ASPIRED Program Report for Q 1 Year 4 - October-December 2018.pdf
PDF 660 KB Posted
- Solicitation number
- 72011121R00002
- Issued by
-
US Agency for International Development
About this file
This solicitation requests proposals for an activity to improve water management in Armenia. The United States Agency for International Development seeks to transform Armenia's approach to water management through the development and dissemination of improved approaches, tools, and best practices to support sustainable and secure water governance. Technical and advisory services will be provided to the Government of Armenia, local communities, and the private sector, including training, applied research, analysis, and support for small-scale pilot projects to enhance water management and use. Proposers should describe their capabilities to achieve the activity's objectives of improving equity of access to water while maintaining environmental flows and water quality through advancing water governance and the sustainable conservation and use of freshwater resources.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ASPIRED Project
Report Q1 – FY 2019
ADVANCED SCIENCE & PARTNERSHIPS
FOR INTEGRATED RESOURCE
DEVELOPMENT PROJECT
QUARTERLY REPORT
October- December 2018
January 2019
This publication was produced for review by the United States Agency for International
Development. It was prepared by ME&A, Inc.
Advanced Science & Partnerships for
Integrated Resource Development
QUARTERLY REPORT
FIRST QUARTER FY 2019
January 2019
Contract No.AID-OAA-I-14-00070/AID-111-TO-15-00001
Prepared for:
United States Agency for International
Development
Armenia Mission
1 American Avenue
Yerevan 0082, Armenia
Prepared by:
ME&A, Inc.
4350 East-West Highway
Suite 210
Bethesda, MD 20814
Tel: +1 301 652 4334
Fax: +1 240 630 8935 www.MEandAHQ.com
Armenian Branch of ME&A, Inc.
105/1 Teryan St., Suite 204, Yerevan 0009
Republic of Armenia
Tel. +374 10 514 315
Fax: +374 10 514 317
Email: aspired@engl.com
DISCLAIMER
This report is made possible by the support of the American people through the United States
Agency for International Development (USAID). The contents are the sole responsibility of ME&A and do not necessarily reflect the views of USAID or the United States Government.
http://www.meandahq.com/ mailto:aspired@engl.com
Table of Contents
List of Acronyms
1. Executive Summary
1.2 ASPIRED Summary
1.3 Main Highlights from the Reporting Period
2. Summary of Performance Indicators
3. Program Implementation
Water Resource Data
Low Cost and Water Efficiency Technologies
Water Regulation and Enforcement
Donor Coordination and Communications
4. General Administrative Issues
5. Environmental Compliance
6. Existing Problems or Issues
7. Planned Activities for the Next Quarter
List of Acronyms
AHGW Arc Hydro Groundwater
ASPIRED Advanced Science and Partnerships for Integrated Resource Development
ATTC Aquaculture Technology Transfer Center
AAB Ararat Artesian Basin
BMO Basin Management Organization
BMP Basin Management Plan
CADI Computer Assisted Development, Inc.
CARD Center for Agribusiness and Rural Development Foundation
CoP Chief of Party
COR Contracts Officer’s Representative
DO Development objective
DSS Decision Support System
EA Environmental Assessment
EC European Commission
EE/RE Energy Efficiency/Renewable Energy
EGO Economic Growth Office
EIA Environmental Impact Assessments
EIMC Environmental Impact Monitoring Center
EMIC Environmental Monitoring and Information Center SNCO
EMMP Environmental Mitigation and Monitoring Plan
EU European Union
FAO Food and Agriculture Organization
FAR Fund for Armenian Relief
FTF Farmer to Farmer Project
GIS Geographic Information System
GOA Government of Armenia
HMC Hydrogeological Monitoring Center
ICARE International Center for Agribusiness Research and Education
IR Intermediate Result
ITF Interagency Task Force
The Lab U.S. Global Development Lab
LOP Life of project
ME&A ME&A, Inc.
MoA Ministry of Agriculture
MNP Ministry of Nature Protection
MoU Memorandum of Understanding
NGO Non-Governmental Organization
PERSUAP Pesticide Evaluation Report and Safe Use Action Plan
PIRS Performance Indicator Reference Sheet
PMP Performance Management Plan
PPR Performance Plan and Report
PURE-Water Participatory Utilization and Resource Efficiency of Water
SCADA Supervisory Control and Data Acquisition
SEDF Sustainable Energy Development Fund
SCWS State Committee on Water Systems
SOW Scope of Work
STTA Short-Term Technical Assistance
SWCIS State Water Cadaster Information System
3D Three-dimensional
TO Task Order
USAID United States Agency for International Development
USGS United States Geological Survey
WRMA Water Resources Management Agency
WUA Water user association
WUP Water use permit
1. Executive Summary
This report describes the programmatic activities implemented by the Advanced Science and
Partnerships for Integrated Resource Development (ASPIRED) Project during the first quarter of Year
4 of the project. It covers the period from October 1 through December 31, 2018. The report reviews progress and achievements in each of the project areas during the reporting period, as well as describes planned activities for the next quarter. The report also highlights challenges and actions taken to address these challenges.
1.2 ASPIRED Project Summary
On September 29, 2015, the United States Agency for International Development (USAID) awarded
ME&A, Inc. (ME&A) a contract to implement the ASPIRED Project under the Water and Development
IDIQ. The purpose of the ASPIRED Project is to support sustainable water resource management and sustainable practices of water users in the Ararat Valley through the use of science, technology, innovation, and partnership initiatives. The ultimate goal is to reduce the rate of groundwater extraction in the Ararat Valley to the sustainable levels.
To this end, the ASPIRED Project focuses on several critical areas:
1. Water Resource Data
2. Technology
3. Regulatory framework/enforcement of laws
4. Coordination across stakeholders
The ASPIRED Project places a strong emphasis on building partnerships with the public and private sectors, research organizations, and international donors to pilot innovative water and energy efficiency technologies, and to promote better water resource monitoring, planning and sustainable management.
1.3 Main Highlights from the Reporting Period
On October 1, 2018, the project received USAID approval of the ASPIRED Project Year 4 Work Plan.
• Data component:
o In November, ASPIRED completed operationalization of the new server of the Ministry of Nature Protection (MNP);
o ASPIRED team addressed the comments of the MNP on the Digital Hydrogeologic Map of the Ararat Valley and Three-Dimensional (3D) Model of the Ararat Valley
Groundwater Basin and the Report on the Methodology and Calculated Values of the
Natural Flow and Water Balance of the Ararat Valley o Provided on-the-job training/coaching to the Deputy Head of the Water Cadastre and
Monitoring Division of the Water Resources Management Agency (WRMA) on calculating ecological flow in the rivers of Armenia
• Technology component:
o Received USAID approval for the well optimization project in Hovtashat community;
o Signed the contract for the construction of the pumping station and drinking water network in Yeghegnut and Aratashen communities.
o Completed and tested the construction of the main structures of the Aquaculture
Technology Transfer Center (ATTC) Project.
• Legal component:
o Submission of the draft of the government decision on establishment of requirements for protection of water resources in recreation zones as part of the ASPIRED Project’s legal assistance to MNP and approval with reservations by the Ministerial Committee for Territorial Development and Environment.
• Communication and Donor Coordination component:
o Held the project completion event and demonstration of the irrigation system built in
Sayat-Nova community to the stakeholders on October 22.
Report Q1 – FY 2019 7
2. Summary of Performance Indicators
Summary of performance indicators for the first quarter of FY 2019 (Year 4 of the project) is presented in the table below. The indicators of IR 2 providing the annual data will be reported by the end of each fiscal year.
1. MNP with its subdivisions, PEER grantee, Institute of Water Problems, USGS, EU Water Initiatives Project, MOA, Metsamor power plant which are/were involved in the data collection process, fisheries: Alex Grig, Interaqua, and Golden Fish.
Indicator
Target/
Actual Year
Actual
Quarter
Year 4
Target/Actual
LOP
Notes: Descriptions/Comments/Assumptions
IR 1: Establish a comprehensive, user-friendly, open data system that is accessible to all stakeholders.
Sub-IR 1.1: Ararat Valley Geocoded, real-time, publicly accessible data system that incorporates water resource, groundwater, and hydrological datasets from multiple stakeholders built and shared with the GOA
Indicators
1.1.1 Percent (of total) of datasets for the
Ararat Valley publicly accessible 20/0 0 80/43
This indicator refers to the datasets related to the water recourses in the Ararat Valley which will be accessible for the general public. By the end of the project life cycle, ASPIRED will make 80% of all datasets available on Ararat Valley public, which accounts for 100% of all the data that can be available to the public according to the Armenian legislation
1.1.2 Percent (of total) wells mapped in the
Ararat Valley.
N/A N/A
100/100
This indicator corresponds to the inventory of the wells, natural springs and fish farms in Ararat
Valley, which the project team successfully completed during Year 1. Therefore, collecting data for this indicator has been completed for the project.
1.1.3 Number of stakeholders engaged in the
data collection activities 1/0 0 16/121
This indicator refers to the number of stakeholders engaged in the groundwater-related data collection activities in the Ararat Valley from different sectors – government, private, and public.
ASPIRED and MNP discussed MNP the possibility of installation of online groundwater monitoring systems at a fourth fishery.
Sub-IR 1.2: An online tool for hydrogeological modelling and decision-support for the Ararat Valley that incorporates hydrologic, economic, energy, social equity and environmental data generated
Indicators
Report Q1 – FY 2019 8
2 In Year 3, the ASPIRED team installed online groundwater use monitoring systems in the Alex Grig, Interaqua, and Golden Fish.
3 During the latest inventory of the groundwater wells, natural springs and fish farms of the Ararat Valley, ASPIRED inventoried a total of 2807 wells in the Ararat Valley, of which 1795 were found to be operational.
Out of 1795 functioning wells, 336 are reportedly located in the fisheries of Ararat and Armavir marzes.
4 The data refers to the Water Reuse Project in Hayanist and the Well Sealing and Well Optimization Projects in Sipanik village
1.2.1 GIS-based decision support tools for
Ararat Valley developed 1/0 0 2/1
This indicator refers to the GIS-based water resource management tools to be developed by the
ASPIRED Project on the Ararat Valley. ASPIRED completed the Hydrological Model of the DSS for the Ararat Valley during Quarter 4 of Year 3. The project anticipates completion of the
Groundwater Flow Model for the Ararat Valley by the end of Year 4.
Sub-IR 1.3: A publicly accessible system that maximizes the use of open source technology and produces reports based on high-quality, real-time monitoring data created
Indicators
1.3.1 Number of fisheries with automatic data
system installed 1/0 0 6/32
MNP is currently exploring the possibility of installing the remaining set of flow meters and data loggers in an additional fishery.
Sub-IR 1.4: Plan for decentralized, sustainable data collection methods to monitor groundwater resources and strengthened implementation capacities of partners developed in partnership with the
Government of Armenia (GOA) and local stakeholders
Indicators
1.4.1 Percent (of total) coverage of the
groundwater extraction points monitored 1.7/0 0 10/5.3
This indicator measures the percentage of the groundwater extraction wells monitored with the use of the online automated system installed by the ASPIRED Project versus the total number of the operational groundwater wells available in the fisheries3. By July 2018, ASPIRED installed 15 groundwater monitoring systems and this indicator also includes 3 groundwater monitoring systems installed under the European Union’s Water Initiative + Project. MNP is currently exploring the possibility of installation of the remaining set of flow meters and data loggers in a fourth fishery.
IR 2: Introduce locally appropriate, cost effective technologies to improve water resource management
Sub-IR 2.1: Technologies developed, piloted, and evaluated at different-sized fish farms with the objective of improving water resources management
Indicators
2.1.1
Number of groundwater extraction reduction technologies piloted and evaluated
4/0 0 7/34
This indicator refers to technologies introduced at fish farms or other water use points that contribute to the reduction of the groundwater extraction by users. This indicator also provides information on annual water saved, measured in cubic meters. During Quarter 4 of Year 3, ASPIRED completed the well optimization/irrigation improvement project in Sipanik.
Report Q1 – FY 2019 9
5Refers to water savings to be achieved by the ASPIRED Project by year 5.
6 This includes total amount of savings generated from ASPIRED pilot projects over 5 years.
7 LOP data refers to 2 years of operation of Hayanist project.
8 Year 4 data refers to Hayanist & Sayat-Nova projects (along with the GHG emissions from farmlands, solar installations at Masis-Dzuk, Vedi, ATTC, as well as GHG reductions from Yeghegnut and Aratashen savings).
9 Data refers to Hayanist, Sayat-Nova, and Sipanik projects starting from the date of their completion to date.
2.1.2 Thousands of cubic meters of water saved
annually in Ararat Valley 8,777/0 0 92005/8,3856
This indicator measures the amount of water savings from the demonstration of innovative water saving technologies by the ASPIRED Project at fish farms and other water use points, as well as the implementation of water rehabilitation projects in the communities of the Ararat Artesian
Basin (AAB) affected by the shortage of groundwater resource (in collaboration with PURE
Project). The annual data for Year 4 counts also recurrent savings provided by completed water projects (Hayanist 1.1 mln, Sipanik well sealing 1.9 mln, Sayat-Nova 1.92mln and Sipanik well optimization 465,000) which will be reported during the last quarter of Year 4. Projections include projects in Aratashen and Yeghegnut communities, as well as other anticipated projects.
Sub-IR 2.2: Technologies with the objective of increasing energy efficiency and/or renewable energy generation of water users developed, piloted, and evaluated
Indicators
2.2.1
Number of energy efficiency and/or renewable energy (EE/RE) technologies piloted and evaluated
3/0 0 4/0
This indicator refers to water-use related EE/RE technologies to be piloted during project implementation. ASPIRED will install renewable technologies (photovoltaic and biogas) at the
Aquaculture Technology Transfer Center (ATTC). Data for this indication will be available after completion of the ATTC Project.
2.2.2 Megawatt hour of energy saved annually 453/0 0 500/487
This indicator refers to the kilowatt-hour energy savings generated due to more efficient use of energy. Recurrent savings generated by completed projects are counted in the subsequent years.
Year 4 Quarter 1 data refers to the Hayanist Water Reuse Project. Year 4 projections include
ATTC, Aratashen, and Yeghegnut.
2.2.3 Clean energy generated annually, MWh 82/0 0 82/0
This indicator refers to the clean energy generation capacity resulting from the introduction of
RE technologies aimed at minimizing extraction of the groundwater. The data of this indicator depends on the implementation of EE/RE technologies, tracked under Indicator 2.2.1
2.2.4
Gains in the reduction of GHG emissions as a result of USG assistance, in metric tons
1,4148/0 0 1440/472.49
GHG emission reduction quantities are estimated based on the kilowatt hour of savings resulting from application of energy saving technologies in metric tons/year. Since the 4th quarter of Year
3, ASPIRED, in concurrence with USAID, started counting the CO2 reductions resulting from irrigated farmlands of the implemented projects.
Report Q1 – FY 2019 10
10 The LOP data refers to the beneficiaries of the two water reuse projects in Hayanist and Sayat-Nova, as well as the well optimization project in Sipanik.
11 ASPIRED will conduct pre- and post-implementation water tests to detect the qualitative changes in water.
12 Initially, this indicator referred only to the drinking water supply projects. Following the recommendation of USAID, ASPIRED will collect data from all water supply projects (both potable and irrigation water supply) which resulted in the improved service quality for the beneficiaries.
13 The results refer to Sipanik community, water reuse projects in Hayanist and Sayat-Nova communities, including communities and the fish-farm owners. Based on the results of Hayanist and Sayat-Nova projects (a) two communities avoided drilling of wells for irrigation needs; (b) two fisheries, Samvel Lablajyan’s fish farm and Masis Dzuk fishery, became more efficient water users.
14 Aeration technology piloted Masis Dzuk fish-farm; Hayanist water reuse project; Sayat-Nova irrigation; Sipanik well sealing project; and Sipanik well optimization project.
2.2.5
Number of people receiving improved service quality from an existing basic or safely managed water service as a result of USG assistance.
9814/0 0
12000/98610
(500 women;
486 men)
This indicator tracks qualitative improvements11 of the water resource resulting from the infrastructure projects implemented by ASPIRED12. The term “water users” refers to households, local farmers, and other groups benefitting from these improvements. (Gender disaggregated whenever possible).
2.2.6 Number of water users experiencing
improved efficiency of water resources 7/0 0 13/513
This indicator tracks improved efficient use of water resulting from the pilot projects implemented under the ASPIRED Project. Examples of such projects can potentially reduce water abstraction by fish farms due to new technologies installed. Year 4 data refers to the
ATTC fish farm, and the community projects, including those implemented in Hovtashat, Yeghegnut, Aratashen, Vedi, and Khachpar.
