Attachment II Schedule of Services.xlsx
XLSX spreadsheet 26 KB Posted
- Attached to
- Singapore Pier Services and Shore Side Support
- Solicitation number
- 70ZL9327QACAR0001
- Issued by
- Not on record
About this file
This file is a Schedule of Services spreadsheet that outlines the detailed service requirements for the Singapore Pier Services and Shore Side Support contract. The document appears to be a template or pricing schedule that corresponds to the USCG solicitation 70ZL9327QACAR0001, a small business set-aside RFQ for commercial pier and shoreside support services at a Singapore location. The schedule likely itemizes specific services, quantities, labor categories, and associated pricing that offerors must complete and submit as part of their proposal response.
Without access to the actual contents of the Excel file, the specific line items, service descriptions, labor rates, and pricing columns cannot be detailed. However, as an attachment to the RFQ, this schedule serves as a critical pricing and service delivery document that offerors must accurately complete and return to the Contracting Officer, Tyrone Minnifield, at tyrone.minnifield2@uscg.mil by the November 13, 2026, 7:00 AM EST deadline. The schedule format enables the Government to evaluate and compare pricing across competing small business offerors for the various pier services and shore-side support functions required under NAICS code 488310.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 70ZL9327QACAR0001_0_US.pdf | ||
| Attachment I Statement of Work - Singapore Pier Berthing and Services.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SCHEDULE OF SUPPLIES AND SERVICES (CLIN 0001 – CLIN 0041) | ||||||
| Task One: Mandatory Port Services & Pier Berthing (CLIN 0001 – CLIN 0009) | ||||||
| CLIN | SOW Ref | Description / Specifications | QTY | Unit | Proposed Unit Price (USD) | Extended Total Price (USD) |
| 1 | 2.1.1 | Mooring Space: 100m–125m isolated, continuous deep-water jetty face (min 4.5m MLLW depth) accommodating 2 FRCs alongside and up to 6 cutters nested ($2 \times 3$ array). | 45 | DY | $ | $ |
| 2 | 2.1.2 | Husbanding Services – Management (Day 1): Initial arrival oversight, port clearances, MPA liaisons, harbor entrance coordination, security integration, and all initial harbor/pier setup fees. | 1 | DY | $ | $ |
| 3 | 2.1.3 | Husbanding Services – Management (Subsequent Days): Continuous daily logistics coordination, gate access, agency coordination, supply expediting, and administrative reconciliation. | 44 | DY | $ | $ |
| 4 | 2.1.4 | Pilotage Services – Inbound: MPA licensed pilotage per inbound vessel transit from boarding ground to berth face. | 4 | JB | $ | $ |
| 5 | 2.1.5 | Pilotage Services – Outbound: MPA licensed pilotage per outbound vessel transit from berth face to pilot disembarkation sea lanes. | 4 | JB | $ | $ |
| 6 | 2.1.6 | Tug Services – Standby: Harbor assist tug standby on station 30 min prior to evolutions; appropriately fendered for Sentinel-class hulls. | 2 | JB | $ | $ |
| 7 | 2.1.7 | Brows / Gangways: Two (2) 10m marine aluminum gangways with double handrails, non-skid deck, and safety netting (2 gangways $\times$ 45 days). | 90 | DY | $ | $ |
| 8 | 2.1.8 | Pneumatic Fenders: Four (4) Yokohama-type pneumatic fenders ($\ge 2.0\text{m dia.} \times 3.5\text{m length}$) with aircraft-tire netting (4 fenders $\times$ 45 days). | 180 | DY | $ | $ |
| 9 | 2.1.9 | Line Handlers: Certified line handling crew (minimum 2 handlers on-station 20 min prior) per arrival/departure evolution. | 6 | JB | $ | $ |
| SUBTOTAL | TASK ONE | Mandatory Port Services & Pier Berthing | $ |
| Task Two: Volumetric Waste, Utilities & Maintenance Management (CLIN 0010 – CLIN 0022) | ||||||
