DESIGN-BUILD OF THREE HEALTH HIV LABS IN TETE, MANICA AND SOFALA
Solicitation number
72065618R00023
Issued by

About this file

THE PURPOSE OF THIS AMENDMENT 03 IS TO: 1. Provide Responses to Solicitation Clarification Questions. See attachment A.

View the file

Other files

File Type Posted
Amendment_05_.pdf PDF
72065618R00023_Amendment_04.pdf PDF
Amendment_02.pdf PDF
Amendment_01.pdf PDF
AID1420-17_Employee_Biodata_Sheet.pdf PDF
Sol_72065618R00023__DESIGN-BUILD_OF_THREE_HEALTH_HIV_LABS_IN_TETE,_MANICA_AND_SOFALA.pdf PDF
Past_Performance_Form.docx DOCX document
Attachment_1_Forms_-_Tables_1-3.rtf RTF text file
Illustrative_Budget_Form.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

01 02

2. AMENDMENT/MODIFICATION NO.

Amendment 03

3. EFFECTIVE DATE

September 19, 2018

4. REQUISITION/PURCHASE REQ. NO.

REQ-656-18-000093

5. PROJECT NO. (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

OFFICE OF ACQUISITION AND ASSISTANCE

USAID MAPUTO, MOZAMBIQUE

JAT COMPLEX, RUA 1231, NO.41

MAPUTO, MOZAMBIQUE

Same as # 6.

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION

NO.

SOL_72065618R00023

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, X is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE

PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor x is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

THE PURPOSE OF THIS AMENDMENT 03 IS TO:

1. Provide Responses to Solicitation Clarification Questions. See attachment A.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Eyole Luma, Contracting Officer

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

NSN 7540-01-152-8070

Previous edition unusable

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

RFP SOL_72065618R00023 - Amendment 03

Attachment A- Questions and Answers

Question 1: Do the firms have to hold a Class 5 construction license (Alvará) even if they are submitting proposals for only one lot/province, or can they hold a lower Class construction license?

Answer 1: Firms willing to submit proposals for all lots/provinces must hold a Class 5 construction license (Alvará). However if firms are willing to submit proposals for only one lot/province they may hold a lower Class construction license (Alvará) equivalent to the magnitude of the lot/province construction amount.

Question 2: Do the firms have to submit the detailed Bill of Quantities in English or it can be submitted in Portuguese?

Answer 2: Firms may submit the detailed Bill of Quantities in Portuguese. However, English submission is encouraged.

Question 3: Do the firms have to submit the proposals in US Dollars and will the resulting contract be paid in US Dollars?

Answer 3: Firms must submit the proposal in US Dollars. Payment can be done either in US Dollars or in the local currency (Meticals).

Anexo A- Perguntas e Respostas

Questão 1: As empresas concorrentes devem possuir uma licença de construção (Alvará) de Classe 5 mesmo se estão a concorrer só para um lote/província, ou podem possuir uma licença de construção de classe inferior?

Resposta 1: As empresas concorrentes que desejam submeter propostas para todos os três lotes/províncias devem possuir uma licença de construção (Alvará) de Classe 5. Contudo, se as empresas estão a concorrer só para um lote/província, podem possuir uma licença de construção de classe inferior, que seja equivalente à magnitude/valor de construção do lote/província.

Questão 2: As empresas concorrentes devem submeter a Lista de Quantidades detalhada em Inglês ou pode ser submetida em Português?

Resposta 2: As empresas concorrentes podem submeter a Lista de Quantidades detalhada em

Português. Contudo, encorajamos a submeter em Inglês.

Questão 3: As empresas concorrentes podem submeter as propostas em dólares americanos e o pagamento do contrato resultante será efectuado em dólares americanos?

Resposta 3: As empresas concorrentes devem submeter as propostas em dólares americanos e o pagamento do contrato resultante poderá ser efectuado em dólares americanos ou na moeda local

(Meticais).

[END OF AMENDMENT 03]