751-23400-01_DWG_MEP_Island Lake-Bald Mountain.pdf

PDF 5 MB Posted

Attached to
751/23400. DPL; 2 Shooting Ranges - 2025 Imprvmnts
Solicitation number
RFQ-171-250000000335-3
Issued by
Livingston County, Michigan

About this file

The document appears to be a comprehensive set of architectural and engineering design drawings for a project at Island Lake-Bald Mountain, specifically focused on mechanical, electrical, and plumbing (MEP) systems. The drawings include detailed site plans, demolition plans, electrical and mechanical specifications, floor plans, electrical symbols and legends, riser diagrams, panel schedules, and electrical and mechanical key notes. The plans show both existing and proposed configurations for structures, with detailed technical specifications for electrical infrastructure, including power and lighting layouts, electrical handhole details, and electrical heater schedules.

The technical drawings are prepared by Matrix engineering consultants and appear to be part of a renovation or reconstruction project involving multiple building structures. The documents include extensive technical specifications covering electrical systems, with detailed load calculations, panel schedules, and electrical key notes. Specific elements include site plans showing building layouts, demolition plans indicating areas of removal or modification, floor plans for power and lighting, and comprehensive technical notes providing guidance on installation, safety, and system requirements. The drawings are marked with page numbers from E-100 to M-400, suggesting a multi-discipline engineering approach to the project documentation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .