4-Attachment_B_MIDGETT_No.2_SSDG_OVERHAUL_FY27-Price_Schedule.xls

XLS spreadsheet 57 KB Posted

Attached to
MIDGETT #2 SSDG OVERHAUL FY27
Solicitation number
70ZU0227QLREP002
Issued by
Not on record

About this file

This is a pricing schedule and cost estimate template for ship repair services on the USCGC BERTHOLF (WMSL-750) during a dockside availability in FY2027. The solicitation, numbered 70ZU0227QLREP002 and titled "MIDGETT #2 SSDG OVERHAUL FY27," requires the contractor to furnish all necessary labor, materials, services, equipment, supplies, power, accessories, facilities, and other items required to perform dockside repairs. The scope includes three definite work items: a Caterpillar Ship Service Diesel Generator engine major overhaul, a diesel engine hot lube oil flush, and a crankshaft renewal, each priced as a job with extended prices currently set at $0.00. The pricing schedule indicates all prices are currently in draft status as of April 24, 2025.

The cost estimate breakdown template establishes a composite labor rate of $55 per hour with assumed G&A and profit factors of 15% and 10%, respectively. The template accommodates detailed labor cost allocation across nine labor categories (engineering technician, machinist/pipe fitter, electrician, shipfitter, welder, firewatch, insulator/lagger, painter, and general labor/helper/rigger), as well as material and subcontract costs. Geographic labor rate adjustments are provided for 26 locations ranging from $45 to $67 per hour, with Houston, Texas established as the median rate area at $55. The solicitation requires the presence of an authorized and licensed Caterpillar Marine Diesel engine/generator OEM service provider for Work Items 01 and 03, as documented in the attached justification and approval.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOS&S

PRICING SCHEDULE FOR:
USCGC BERTHOLF (WMSL-750) DOCKSIDE AVAILABILITY FY2027
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
D-001Caterpillar (CAT) Ship Service Diesel Generator, Engine Major OverhaulJOB1$0.00
D-002Caterpillar (CAT) Diesel Engine Hot Lube Oil Flush, PerformJOB1$0.00
D-003Caterpillar (CAT) Ship Service Diesel Generator, Crankshaft RenewalJOB1$0.00
Total Price of Definite Items$0.00
Total Price of Option Items$0.00
Total Price of Definite and Optional Items$0.00

&C(4/24/2025) Draft-00 - Page &P of &N

CostEstimateBreakdowns

Composite Labor Rate55
Assumed G&A Factor15%
Assumed Profit Factor10%Direct LaborDirect Material/Subs Cost
ITEMDESCRIPTIONUNIT PRICESub-Contracted (put a "1" in the blank)Total Labor HoursTotal Material & Subs (cost + G&A + profit)Eng TechMachinest/Pipe FitterElectricianShipfitterWelderFirewatchInsulator/LaggerPainterGen Labor/Helper/RiggerSupt/QA/NDTMat/Sub Cost 1Mat/Sub Cost 2Mat/Sub Cost 3Mat/Sub Cost 4Lab RateAreaWorkItemIDWIFileIDLoadData
62Baltimore, MD
52Biloxi, MS
56Boston, MA
50Charleston, SC
60Corpus Christi, TX
51Hampton Roads
64Honolulu, HI
55Houston, TX
56Los Angeles, CA
55Median Rate
49Miami
50Narragansett Bay, RI
55New London, CN
45New Orleans
62NYNY
49Panama City, FL
60Philadelphia, PA
51Portland, ME
57Portland, OR
55San Diego, CA
67San Francisco, CA
55Santa Barbara, CA
55SE North Carolina
65Seattle, WA
48Tampa-St. Petersburg
60Wilmington, DE

&C(09/28/2009) Page &P of &N

CostEstimateTemplate