLT PHASE HZ

DISCONNECT SWITCH:

CFM HP MCA FLA MOCP

PROV. BY:

M.C. E.C.

AC-1 DAIKIN CTXV07AVJU9 WALL MOUNTED DUCTLESS UNIT

330 7

X WALL MTD

TSTAT

25 NOTE #1

AC-2 DAIKIN

FTXV09/12AVJ

U9

WALL MOUNTED DUCTLESS UNIT

385 9

X WALL MTD

TSTAT

25 NOTE #1

HP-1 DAIKIN 2MXT18AVJU9

WALL MOUNTED AIR SOURCE

HEAT PUMP

21 SEER2 17.2 95 MOD

18 MOD

18.7 20 240 1 60 X INTERLOCK W/

AC-1 & AC-2

150 NOTE #2

TEF-1 GREENHECK SP-A390-VG

CEILING MOUNTED TOILET

EXHAUST FAN

110 0.36 0.01 939 0.29 120 1 60 X OCC. SENSOR 25 NOTE #3

EBB-1 QMARK QMKC2513W ELECTRIC BASE BOARD

2.56 0.75 6.25 15 120 1 60 X INTEGRAL

TSTAT

10 NOTE #5

EBB-2 QMARK QMKC2513W ELECTRIC BASE BOARD

2.56 0.75 6.25 15 120 1 60 X INTEGRAL

TSTAT

10 NOTE #5

EBB-3 QMARK QMKC2546W ELECTRIC BASE BOARD

5.12 1.5 6.3 15 240 1 60 X INTEGRAL

TSTAT

10 NOTE #5

RCP-1 QMARK CP251

24x24 ELECTRIC RADIANT

HEATING PANEL

0.853 0.25 2.08 15 120 1 60 X WALL MTD

TSTAT

20 NOTE #4

NOTE 1:

PROVIDE WITH:

• WIRED THERMOSTAT

• CONDENSATE PUMP

SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.

NOTE 2:

PROVIDE WITH:

• NON-FUSED DISCONNECT

• INVERTER SCROLL COMPRESSOR

• WALL MOUNT HARDWARE

SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.

NOTE 3:

PROVIDE WITH:

• BUILT-IN BACKDRAFT DAMPER

• INTEGRAL METAL GRILLE

• VIBRATION ISOLATION HANGERS

SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.

NOTE 4:

PROVIDE WITH:

• MOUNTING HARDWARE

• BATT INSULATION

• THERMOSTAT

SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.

NOTE 5:

PROVIDE WITH:

• INTEGRAL THERMOSTAT

SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.

E

N '5 "W

.6

S '5 "E

.7 1'

M= N88°40'13"W 200.00'

N '5

"W

.0

M

N '5

"W

.0

M= N88°40'13"W 1116.29'

CP#50

CP#51

CP#52

CP#53

CP#54

J

EXISTING TICKET

BOOTH

NEW MAINTENANCE

FACILITY

NEW UTILITY

POLE-MOUNTED

TRANSFORMER

UNDERGROUND

POWER FEEDER

UNDERGROUND

TELEPHONE CONDUIT

WELL PUMP

ELECTRICAL

FEED

EXISTING UTILITY

METER

27,29

P L

U R

I B

U E

S U

N U

M

C I

R C

U M

S P

I C

E

S I

Q U

E R

E I

S P

E N

I N

S U

L A

M A

M

OE

N A

M

9711 Valparaiso Drive

221 N. LaSalle Street

(219)924-8400

Munster, IN 46321

Chicago, IL 60601 www.milliesengineeringgroup.com

MILLIES

ENGINEERING GROUP

820 Monroe Ave NW Grand Rapids, MI 49503

Copyright © 2026 Millies Engineering Group

S th S tr e e t, P O

B o x

O s h te m o

M

I

(2

-8

S N

A N

O -1

F

IL

E N

O

.J

L M

S H

E E

T

ID

E N

T

IF

IC

A

T

IO

N N

O

IS

S

U E

D F

O R

D A

T E

C o p y ri g h t

S c h le y N el so n A rc h it e ct s, I n c.

C O

N S

T R

U C

T

IO

N

F

IN

A L

R E

C O

R D

P R

E L

IM

R

E V

IE

W

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

A D

A M

P L

A C

H

R A

D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N t h

A v e

S a u g a t u c k

D u n e s M I

S a u ga tu ck

D u n es

S ta te

P a r k

S to r a ge

B u il d in g

D ep a r tm en t o f N a tu r a l R es o u r ce s

L a k e t o w n

T o w n s h ip A ll e g a n

C o u n t y M ic h ig a n

E0.0

-1

-2

F O

R B

ID

C O

N S

T R

1" = 40'-0"

SITE PLAN - ELECTRICAL

M3

H

M3

H

W P

M2

M1

3 3

WP WP

D O

D O

D O

PC

M

M

MEZZANINE

GARAGE BELOW

IB1 IB1 IB1 IB1

IB1IB1IB1IB1

7b

7a 7b

7b 7b

7b 7b

7b

IB1

IB1

7b

7b a,b a,b

ALT. 1

GARAGE

ADA/BF UNISEX TLT.

OFFICE

CLO.

BREAK ROOM

EBB

RCP

MICROWAVE

RECEPTACLE

EBB

COFFEE MAKER

RECEPTACLE

REFRIG.

RECEPTACLE

TEF

b a a

WA1

BA2

BA2

BA2

XCEM

EM1

EM1

EM

EM

EM1

EM

11 11

21 21

19 15

14 16 18

7f

7c

7c c d

7d f

WH

G1

IA1

7e e

G1

9PANEL P-1

HP

EBB

T.T.B.

20'-0" AFG

P L

U R

I B

U E

S U

N U

M

C I

R C

U M

S P

I C

E

S I

Q U

E R

E I

S P

E N

I N

S U

L A

M A

M

OE

N A

M

9711 Valparaiso Drive

221 N. LaSalle Street

(219)924-8400

Munster, IN 46321

Chicago, IL 60601 www.milliesengineeringgroup.com

MILLIES

ENGINEERING GROUP

820 Monroe Ave NW Grand Rapids, MI 49503

Copyright © 2026 Millies Engineering Group

S th S tr e e t, P O

B o x

O s h te m o

M

I

(2

-8

S N

A N

O -1

F

IL

E N

O

.J

L M

S H

E E

T

ID

E N

T

IF

IC

A

T

IO

N N

O

IS

S

U E

D F

O R

D A

T E

C o p y ri g h t

S c h le y N el so n A rc h it e ct s, I n c.