| CLIN | SOW Ref | Description / Specifications | Est. Qty | Unit | Proposed Unit Price (USD) | Extended Total Price (USD) |
| 10 | 2.2.1 | Shore Power Generator Rental: Two (2) 500 kVA, 450–480 VAC, 3-Phase, 60 Hz sound-attenuated generators ($<84\text{ dBA}$ at 1m) with cables and USCG pin connections (2 sets $\times$ 45 days). | 90 | DY | $ | $ |
| 11 | 2.2.2 | Shore Power Fuel & Consumables: Continuous Ultra-Low Sulfur Diesel (ULSD), lube oils, and filters for 24/7 generator operation without power interruption. | 64,500 | LT | $ | $ |
| 12 | 2.2.3 | CHT / Sewage Management – Volumetric Fee: Daily readiness, vacuum barge/truck staging, certified camlock hoses, spill berms, and scheduling. | 45 | DY | $ | $ |
| 13 | 2.2.4 | CHT / Sewage Management – Pump-Outs: Extraction, transportation, and certified municipal disposal of blackwater/greywater at NEA/PUB plants. | 243 | CZ | $ | $ |
| 14 | 2.2.5 | Refuse & Trash Removal – Daily Management: Daily pier sanitation, provision of $\ge 4$ covered 1,100L bins, vermin control, and continuous debris cleanup. | 45 | DY | $ | $ |
| 15 | 2.2.6 | Refuse & Trash Removal – Disposal: Hauling and compliant disposal/recycling of domestic trash, food waste, plastics, cardboard, and pallets (MARPOL Annex V / NEA compliant). | 243 | CZ | $ | $ |
| 16 | 2.2.7 | Oily Waste Removal – Daily Management: Staging, certified vacuum tanker readiness, hazardous spill containment barriers, and safety standby. | 8 | DY | $ | $ |
| 17 | 2.2.8 | Oily Waste Removal – Disposal: Extraction, transport, and certified disposal of oily bilge wastewater and petroleum sludge at licensed toxic waste plants. | 10 | CZ | $ | $ |
| 18 | 2.2.9 | Potable Water Delivery: Supply of certified fresh drinking water meeting WHO/USCG standards via dedicated sanitary trucks or metered backflow-prevented hydrants. | 203 | MT | $ | $ |
| 19 | 2.2.10 | Underwater Body Diver Inspection (B10015.D): Visual and HD video engineering inspection of hull, props, shafts, rudders, and sea chests (USCG Item B10015.D). | 6 | JB | $ | $ |
| 20 | 2.2.11 | Underwater Zinc Anodes Replacement (B10018.D): Diver replacement of sacrificial zinc anode sets to OEM specs on hull, struts, sea chests, and rudders (USCG Item B10018.D). | 6 | JB | $ | $ |
| 21 | 2.2.12 | FM-200 Fire System Recertification (N31015.D): Certified inspection, cylinder weighing, pressure testing, and recertification by accredited marine technicians (USCG Item N31015.D). | 6 | JB | $ | $ |
| 22 | 2.2.13 | Galley Hood CTR Fire System Test (N30050.D): Semi-annual inspection, fusible link testing, nozzle clearing, and recertification (USCG Item N30050.D). | 6 | JB | $ | $ |
| SUBTOTAL | TASK TWO | Volumetric Waste, Utilities & Maintenance Management | $ |
| Task Three: Communications & Transportation (CLIN 0023 – CLIN 0024) | ||||||
| CLIN | SOW Ref | Description / Specifications | Est. Qty | Unit | Proposed Unit Price (USD) | Extended Total Price (USD) |
| 23 | 2.3.1 | Pocket Wi-Fi Hotspots: Twenty-four (24) units with 100% unthrottled unlimited 4G/5G Singapore data, $\ge 10$ connected devices per unit, chargers, and cases (24 units $\times$ 45 days). | 1,080 | DY | $ | $ |
| 24 | 2.3.2 | Passenger Buses with Drivers: Four (4) dedicated 23-passenger air-conditioned motor coaches with licensed, English-fluent drivers (Class 4 license; 4 buses $\times$ 45 days). | 180 | DY | $ | $ |
| SUBTOTAL | TASK THREE | Communications & Transportation | $ |
| Task Four: Support Facilities, MHE & Underwater Support (CLIN 0025 – CLIN 0038) | ||||||
| CLIN | SOW Ref | Description / Specifications | Est. Qty | Unit | Proposed Unit Price (USD) | Extended Total Price (USD) |