Sub-IR 2.3: Based on the pilot process and available research, recommendations developed for successful water and energy technologies for policy-makers and stakeholders shared
Indicators
2.3.1
Number of successful technologies recommended and shared with the stakeholders and policy-makers
6/0 0 11/514 ASPIRED will pilot at least six technologies by the end of the project as well as conduct an evaluation and provide recommendations during Year 5 of the project.
Sub-IR 2.4: Technology or method to permanently close illegal and/or abandoned wells, developed, piloted, and evaluated
Indicators
2.4.1
Number of piloted technologies to permanently close illegal or abandoned wells
1/0 0 3/2
ASPIRED initially planned to pilot at least two well optimization/sealing projects during Year 3.
During Year 3 Quarter 4, the ASPIRED completed the well optimization project in Sipanik village. As of now, the ASPIRED team has submitted a letter of inquiry to MNP regarding additional recommended wells for closure and is waiting for a response.
IR 3: Introduce new policies and regulations to improve integrated water resource management.
Sub-IR 3.1: Trainings to build groundwater monitoring capabilities, capacity strengthening, and knowledge of how to use equipment; and follow-up assessments to test knowledge on groundwater monitoring and analysis of the basin management organizations (BMOs) and relevant water management agency officials to improve enforcement.
Indicators
Report Q1 – FY 2019 11
3.1.1 Number of trainings for building capacity
of MNP in groundwater monitoring 1/0 0 6/4
This indicator refers to trainings on the enhanced up-to-date State Water Cadaster Information
System (SWCIS) and Management Information System (MIS) for the Ararat Valley and on enhanced transparent water use permitting, control, oversight systems and decision support tools.
3.1.2
Number of people educated on tools, approaches, and/or methods for water security, integrated water resource management, water source protection and sustainable water use as a result of
USG assistance.
25/1 1
126/92
(17 women and 75 men)
This indicator refers to trainings on enhanced up-to-date SWCIS and MIS for the Ararat Valley;
enhanced transparent water use permitting, control, and oversight systems; and environmental compliance procedures and efficient water use trainings for the beneficiaries of the communities.
This indicator is not cumulative and is reported on a quarterly basis. During the reported period, ASPIRED provided on-the-job training for the Deputy Head of the Water Cadastre and
Monitoring Division of the WRMA on calculating ecological flow in the rivers of Armenia
ASPIRED plans to conduct a GIS course for the stakeholders during Quarter 2 of Year 4.
Sub-IR 3.2: Rigorous, evidence-based analysis of optimal water fee levels completed, shared with engaged stakeholders and recommendations provided to the GOA
Indicators
3.2.1
Number of workshops and consultations with stakeholders to discuss water fee levels
N/A N/A 9/9 The target for this indicator was met during Year 2 /Quarter 2; therefore, ASPIRED has completed data collection under this indicator for the project.
Sub-IR 3.3: Water permitting monitoring and enforcement measures assessed and publicly available and recommendations, including development of regulations, provided to the GOA.
Indicators
3.3.1
Package of recommendations to address water permitting monitoring and enforcement measures provided to GoA.
1/1 1 4/3
This indicator refers to the package of recommendations that the ASPIRED Project drafted and submitted to the GOA. In reporting period 1, the ASPIRED Project submitted the draft
Government decree on establishment of the requirements for the protection of water resources in the recreational zones to the MNP.
IR: Ensure communications and coordination with stakeholders to avoid duplication of efforts
Sub:IR: 4.1 Systems-mapping to gain and apply knowledge of points of influence, incentives, and resources of stakeholders in water and the water-energy nexus completed and shared
Indicators
4.1.1
Number of international and local organizations participating in the system mapping activities
1/0 0 26/24 This indicator refers to newly identified stakeholders and points of influence in water and water-energy nexus for the ASPIRED Project.
4.1.2
Number of partnerships made by
ASPIRED with other organizations
3/3 3 16/15
This indicator refers to partnerships, collaboration with other public and private sector organizations, donor projects for the implementation of joint projects and/or other initiatives contributing to the accomplishment of ASPIRED objectives. The indicator refers to partnerships with the communities of Yeghegnut, Aratashen and Hovtashat.
Report Q1 – FY 2019 12
15 This figure represents the actual cost-share of partners (Coca-Cola HBC, ERGIS and Hayanist community –for Hayanist project; VALML LLC for Sipanik, Sipanik community for well optimization; Partnerships for
Rural Development Project (PRP), Fund for Armenian Relief (FAR) and Sayat-Nova community for water reuse project in Sayat-Nova) versus the total cost of the projects. Since the ASPIRED Project has different share in different projects, the total percentage of the leveraged funding may be lower than that for a particular year.
16 The results refer to the population size of Sipanik, Hayanist, and Sayat-Nova communities versus the total size of the population in the AAB.
17 This figure refers to (1) ASPIRED completed the inventory of groundwater wells, and springs in September 2016. (2) USAID presented two reports to the GOA - Achieving Sustainable Groundwater Use in the
Ararat Valley: the Role of the Fisheries Sector and the Final Report on the Inventory of Groundwater Wells, Natural Springs, and Fisheries of the Ararat Valley; (3) ASPIRED was involved into the Interagency Task
Force (ITF) established by the Prime-Minister’s assignment in January-February 2017. In May 2017, the Armenian Prime-Minister Karen Karapetyan approved the Program of Measures for Efficient Management of the
Groundwater Resources of Ararat Valley. Developed with the expertise and data support of the ASPIRED Project, the Program envisages an array of regulatory, legislative, institutional and technical measures for a more rational use of water in the Ararat Valley for different purposes such as fish farming, irrigation, drinking, and drainage system; (4) ASPIRED launched two pilot projects aimed at improving water management on the grassroots level by the communities, fish-farmers: irrigation improvement project in Hayanist (launched in May 2017) and well conservation project in Sipanik. (5) Installation of the automated online groundwater use monitoring system in the fisheries of the Ararat Valley; and (6) hydrological model of the decision support system (DSS).