C O

N S

T R

U C

T

IO

N

F

IN

A L

R E

C O

R D

P R

E L

IM

R

E V

IE

W

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

A D

A M

P L

A C

H

R A

D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N t h

A v e

S a u g a t u c k

D u n e s M I

S a u ga tu ck

D u n es

S ta te

P a r k

S to r a ge

B u il d in g

D ep a r tm en t o f N a tu r a l R es o u r ce s

L a k e t o w n

T o w n s h ip A ll e g a n

C o u n t y M ic h ig a n

E1.0

-1

-2

F O

R B

ID

C O

N S

T R

1/4" = 1'-0"

MEZZANINE PLAN - ELECTRICAL LIGHTING & POWER

1/4" = 1'-0"

FLOOR PLAN - ELECTRICAL LIGHTING & POWER

REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION TOTAL CONNECTED AMPS: 117.9 A

TOTAL CONNECTED LOAD: 28300 VA

TOTAL CONNECTED LOAD PHASE C: 0 VA

TOTAL CONNECTED LOAD PHASE B: 14352 VA

TOTAL CONNECTED LOAD PHASE A: 13948 VA

PANEL TOTALS

GC = PROVIDE GFI CIRCUIT BREAKER

ST = PROVIDE SHUNT TRIP BREAKER

LO = PROVIDE LOCKABLE DEVICE

EX = EXISTING CIRCUIT BREAKER

LEGEND:

41 42

39 40

37 38

35 36

33 34

31 32

29 1248 30

WELL PUMP 20 A 2

1248 28

25 LOW VOLTAGE POWER 20 A 1 1000 1500 1 20 A MICROWAVE RECEP 26

23 COFFEE MAKER RECEP 20 A 1 1400 800 1 20 A GC FRIDGE RECEP 24

21 RECEPS SE GARAGE 20 A 1 600 400 1 20 A BENCH RECEPS, AC S RECEP 22

19 SHOP VAC. & GEN RECEP. 20 A 1 1700 1000 1 20 A RECEPS GEN. BREAK, TLT. 20

17 BENCH AC WEST RECEPS 20 A 1 600 1200 1 20 A OH DOOR EAST 18

15 AIR COMPRESSOR & GEN RECEPS 20 A 1 1900 1200 1 20 A OH DOOR CENTER 16

13 RECEPS MEZZANINE 20 A 1 400 1200 1 20 A OH DOOR WEST 14

11 EXTERIOR RECEPS 20 A 1 600 800 1 20 A RECEPS OFFICE, CLOSET 12

9 EXTERIOR LIGHTING 20 A 1 34 1650 1 20 A WATER HEATER CLOSET 10

7 INTERIOR LIGHTING 20 A 1 840 250 1 15 A RADIANT CEILING PANEL RCP-1 8

5 BASEBOARD HEAT EBB-2 BTHRM 15 A 1 750 750 1 15 A BASEBOARD HEAT EBB-1 BTHRM 6

3 2244 756 4

HEAT PUMP 20 A 2

2244 756

2 15 A BASEBOARD HEAT EBB-3 BREAK

CKT CIRCUIT DESCRIPTION LEG. TRIP POLES A B A B POLES TRIP LEG. CIRCUIT DESCRIPTION CKT

NOTES:

A.I.C. RATING: 22000 A BUSSING: COPPER

ENCLOSURE: NEMA-1 MAIN RATING: 150 A

MOUNTING: SURFACE MAINS TYPE: MCB

SUPPLY FROM: PHASES: 1

LOCATION: GARAGE 5 VOLTS: 120/240 Single

PANEL P-1

SYMBOL LIST

RN

REMOVE EXISTING DEVICE AND PROVIDE NEW AS INDICATED IN EXISTING BACK BOX, JUNCTION BOX, ETC. VERIFY EXACT LOCATION AND CONDITIONS IN FIELD. MODIFY EXISTING BACK BOX, JUNCTION BOX, ETC. PROVIDE TRIM PLATES, EXTENSION RINGS, ETC. AS REQUIRED TO MOUNT

NEW DEVICE AS INDICATED.

DO

NI

EMERGENCY BATTERY LIGHT MOUNTED 7'-6" AF (OR AS NOTED)

F&I NEW DEVICE AS INDICATED.

LIGHTING SEQUENCE SCHEME TAG REFERENCE TO LIGHTING CONTROL SEQUENCE OF OPERATIONS

PC EXTERIOR LIGHTING CONTROL PHOTOCELL

ELECTRIC MOTOR CONNECTION - PROVIDE LOCAL DISCONNECT SWITCH PER NATIONAL ELECTRIC CODE - CONNECT MISCELLANEOUS ACCESSORIES SUCH AS BACK DRAFT DAMPERS, ETC. COMPLETE

AS REQUIRED.

J

LP-A1 #1

120V-20A SPECIFICATION GRADE DUPLEX RECEPTACLE - (MOUNTED 42" A.F.F. OR 2" ABOVE

BACKSPLASH IF LOCATED ABOVE COUNTER) (HUBBELL #5362 OR EQUAL)

120V-20A SPECIFICATION GRADE GROUNDED DUPLEX RECEPTACLE WITH G.F.I. PROTECTION -

(MOUNTED 18" A.F.F. OR AS NOTED) (HUBBELL #GF20 OR EQUAL)

120V-20A SPECIFICATION GRADE GROUNDED DUPLEX RECEPTACLE WITH G.F.I. PROTECTION

(MOUNTED 42" A.F.F. OR 2" ABOVE BACKSPLASH IF LOCATED ABOVE COUNTER) (HUBBELL #GF20 OR

EQUAL)

120V-20A SPECIFICATION GRADE DUPLEX RECEPTACLE - (MOUNTED AT SPECIAL HEIGHT -

COORDINATE IN FIELD) (HUBBELL #5362 OR EQUAL)

TWO DEVICE MOUNTED UNDER COMMON COVER. WHERE LOW VOLTAGE DEVICES ARE

MOUNTED UNDER COMMON COVER, COMBINE CONDUIT STUBS MAINTAINING THE EQUIVALENT

FREE AREA FOR THE LOW VOLTAGE CABLING.

