About this file
This document is a set of plans and specifications for a sewage pump station replacement project at the Father Marquette National Memorial in Moran Township, Michigan. The project is being managed by the Michigan Department of Technology, Management and Budget, State Facilities Administration, Design and Construction Division.
The project involves the demolition of the existing sewage pump station and replacement with a new package pump station. Key details include verifying field measurements, preparing final shop drawings, restoring impacted concrete and asphalt areas, and installing new buried electrical and controls. The project is scheduled to begin in June 2023 and continue through January 2024. Contractors must comply with soil erosion and sedimentation control requirements. Pricing, funding sources, and set-asides are not specified in the document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Father Marquette National Memorial Date Issued: June 28, 2023
SHEET INDEX
Bids and Construction
Location Maps
NTS
Cover Sheet
C1.0 Existing Conditions Plan C2.0 Soil Erosion & Sedimentation Control Plan and Details C3.0 Demolition Plan C4.0 Construction Plan535 West William, Suite 101
Planning, Engineering and Landscape Architecture
Beckett & Raeder, Inc.
Ann Arbor, MI 48103
663.2622 663.6759 ph fx
Beckett&Raeder RB i
Submittals
Environmental Services
Overall Vicinity Map Site Plan Vicinity Map
05.18.2023 90% Owner Review
06.16.2023 100% Owner Review
06.28.2022 Bidding
File Number: 751/18297.TAP Index Number: 2500 Moran Township, Michigan 49781
Permits Required SESC Permit - DNR/BRI & Contractor LARA Plan Review - DNR/BRI & Contractor
Landscape Architect / EngineerAgency and Project Director
Contacts Christopher DeGood 231.420.5601 cdegood@bria2.com
Project Site Location 592 Boulevard Drive, St. Ignace, MI 49781
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
STATE OF MICHIGAN
ADAM P. LACH, RA, DIRECTOR
STATE FACILITIES ADMINISTRATION
DESIGN AND CONSTRUCTION DIVISION
Lake Michigan
Lake Huron
Mackinac Island
PROJECT
SITE
Bois Blanc Island
Cecil
Mackinaw City
Chain Lake
I7
I75
I75
M ac ki na w H w y
W ild er ne ss P ar k
Dr
State Hwy 2
State Hwy 23
Chain Lake
Lake Huron
PROJECT
SITE
I75
I7
Old Portage Trail
State Hwy 2
I75
Ferry Ln Straits State Park
St Ignace
Sewage Pump Station Replacement
AutoCAD SHX Text P
AutoCAD SHX Text L
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text B
AutoCAD SHX Text U
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text U
AutoCAD SHX Text N
AutoCAD SHX Text U
AutoCAD SHX Text M
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text M
AutoCAD SHX Text S
AutoCAD SHX Text P
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text Q
AutoCAD SHX Text U
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text P
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text S
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text M
12" C
12" WB
8" C 8" C
12" C
2-6" C
12" C
6" S
6" S 6" S
6" S
8" C
8" C
2-8"/12" C
2-4" WB
8" S
12" S
8" C 12" C
8" C 20" C 15" C
10" S
6" C
6" C
8" C
4-8" C
6" A 12" WB
6" I
12" A
12" C
3-12" C
8" A
2-10" C
6" C 8" C
14" C
8" A
14" C
2-8" C
14" C
14" C
8" A
6" B
10" B
2-10" M
8" A
12" WP
14" WB
10" WP
3-8" C
3-8" C3-8" C
16" WB
18" O
8" T
24" O
8" T 6" T
3-8" C
15" C
3-8" C 2-10" C
2-5"/8" C
2-6" C
7" C
10" C
16" WB
16" A
2-8"/10" C
18" A
6" M
6" C
12" A
12" C
8" P
12" C
8" C
12" A
2-9" M
10" C
12" Ah
8" A
6" A 10" A
16" C
10" B
8" C
8" C 8" A
8" B
9" C
12" S
12" C
6" S 12" A