18 The LOE result includes six fisheries with improved water management practices: three have been equipped with online monitoring systems and three fish-farms participate in the infrastructure projects – ATTC and water reuse for irrigation (Lablajyan and Masis Dzuk).
Sub-IR 4.2: A transformative partnerships model to respond to needs for research, pilots, analysis and other coordinated efforts that is demand-driven, flexible, and has a plan for financial sustainability created
Indicators
4.2.1
Percent of total funding leveraged from stakeholders for water resources management activities.
35/0 0 35/3015
This indicator refers to the total in-kind and financial contribution by ASPIRED partners versus the total contribution of the ASPIRED Project for a given year. Targets are not cumulative and refer to a specific year of the project cycle. Although the ASPIRED team started the pilot projects in Yeghegnut, Aratashen and Hovtashat villages, the project team will report figures associated with these projects upon their completion.
1. Portfolio-level indicators
5.1 Percent of population living in targeted
areas with improved water management
41.8
(women: 4.2;
men: 4)/0
52/8.216
(women –
4.2%; men -
4%)
The geographical target area is the Ararat Artesian Basin (AAB), a territory of 13,075 hectares with a population of 58,373 people (28,392 men; 30,345 women).
5.2
Number of key implementation steps taken to improve water management in the Ararat Valley
2/0 0 10/617 This indicator refers to policy, analysis, and other activities targeted towards improvement of water data-related activities, including training and pilot projects.
5.3
Number of private sector firms that have improved management practices or technologies as a result of USG assistance
2/0 0 9/618
This indicator refers to (a) the number of fisheries with automated groundwater use monitoring systems installed; and (b) fisheries which have adopted innovative water or energy efficiency
(including renewable) technologies.
Report Q1 – FY 2019 13
19 The LOP data refers to the practice of the secondary use of outlet water from fisheries for irrigation purposes, which has never been practiced at a community scale; well sealing/optimization activities; the ATTC;
and installation of the online monitoring system in the fisheries.
5.4 Number of innovations supported
through USG assistance.
1/0 0 5/419
Innovative technologies, management/monitoring tools or practices introduced by the ASPIRED team in fish farms, at water use points and/or communities of Ararat Valley which contribute to the reduction of the groundwater use.
5.5
Number of innovations supported through USG assistance with demonstrated uptake by private and/or public sector firms
1/0 0 4/2
This indicator refers to the uptake/replication by the public and/or private sectors of projects, technologies, innovations and/or practices introduced by the ASPIRED Project at fish farms, water use points, and/or communities of the Ararat Valley. In Year 4, the ASPIRED team assisted the Hovtshat community with initiating the well optimization project. ASPIRED will report the pilot project results, upon the project’s completion.
3. Program Implementation
3.1Water Resource Data
SWCIS Enhancement
In November, ASPIRED completed operationalization of the new server of the Ministry of Nature
Protection (MNP). The Project team installed the programmed databases of the State Water Cadaster
Information System (SWCIS) Data Warehouse on the server and conducted series of technical discussions with personnel of the Water Resource Management Agency (WRMA) on populating the databases with the real data. WRMA and ASPIRED agreed on the format of recording the bugs identified in the process of data entry, which will allow the ASPIRED team to debug the programmed databases. In December, the ASPIRED and WRMA teams worked on testing and debugging of the selected databases and jointly initiated the process of designing the reporting templates for the SWCIS
Data Warehouse.
In response to MNP’s request to USAID for assistance on the implementation of e-governance mechanisms for transparent water resource management and the water use permitting process, USAID/Armenia’s ASPIRED and Participatory Utilization and Resource Efficiency of Water (PURE-
Water) Projects teams developed a proposal for creating a simplified platform for online submission of applications for water use permits. ASPIRED and PURE-Water teams presented the proposal and implementation details regarding hosting of the platform on the WRMA’s web-site to the First Deputy
Minister of Nature Protection on November 20 and received the Deputy Minister’s concurrence. The
ASPIRED team and the WRMA head agreed on the proposed approach, technicalities of developing the platform and providing linkages with the SWCIS Data Warehouse, including the implementation schedules and the roles of the WRMA, ASPIRED Project, and PURE Project teams.
Decision Support Tools
Before submitting the interim results to the MNP for review and feedback, the ASPIRED Project presented the interim results of the hydrologic analyses of the Ararat Valley to the USAID/Armenia
Contracts Officer’s Representative (COR) in October. The ASPIRED Team developed these two deliverables using the decision support tools which have been calibrated with the Ararat Valley datasets, including:
• Decision Support System (DSS) for calculating annual and multi-annual average values of water balance components for the Ararat Valley; and
• Arc Hydro Groundwater (AHGW) ArcGIS extension for creating the three-dimensional (3D) model of the Ararat Valley groundwater basin.