HOMERUN TO PANEL INDICATING PANEL AND CIRCUIT BREAKER NUMBER WITHIN THE PANEL.

ELLIPSE TAG REFERENCE TO SHEET NOTES

HEXAGON TAG REFERENCE TO EQUIPMENT CONNECTION SCHEDULE

JUNCTION BOX - SIZE AND TYPE AS REQUIRED.

OVERHEAD DOOR PUSHBUTTON CONTROL STATION OUTLET BOX - CONTRACTOR SHALL FURNISH

CONDUIT BETWEEN ALL OVERHEAD DOOR DEVICES AS REQUIRED FOR A COMPLETE AND PROPERLY

OPERATING SYSTEM.

120V-20A SPECIFICATION GRADE SIMPLEX RECEPTACLE - (MOUNTED 18" A.F.F. OR AS NOTED)

(HUBBELL #5251 OR EQUAL)

FURNISH AND INSTALL WALL SWITCH SINGLE BUTTON DUAL TECHNOLOGY OCCUPANCY SENSOR WITH MANUAL ON OPERATION MTD 42" AFF: SENSORSWITCH #WSX-PDT OR APPROVED EQUAL BY COOPER

OR HUBBELL CONTROLS.

FURNISH AND INSTALL WALL SWITCH DUAL TECHNOLOGY OCCUPANCY SENSOR CAPABLE OF

DIMMING WITH MANUAL ON OPERATION MTD 42" AFF: SENSORSWITCH #WSX-PDT-D OR APPROVED EQUAL

BY COOPER OR HUBBELL CONTROLS.

M1

M3

FURNISH AND INSTALL CEILING MOUNTED DUAL TECHNOLOGY OCCUPANCY SENSOR WITH POWER

PACK. MANUFACTURERS: SENSORSWITCH #CM-PDT-10-MP-20 (WITH MICROPHONICS) OR APPROVED

EQUAL BY COOPER OR HUBBELL CONTROLS. SENSOR SHALL BE PROGRAMMED FOR MANUAL ON

UNLESS OTHERWISE NOTED.

M2

120V-20A SPECIFICATION GRADE DUPLEX RECEPTACLE - (MOUNTED 18" A.F.F. OR AS NOTED)

(HUBBELL #5362 OR EQUAL).

SPECIAL PURPOSE OUTLET (AS NOTED ON PLAN OR SPECIFICATIONS).

ELECTRIC PANELBOARDS.

DISCONNECT SWITCH SIZE AND TYPE AS REQUIRED - COORDINATE AMPERE RATING WITH

EQUIPMENT SUPPLIER

DOOR OPERATOR FOR OVERHEAD DOORS

FURNISH AND INSTALL TWO BUTTON ON/OFF SWITCH MTD 42" AFF: SENSORSWITCH #SPODM OR

APPROVED EQUAL BY COOPER OR HUBBELL CONTROLS. PROVIDE WITH POWER PACK AS REQUIRED

FOR CONTROL OF FIXTURES.

FURNISH AND INSTALL TWO BUTTON ON/OFF 3-WAY SWITCH MTD 42" AFF: SENSORSWITCH #SPODM OR APPROVED EQUAL BY COOPER OR HUBBELL CONTROLS. PROVIDE WITH POWER PACK AS REQUIRED

FOR CONTROL OF FIXTURES.

X X

LIGHTING

SWITCHING

EQUIPMENT AND WIRING

SHEET SYMBOLS

RECEPTACLES

120V-20A SPECIFICATION GRADE HALF-CONTROLLED DUPLEX RECEPTACLE - (MOUNTED 18" A.F.F. OR AS NOTED) (HUBBELL BR20C1 OR EQUAL). PROVIDE MANUFACTURER MARK FOR CONTROLLED FACE.

120V-20A SPECIFICATION GRADE HALF-CONTROLLED DUPLEX RECEPTACLE - (MOUNTED 42" A.F.F. OR AS NOTED) (HUBBELL BR20C1 OR EQUAL). PROVIDE MANUFACTURER MARK FOR CONTROLLED FACE.

X

A. WORK SHALL COMPLY WITH LOCAL, STATE AND NATIONAL ELECTRIC CODES, AMERICANS WITH DISABILITIES ACT (or MICHIGAN ACCESSIBILITY CODE AND MICHIGAN LIFE SAFETY CODE FOR

SCHOOLS).

B. THE PANEL SCHEDULES ARE PROVIDED FOR ASSISTANCE ONLY IN UNDERSTANDING THE

LOADING ON THE VARIOUS CIRCUITS AND THE CIRCUIT DESIGNATIONS DESIRED FOR THE

PANEL DIRECTORIES. THE PANEL SCHEDULES MUST BE BALANCED UPON COMPLETION OF THE

PROJECT TO COMPLY WITH CODE. IN ADDITION, THE PANEL SCHEDULES DO NOT IDENTIFY THE TYPES OF CIRCUIT BREAKERS TO BE USED (SUCH AS GFCI, HACR, SHUNT TRIP UNITS, ETC.) NOR DO THE SCHEDULES IDENTIFY CIRCUIT BREAKERS REQUIRED. (SUCH AS C/B'S FEEDING SURGE

PROTECTION UNITS). REFER TO THE REST OF THE DRAWINGS AND THE SPECIFICATIONS FOR

ADDITIONAL REQUIREMENTS AND DETAILED INFORMATION.

C. COORDINATE EQUIPMENT ELECTRICAL REQUIREMENTS (VOLTAGES, PHASE, LOAD, ETC.) TO

AVOID CONFLICTS.