6" C
3-8" A8" S
2-6" S
8" S
16" C
12" C
10" C
8" C
12" A
3-12" C
3-10" C
6" C
8" C 6" B
3-10" C 2-6" C
3-8" C
6" C
2-6" C
8" B
8" C
8" C
12" C
3-10" C 8" C
6" C
12" B3-6" C
6" C
6" C 8" C
6" C
2-12" C
3-8" C
8" C 6" C
2-6" C
12" WB
6" B
6" C
3-12" C
12" C
6" B
6" C
6" A
10" A
15" C
8" A
6" C
8" M 5" A
8" A 6" A
14" A
4" A
3-6" A
8" A8" A
4" A
6" A
18" C
12" C
6" C
16" C
6" C
10" C
3-12" C
6" C
2-5" S
6" C
6" C
6" S
8" C 6" C
12" C 8" C
8" C
6" C 6" C
8" C
6" B
6" S
8" A
6" S
6" A
8" A 8" A
10" A
6" S 6" B
6" B
6" S
6" C
6" C 8" C
10" C
12" A
3-10" C
16" C
6" C
3-6" C
2-8" C
8" C
2-10" C
2-7" C
3-10" C
12" C
2-8" C
3-8" C
10" C
6" B
6" S
3-8" C 10" C
8" B
10" C
12" C
6" C3-12" C6" S
8" S
10" C
6" C
4-6" C
8" C
6" C
8" C
3-8" C
2-10" C
12" C
10" C
6" C
12" C
12" C 6" C
6" C
8" C
2-6"/10" C
2-8" C
2-6" C
6" C
6" C
12" B10" C 10" C
6" C
8" C
6" WP
9" C 3-10" C10" B
6" C 8" S
6" C
6" WP
6" C
6" S
8" S
10" S 10" C
10" C
6" B 6" C
6" C8" C
12" C 6" S
10" C
24" WP6" S
12" C
12" C 6" C
8" C
2-8" C
6" C
6" C
6" B
6" S
8" C
8" WP 6" C
12" C
8" C
10" B
10" C
10" C
8" C
18" WP
2-8" C
10" B
12" C
3-6" C
2-6" C
6" B
6" B
6" B
6" WP
10" WP
8" C 6" C
6" B
12" B
10" S
8" C
8" C
12" C
15" C
6" C 10" B
8" C
8" B
6" WP
6" B
8" C 6" C
6" C
8" B
10" B
6" B
6" B
8" B
6" B
6" B 8" B
6" C
12" C 12" C
8" C8" S
6" S
2-8" C
10" S
6" S
6" S
8" C
6" C
6" C
6" C
6" C
12" C
8" B
6" C 6" S
3-6" C
8" B
8" S 10" B
6" C
10" S
2-8" C
8" C
2-6" C
20" C
6" S
16" WP
6" C
8" C
6" C
6" S
8" C 8" WP
6" B
6" S
12" C
4-10" C
8" C
8" C
2-8" C
8" C
10" C
12" WB
10" S 3-8" C
12" C
8" C 12" C
6" C
12" WP
10" B
8" B
2-6" C
8" B
6" C2-6" C
6" C 6" C
2-8" C
6" C
8" C
8" S
6" C 6" S
2-6" C
3-6" WB
3-8" WB
10" C
12" C
12" H
2-8" C
12" C
12" A
8" C 12" C
2-6" C
2-6" C
8" B
8" C
8" C 6" C
6" S 6" C 6" S
6" C
8" C
10" C
8" B 8" C
2-6" C
6" B8" C 6" B
6" B
8" B
24" C
6" S
10" S
8" S
6" S
2-6" C
8" S
10" WB
694 12" S
8" C
12" A
10" A
20" O
8" A 8" S
3-10" C
2-4" T
MEMORIAL
STONE
2-8" S
8" C
8" S
6" C
10" S
6" B
8" C
8" C
8" C
2-6" B
6" C
3-6" C
2-8" C
6" C
6" S
6" S
6" C
8" B 10" C
10" C
2-6" C
8" C
6" C
C Clump
2-10" C
4" A
10" H
3-8"/8"/12" C
8" S
8" C
2-6" C
8" C
2-8" S
2-8" C
6" S
10" S
6" S
6" C
14" H
2-6" A8" A
6" S
6" A 6" A 5" A
2-5" A 2-8" A
2-6" C3-4" M
5" A
12" Ah
12" Ah
6" A 6" A
6" M
8" A
6" M
20" C
2-6"/10" B
12" B
8" C
16" C
2-8" A 2-6"/10" M
3-4"/4"/8" C
3-4" T
12" WB
8" C
8" S
6" S
2-10" C
12" C
10" B
15" C M
P
FM
FM
FM
FM
FM
FM
FM
SN
W
W
W
C O
N C
BI
T.
BIT.
CONC.
CONC.
CONC.
KIOSK
BIT.
CO
NC.
METER
4" FORCEMAIN
TRANS.
CONTROLS
LIFT STATION
4" SANITARY
SEWER
SIGN
BENCH
TRASH
FLAG POLE
FLAG POLE
SIGN
UE
UE
UE
UE
UE
UE
UE
UE
Checked:
201923
Approved:
Drawn:
Issued forDates
Seal
535 West William, Suite 101
Planning & Engineering Landscape Architecture
Beckett & Raeder, Inc.
Ann Arbor, MI 48103
663.2622 663.6759 ph fx
Beckett&Raeder RB i
Moran Township, Michigan
Environmental Services
Michigan Department of Natural Resources
Father Marquette National Memorial
CD
CS
KD
Bids and Construction06.28.23
Sewage Pump Station Replacement
C1.0
1" = 20'
NORTH
Know what's below.
before you dig.Call
R
Existing Conditions Plan
1. CONTRACTOR SHALL CALL MISS DIG (811) A MINIMUM OF THREE WORKING DAYS
PRIOR TO START OF CONSTRUCTION.
2. CONTRACTOR SHALL INVESTIGATE EXTENT AND LOCATION OF ALL EXISTING
UTILITIES AND SHALL BE RESPONSIBLE FOR PROTECTION AND RESTORATION OF
SAME IF DAMAGED AS A RESULT OF CONTRACTOR'S OPERATIONS.
3. CONTOUR INTERVAL SHOWN IS 1-FOOT.
LOCATION OF PUMP STATION REPLACEMENT WORK
BENCHMARK ENGINEERING, INC.