In December, the ASPIRED team met with the Head of the WRMA and specialists of the
Environmental Monitoring Information Center (EMIC) to discuss their feedback, including questions for further clarification of the applied methodology, the data used in the calculation of the water balance components for 2016, the recommendations on the methodology, and findings narrative and presentation of the break-down of water balance components for separate rivers basins of the Ararat
Valley groundwater basin catchment area. The ASPIRED team updated the water balance calculations following the Ministry’s feedback and re-submitted the revised version of the reports to the MNP on
December 27, 2018. It was proposed to MNP to have a presentation and further discussion of the main outputs in January 2019, before the project deliverables are presented to a larger group of stakeholders.
DSS: During the reporting period, the ASPIRED team continued enhancing the DSS for the Ararat
Valley. More specifically, the team made the following progress:
• Completed the programming of the surface water quality assessment modules of the DSS. This module allows qualitative classification of the surface waters of the Ararat Valley by using surface water monitoring data. The module also allows an assessment of the surface water resources based on their suitability for drinking and irrigation purposes, using the water quality norms defined by the Armenian legislation for drinking water and norms for irrigation recommended by the Food and Agriculture Organization (FAO) (Armenia does not have approved irrigation water norms).
• Started programming the groundwater quality assessment component of the DSS, which will be used to assess the quality of the groundwater resources, based on available data from the national reference monitoring network.
• Finalized processing of data sets of seven meteorological stations in the Ararat Valley (Ararat, Artashat, Armavir, Urtsadzor, Ashtarak, Yerevan Agro, and Yerevan Arabkir), as well as the
Aragats high mountainous meteo-station required for calibrating the Climate Change model of the DSS for the Ararat Valley. Based on the ASPIRED team’s request, the Armenian State
Hydro-Meteorological Service provided information on gaps in the historical time-series which the ASPIRED team identified during analysis.
• Designed a conceptual scheme for reprogramming the ecological flow component of the supply-and-demand balance component of the DSS, based on the requirements of new ecological flow method adopted in February 2018.
Groundwater modeling tools: During the reporting period, the ASPIRED team initiated the process of constructing the numeric groundwater flow model for the Ararat Valley, which builds on the 3D model completed in September 2018. The team developed a schematic design of the groundwater numeric flow modeling in the MODFLOW environment that was discussed with the AQUAVEO team for its completeness and feasibility for achieving the project’s modeling goals. The ASPIRED team identified and procured three new modules under the GMS software – Boreholes, TIN, and Solids – that are required to ensure the implementation of all technical steps for designing the groundwater flow model.
Introduction of the automated online system for groundwater use monitoring
ASPIRED continues to monitor the operation of the flow meters installed on 15 groundwater wells in the three fisheries in collaboration with the sub-contractor Hybrid Telematica. Hybrid Telematica provided an option for accumulating the flow measurement data in a temporary virtual space until the
MNP provides its feedback on the second component of the automated online groundwater monitoring system – the Supervisory Control and Data Acquisition (SCADA) software. By the end of the reporting period, ASPIRED was waiting for MNP’s feedback on the SCADA software and its technical requirements.
In December, the WRMA finally reached an agreement with Max Fish company for installation of the remaining five flow meters and data loggers in one of the company’s fisheries. ASPIRED and its subcontractor specialists visited the fishery to observe site conditions and assess feasibility of installing water metering devices. This fishery operates four groundwater wells, which can be equipped with flow meters. ASPIRED Subcontractor will provide its technical and financial proposal to the ASPIRED
Project in January 2019.
Extending the national reference groundwater monitoring network in the Ararat Valley
The ASPIRED team, jointly with the Project COR, monitored four refurbished groundwater monitoring wells in the feeding zone of the Ararat Valley and determined that all four wells can be handed over to EMIC for inclusion in the national reference groundwater monitoring network.
During the reporting period, ASPIRED also completed procurement of the spare parts of the mass spectrometer, which have been transferred to EMIC. In November, the ASPIRED team and the Project
COR coordinated the procurement of the remaining items for EMIC from the agreed procurement list, based on EMIC’s priority needs for groundwater resources quality and quantity monitoring.
Additional assistance to the MNP
In November, the ASPIRED team collaborated with the working group established by the
Environmental and Mineral Resources Inspectorate of the GOA for discussing issues to be considered by the Inspectorate during the supervision of the environmental performance of the small hydropower plants, including but not limited to: water use permits (WUPs), environmental impact assessments and expertise conclusion, ecological flow, embankments and fish passes, and water control/metering devices. The ASPIRED team presented the key data and findings of the inventory, ongoing activities on modeling, and expected results to the Inspectorate, with a purpose of supporting their understanding of the baseline situation in the Ararat Valley and improving the inspection of groundwater management and use, particularly by fisheries. In addition, the ASPIRED team and the Project COR clarified the areas of partnership and cooperation with the Head of Inspectorate, including the Inspectorate’s staff members’ capacity building in hydrologic and hydrogeologic analyses conducted for the Ararat Valley, introduction of the SCADA in selected fisheries in the valley, and support in improving the legal framework.
During the reporting period, the ASPIRED team worked on the design of a training program on calculation of the ecological flow values in the rivers of Armenia for the representatives of the WRMA and its six basin management organizations (BMOs), Environmental Impact Expertise Center of the
MNP, Ministry of Agriculture, Environmental and Mineral Resources Inspectorate of the GOA.
ASPIRED conducted a pre-training evaluation of the skills and capacities of the proposed trainees in general hydrology, use of MS Excel and ArcGIS software, based on which the team put together a 10-day training program to take place in January 2019.
Following MNP’s request, the ASPIRED Hydrologist conducted on-the-job training for the Deputy
Head of the Water Cadastre and Monitoring Division of the WRMA on calculating ecological flow in the rivers of Armenia. ASPIRED provided about 25 hours of individual coaching during the reporting period and will continue providing individual coaching throughout the next quarter.