| 25 | 2.4.1 | Forklift Services with Operator: Minimum 4.0-ton industrial forklift with overhead cage, dual mast, and certified operator on-demand for cargo handling. | 45 | DY | $ | $ |
| 26 | 2.4.2 | Mobile Crane Services – Standard: Hydraulic crane (minimum 25-ton capacity) with certified operator, riggers, signalmen, and safety observers. | 5 | DY | $ | $ |
| 27 | 2.4.3 | Mobile Crane Services – Heavy Reach: Telescoping crane ($\ge 50\text{-ton class}$) capable of lifting $\ge 455\text{ kg}$ (1,000 lbs) at a 35m radius to service nested outboard cutters. | 5 | DY | $ | $ |
| 28 | 2.4.4 | Flatbed Trailer Truck with Operator: 40-foot flatbed tractor-trailer with driver for parts/stores shuttles between warehouse and pier (M/W/Th + on-call). | 21 | DY | $ | $ |
| 29 | 2.4.5 | Paint Floats: Two (2) heavy-duty pontoons (min 3-person capacity) with guardrails, non-skid deck, and fendering (2 floats $\times$ 45 days). | 90 | DY | $ | $ |
| 30 | 2.4.6 | Warehouse Space Rental: Dedicated covered, secure, climate-controlled space ($\ge 12,000\text{ sq ft}$) within 500m of pier; biometric access, CCTV, hot-work area, and space for two 26ft OTH boats. | 45 | DY | $ | $ |
| 31 | 2.4.7 | Warehouse Shelving: Industrial 3-tier heavy-duty pallet racking installed up to 15 feet vertical height. | 1 | LOT | $ | $ |
| 32 | 2.4.8 | Seabed Sweeping Diving Services: Pre-arrival hydrographic and diver clearance sweep of 100m–125m berth and fairway with 3-diver surface-supplied air team. | 1 | JB | $ | $ |
| 33 | 2.4.9 | Diving Services – General: On-demand diving for emergent repairs, sea-chest cofferdam installations, and running gear clearing. | 6 | JB | $ | $ |
| 34 | 2.4.10 | Command Office Space Rental: Dedicated HVAC suite ($\ge 227\text{ sqm}$) with 9 private offices, 1 conference room, LAN drops, power, and private restrooms. | 45 | DY | $ | $ |
| 35 | 2.4.11 | Support Office Space Rental: Open-plan HVAC suite ($\ge 175\text{ sqm}$) with commercial LAN drops and power for 36 operational workstations. | 45 | DY | $ | $ |
| 36 | 2.4.12 | Health Service (HS) Office Space Rental: Dedicated HVAC suite ($\ge 60\text{ sqm}$) accommodating 5 HS crew with 4 isolated patient consultation areas. | 45 | DY | $ | $ |
| 37 | 2.4.13 | CGIS Support Office Space Rental: Dedicated secure HVAC suite ($\ge 60\text{ sqm}$) accommodating 3 agents with 1 isolated interview room. | 45 | DY | $ | $ |
| 38 | 2.4.14 | Office Furnishings: Complete furnishing for Command (9 exec desks/chairs, 18 guest chairs, 9 filing cabinets, conference table for 10), Support (36 desks/chairs), and HS (4 desks/chairs, 10 guest chairs, 4 cabinets). | 1 | LOT | $ | $ |
| SUBTOTAL | TASK FOUR | Support Facilities, MHE & Underwater Support | $ |
| Task Five: Utilities Distribution & Force Protection Barricades (CLIN 0039 – CLIN 0041) | ||||||
| CLIN | SOW Ref | Description / Specifications | Est. Qty | Unit | Proposed Unit Price (USD) | Extended Total Price (USD) |
| 39 | 2.5.1 | Potable Water Maintenance: Daily inspection, sanitization, halogen testing, and technical servicing of distribution piping, manifolds, backflow preventers, and food-grade hoses. | 45 | EA | $ | $ |
| 40 | 2.5.2 | Force Protection Barricade (Conex Box): Daily lease of four (4) ISO shipping containers positioned as anti-ram standoff buffers and vehicle chicanes (4 boxes $\times$ 45 days). | 180 | EA | $ | $ |
| 41 | 2.5.3 | Mob/Demob of Force Protection Barricades: Crane offloading, flatbed trucking, positioning by Site Readiness Date (Nov 20, 2026), and post-stay site clearance within 72 hours. | 4 | JB | $ | $ |
| SUBTOTAL | TASK FIVE | Utilities Distribution & Force Protection Barricades | $ |
File details come from the government source that posted it. Updated .