607 E. LAKE STREET
HARBOR SPRINGS, MI 49740
(231) 526-2119 BENCHMARK607@GMAIL.COM
SURVEY PREPARED BY:
4020100
SCALE: 1" = 20'
EXISTING CONDITIONS LEGEND
EXISTING ROW / EASEMENT
EXISTING PROPERTY LINE
EXISTING LOT LINE
EXISTING CURB AND GUTTER
EXISTING MINOR CONTOUR
EXISTING MAJOR CONTOUR
EXISTING STORM LINE
EXISTING GAS LINE
EXISTING OVERHEAD UTILITIES
EXISTING WATER LINE
EXISTING SANITARY LINE
EXISTING FENCE
CONTROL POINT
EXISTING SIGN
EXISTING CLEANOUT
EXISTING SANITARY MANHOLE
EXISTING STORM MANHOLE
EXISTING SPOT GRADE
EXISTING STORM CATCH BASINS
EXISTING IRRIGATION HEAD
EXISTING LIGHT POLE
EXISTING ELECTRIC MANHOLE
EXISTING ELECTRIC METER
EXISTING ELECTRIC HANDHOLE
EXISTING UTILITY POLE
EXISTING TRAFFIC SIGNAL POST
EXISTING HYDRANT
EXISTING TREE
LIMITS OF DISTURBANCE
LIM
ITS O
F DISTURBANCE
AutoCAD SHX Text 8" C
AutoCAD SHX Text 6" B
AutoCAD SHX Text 8" B
AutoCAD SHX Text 8" B
AutoCAD SHX Text 6" C
AutoCAD SHX Text 8" C
AutoCAD SHX Text 12" C
AutoCAD SHX Text 10" C
AutoCAD SHX Text 10" C
AutoCAD SHX Text 6" S
AutoCAD SHX Text 8" C
AutoCAD SHX Text 6" C
AutoCAD SHX Text 6" C
AutoCAD SHX Text 12" C
AutoCAD SHX Text 8" C
AutoCAD SHX Text 10" S
AutoCAD SHX Text 18" C
AutoCAD SHX Text 6" S
AutoCAD SHX Text 16" C
AutoCAD SHX Text 14" C
AutoCAD SHX Text 8" C
AutoCAD SHX Text 2-6" S
AutoCAD SHX Text
8" WB
AutoCAD SHX Text 10" C
AutoCAD SHX Text 8" C
AutoCAD SHX Text 2-10" C
AutoCAD SHX Text
BATHROOM
AutoCAD SHX Text
FACILITY
AutoCAD SHX Text 12"r
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
OVERHEAD UTILITIES
AutoCAD SHX Text
SANITARY
AutoCAD SHX Text
GAS
AutoCAD SHX Text
8"D.I. CL54
AutoCAD SHX Text 578.62
AutoCAD SHX Text R
AutoCAD SHX Text S
AutoCAD SHX Text U
AutoCAD SHX Text C.O.
AutoCAD SHX Text
HH
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text
TS
SH
12" WP
14" WB
10" WP
24" O
8" T 6" T
3-8" C
15" C
3-8" C 2-10" C
2-5"/8" C
2-6" C
7" C
10" C
16" WB
16" A
2-8"/10" C
18" A
6" M
8" P
6" C
6" A
10" A
15" C
8" A
6" C
8" M 5" A
8" A 6" A
14" A
4" A
3-6" A
8" A8" A
4" A
6" A
18" C
12" C
16" C
2-5" S
6" C
6" C
20" O
2-4" T
2-10" C
4" A
6" A 6" A 5" A
2-5" A 2-8" A
2-6" C3-4" M
5" A
12" Ah
12" Ah
6" A 6" A
6" M
8" A
3-4"/4"/8" C
3-4" T
12" WB
FM
FM
FM
FM
FM
SN
SN
SN
W
W
W
BI
T.
BIT.
CONC.
CONC.
KIOSK
CO
NC.
METER
4" FORCEMAIN
TRANS.
CONTROLS
LIFT STATION
4" SANITARY
SEWER
SIGN
BENCH
FLAG POLE
SIGN
UE
UE
UE
UE
UE
UE
UE
Checked:
201923
Approved:
Drawn:
Issued forDates
Seal
535 West William, Suite 101
Planning & Engineering Landscape Architecture
Beckett & Raeder, Inc.
Ann Arbor, MI 48103
663.2622 663.6759 ph fx
Beckett&Raeder RB i
Moran Township, Michigan
Environmental Services
Michigan Department of Natural Resources
Father Marquette National Memorial
CD
CS
KD
Bids and Construction06.28.23
Sewage Pump Station Replacement
C2.0
1" = 10'
NORTH
Know what's below.
before you dig.Call
R
Soil Erosion & Sedimentation Control Plan
SESC LEGEND
201050
SCALE: 1" = 10'
TREE PROTECTION FENCE
LIMIT OF WORK LINE
REMOVE TREE
FILTER FABRIC FENCE
CONSTRUCTION SEQUENCE
SEEDING AND EROSION BLANKETS
TOPSOIL / SEDIMENT CONTROL
TREE REMOVAL & STUMP GRINDING
TEMPORARY CONTROL MEASURES
FINISH GRADING
SITE CONSTRUCTION
SITE UTILITIES
OPERATION TIME SCHEDULE (2023-2024)
CONSTRUCTION SEQUENCE
MAY JUNE JULY AUG SEPT OCT NOV DEC JAN
4' T
Y P.
ELEVATION
3.
PLASTIC CONSTRUCTION FENCE
PLAN
1.
2.
NOTES:
STEEL FENCE POSTTYP.6'
TREE PROTECTION FENCING SHALL BE ERECTED PRIOR TO
ANY EARTHWORK OR CONSTRUCTION AND IS TO REMAIN
IN PLACE UNTIL CONSTRUCTION IS COMPLETE.
FENCE SHALL BE LOCATED AT THE OUTER PERIMETER OF
THE SPREAD OF THE BRANCHES OR CLOSER ONLY AT THE
DIRECTION OF THE PROJECT LANDSCAPE ARCHITECT.
ALL DEBRIS, FILL, EQUIPMENT AND MATERIAL SHALL BE
KEPT CLEAR OF AREA WITHIN PROTECTIVE FENCE. NO
CLEANING, STORAGE, OR DISPOSAL OF ANY MATERIAL
ALLOWED WITHIN THE DRIP LINE OF TREES TO BE SAVED.
4. TREE PROTECTION FENCING SHALL BE INSTALLED WHERE
DIRECTED BY LANDSCAPE ARCHITECT AND SHALL BE PAID
ON A UNIT PRICE BASIS.
NO SCALE
Filter Fabric Fence: MDMB SESC Detail
SILT FENCE
SPACING 6-10' MAX.
1' MIN.
6" ANCHOR TRENCH
FENCE POSTS DRIVEN INTO
GROUND 1' MIN.
SILT FENCE B
SILT FENCE A
FABRIC TO BE
WRAPPED AROUND
FENCE POST
1' MIN.