3.2 Low Cost and Water Efficiency Technologies
The table below summarizes the status of the pilot projects as of December 31, 2018.
Project Name/
Technology
Status Total cost, USD
ASPIRED
cost-share, USD
Partner cost-share, USD
Partner
Hayanist irrigation rehabilitation project
Completed in April
131,705
89,524
27,212 Coca Cola HBC
11,269 ERGIS
3,700 Hayanist community
Sipanik well sealing
Completed in August
51,546 47,823 3,723 VALML LLC
Well optimization
Sipanik
Completed in September
2018 24,554 22,002 2,552 Sipanik community
Sayat-Nova water reuse project
Completed in
September 2018.
124,871 80,409
20,876
Partnership for
Rural Prosperity
Project
14,395 Fund for Armenian
Relief
16,420 Sayat-Nova community
Aquaculture
Technology
Transfer
Center (ATTC)
Ongoing
• The sub-contractor completed construction of the
178,028 114,542 63,486 Armavir Farmer LLC
Technology
Status Total cost, USD
ASPIRED
cost-share, USD
Partner cost-share, USD
Partner
ATTC, including finishing the external walls.
• On November 30, ASPIRED tested the performance of the system in terms of leakages, having filled the fish and crawfish tanks with water.
Since minor leakages were detected around pipes and fitting, ASPIRED requested that the sub-contractor improve the water circulation system in accordance with the design requirements.
• The sub-contractor eliminated the defects identified in the
Construction
Deficiency Act, signed by the ASPIRED and sub-contractor representatives.
Yeghegnut
Ongoing
ASPIRED finalized the tender results and signed the contract with
Armplast LLC on
December 21 for construction of the water system.
The community will announce a tender for the trenchwork in
January 2019.
120,809 79,777 41,032 Yeghegnut community
Aratashen Ongoing 125,365 87,455 37,910 Aratashen community
Technology
Status Total cost, USD
ASPIRED
cost-share, USD
Partner cost-share, USD
Partner
ASPIRED finalized the tender results and signed the contract with
Armplast LLC on
December 21 for construction of the water system.
The community will announce a tender for the trenchwork in
January 2019
Hovtashat
Ongoing: USAID approved the concept on optimization of the well in Hovtashat community in
December 2018. In
January 2019, ASPIRED will finalize and announce open competition for the project design.
4,3539 28,587 14,952 Hovtashat community
TOTAL 808,096 550,119 250,307
Left to right: ATTC fish ponds and the training center.
Left to right: Sayat-Nova Project: before and after the operation of the irrigation system. On the right photo: Sayat-Nova mayor
Razmik Alaverdyan, USAID Assistant Administrator Brock Bierman, and farmer Armen Gharibyan.
Design of New Projects
ASPIRED Project’s technical team finalized the draft concept of the Vedi urban irrigation project. The
PURE-Water Project will finalize and submit its portion of the environmental documentation to
USAID. Once USAID reviews and approves the environmental documentation, the ASPIRED Project will submit the project concept to USAID.
The ASPIRED Project collaborates with the Pokr Vedi community and the local water user association
(WUA) to prepare the concept paper for the irrigation project.
3.3 Water Regulation and Enforcement
On October 27, the ASPIRED Project received USAID approval to submit the draft Government decree on establishment of the requirements for the protection of water resources in the recreational zones to the MNP. The Ministerial Committee for Territorial Development and Environment discussed and approved the draft government decree; however, during the Government session on 20 December 2018, the Committee decided to postpone the submission of the draft decree to the Government till October
2019, given the need for amendments to the RA Water Code.
In October, the ASPIRED team began developing the method for assessment of self-purification capacity of rivers and its enforcement mechanisms. To this end, the ASPIRED team and the MNP discussed the planned tasks and finalized the composition of the working group, including involvement of other ministries and additional field experts. Thus, the relevant specialists from the Ministry of
Emergency Situations and the Ministry of Territorial Administration and Development will participate in the working group activities. Since biotic and abiotic components of ecosystem (including phytoplankton, algae etc.) play a significant role in self-purification of water resources, the ASPIRED team considered recruiting relevant specialists on a short-term basis. During November and December, the ASPIRED team initiated recruitment of a hydro-biologist and hydro-morphologist for the final staffing of the working group, with all contractual arrangements to be finalized in January 2019.
During the reporting period, the ASPIRED team participated in the legal component activities of the
PURE-Water Project, including the meeting of the informal public advocacy network. The purpose of the meeting was to discuss the contractual issues between the WUAs and water users where the
ASPIRED Project was asked to consider assisting in the development of block pricing structure for irrigation water tariffs.
3.4 Donor Coordination and Communications
On October 22, the ASPIRED Project held an event dedicated to the completion of the irrigation improvement project in Sayat-Nova village. Participants included USAID/Armenia’s Mission Director
Deborah Grieser, Governor of Ararat Province Garik Sargsyan, and representatives of the MNP, Ministry of Agriculture, and local administration. During the organization of the event, ASPIRED collaborated with the community and the regional government’s international relations and media departments. The event started with a demonstration of the pumping station and the irrigation system in operation, followed by welcoming remarks and children’s dance performance at the village secondary school. The link to the event story is available on ME&A Armenia’s Facebook page and the project web site: http://www.aspired.wadi-mea.com/en/2018/10/23/new-irrigation-system-for-sayat-nova-community/20
The ASPIRED and PURE-Water Projects collaborated extensively on the legal and pilot project components. Furthermore, in October and November, the ASPIRED team was involved in the selection committee of small grants announced by PURE-Water Project among NGOs and individuals interested in launching nation-wide advocacy campaigns on water issues of the Ararat Valley. On October 31, the
ASPIRED team led a session during the training of trainers for the secondary school teachers from the communities of Ararat and Armavir regions, which was focused on the Ararat Valley Artesian Basin
(AAB) and its issues.