D. REFER TO ARCHITECTURAL PLANS AND ELEVATIONS FOR ADDITIONAL ELECTRICAL

INFORMATION AND REQUIREMENTS. IN ALL CASES DEVICE MOUNTING HEIGHTS AND LOCATIONS

SHALL CONFORM TO THE LATEST AMERICANS WITH DISABILITIES FEDERAL STANDARDS.

E. EXCAVATION NECESSARY FOR COMPLETION OF WORK SHALL BE PROVIDED. COORDINATE

WITH ONE ANOTHER TO SHARE TRENCHES WHEREVER POSSIBLE.

F. REFER TO THE PLANS FOR ADDITIONAL ELECTRICAL WORK AND REQUIREMENTS. FURNISH,

INSTALL AND LOCATE DISCONNECT SWITCHES AT EQUIPMENT/MOTOR LOCATION, AS

REQUIRED, AND IN ACCORDANCE WITH CODE. IF THE WORK OF OTHER TRADES CAUSES A LOSS

OF CONTINUITY OF THE EXISTING ELECTRICAL DISTRIBUTION, GROUNDING SYSTEM OR

CIRCUITRY, IT SHALL BE RECONNECTED OR REPAIRED AT NO ADDITIONAL COST.

G. SCHEDULE WORK TO AVOID FACILITY (TICKET BOOTH) DOWNTIME AND INCONVENIENCE TO

OWNER. OWNER'S EXISTING FACILITY (TICKET BOOTH) SHALL REMAIN IN OPERATION AT ALL

TIMES. REQUIRED SHUTDOWN OF EXISTING FACILITY UTILITIES SHALL BE SCHEDULED WITH

OWNER'S OPERATING PERSONNEL.

H. LAYOUT IS DIAGRAMMATIC AND INSTALL DEVICES, CONDUIT AND EQUIPMENT TO MEET ACTUAL

FIELD CONDITIONS. REVIEW PROJECT SPECIFICATIONS BEFORE STARTING WORK AND SUBMIT

COMPLETE SHOP DRAWINGS AS PER SPECIFICATIONS.

I. VISIT SITE PRIOR TO BID TO DETERMINE AND VERIFY EXISTING INTERIOR AND EXTERIOR

ELECTRICAL SYSTEMS TO VERIFY QUANTITIES AND LOCATIONS OF EXISTING SYSTEMS TO

DETERMINE FULL EXTENT OF WORK. INCLUDE THE NECESSARY MODIFICATIONS TO THE

EXISTING CONDITIONS (INCLUDING CEILINGS, WALLS, FLOORS, PIPES, CONDUIT, ROOF WORK, ETC.) AS REQUIRED, TO ALLOW FOR PROPER INSTALLATION OF WORK. ADJUST INSTALLATIONS

TO MEET FIELD CONDITIONS AS REQUIRED FOR A COMPLETE AND PROPER INSTALLATION. NO

EXTRAS WILL BE ALLOWED AFTER BIDDING FOR ANY REWORK OF EXISTING FIELD CONDITIONS

TO RESOLVE CONFLICTS OR NOT FULLY UNDERSTANDING THE SCOPE OF THE WORK

REQUIRED. EXISTING EQUIPMENT, CONDUIT, PIPING, ETC. SHALL BE REMOVED AS NOTED ON

DRAWINGS AND AS REQUIRED TO MEET NEW SCOPE OF WORK.

J. HIDDEN CONDITIONS IDENTIFIED THROUGH THE COURSE OF CONSTRUCTION SHALL BE

IMMEDIATELY BROUGHT TO ATTENTION IN WRITTEN FORM FOR REVIEW AND DIRECTION.

FAILURE TO DO SO SHALL REQUIRE THE CHANGES AND COSTS TO CORRECT SAID HIDDEN

CONDITION TO BE COMPLETED AT NO COST. EXISTING EQUIPMENT NOT IDENTIFIED SHALL BE

BROUGHT TO ATTENTION FOR REVIEW AS TO WHETHER THE EQUIPMENT SHALL REMAIN AND

BE RECONNECTED TO THE NEW SERVICES, BE RELOCATED, BE ABANDONED, ETC.

K. WIRE FIXTURES IN TANDEM AS REQUIRED TO ACCOMPLISH THE SWITCHING ARRANGEMENT AS

INDICATED ON DRAWINGS.

L. VERIFY CEILING STYLES/FRAMES AND TYPES BEFORE ORDERING FIXTURES AND CEILING

MOUNTED DEVICES. PROVIDE APPROPRIATE STYLES/FRAMES AS REQUIRED TO MATCH

CEILING STYLE AND TYPES.

M. COORDINATE LIGHTING LAYOUTS WITH CEILING REGISTERS, GRILLES, DIFFUSERS, SPRINKLER HEADS AND CEILING GRID (SEE ARCHITECTURAL REFLECTED CEILING PLAN.) VERIFY LOCATION

WITH OWNER'S REPRESENTATIVE IN FIELD PRIOR TO INSTALLATION.

N. WHERE INDICATED ON THE DRAWINGS IN UNFINISHED SPACES, RUN EXPOSED RACEWAYS

PARALLEL WITH OR AT RIGHT ANGLES TO WALL.

O. NO RACEWAYS SHALL BE INSTALLED WITHIN 6" OF STEAM, HOT WATER PIPES OR SIMILAR HEAT

PRODUCING APPLIANCES.

P. PROVIDE PULL WIRE IN EACH RACEWAY IN WHICH WIRING IS NOT INSTALLED.

Q. COVERS OF JUNCTION OR PULL BOXES SHALL BE ACCESSIBLE AND IDENTIFIED PER

SPECIFICATIONS. FIRE ALARM JUNCTION BOXES SHALL BE PAINTED RED. JUNCTION OR PULL

BOXES AND THE LIKE SHALL BE INDEPENDENTLY SUPPORTED TO BUILDING STRUCTURE WITH

NO WEIGHT BEARING ON RACEWAYS.

R. WIRE COLOR CODING SHALL BE COORDINATED THROUGHOUT THE ENTIRE PROJECT/BUILDING

FOR NEW AND EXISTING SYSTEMS.

S. IF MORE THAN THREE (3) PHASE (UNGROUNDED) CONDUCTORS ARE RUN IN THE SAME

RACEWAY, CONDUCTOR AMPACITY SHALL BE DERATED IN ACCORDANCE WITH NEC ARTICLE

310.