UNDISTURBED VEGETATION
GEOTEXTILE FILTER FABRIC
FASTENED ON UPHILL SIDE,
TOWARDS EARTH
DISRUPTION
RIDGE OF COMPACTED
EARTH ON UPHILL SIDE OF
FILTER FABRIC
SHEET FLOW
6"x6" ANCHOR TRENCH
ROLL JOINTS
STANDARD SYMBOL MICHIGAN
DEPARTMENT OF
MANAGEMENT AND BUDGET
S51
ROLL JOINT
TASK
X
C O
M
PO
N
EN
T
ST
O
RM
S
EW
ER
C
U
LV
ER
TS
SW
A
LE
S
SE
D
IM
EN
TA
TI
O N
B A
SI
N
S
SCHEDULE
INSPECT FOR SEDIMENT ACCUMULATION WEEKLY
REMOVAL OF SEDIMENT ACCUMULATION AS NEEDED AND PRIOR TO TURNOVER
INSPECT FOR FLOATABLES AND DEBRIS QUARTERLY
REMOVAL OF FLOATABLES AND DEBRIS QUARTERLY AND AT TURNOVER
INSPECT FOR EROSION WEEKLY
RE-ESTABLISH VEGETATION ON ERODED
SLOPES
AS NEEDED AND PRIOR TO TURNOVER
REPLACEMENT OF STONE AS NEEDED*
RI
P
RA
P
MOWING 0 TO 2 TIMES PER YEAR
INSPECT STRUCTURAL ELEMENTS DURING WET
WEATHER AND COMPARE TO AS-BUILT PLANS
(BY PROFESSIONAL ENGINEER)
ANNUALLY AND PRIOR TO TURNOVER
MAKE ADJUSTMENTS OR REPLACEMENTS AS
DETERMINED BY PRE-TURNOVER INSPECTION
AS NEEDED
X
X X
X X
X X
X
X
X X X X
X X X
TASK
X C
O M
PO
N
EN
T
SCHEDULE
INSPECT FOR SEDIMENT ACCUMULATION ANNUALLY
REMOVAL OF SEDIMENT ACCUMULATION ANNUALLY AS NEEDED
INSPECT FOR FLOATABLES AND DEBRIS
REMOVAL OF FLOATABLES AND DEBRIS
INSPECT FOR EROSION
RE-ESTABLISH VEGETATION ON ERODED
SLOPES
AS NEEDED
REPLACEMENT OF STONE EVERY 3-5 YEARS AS NEEDED
MOWING 0 TO 2 TIMES PER YEAR
INSPECT STRUCTURAL ELEMENTS DURING WET
WEATHER AND COMPARE TO AS-BUILT PLANS
(BY PROFESSIONAL ENGINEER)
ANNUALLY
MAKE ADJUSTMENTS OR REPLACEMENTS AS
DETERMINED BY INSPECTION
AS NEEDED
X
X X
X X
X X
X
X
X X X X
X X X
CLEAN STREETS, DRIVES AND PARKING AREAS 0 TO 2 TIMES PER YEAR
ANNUALLY
ANNUALLY AS NEEDED
ANNUALLY
X
X
X
X
XX
X X
X X
X
ST
O
RM
S
EW
ER
C
U
LV
ER
TS
SW
A
LE
S
SE
D
IM
EN
TA
TI
O N
B A
SI
N
S
RI
P
RA
P
X
X
X
X
X X
X X
X X
X
MAINTENANCE SCHEDULE
(DURING CONST. BY GC)
MAINTENANCE SCHEDULE
(POST CONST. BY OWNER)
MDMB SOIL EROSION AND
SEDIMENTATION CONTROL NOTES
1. ALL WORK SHALL COMPLY WITH THE APPLICABLE SOIL EROSION AND SEDIMENTATION CONTROL (SESC) RULES AND REGULATIONS (SOIL EROSION AND SEDIMENTATION CONTROL - 1994 PA 451, PART
91, AS AMENDED, MCL 324.9101 ET. SEQ.).
2. ALL EARTH CHANGES OF ONE ACRE OR MORE OR WITHIN 500 FEET OF WATERS OF THE STATE REQUIRE A SESC PERMIT. IF A SESC PERMIT IS REQUIRED THE PROFESSIONAL SERVICES CONTRACTOR (DESIGN CONSULTANT SHALL PREPARE AN SESC PLAN. THE SESC PLAN SHALL ADDRESS BOTH WIND
AND WATER EROSION AND SEDIMENTATION.
3. THE CONTRACTOR SHALL REVIEW THE DESIGN CONSULTANT'S SESC PLAN IN ORDER TO PREPARE AND ISSUE FOR APPROVAL AN "SESC IMPLEMENTATION PLAN", WHICH INDICATES THE CONTRACTOR'S
INTENDED IMPLEMENTATION OF THE SESC PLAN FOR THE PROJECT, INCLUDING A SCHEDULE.
4. THE DTMB SESC PROGRAM, UPON APPROVAL OF THE IMPLEMENTATION PLAN, WILL ISSUE THE CONTRACTOR AN "AUTHORIZATION TO PROCEED WITH EARTH CHANGE", WHICH IS TO BE POSTED AT THE JOB SITE. THIS DOCUMENT IS ISSUED IN LIEU OF A PERMIT FROM THE COUNTY OR OTHER
LOCAL ENFORCING AGENCY.
5. THE CONTRACTOR SHALL IMPLEMENT SOIL EROSION AND SEDIMENTATION CONTROL MEASURES AS REQUIRED BY THE PROJECT'S SESC PLAN, SESC IMPLEMENTATION PLAN, DTMB'S SOIL EROSION AND
SEDIMENTATION CONTROL GUIDEBOOK, DATED FEBRUARY 2005, AND AS DIRECTED BY THE
PROFESSIONAL SERVICES CONTRACTOR, DTMB SESC INSPECTOR, AND / OR DTMB PROJECT DIRECTOR.
