This is a pricing schedule and cost estimate template for ship repair services on the USCGC BERTHOLF (WMSL-750) during a dockside availability in FY2027. The solicitation, numbered 70ZU0227QLREP002 and titled "MIDGETT #2 SSDG OVERHAUL FY27," requires the contractor to furnish all necessary labor, materials, services, equipment, supplies, power, accessories, facilities, and other items required to perform dockside repairs. The scope includes three definite work items: a Caterpillar Ship Service Diesel Generator engine major overhaul, a diesel engine hot lube oil flush, and a crankshaft renewal, each priced as a job with extended prices currently set at $0.00. The pricing schedule indicates all prices are currently in draft status as of April 24, 2025.
The cost estimate breakdown template establishes a composite labor rate of $55 per hour with assumed G&A and profit factors of 15% and 10%, respectively. The template accommodates detailed labor cost allocation across nine labor categories (engineering technician, machinist/pipe fitter, electrician, shipfitter, welder, firewatch, insulator/lagger, painter, and general labor/helper/rigger), as well as material and subcontract costs. Geographic labor rate adjustments are provided for 26 locations ranging from $45 to $67 per hour, with Houston, Texas established as the median rate area at $55. The solicitation requires the presence of an authorized and licensed Caterpillar Marine Diesel engine/generator OEM service provider for Work Items 01 and 03, as documented in the attached justification and approval.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC BERTHOLF (WMSL-750) DOCKSIDE AVAILABILITY FY2027 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Caterpillar (CAT) Ship Service Diesel Generator, Engine Major Overhaul | JOB | 1 | $0.00 | |
| D-002 | Caterpillar (CAT) Diesel Engine Hot Lube Oil Flush, Perform | JOB | 1 | $0.00 | |
| D-003 | Caterpillar (CAT) Ship Service Diesel Generator, Crankshaft Renewal | JOB | 1 | $0.00 | |
| Total Price of Definite Items | $0.00 | ||||
| Total Price of Option Items | $0.00 | ||||
| Total Price of Definite and Optional Items | $0.00 |
&C(4/24/2025) Draft-00 - Page &P of &N
CostEstimateBreakdowns
| Composite Labor Rate | 55 | |||||||||||||||||||||||
| Assumed G&A Factor | 15% | |||||||||||||||||||||||
| Assumed Profit Factor | 10% | Direct Labor | Direct Material/Subs Cost | |||||||||||||||||||||
| ITEM | DESCRIPTION | UNIT PRICE | Sub-Contracted (put a "1" in the blank) | Total Labor Hours | Total Material & Subs (cost + G&A + profit) | Eng Tech | Machinest/Pipe Fitter | Electrician | Shipfitter | Welder | Firewatch | Insulator/Lagger | Painter | Gen Labor/Helper/Rigger | Supt/QA/NDT | Mat/Sub Cost 1 | Mat/Sub Cost 2 | Mat/Sub Cost 3 | Mat/Sub Cost 4 | Lab Rate | Area | WorkItemID | WIFileID | LoadData |
| 62 | Baltimore, MD | |||||||||||||||||||||||
| 52 | Biloxi, MS | |||||||||||||||||||||||
| 56 | Boston, MA | |||||||||||||||||||||||
| 50 | Charleston, SC | |||||||||||||||||||||||
| 60 | Corpus Christi, TX | |||||||||||||||||||||||
| 51 | Hampton Roads | |||||||||||||||||||||||
| 64 | Honolulu, HI | |||||||||||||||||||||||
| 55 | Houston, TX | |||||||||||||||||||||||
| 56 | Los Angeles, CA | |||||||||||||||||||||||
| 55 | Median Rate | |||||||||||||||||||||||
| 49 | Miami | |||||||||||||||||||||||
| 50 | Narragansett Bay, RI | |||||||||||||||||||||||
| 55 | New London, CN | |||||||||||||||||||||||
| 45 | New Orleans | |||||||||||||||||||||||
| 62 | NYNY | |||||||||||||||||||||||
| 49 | Panama City, FL | |||||||||||||||||||||||
| 60 | Philadelphia, PA | |||||||||||||||||||||||
| 51 | Portland, ME | |||||||||||||||||||||||
| 57 | Portland, OR | |||||||||||||||||||||||
| 55 | San Diego, CA | |||||||||||||||||||||||
| 67 | San Francisco, CA | |||||||||||||||||||||||
| 55 | Santa Barbara, CA | |||||||||||||||||||||||
| 55 | SE North Carolina | |||||||||||||||||||||||
| 65 | Seattle, WA | |||||||||||||||||||||||
| 48 | Tampa-St. Petersburg | |||||||||||||||||||||||
| 60 | Wilmington, DE |
&C(09/28/2009) Page &P of &N
CostEstimateTemplate
File details come from the government source that posted it. Updated .