T. CONDUIT, LIGHTING, EQUIPMENT, ETC. SHALL NOT BE SUPPORTED FROM THE BOTTOM CHORD

OF ENGINEERED JOISTS WITHOUT WRITTEN APPROVAL FROM THE STRUCTURAL ENGINEER.

CONDUITS, ROUTED THROUGH AREAS WITH NO CEILING, SHALL BE ROUTED WITHIN THE

WEBBING OF THE JOISTS AND SHALL NOT BE ROUTED BELOW THE BOTTOM CHORD OF THE

JOIST.

U. SMOKE OR HEAT DETECTORS SHALL BE SURFACE MOUNTED TO CEILING, ROOF DECK

MATERIALS, ETC. IN LIEU OF MOUNTING TO BOTTOM CHORD OF ENGINEERED JOIST OR ANY

OTHER COMPONENTS NOT AN INTEGRAL PART OF THE HORIZONTAL CEILING.

V. WIRING DEVICES SHOWN BACK-TO-BACK IN WALLS SHALL BE SEPARATED BY 8" MINIMUM.

W. UNLESS OTHERWISE NOTED, DEVICE ELEVATIONS REFER TO CENTER LINE OF JUNCTION BOX.

VERIFY JUNCTION BOX LOCATIONS WITH FINAL EQUIPMENT LAYOUT PRIOR TO ROUGHING IN

SAME.

X. FURNISH AND INSTALL A GREEN GROUND WIRE IN POWER CONDUITS (NOT LIGHTING). ALL

DEVICES, EQUIPMENT, FIXTURES AND THE LIKE, MUST BE GROUNDED.

MECHANICAL/ELECTRICAL BONDS OF THE METALLIC RACEWAY SYSTEM SHALL BE MAINTAINED.

Y. PROVIDE CONDUIT AND WIRE AND MAKE FINAL POWER CONNECTIONS AS REQUIRED TO

EXHAUST FANS AND MISCELLANEOUS EQUIPMENT FURNISHED WITH MOTORIZED BACKDRAFT

DAMPERS. DAMPERS SHALL BE CONNECTED TO EQUIPMENT 120 VOLT POWER CIRCUIT SO AS

TO INTERLOCK THE MOTORIZED DAMPER WITH THE EXHAUST FAN. FOR THREE PHASE

MOTORS, PROVIDE AN ADDITIONAL 120 VOLT CIRCUIT ROUTED THROUGH AN AUXILIARY

CONTACT IN THE MOTOR STARTER.

Z. AT NEW WATER METER LOCATION PROVIDE CONDUIT AS REQUIRED TO REMOTE READER

LOCATION. REFER TO PLUMBING DRAWINGS FOR METER LOCATIONS. COORDINATE READER

LOCATION WITH UTILITY COMPANY PRIOR TO ROUGH-IN.

AA. SINGLE POLE CIRCUITS SHALL HAVE SEPARATE INDEPENDENT NEUTRAL CONDUCTORS (NON-

NETWORKED), WHICH (PER CODE) ARE CONSIDERED CURRENT CARRYING CONDUCTORS.

THEREFORE, IF MORE THAN THREE (3) CURRENT CARRYING CONDUCTORS ARE RUN IN THE

SAME RACEWAY, CONDUCTOR AMPACITY SHALL BE DERATED IN ACCORDANCE WITH NEC

ARTICLE 310. AS SUCH, MULTIPLE BRANCH CIRCUIT HOME RUNS SHALL, AT A MINIMUM, UTILIZE

#10 AWG CONDUCTORS TO COMPLY WITH REQUIREMENTS HEREIN. COORDINATE

REQUIREMENTS IN FIELD WITH SPECIFIC HOME RUN CONFIGURATION AND NEC 2008.

BB. CONTRACTOR SHALL OBTAIN AVAILABLE FAULT CURRENT, UTILITY TRANSFORMER SIZE AND

IMPEDANCE WITHIN 14 DAYS OF CONTRACT AWARD. ELECTRICAL PANEL AND GEAR SHOP

DRAWINGS SHALL BE SUBMITTED ALONG WITH COORDINATION/ARC FLASH STUDY WITH 30

DAYS OF CONTRACT AWARD FOR REVIEW. ALL GEAR SHALL BE RATED TO PROPERLY

WITHSTAND AVAILABLE FAULT CURRENT.

GENERAL NOTES

1. INTERIOR FIXTURES, EXTERIOR FIXTURES AND COLORS TO BE SELECTED BY ARCHITECT.

2. LED FIXTURES (LESS THAN 10000 LUMENS) SHALL BE PROVIDED WITH FACTORY INSTALLED

INTEGRAL EMERGENCY BATTERY UNITS BATTERY UNITS SHALL PROVIDE A MINIMUM OF 1400

LUMENS.

3. FIXTURES THAT CANNOT BE PROVIDED WITH EMERGENCY BALLASTS OR FIXTURES WITH

GREATER THAN 10000 LUMENS SHALL BE PROVIDED WITH EMERGENCY INVERTER (MYERS #LV

SERIES OR APPROVED EQUAL) WITH SUITABLE CAPACITY TO POWER FIXTURE FOR A MINIMUM

OF 90 MINUTES PER CODE. VERIFY SIZING AND REQUIREMENTS WITH CONTRACT DOCUMENTS

PRIOR TO ORDERING.

4. SHADED FIXTURES SHALL HAVE AN EMERGENCY SOURCE OF POWER AS SPECIFIED.

5. FIXTURES WITH EMERGENCY BATTERIES SHALL BE PROVIDED WITH CONSTANT HOT SENSING

WIRE SO THAT FIXTURE CAN BE SWITCHED ON AND OFF WITHOUT ACTIVATING EMERGENCY

BALLAST. UPON LOSS OF POWER, THE FIXTURE SHALL BE ILLUMINATED FOR A MINIMUM OF 90

MINUTES REGARDLESS OF THE LIGHT SWITCH POSITION. PROVIDE TEST SWITCH AND

CHARGING INDICATOR FOR EMERGENCY BATTERY

AS SPECIFIED.