THE DTMB SESC INSPECTOR SHALL INSPECT THE SITE WEEKLY AND AFTER SIGNIFICANT RAIN EVENTS.
6. THE CONTRACTOR SHALL INSTALL TEMPORARY EROSION AND SEDIMENTATION CONTROL MEASURES
PRIOR TO OR UPON COMMENCEMENT TO EARTHWORK ACTIVITIES.
7. THE CONTRACTOR SHALL INSTALL TURBIDITY CURTAIN AS NEEDED BASED ON SITE CONDITIONS.
TURBIDITY CURTAIN SHALL BE PLACED AT THE PERIMETER OF THE EXISTING DOCK.
8. THE CONTRACTOR WILL PERFORM SWEEPING AS NEEDED TO REMOVE ANY SEDIMENT TRACKED OFF
SITE. FREQUENCY OF SWEEPING WILL BE BASED ON SITE CONDITIONS.
9. THE CONTRACTOR WILL PERFORM DUST CONTROL AS NEEDED BASED ON SITE CONDITIONS. DUST CONTROL SHOULD OCCUR ALONG THE TRAIL AND PARKING AREA AS WELL AS ACCESS INTO THE SITE.
10. DISTURBED AREAS THAT WILL REMAIN IDLE DURING CONSTRUCTION MUST BE TEMPORARILY STABILIZED, INCLUDING SOIL STOCKPILES, USING DTMB SESC BEST MANAGEMENT PRACTICES.
11. THE CONTRACTOR SHALL MAINTAIN AND INSPECT SESC MEASURES THROUGHOUT THE COURSE OF
THE PROJECT.,RECOMMENDED ON A DAILY BASIS. AT A MINIMUM, THE CONTRACTOR SHALL
INSPECT AND MAINTAIN SESC MEASURES ONCE A WEEK AND AFTER RAIN EVENTS.
12. THE CONTRACTOR SHALL CORRECT NON-CONFORMING SESC MEASURES WITHIN 24 HOURS, IF WATERS OF THE STATE ARE BEING IMPACTED OR WITHIN 48 HOURS FOR ROUTINE MAINTENANCE ITEMS. OTHER SESC MAINTENANCE SHALL BE COMPLETED AS SOON AS POSSIBLE BUT NEVER MORE
THAN FIVE (5) DAYS AFTER DETECTION.
13. THE CONTRACTOR SHALL COMPLETE PERMANENT SOIL EROSION CONTROL MEASURES FOR ANY DISTURBED LAND AREA WITHIN 5 CALENDAR DAYS AFTER FINAL GRADING OR THE FINAL EARTH
CHANGE HAS BEEN COMPLETED. THE CONTRACTOR SHALL MAINTAIN TEMPORARY CONTROL
MEASURES UNTIL PERMANENT SOIL EROSION CONTROL MEASURES ARE IN PLACE AND THE AREA IS
STABILIZED. .THERE WILL BE A $500/DAY FINE AND ASSESSMENT OF ACTUAL DAMAGE.
14. THE CONTRACTOR SHALL REMOVE TEMPORARY EROSION CONTROL MEASURES AFTER PERMANENT SOIL EROSION MEASURES ARE IN PLACE AND THE AREA IS STABILIZED. CARE SHALL BE TAKEN DURING
REMOVAL TO PREVENT SOIL EROSION AND SEDIMENTATION.
15. AFTER THE COMPLETION OF THE PROJECT, PERMANENT SESC MEASURES WILL BE MAINTAINED BY THE
PROPERTY OWNER.
16. ALL WORK UNDER THIS CONTRACT MUST MEET THE STORM WATER MANAGEMENT REQUIREMENTS OF THE PROJECT AND COMPLY WITH THE APPLICABLE SOIL EROSION AND SEDIMENTATION CONTROL (SESC) RULES AND REGULATIONS (SOIL EROSION AND SEDIMENTATION CONTROL- 1994 PA 451, PART 91, AS AMENDED, MCL 324.9101 ET SEQ.) AND SPECIFIC PROVISIONS AND REGULATIONS FOR SAME
WITHIN THE CONTRACT DOCUMENTS. THE DEPARTMENT OF TRANSPORTATION, MANAGEMENT AND
BUDGET, FACILITIES ADMINISTRATION, AND AUTHORIZED PUBLIC AGENCY (APA), HAS PROMULGATED STANDARD PROCEDURES AND SPECIFICATIONS FOR EROSION CONTROL THAT SHALL BE CONSIDERED A PART OF THE CONTRACT DOCUMENTS. SESC MEASURES WILL BE MONITORED AND ENFORCED BY FACILITIES ADMINISTRATION THROUGH THE REVIEW OF THE CONTRACTOR'S IMPLEMENTATION PLANS AND SITE INSPECTIONS. FACILITIES ADMINISTRATION OR THE PROFESSIONAL WILL NOTIFY THE CONTRACTOR IN WRITING OF ANY VIOLATION(S) OF THE APPLICABLE SESC STATUTES AND/OR THE
CORRECTIVE ACTION(S) UNDERTAKEN BY THE OWNER AND MAY ISSUE STOP WORK ORDERS.
FACILITIES ADMINISTRATION HAS THE RIGHT TO ASSESS A FINE TO THE CONTRACTOR FOR
NONCOMPLIANCE WITH THE PROVISIONS OF THE CONTRACT DOCUMENTS AND/OR SESC
REGULATIONS APPLICABLE TO THIS WORK AND FINES SHALL BE IN ADDITION TO ANY OTHER
REMEDIATION COSTS OR LIQUIDATED DAMAGES APPLICABLE TO THE PROJECT AND MAY EXCEED THE
VALUE OF THE CONTRACT.
