Illustrative_Budget_Form.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
DESIGN-BUILD OF THREE HEALTH HIV LABS IN TETE, MANICA AND SOFALA
Solicitation number
72065618R00023
Issued by

About this file

ILLUSTRATIVE BUDGET FORM

View the file

Other files

File Type Posted
Amendment_05_.pdf PDF
72065618R00023_Amendment_04.pdf PDF
Amendment_03.pdf PDF
Amendment_02.pdf PDF
Amendment_01.pdf PDF
AID1420-17_Employee_Biodata_Sheet.pdf PDF
Sol_72065618R00023__DESIGN-BUILD_OF_THREE_HEALTH_HIV_LABS_IN_TETE,_MANICA_AND_SOFALA.pdf PDF
Past_Performance_Form.docx DOCX document
Attachment_1_Forms_-_Tables_1-3.rtf RTF text file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary

Summary Prices
CLINSite IdentificationLot/ProvinceDescriptionPrice in USD
1S1TeteTete Lab, Tete
2S2ManicaChimoio Lab, Chimoio
3S3SofalaPonta Gea Lab, Beira
TOTAL$0.00

Tete Lab

S1TETE LAB Illustrative activities (CLIN 01)
NrActivitiesPrice
1Design proposal and recommendation
2Construction
2.1Preliminaries (camping, temporary works including water, sanitation and electricity)
2.2Removal of existing tiles and installation of epoxy or tiles or any other suitable material approved in the proposed design;
2.3Acquisition and Installation of approved ceiling including wooden ceiling framing and new PVC or similar type ceiling
2.4Acquisition and installation of ACs suitable for the existing rooms as applicable
2.5Execution of internal partitions
2.6Acquisition and Installation of approved doors (removing or adding)
2.7Acquisition and Installation of approved windows (removing or adding)
2.8Acquisition and Installation of electric system
2.9Acquisition and Installation of standby generator (60 Kva)
2.10Installation of new water supply systems including plumbing
2.11Repairs of the sewage systems
2.12Execution of the connection of the lab to other buildings
2.13Testing of electrical and water systems
2.14Handover of facility and respective systems
Total price for Tete Lab

Manica Lab

S2MANICA LAB Illustrative activities (CLIN 02)
NrActivitiesPrice in USD
1Design proposal and recommendation
2Construction
2.1Preliminaries (camping, temporary works including water, sanitation and electricity, Municipal approval)
2.2Removal and properly store all internal partitions and fixtures including electrical fixtures, water supply and any other fixtures
2.3Removal and dispose the floor finishing materials and magnesium board;
2.4Supply and Installation of additional steel frame beams
2.5Supply and install profile sheeting, shear studs and rebar as appropriate.
2.6Installation of removed plumbing, cables including supply of materials
2.7Construction of the reinforced slab C-25 concrete with a minimum thickness of 10cm
2.8Supply and install epoxy or other finishes appropriate for the industry
2.9Painting to protect the existing walls from damages, concrete stains or scratches
2.10Reinstall all the internal partitions, electric fixtures, water supply lines and other forms of installation removed with the partitions
2.11Testing of electrical and water systems
2.12Handover of facility and respective systems
Total price for Manica Lab

Sofala Lab

S3SOFALA LAB Illustrative activities (CLIN 03)
Nr.ActivitiesPrice in USD
1Design proposal and recommendation
2Construction
2.1Preliminaries (camping, temporary works including water, sanitation and electricity, Municipal approval)
2.2Demolitions of Roof Cover, Wooden Truss and Purlins, Wooden Ceiling, Interior Walls, Doors and Windows, Floor Tile, and the Top Layer of the Floor Concrete
2.3Construction of new Concrete Layer for the Floor to Receive Epoxy Finish
2.4Epoxy Finish
2.5Acquisition and Installation of Doors
2.6Acquisition and Installation of Windows
2.7Construction of Steel Truss and Purlin
2.8Construction of Roof Cover
2.9Construction of Partition Walls
2.10Construction of Ceiling
2.11Execution of Plaster and Paint of the Perimeter Walls
2.12Installation of Electrical Systems
2.13Acquisition and Installation of Backup Generator
2.14Acquisition and Installation of Water System Including Water Tank
2.15Acquisition and Installation of Sewer System Including Septic Tank, and
2.16Acquisition and Installation of Air Conditioning System
2.17Testing of electrical and water systems
2.18Handover of facility and respective systems