6. ALL INTEGRAL EMERGENCY BATTERIES USED IN EXTERIOR APPLICATIONS SHALL HAVE A

MINIMUM STARTING TEMPERATURE OF -20 DEGREES F UNLESS OTHERWISE SPECIFIED.

7. CAREFULLY COORDINATE MOUNTING REQUIREMENTS FOR FIXTURES WITH CONTRACT

DOCUMENTS AND FIXTURE MANUFACTURER. PROVIDE APPROPRIATE MOUNTING FRAMES FOR

LAY-IN OR GYPSUM CEILINGS. VERIFY CEILING REQUIREMENTS WITH FINAL ARCHITECTURAL

REFLECTED CEILING PLAN.

8. COMPLETE PHOTOMETRICS OF THE INTERIOR AND EXTERIOR LIGHTING SHALL BE SUBMITTED

ALONG WITH THE LIGHTING SHOP DRAWINGS FOR REVIEW. FOR FINISHED SPACES, 80/50/20

REFLECTANCES SHALL BE UTILIZED. FOR UNFINISHED SPACES 50/50/20 REFLECTANCE SHALL BE UTILIZED. THE LLD VALUE THAT SHALL BE UTILIZED FOR LED IS .9. EXTERIOR CALCULATIONS

SHALL ACCOUNT FOR HOUSE SIDE SHIELDING AND SHALL CONFORM TO LOCAL

REQUIREMENTS.

9. VERIFY FIXTURE MOUNTING HEIGHTS WITH ARCHITECT PRIOR TO ROUGH-IN.

10. COORDINATE LOCATIONS OF INTERIOR AND EXTERIOR LIGHTING FIXTURES WITH FINAL

ARCHITECTURAL DRAWINGS. FIXTURES THAT ARE NOT INSTALLED IN THE CORRECT LOCATION

SHALL BE RELOCATED AND REINSTALLED IN THE CORRECT LOCATION AT NO ADDITIONAL

CHARGE.

11. FIXTURES SHALL BE CAREFULLY COORDINATED WITH MANUFACTURER TO DELIVER THE

SPECIFIED PRODUCT IN SUFFICIENT TIME TO MEET PROJECT DEADLINES. EQUIPMENT DELIVERY

LEAD TIME SHALL NOT BE HELD AS A VALID REASON FOR REQUESTING LUMINAIRE

SUBSTITUTION UNLESS LUMINAIRE LEAD TIME FROM SPECIFIED MANUFACTURER IS IN EXCESS

OF 14 WEEKS. IT SHALL BE THE SOLE RESPONSIBILITY OF THE ELECTRICAL CONTRACTOR TO

DETERMINE NECESSARY EQUIPMENT LEAD TIMES, DELIVER SUBMITTALS FOR REVIEW IN A

TIMELY FASHION, AND PLACE ORDERS ACCORDINGLY TO ENSURE TIMELY DELIVERY.

12. EVALUATION OF APPROVED EQUALS SHALL BE AT THE SOLE DISCRETION OF THE ARCHITECT

AND ENGINEER. IF THE PRODUCT SUBMITTED DURING THE REVIEW PROCESS IS NOT JUDGED

AS AN EQUAL BY THE REVIEWING ENGINEER, THE CONTRACTOR SHALL PROVIDE THE PRODUCT

SPECIFIED.

13. CAREFULLY COORDINATE VOLTAGES OF FIXTURES PRIOR TO ORDERING FIXTURES.

14. CAREFULLY VERIFY COLOR TEMPERATURE OF FIXTURES WITH ARCHITECT PRIOR TO

ORDERING.

FIXTURE GENERAL NOTES

P L

U R

I B

U E

S U

N U

M

C I

R C

U M

S P

I C

E

S I

Q U

E R

E I

S P

E N

I N

S U

L A

M A

M

OE

N A

M

9711 Valparaiso Drive

221 N. LaSalle Street

(219)924-8400

Munster, IN 46321

Chicago, IL 60601 www.milliesengineeringgroup.com

MILLIES

ENGINEERING GROUP

820 Monroe Ave NW Grand Rapids, MI 49503

Copyright © 2026 Millies Engineering Group

S th S tr e e t, P O

B o x

O s h te m o

M

I

(2

-8

S N

A N

O -1

F

IL

E N

O

.J

L M

S H

E E

T

ID

E N

T

IF

IC

A

T

IO

N N

O

IS

S

U E

D F

O R

D A

T E

C o p y ri g h t

S c h le y N el so n A rc h it e ct s, I n c.

C O

N S

T R

U C

T

IO

N

F

IN

A L

R E

C O

R D

P R

E L

IM

R

E V

IE

W

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

A D

A M

P L

A C

H

R A

D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N t h

A v e

S a u g a t u c k

D u n e s M I

S a u ga tu ck

D u n es

S ta te

P a r k

S to r a ge

B u il d in g

D ep a r tm en t o f N a tu r a l R es o u r ce s

L a k e t o w n

T o w n s h ip A ll e g a n

C o u n t y M ic h ig a n

E2.0

-1

-2

F O

R B

ID

C O

N S

T R

ELECTRICAL ONE-LINE SCHEMATIC DIAGRAM

120/240V POLE MOUNTED

TRANSFORMER BY UTILITY

NEW PANEL P-1

120/240V, 1PH, 3W, 150A

REUSE EXISTING C/T

FOR UTILITY METER

OVERHEAD

SECONDARY

FEED BY UTILITY

UNDERGROUND

POWER FEEDER

3 #1/0 & 1 #6 GRD.

1-1/2" C.

EXTERIOR LIGHTING CONTROL DIAGRAM

PHOTOCELL (TORK #2100)

CONTACTOR 'A'

R

P-1 #9

CKT.

ON OFF

'A'

R

NEUTRAL

CP

EXTERIOR LIGHTING

TIME CLOCK (TORK

#T920L-2 CKT.)

TO SECURITY

LTG. - BLDG.

EXTERIOR LIGHTING CONTACTOR 20A.