17. PERIMETER EROSION CONTROL MEASURES SHOWN, SUCH AS SILT FENCE OR TURBIDITY CURTAIN, ARE
SCHEMATIC. CONTRACTOR SHALL MAKE ANY ADJUSTMENTS REQUIRED TO ENSURE PROPER SOIL
EROSION AND SEDIMENTATION CONTROL OR AS DIRECTED BY THE ENFORCING AGENCY THE TOTAL
AREA OF DISTURBANCE IS 0.05 ACRES.
18. ACCORDING TO THE NATIONAL COOPERATIVE SOIL SURVEY, THE ENTIRE SITE IS SOIL TYPE La -
LAMSON FINE SANDY LOAM.
NO SCALE
Tree Protection Fence
C2.0
2TREE PROTECTION
FENCE, TYP.
C2.0
1 FILTER FABRIC
FENCE
FEB
C2.0
2TREE PROTECTION
FENCE, TYP.
2 699
8" A
FM
FM
FM
FM
FM
SN
SN
SN
W
W
W
4" FORCEMAIN
4" SANITARY
SEWER
UE
UE
UE
UE
UE
UE
UE
X X X X X X X X X X X
XXXXXXXXXXXXXXXX
X X X X X X X X X X
X X X X X X X X X X X
XXXXXXXX
X X X X X X
XXXXXXX
XXXXX
Checked:
201923
Approved:
Drawn:
Issued forDates
Seal
535 West William, Suite 101
Planning & Engineering Landscape Architecture
Beckett & Raeder, Inc.
Ann Arbor, MI 48103
663.2622 663.6759 ph fx
Beckett&Raeder RB i
Moran Township, Michigan
Environmental Services
Michigan Department of Natural Resources
Father Marquette National Memorial
CD
CS
KD
Bids and Construction06.28.23
Sewage Pump Station Replacement
C3.0
1" = 10'
NORTH
Know what's below.
before you dig.Call
R
Demolition Plan
DEMOLITION & SESC LEGEND
1. CONTRACTOR SHALL CALL MISS DIG (811) A MINIMUM OF THREE WORKING
DAYS PRIOR TO START OF CONSTRUCTION.
2. CONTRACTOR SHALL INVESTIGATE EXTENT AND LOCATION OF EXISTING
UTILITIES AND SHALL BE RESPONSIBLE FOR PROTECTION AND RESTORATION OF
SAME IF DAMAGED AS A RESULT OF CONTRACTOR'S OPERATIONS.
3. ALL ITEMS NOT INDICATED FOR REMOVAL SHALL REMAIN UNDISTURBED AND
PROTECTED. CONTRACTOR SHALL FULLY RESTORE ANY ITEMS/MATERIALS
DAMAGED DURING CONSTRUCTION AT NO ADDITIONAL COST TO THE OWNER.
4. ALL CONCRETE PAVEMENT AND CURB REMOVALS SHALL BE TO THE NEAREST
JOINT BEYOND INDICATED EXTENT.
5. CONTRACTOR SHALL MAINTAIN CLEAN SAW CUT EDGES FOR PROPOSED WORK
TO ABUT. BROKEN EDGES RESULTING FROM CONTRACTOR'S FAILURE TO
PROTECT THE EDGE WILL BE SAW CUT BEYOND THE BREAKS AT THE NEAREST
JOINT, AT THE CONTRACTOR'S EXPENSE.
6. ALL REMOVALS SHALL BE SAW CUT FULL DEPTH AND COORDINATED WITH
LAYOUT / GRADING PLANS.
7. REMOVALS SHALL INCLUDE SUBSOIL/EXISTING BASE MATERIALS TO FULL DEPTH
REQUIRED FOR INSTALLATION OF NEW WORK INCLUDING BASE COURSE. ALL
EXCAVATIONS SHALL PROVIDE ADEQUATE SOIL SUPPORT THROUGH THE USE OF
ADEQUATE CUT SLOPES OR STRUCTURAL SHORING.
8. OWNER TO COORDINATE WITH RESPECTIVE UTILITY COMPANY FOR REMOVAL
OF EXISTING TRANSFORMER, ELECTRICAL, CABLE, TELEPHONE AND FIBER OPTIC
LINES.
9. PROJECT AREA IS PARTIALLY IRRIGATED. REMOVE EQUIPMENT AFFECTED BY
NEW WORK AND SALVAGE TO OWNER. CUT, CAP AND RECORD LOCATIONS OF
ALL LINES.
10. CONTRACTOR SHALL REPAIR ALL DISTURBED TURF AREAS OUTSIDE OF PROJECT
LIMITS DAMAGED DURING CONSTRUCTION.
11. ALL TOPSOIL AND ORGANIC MATERIAL SHALL BE REMOVED FROM UNDER
PROPOSED BUILDING, FOOTINGS, SLABS, AND PAVED AREAS.
12. ALL SPOIL MATERIAL, INCLUDING TOPSOIL, TO BE REMOVED OFF SITE AND
DISPOSED IN A LEGAL MANNER.
13. CONTRACTOR TO RELOCATE TREES PROTECTION FENCE WITH LANDSCAPE
ARCHITECT/ENGINEER'S APPROVAL IN ORDER TO ACCOMPLISH WORK.
14. LAWN AND TOPSOIL REMOVALS AROUND EXISTING TREES TO BE PERFORMED
WITH EXTREME CARE. REMOVALS TO BE COMPLETED BY HAND. NO HEAVY
EQUIPMENT ALLOWED BENEATH TREES CANOPY.
15. DISCHARGE OF WATER, DUST, OR DEBRIS FROM CONCRETE AND ASPHALT
WORK TO STORM OR SANITARY SYSTEMS IS PROHIBITED.
