Attachment J.1- Bill of Quantities.xlsx

XLSX spreadsheet 78 KB Posted

Attached to
Solarization of John F. Kennedy (JFK) Hospital Neonatal Intensive Care Unit (NICU)
Solicitation number
72066924R00002-Solarization-JFK-NICU
Issued by

About this file

This document is a Bill of Quantities (BOQ) for a solar photovoltaic (PV) system to be installed at the John F. Kennedy (JFK) Hospital Neonatal Intensive Care Unit (NICU) in Liberia. The BOQ lists the detailed equipment, materials, and labor required for the system, including inverters, charge controllers, PV modules, batteries, wiring, and civil works. The total estimated cost is $0, with a breakdown of material, labor, transportation, overhead, and profit costs.

The related federal contract opportunity is for the "Solarization of John F. Kennedy (JFK) Hospital Neonatal Intensive Care Unit (NICU)," solicitation number 72066924R00002. The objective is to install a solar PV system alongside existing diesel generators to provide reliable power and address challenges with grid outages and generator malfunctions, ensuring continuous power to critical NICU equipment. The system must be able to sustain NICU operations for at least six hours during power disruptions.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IGCE

NICU Solar Bill of Quantities (BOQ)
Item No.DescriptionName of ItemQuantityUnitUnit CostTotal Cost
1Mobilization and demobilzation1LS$0$0
2Provide for insurance/performance bond1LS$0$0
Inverters
3InvertersOutBack Power Systems GS7048E7number$0$0
4Inverter load centerOutBack Power Systems GSLC 175-2306number$0$0
5Inverters support standAluminum support stand, 4.83 x 9.67 x 0.42 (ft) (H x W x D)1number$0$0
6AC output load center3-phase, 12 breaker panel1number$0$0
7AC input load center3-phase, 12 breaker panel1number$0$0
8Transfer switch4 pole transfer switch, 100A1number$0$0
Controls and Monitorig
9System controlsOutBack Power Systems Mate3S5number$0$0
10Communications hubOutBack Power Systems HUB 102number$0$0
11DC shunt monitoring deviceOutBack Power Systems FLEXnet DC2number$0$0
Charge Controllers
12Charge controllerOutBack Power Systems FLEXmax 1008number$0$0
PV Array0
13PV modulesMaxeon SPR X22-485-COM65number$0$0
14PV combiner disconnectsMidnite Solar MNPV4 Deluxe6number$0$0
15PV combiner disconnect security boxPlastic lockable box (3.5'x5'x8")1number$0$0
16PV wirePV Wire, MC 4 connectors ( # of Charge controllers x 3 strings each)20number$0$0
17PV rackingUnirac RM531,600LS$0$0
18Miscelaneous and incidentalsConduit, junction box (12"x8"x6"), cable ties, etc1number$0$0
Battery
19BatteriesSimpliphi LFP Lithium 3.8-4878number$0$0
20Battery racksBattery Racking6number$0$0
21Battery connecting strips600A, positive and negative strip, 7 connections (3 per battery rack) with enclosure28number$0$0
22Battery combiner w/ disconnect breakerMidnite Solar MNBCB 1000/1003number$0$0
23Battery combiner breakersMidnite Solar inverter breakers - 250 A8number$0$0
24Battery combiner breakersMidnite Solar charge controller breakers -125 A6number$0$0
25Battery combiner breakersMidnite Solar battery breakers - 125 A15number$0$0
Wiring and cables
26Minigrid electrical balance of systemInterior cables including bus bars, wiring, conduit wiring troughs, disconnects, grounding, and all necessary fixing accessories, as specified and as shown on drawings E-101 to E-112.1LS$0$0
27Lightning protection systemLightning arresters, conductors, conduit, grounding, and all necessary fixing accessories, as specified and as shown on drawings E-113.1LS$0$0
Civil Works
28Masonry Wall, Painting, Door installation & LintelSupply and construct all materials for civil works which should include the construction of concrete pedestal for cabinets, Concrete Masonry wall and wooden door completely install with lock as per drawings.1number$0$0
29Raised Access FloorSupply and construct all materials for a Raised Access Flooring System above the existing concrete floor in the battery room for cabling as per drawings.1number$0$0
Internal Lighting
30Internal LightingSupply and install internal wiring in electrical room and switch gear room to include the installation of lighting sockets and switches as per drawing1number$0$0
Air-Conditioning System
35Electrical RoomFurnish and install one 9,000 BTU/hr air cooling system for the Battery Room; shop drawing approval of the equipment and installation methods required; includes all equipment, materials, labor to complete the work1number$0$0
36Switch Gear RoomFurnish and install one 18,000 BTU/hr air cooling system for the Switch Gear Room; shop drawing approval of the equipment and installation methods required; includes all equipment, materials, labor to complete the work1number$0$0
Total Material Cost$0

Labor Cost @ 25% of Total Material Cost $0

Transportation, Overhead & Profit @ 20% of Total Material Cost $0

GRAND TOTAL $0