2P. IN NEMA 1 ENCLOSURE (ALLEN

BRADLEY #500LP-AAD9)

NOTE: TIME CLOCK FUNCTION IS FOR CONTROL OF CIRCUIT 'A' -

PHOTOCELL ON-TIME CLOCK OFF

TO PNL. 'P-1'

CKT. 9

NEUTRAL BUS

SURGE ARRESTOR

1. CONTRACTOR SHALL FOLLOW THIS DETAIL FOR PROPER GROUNDING CONNECTIONS, INCLUDING FURNISH AND INSTALL ALL CONDUCTORS AND EQUIPMENT SUCH AS GROUND RODS, SURGE ARRESTOR, GROUND BUS, ETC.

TO PROPERLY GROUND/BOND ALL EQUIPMENT.

2. GROUNDING ELECTRODE RESISTANCE SHALL BE 25 OHMS OR LESS. SHOULD THE MEASURED RESISTANCE BE HIGHER THAN 25 OHMS, ADDITIONAL SUPPLEMENTAL ELECTRODES SHALL BE PROVIDED AS REQUIRED TO

REACH A RESISTANCE TO EARTH OF 25 OHMS OR LESS.

3. IN ADDITION TO THE ABOVE DEPICTED CONNECTIONS, CONTRACTOR SHALL PROVIDE ALL GROUND RODS, GROUND GRIDS, AND OTHER GROUNDING ELECTRODES AS REQUIRED BY THE UTILITY COMPANY AND MAKE

CONNECTIONS TO UTILITY EQUIPMENT PER UTILITY COMPANY STANDARDS.

NOTES:

3/0 CU

3/0 CU

3/0 CU

3/0 CU

COLD WATER PIPE

3/0 CU. SHUNT AROUND

WATER METER

WATER METER

3/0 CU

CONNECT TO COLD

WATER SYSTEM

(NTS.)

SYSTEM BONDING

JUMPER

(TYP. FOR 3 OR 4

ROD GROUNDING

FIELD.)

(3) 3/4" COPPERWELD

10' LONG GROUND RODS

EQUIPMENT

GROUND BUS AT MAIN

PANEL (P-1)

TO RE-STEEL IN CONCRETE

FOUNDATION

3/0 CU

10' MIN.

GROUNDING DETAIL

LOW VOLTAGE SERVICE ENTRANCE DIAGRAM

WALL

FLOOR LINE

WALL

(NTS.)

4' WIDE X 4' X 3/4" THICK PLYWOOD

TELEPHONE TERMINAL BOARD

(T.T.B.) - 2 COATS FIRE RESISTANT

GRAY PAINT

TELEPHONE WIRE

TERMINATION BLOCKS/

STRIPS, ETC. SEE SPECS

FOR ADDITIONAL

INFORMATION

PROVIDE INLINE

SURGE SUPPRESION

PROVIDE IN-LINE SURGE

SUPPRESSION ON

INCOMING CATV &

TELEPHONE FEEDERS.

QUAD

RECEPTACLE

P-1 #25

(1) 3" PVC CONDUIT WITH TWO (2) NYLON PULL CORDS ROUTED

MINIMUM 36" BELOW GRADE (WITH CONTINUOUS YELLOW WARNING TAPE

18" ABOVE) TO PROPERTY LINE FOR TELEPHONE UTILITY

SERVICES. COORDINATE TERMINATION POINT WITH UTILITIES PRIOR TO

INSTALLING SAME. VERIFY FIELD CONDITIONS . TRENCH AND BACKFILL

AS REQUIRED, PER SPECIFICATIONS. COORDINATE WITH LOCAL

UTILITIES, FOR SERVICE ENTRANCE LOCATIONS, AND ADDITIONAL

REQUIREMENTS.

LIGHTING FIXTURE SCHEDULE

TYPE DESCRIPTION MANUFACTURER SERIES OR CATALOG NUMBER LAMP

COLOR

TEMP MIN LUMENS MAX WATTS VOLTS CONTROL MOUNTING TYPE

MOUNTING

HEIGHT REMARKS

BA2

2'X4' SURFACE MOUNTED FLAT PANEL LED FIXTURE

W/ SURFACE MOUNT KIT

LITHONIA

METALUX

COLUMBIA

CPX-2X4-5000LM-80CRI-35K-SWL-MIN1-ZT-MVOLT / 2X4SMKSH

24CGTX-55-L835-HCD / SMK-24-W

SRP24-35MLG-ED1U / PSMK-24

LED 3500K 5000 LM 40 W 120/277V 0-10V SURFACE ---

EM1

UNIT BATTERY EMERGENCY LIGHTING FIXTURE

WITH 90 MINUTE CAPACITY AND SELF DIAGNOSTICS

LITHONIA

MULE

DUAL LITE

ELM6L-UVOLT-LTP-SDRT

TSR-HO-W-SD

EVHC12I-06L

LED --- --- 5 W 120/277V ---

WALL

SURFACE

IA1

2' WALL MOUNTED LED INDUSTRIAL FIXTURE WITH

FLAT DIFFUSE LENS AND WHITE FINISH

LITHONIA

METALUX

WILLIAMS

DAY-BRITE

CLX-L24-1500LM-SEF-FDL-MVOLT-GZ1-35K-80CRI-WH

2SNX-19SL-FDL-UNV-L835-HCD1

75S-2-L15-835

FLP-2-20L-835-Q-UNV-DIM

LED 3500K 1500LM 11 W 120/277V 0-10V WALL ---

COORDINATE LOCATIONS

WITH DUCTWORK AND PIPING

IB1

8' SUSPENDED LED INDUSTRIAL FIXTURE WITH FLAT

DIFFUSE LENS, WHITE FINISH, WIREGUARD, AND

SAFETY CHAINS

LITHONIA

METALUX

COLUMBIA

CLX-L96-10000LM-SEF-FDL-MVOLT-GZ1-35K-80CRI-WH- HC36M12-WGCLX48

8SNX-10SL-FDL-UNV-L835-HCD1-AYC-CHAIN/SET-U-WG-SNX/SN-4FT-B

MPS8-35HL-FW-ED1U-CSHC-MPSWG4

LED 3500K 10000 LM 64 W 120/277V 0-10V

'Y' CHAIN

SUSPENDED

16'-0" A.F.F.