16. STORM DRAINS MUST BE PROTECTED FROM DUST AND DEBRIS.
17. ANY WATER USED DURING CONCRETE AND ASPHALT WORK (INCLUDING
SWEEPING AND SAWCUTTING) MUST BE CONTAINED AND COLLECTED FOR
PROPER DISPOSAL. SUGGESTED CONTROLS INCLUDE WET VACUUM OR
ABSORBENTS.
DEMOLITION NOTES
201050
SCALE: 1" = 10'
TREES PROTECTION FENCE
LIMIT OF WORK LINE
REMOVE ITEM
PROTECT ITEMP
R
REMOVE TREES
EXISTING ROW / EASEMENT
EXISTING PROPERTY LINE
EXISTING LOT LINE
EXISTING EDGE OF WATER
EXISTING WETLAND BOUNDARY
P TREES,
TYP.
P KIOSK
PFORCEMAIN
PBITUMINOUS,
TYP.
PCONCRETE
TYP.
PCONCRETE,
TYP.
P TRANSFORMER
P REMOVE AND
RESTORE
P ELECT. METER
R PUMP STATION
CONTROLS
FORCEMAINP
TREES, TYP. R
TREES, TYP.P
P CONCRETE,TYP.
R PARTIAL DEMOLITION
OF PUMP STATION
(SEE DETAIL)
TREES, TYP.P
TREES, TYP.P
SANITARY
SEWER
P
REMOVE ALL WET WELL PUMPS
EQUIPMENT, BRACKETS, ETC.
Partial Demolition of Package Pump Station
NO SCALE
REMOVE TOP OF
STEEL PUMP
STATION
REMOVE WALLS OF WET WELL
TO DEPTH OF THE BOTTOM OF
THE VALVE CHAMBER
1. CONTRACTOR SHALL PROVIDE VACUUM TRUCK TO PUMP
STATION DRY AND REMOVE SLUDGE DEPOSITION.
CONTRACTOR AND THEN FIELD VERIFY MEASUREMENTS TO
INVERT OF THE BOTTOM OF WET WELL, INVERT TO SANITARY
SEWER DISCHARGE, AND INVERT TO FORCEMAIN.
CONTRACTOR SHALL DOCUMENT AND REPORT
MEASUREMENTS TO ENGINEER (PSC)
2. CONTRACTOR PROVIDED FIELD MEASUREMENTS SHALL BE
UTILIZED TO PREPARE FINAL SHOP DRAWINGS FOR NEW
PACKAGE PUMP STATION.
PUMP STATION DEMOLITION NOTES
REMOVE VALVE CHAMBER IN
ITS ENTIRETY INCLUDING TOP
SIDE WALLS, FLOOR AND WALL
SHARED WITH WET WELL
EXISTING CONCRETE
BALLAST TO REMAIN
EXISTING STEEL TANK
WALLS TO REMAIN
REMOVE WALLS OF WET WELL
TO DEPTH OF THE BOTTOM OF
THE VALVE CHAMBER
REMOVE VALVE CHAMBER IN
ITS ENTIRETY INCLUDING TOP
SIDE WALLS, FLOOR AND WALL
SHARED WITH WET WELL
X X X X X X
REMOVE ALL WET WELL PUMPS
EQUIPMENT, BRACKETS, ETC.
6'0"
P UNDERGROUND
ELECTRIC
R UNDERGROUND
ELECTRIC
XX
XXX
X XXX
XXX
XXXX
XXXX
STATION INVERT - 683.6 (ASSUMED SEE NOTE 1)
685.0 (1974 PLAN)
TOP OF STATION - 696.6 (SURVEYED)
698.0 (1974 PLAN)
INFLOW INVERT - 689.9 (FIELD MEASUREMENT)
692.5 (1974 PLAN)
EX. 4" SANITARY
SEWER
4" FORCEMAIN INVERT
692.5 (1974 PLAN)
(SEE NOTE 1)
TREES & BRUSH
WITHIN LIMITS
OF WORK, TYP.
R
TREES, TYP. R
P CONCRETE,TYP.
P CONCRETE,TYP.
P REMOVE AND
RESTORE
P RESTORE ALL CONCRETE
IMPACTED BY CONSTRUCTION
IN KIND, TYP.
PRESTORE ALL ASPHALT
IMPACTED BY CONSTRUCTION
IN KIND, TYP.
AutoCAD SHX Text
BATHROOM
FACILITY
2 699
FM
FM
FM
FM
FM
SN
SN
SN
W
W
W
4" FORCEMAIN
4" SANITARY
SEWER
UE
UE
UE
UE
UE
UE
UE
Checked:
201923
Approved:
Drawn:
Issued forDates
Seal
535 West William, Suite 101
Planning & Engineering Landscape Architecture
Beckett & Raeder, Inc.
Ann Arbor, MI 48103
663.2622 663.6759 ph fx
Beckett&Raeder RB i
Moran Township, Michigan
Environmental Services
Michigan Department of Natural Resources
Father Marquette National Memorial
CD
CS
KD
Bids and Construction06.28.23
Sewage Pump Station Replacement
C4.0
NORTH
Know what's below.
before you dig.Call
R
Construction Plan
CONSTRUCTION PLAN LEGEND
TREES PROTECTION FENCE
LIMIT OF WORK LINE
EXISTING ROW / EASEMENT
EXISTING PROPERTY LINE
EXISTING LOT LINE
EXISTING EDGE OF WATER
EXISTING WETLAND BOUNDARY
LAYOUT & MATERIALS NOTES
1. ALL WORK SHALL BE COMPLETED IN CONFORMANCE WITH CURRENT ADA
STANDARDS.
2. ALL DIMENSIONS ARE TO BACK OF CURB, FACE OF BUILDING OR EDGE OF
MATERIAL UNLESS OTHERWISE NOTED.
