751_ 18360.RAA DMB 0414 RFP Addendum 2.pdf

PDF 1 MB Posted

Attached to
751/18360. RAA Porcupine Mountains SP - Iron Belle Trail
Solicitation number
RFP 171 190000000706 3
Issued by
Otsego County, Cheboygan City, Michigan

About this file

This is a Request for Proposal Addendum No. 2 issued by the Michigan Department of Technology, Management and Budget, State Facilities Administration Design and Construction Division for the Porcupine Mountains Wilderness State Park Iron Belle Trail Pedestrian Bridge project. The addendum, issued on February 15, 2019, clarifies the scope of work for the Professional Services Consultant (PSC) and modifies project responsibilities. The PSC is responsible for obtaining easements only for construction access to the trail bridge site, with the scope of work limited to the bridge structure, bridge abutments, bridge approaches extending 50 feet in each direction from the bridge, and the construction easement itself. The proposed trail reroute work will be performed by others and is explicitly excluded from the PSC scope of work. The proposal due date is February 21, 2019. A revised topographic map is attached and delineates the preferred construction easement route, which follows an existing road and former rail grade in good condition with vegetation cleared to 8-10 feet wide from the South boundary road to the bridge site.

The addendum does not address pricing terms, set asides, incumbents, or funding sources in its content. The document serves as a clarification tool to ensure all proposers understand that easement acquisition for the broader trail route is outside the contract scope and will be handled through separate means. The attachment includes a detailed topographic map showing the project location within Porcupine Mountains Wilderness State Park, the proposed bridge location, the construction easement route, and notes regarding private in-holdings and areas to be developed post-construction by the Department of Natural Resources.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DTMB-0414 RFP (Rev 6/16)

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

State Facilities Administration Design and Construction Division

REQUEST FOR PROPOSAL ADDENDUM NO. 2

This form identifies an Addendum to a Request for Proposal for Professional Services, and incorporates interpretations or clarifications, modifications, and other information into the Request for Proposals. Addenda will be numbered by the Project Director and distributed through www.michigan.gov/SIGMAVSS as an attachment.

TO:

ALL PROPOSERS

DATE ISSUED

2/15/2019

PROJECT NAME

Porcupine Mountains Wilderness State Park - Iron Belle Trail Pedestrian Bridge

FILE NUMBER

751/18360.RAA

PROJECT DIRECTOR

Robert A. Adams

PROPOSAL DUE DATE:

2/21/2019

ADDENDUM ITEMS: (attach additional sheets and drawings if required)

1) The following addendum is being issued to clarify that the PSC will be responsible for obtaining the easements for only the construction access to trail bridge site. The PSC scope of work only includes the bridge, bridge abutments, bridge approaches for 50’ in each direction of the bridge and the construction easement. Easements required for the proposed trail route are not included in the scope of work as the proposed trail re-route work will be performed by others. Refer to the attached revised topo map which delineates the proposed preferred construction easement route.

APPROVED BY:

DATE: 2/15/2019

http://www.michigan.gov/SIGMAVSS

ON

TO

NA

GO

N

CO

LostCreek

Anderson Creek

As hCree k

Lit tle

Iro nR ive r

Canada C reek

Hood edCree k

Elm Creek

Lit tle

Un ion

Ri ver

Lo gge rhe ad

Cree k

We st B ran ch

Iro nR ive r

We s tB ran ch

Iro n R iver

Elm Cr ee k

Elm Cr ee k

Logge rhe ad Cr e ek

Litt leIronRiv er

Little Iro n R ive r

Elm Cr eek

Lit tle

I ro n River

Logg erh ead Cr eek

Lit tle

Iro nRiver

Lit tle

Iro nRiver

Br idg e

Ca mp ing Po rki es

St ate

Pa rk

Ot taw a N ati on al

Fo res t

0.5

0.2

Mi les±

Le ge nd Pr op os ed

R ou te Pr ev iou s P rop os ed

R ou te Lo st La ke Tr ail

NC

T cadeaue Callout Light green shaded area is a private in holding (36 acres). And is surrounded by State Park Land.

cadeaue Callout Proposed trail route post construction - by DNR (not included in scope of work).

cadeaue Callout Proposed pedestrian bridge location.

cadeaue Callout Proposed route of construction easement along existing road / former rail grade. Route is in good condition from South boundary road to bridge site. Vegetation is cleared 8-10' wide.

Topo map with construction easement.pdf
751_ 18360.RAA DMB 0414 RFP Addendum 2.pdf

File details come from the government source that posted it. Updated .