COORDINATE LOCATIONS

WITH DUCTWORK AND PIPING

WA1

24" LONG SQUARE LED VANITY FIXTURE WITH

WHITE DIFFUSER AND BRUSHED NICKEL HOUSING

LITHONIA

ABRA

OXYGEN

FMVCSLS-24IN-MVOLT-30K-90CRI

20017WV-XX

3-537-XX

LED 3500K 1300 LM 18 W 120/277V 0-10V WALL

MOUNTED

ABOVE

MIRROR

VERIFY MOUNTING HEIGHT

AND FINISH WITH ARCHITECT

XC

LED DIE-CAST ALUMINUM SINGLE FACE EXIT SIGN,

RED LETTERING, BRUSHED ALUMINUM, NICAD

BATTERY, SELF-DIAGNOSTICS

LITHONIA

SURELITES

DUAL LITE

LE-S-1-R-ELN-SD

CX71SD

SESRWEI

LED --- --- 1 W 120/277V --- WALL/CEILING ---

ENGINEER - CONFIRM LETTER

COLOR, FINISH, BATTERY VS

AC ONLY

G1

EXTERIOR GOOSE NECK FIXTURE W/ INTEGRATED

PHOTOCELL

SPECTRUM

BARN LIGHT

AFX

SW1509GV-15L-27K-EX-TF2-CP104-SP9012-MWI-WLKA

BLE-G-ASFC14-XX-XX-G17-XX-NA-NA-CLR-NA-NA-LED16.8-3500K

GILW1210LAJENBK

LED 3500K 1500LM 10 W 120/277V ---

WALL

MOUNTED

MOUNTED

ABOVE DOOR

EM

FIXTURE ON EMERGENCY CIRCUIT WITH 90 MINUTE,

HIGH OUTPUT (MIN 1400LM) BATTERY UNIT OR

INVERTER

BODINE FACTORY INSTALLED BATTERY, OR, AT CONTRACTOR'S DISCRETION,

MYERS LV SERIES INVERTER (SIZE AND QUANTITY AS REQUIRED)

0 W 120/277V ---

- PROVIDE TEST SWITCH AND

CHARGING INDICATOR

- INTEGRAL BATTERIES NOT

ALLOWED IN FIXTURES WITH

GREATER THAN 10000

LUMENS

MECHANICAL EQUIPMENT CONNECTION SCHEDULE

TAG DESCRIPTION

LOAD

MOCP VOLT PHASE PANEL CKT. NO.

FEEDER DISCONNECT SWITCH STARTER

REMARKSWATTS HP MCA FLA CABLE CONDUIT SIZE FUSE

PROV. BY

TYPE

PROV. BY:

M.C./P.C. E.C. M.C./P.C. E.C.

EBB-1 ELECTRIC BASEBOARD HEATER 750 6.25 15 120 1 PANEL P-1 6 2 #12 & 1 #12 GRD. 3/4" 15A X

EBB-2 ELECTRIC BASEBOARD HEATER 750 6.25 15 120 1 PANEL P-1 5 2 #12 & 1 #12 GRD. 3/4" 15A X

EBB-3 ELECTRIC BASEBOARD HEATER 1512 6.3 15 240 1 PANEL P-1 2,4 3 #12 & 1 #12 GRD. 3/4" 30A X

HP-1 HEAT PUMP 4488 18.7 20 240 1 PANEL P-1 1,3 3 #10 & 1 #10 GRD. 3/4" 15A X

RCP-1 RADIANT CEILING PANEL 249.6 2.08 15 120 1 PANEL P-1 8 2 #12 & 1 #12 GRD. 3/4" 15A X

TEF-1 TOILET EXHAUST FAN 34.8 0.29 120 1 PANEL P-1 7 2 #12 & 1 #12 GRD. 3/4" 15A X

WH-1 WATER HEATER 1650 13.75 120 1 PANEL P-1 10 2 #12 & 1 #12 GRD. 3/4" 30A

P L

U R

I B

U E

S U

N U

M

C I

R C

U M

S P

I C

E

S I

Q U

E R

E I

S P

E N

I N

S U

L A

M A

M

OE

N A

M

9711 Valparaiso Drive

221 N. LaSalle Street

(219)924-8400

Munster, IN 46321

Chicago, IL 60601 www.milliesengineeringgroup.com

MILLIES

ENGINEERING GROUP

820 Monroe Ave NW Grand Rapids, MI 49503

Copyright © 2026 Millies Engineering Group

S th S tr e e t, P O

B o x

O s h te m o

M

I

(2

-8

S N

A N

O -1

F

IL

E N

O

.J

L M

S H

E E

T

ID

E N

T

IF

IC

A

T

IO

N N

O

IS

S

U E

D F

O R

D A

T E

C o p y ri g h t

S c h le y N el so n A rc h it e ct s, I n c.

C O

N S

T R

U C

T

IO

N

F

IN

A L

R E

C O

R D

P R

E L

IM

R

E V

IE

W

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

A D

A M

P L

A C

H

R A

D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N t h

A v e

S a u g a t u c k

D u n e s M I

S a u ga tu ck

D u n es

S ta te

P a r k

S to r a ge

B u il d in g

D ep a r tm en t o f N a tu r a l R es o u r ce s

L a k e t o w n

T o w n s h ip A ll e g a n

C o u n t y M ic h ig a n

E2.1

-1

-2

F O

R B

ID

C O

N S

T R

014 2603048 Plumbing 2026-06-15
P1.0 - MEZZANINE & FLOOR PLANS - PLUMBING
P2.0 - PLUMBING DETAILS
015 2603048 Mechanical 2026-06-15
M1.0 - MEZZANINE & FLOOR PLANS - MECHANICAL
M2.0 - MECHANICAL DETAILS
016 2603048 Electrical 2026-06-15
E0.0 - SITE PLAN - ELECTRICAL
E1.0 - MEZZANINE & FLOOR PLANS - ELECTRICAL
E2.0 - ELECTRICAL NOTES & SYMBOLS
E2.1 - ELECTRICAL DETAILS & SCHEDULES

File details come from the government source that posted it. Updated .