3. ALL LINES ARE PARALLEL OR PERPENDICULAR TO THE CURB/ PAVEMENT/ BUILDING
LINE FROM WHICH THEY ARE DIMENSIONED UNLESS OTHERWISE NOTED.
4. FOLLOWING LAYOUT OF ALL MATERIALS, CONTRACTOR SHALL REVIEW WITH
OWNER'S REPRESENTATIVE.
5. ANY DISCREPANCIES IN THE LAYOUT PLAN SHOULD BE IMMEDIATELY REPORTED
TO OWNER'S REPRESENTATIVE.
1. CONTRACTOR IS RESPONSIBLE FOR CONSTRUCTION ALL WORK COMPLETED IN
CONFORMANCE WITH CURRENT ADA STANDARDS.
2. PROPOSED CONTOUR LINES AND SPOT ELEVATIONS REFLECT FINISH GRADES.
HOLD DOWN SUBGRADE ELEVATIONS ACCORDINGLY. ADJUST RIM ELEVATIONS OF
ALL UTILITIES AFFECTED BY WORK IN THIS CONTRACT. CONTRACTOR SHALL
ENSURE POSITIVE DRAINAGE ON THE SITE. ANY AREA THAT APPEARS TO NOT
PROPERLY DRAIN SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE
LANDSCAPE ARCHITECT/ ENGINEER FOR RESOLUTION.
GRADING NOTES
1. EXISTING 3" WATER SERVICE LOCATION BASED ON RECORD
UTILITY DRAWINGS (NOT LOCATED IN FIELD)
2. EXISTING 4" FORCEMAIN LOCATION BASED ON RECORD
UTILITY DRAWINGS (NOT LOCATED IN FIELD)
3. 1975 PLAN DRAWINGS OF DUPLEX PUMP STATION
(ALL ELEVATIONS MUST BE VERIFIED IN THE FIELD)
GRAVITY SEWER TO BATHROOM FACILITY
4" DIAMETER PER RECORD DRAWING (VERIFY IN FIELD)
NOTE: THE OPERATIONAL PARAMETERS OF THE EXISTING
PROPRIETARY PACKAGE PUMP STATION ARE ASSUMED TO
BE CONSISTENT WITH THE DESIGN PLANS.
TOP OF LIFT STATION = 698.0
INVERT INTO WET WELL = 692.5
INVERT OF FORCE MAIN OUT OF WET WELL = 692.5
BOTTOM OF WET WELL = 685.0
WET WELL
ALARM LEVEL = 690.50
BOTH PUMPS ON = 690.0
ONE PUMP ON = 689.5
BOTH PUMPS OFF = 689.5
UTILITY NOTES
4NEW PACKAGE
PUMP STATION
New Package Pump Station
NO SCALE
1. CONTRACTOR SHALL PROVIDE VACUUM TRUCK TO PUMP
STATION DRY AND REMOVE SLUDGE DEPOSITION.
CONTRACTOR SHALL FIELD VERIFY MEASUREMENTS TO
INVERT OF THE BOTTOM OF WET WELL, INVERT TO SANITARY
SEWER DISCHARGE, AND INVERT TO FORCEMAIN.
CONTRACTOR SHALL DOCUMENT AND REPORT
MEASUREMENTS TO ENGINEER (PSC)
2. CONTRACTOR PROVIDED FIELD MEASUREMENTS SHALL BE
UTILIZED TO PREPARE FINAL SHOP DRAWINGS FOR THE NEW
PUMP STATION.
PUMP STATION DEMOLITION NOTES
EXISTING CONCRETE
BALLAST TO REMAIN
REMOVE WALLS OF WET WELL
TO DEPTH OF THE BOTTOM
OFTEN VALVE CHAMBER
4'0"
STATION INVERT
TOP OF STATION - 696.6 (PROPOSED)
INFLOW INVERT
689.9 (FIELD MEAS.)
EX. 4" SANITARY
SEWER
4" FORCEMAIN INV.
692.5 (1974 PLAN)
(SEE NOTE 1)
6'0"
4" REPAIR CLAMP
4" PVC SCH40
4" PRESSURE
REPAIR CLAMP
EXISTING STEEL TANK
WALLS TO REMAIN
4'0"
6'0"
STEEL COVER
LOCKABLE W/ OWNER
SUPPLIED PADLOCK
4" PRESSURE
REPAIR CLAMP
4" PVC SCH 40
FORCEMAIN EX. 4"
SEWER
692.5 (1974 PLAN)
STEEL POST MOUNTED
DUPLEX PANEL
(FIELD INSTALLED)
4" REPAIR CLAMP
BACKFILL WITH
MDOT CLASS II
FILL ANNULAR SPACE
BETWEEN STEEL WALL AND
NEW PUMP STATION WITH
CONCRETE
684.6 (PROPOSED)
1/8" 302 STAINLESS
STEEL LIFTING CABLE 4" TOPSOIL
FLOAT TREE
ASSEMBLY
DISCHARGE
PIPING
GUIDE RAILS
PUMP
1" = 10'
201050
SCALE: 1" = 10'
RESTORE EXISTING GRADES
AND PLACE TOPSOIL AND
SEED PER SPECIFICATIONS
RESTORE ALL CONCRETE
IMPACTED BY CONSTRUCTION
IN KIND, TYP.
RESTORE ALL ASPHALT IMPACTED
BY CONSTRUCTION IN KIND, TYP.
NEW BURIED
ELECTRICAL
STEEL POST MOUNTED
DUPLEX PANEL
NEW BURIED
ELECTRICAL
EXISTING
TRANSFORMER
EXISTING METER
RESTORE EXISTING GRADES
AND PLACE TOPSOIL AND
SEED PER SPECIFICATIONS
AutoCAD SHX Text
BATHROOM
FACILITY
| Sheets and Views |
| C0.0 |
File details come from the government source that posted it. Updated .