On December 3, the ASPIRED team met with the head of the PR and Programs Department of the All-
Armenian Fund to discuss the collaboration opportunities and the possibility of joint projects. The
ASPIRED team presented the project objectives and the focus of the pilot projects implemented by
ASPIRED, as well as their overlap with the goals of the All-Armenian Fund. The parties agreed that the ASPIRED team would share the concept paper of the Pokr Vedi irrigation project with the Fund’s management for review, while the Fund would research the availability of funding through their sources.
20 The media coverage links https://www.ecolur.org/hy/news/water/-60-/10521/ https://news.am/arm/news/477475.html https://armenpress.am/arm/news/952775.html https://www.lragir.am/2018/10/30/391292/ https://www.anau.am/ru/about-us/2544-2018-11-03-09-05-05 http://www.aspired.wadi-mea.com/en/2018/10/23/new-irrigation-system-for-sayat-nova-community/ http://www.aspired.wadi-mea.com/en/2018/10/23/new-irrigation-system-for-sayat-nova-community/ https://www.ecolur.org/hy/news/water/-60-/10521/ https://news.am/arm/news/477475.html https://armenpress.am/arm/news/952775.html https://www.lragir.am/2018/10/30/391292/ https://www.anau.am/ru/about-us/2544-2018-11-03-09-05-05
Performance Monitoring: On October 20, the ASPIRED Project submitted FY 2018 inputs on the indicators contained in the Performance Plan and Report to USAID, including the explanation on any deviations found in the indicators. Furthermore, on November 29, the USAID and ASPIRED teams met for the data quality assurance (DQA) review by USAID on the following indicators: the GHG emission reduction, the number of innovations supported by the ASPIRED Project, and the number of innovations replicated by private and public entities.
Communications and Outreach. During the reporting period, the ASPIRED team conducted the media monitoring of the coverage of the project event in Sayat-Nova community. The success story on the project, which also highlights the visit of USAID’s Assistant Administrator Brock Bierman to Sayat-
Nova was prepared and shared with ME&A headquarters. Updates of the web site and Facebook pages of the project included news stories, photo and library uploads, posting of announcements.
Furthermore, the ASPIRED Project participated in the communications training organized by USAID for the implementing partners on October 31-November 1. Throughout the communications training, USAID briefed its implementing partner representatives on the most recent outreach-related requirements and PR projects of USAID, and discussed the focus of the communications activities implemented by the partners.
Left to right: USAID/Armenia Mission Director Deborah Grieser and Ararat Governor Garik Sargsyan launching the pumps; The demonstration of the irrigation system to the stakeholders.
4. General Administrative Issues
During the reporting period, the project administration focused on the budget review and realignment for the remaining funding period. Two representatives from ME&A’s headquarters visited the Yerevan office from October 24, 2018 through October 27, 2018 to conduct a mid-term review of the ASPIRED
Project progress, discuss the Project activities for the upcoming year, meet with USAID/Armenia representatives and project counterparts, and conduct pilot project site visits.
During the reporting period, the ASPIRED Project administered the tender for Yeghegnut and
Aratashen villages for the installation of the pump and water pipes and fully-executed the contract with
Armplast LLC. The bids received were on average higher than the budgeted figures by 16% due to the complexities of construction work and pipework in winter period and the necessity to install a new transformer substation in Aratashen. ASPIRED requested USAID approval to increase the total cost of the tender. After the project received USAID approval for this request, ASPIRED signed a contract with
Armplast on December 21.
On November 14, the ASPIRED Project started recruitment of short-term services of a hydro-biologist and hydro-morphologist for technical assistance under the legal component.
On November 15, ME&A Headquarters conducted its annual online training for the ASPIRED Project team regarding ethics, non-discrimination, and prevention of harassment at the workplace.
5. Environmental Compliance
During the reporting period, the ASPIRED Project conducted regular environmental compliance monitoring of the ongoing projects in Metsamor (ATTC) and Sayat-Nova project sites, as well as at three fisheries where the flow meters were installed. In Metsamor and Sayat-Nova, the sub-contractors were instructed to abide by the EMMP requirements, particularly on the proper and safe disposal of the construction debris and safety norms to be maintained at the project sites. The specialist recommended reinforcing the bank of the biological pond of the ATTC and water intake canal at the pumping station area of the Sayat-Nova project. The ASPIRED team has documented the observations made during the monitoring visits and instructions to the ASPIRED Subcontractors and other implementing parties in the Field observations checklists kept at the ASPIRED office.
During the reporting period, the ASPIRED and PURE-Water Projects’ environmental specialists worked together on the preparation of the environmental review checklist and EMMP for improving irrigation of green zones of Vedi town. The ASPIRED and PURE-Water teams also conducted a site visit to Vedi to assess the baseline environmental conditions.
The ASPIRED Project also prepared the environmental review documentation for the well optimization project in the Hovtashat community to complete the package for submission to USAID.
The examination of the well water quality, specifically its physical and chemical monitoring demonstrated that it is suitable for irrigation, following the FAO recommended quality norms.
6. Existing Problems or Issues
The ASPIRED Project anticipates a delay in the installation of the water pipes by the ASPIRED sub-contractor due to the delay in the announcement of the tender for trenchwork by Aratashen and
Yeghegnut communities. During the joint meeting of the ASPIRED and PURE-Water Projects with the communities’ mayors on December 20 and 21, PURE-Water…