USCG SKW Janitorial Consolidated_Questions 11162026.pdf

PDF 2 MB Posted

Attached to
USCG Sector Key West Recurring Janitorial Services in Key West, FL
Solicitation number
70ZL26-27-SectorKWJanitorialServices
Issued by
Not on record

About this file

This document is a Questions and Answers (Q&A) file for a USCG Miami Contracting Office solicitation for janitorial services at Sector Key West. The requirement covers cleaning services for two buildings (Building 48 Command Building and Building 107 UPH Ground Floor) under a Firm-Fixed-Price contract structure. The solicitation is a 100% Small Business Set-Aside under NAICS 561720, with evaluation based on Lowest Price Technically Acceptable (LPTA) methodology considering technical acceptability, price (base year plus three option years), and past performance if applicable. The contract period runs from December 1, 2026 through November 30, 2027 for the base year with three optional years. An active SAM.gov registration is required by the November 20, 2026 solicitation close at 3:00 PM EST, and offerors must submit a Technical Volume/capability statement and Quality Control Plan with their proposals.

The scope includes cleaning of common areas, restrooms, showers, locker rooms, hallways, stairs, and gym/cardio facilities across both buildings. The contractor is responsible for supplying all cleaning equipment, materials, and supplies, with no Government-Furnished Equipment required. Work must be performed during 0730–1530 hours with flexibility to leave once daily tasks are completed; after-hours work is prohibited. Building 48 contains four restrooms (two male, two female) with multiple fixtures and shower areas, while the UPH has one male and one female restroom. Flooring consists of mopped tile, concrete with glossy finish, and gym rubber flooring. Standard FAR 52.228-5 insurance requirements apply: Workers' Compensation at statutory limits, General Liability minimum $500,000 per occurrence, and Automobile Liability $200,000 per person/$500,000 per occurrence. Service Contract Labor Standards Wage Determination WD 2015-4583 (Revision 34, dated 08/17/2026) governs, with health and welfare benefits priced at the Executive Order 13706 rate ($5.42/hr) due to paid sick leave requirements. FAR 52.219-14 limitations on subcontracting apply, requiring the prime contractor to perform at least 50% of contract costs with its own employees; similarly situated small business subcontractors count toward this requirement. The document includes extensive facility photographs showing hallways, restrooms, showers, gym areas, and common spaces across both buildings.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USCG MIAMI CONTRACTING OFFICE

Prospective Vendor Questions

SKW Janitorial Services — Sector Key West

Date: November 2026

Originating Office: USCG Miami Contracting Office

Requirement: Janitorial Services for Sector Key West (Building 48 and Building 107)

Contract Type: Firm-Fixed-Price (FFP)

USCG Sector Key West Janitorial Q&A | Working Draft

Table of Contents

I. Questions and Answers

Category 1: Facility Measurements, Flooring Types, and Scope of Areas

Q# Consolidated Vendor Question Government Response (To be completed by requiring unit)

1 What is the cleanable square footage for Building 48 (Command Building) and Building 107 (UPH Ground Floor), broken down by flooring type (e.g., carpeted, vinyl/linoleum, ceramic tile, gym/cardio)?

SQ Foot is unknown. Photos are provided. None of the areas are carpet based. All floors are able to be mopped.

There is a combination of gym rubber type flooring, tile and a concrete with a glossy finish throughout the various areas.

2 What are the specific restroom, shower, locker room, and toilet/urinal/sink fixture counts for each building?

BLDG 48 – 4 restrooms (2 male and 2 female).

Male bottom: 4 sinks, 1 mirror, 3 urinals, 3 toilets, 6 showers

Female Bottom: 4 sinks, 1 mirror, 3 showers, 3 toilets

Male Top – 2 Urinals, 3 sinks, 4 toilets, 1 mirror

Female Top – 2 toilets, 1 mirror

Top Floor BLDG 48 shower – 2 showers, 1 sink, 1 mirror

UPH – One female and one male restroom.

Male - 1 toilet, 1 urinal and 1 sink and 1 mirror.

Female – 1 toilet, 1 sink and 1 mirror

Q# Consolidated Vendor Question Government Response (To be completed by requiring unit)

3 What is the total number of windows, and what are the specific window-cleaning requirements (quantities, heights, frequencies, interior/exterior scope)?

NA

4 Are offices, workstations, conference rooms, or any other spaces in Building 48 included in the cleaning scope, or is cleaning strictly limited to the common areas listed in Section L.3.1?

Common spaces only

5 Are floor plans, building layout maps, or photos of the areas to be serviced available to the offerors?

Photos are available with no floor plans.

6 Are janitor closets equipped with water access and drainage available on all decks/floors for contractor use?

There is a janitorial closet in BLDG 48 on the bottom floor and one at the UPH. Drainage and water available.

Category 2: Equipment, Supplies, and Materials (GFE vs. CFE)

Q# Consolidated Vendor Question Government Response (To be completed by requiring unit)

7 Please clarify exactly which equipment, materials, and supplies are Government-Furnished (GFE) versus Contractor-Furnished (CFE). Specifically:

• Does the Government provide specialized floor-care machinery (floor buffers, burnishers, auto-scrubbers, carpet extractors) and associated chemicals/consumables for quarterly stripping/waxing and semi-annual carpet cleaning?

• Does the Government provide standard daily equipment (mops, brooms, vacuums, personal protective equipment)?

No machines or materials/supplies are required by the vendor. We supply all the required materials.

8 Who is responsible for the maintenance, repair, and replacement of cleaning equipment (especially if GFE is utilized)?

The UPH manager is in charge of replenishment however concerns can be passed on within supply and can be directed to the UPH manager.

9 What is the standard procedure and turnaround time for requesting the replenishment of Government-furnished supplies (e.g., toilet paper, hand soap, paper towels)?

We need to order according to DHS/USCG policy through mandatory sources. On average 1-2 weeks for supplies that are low/depleted. Ideally, we want the staff to inform us when

Q# Consolidated Vendor Question Government Response (To be completed by requiring unit) supplies are getting low that way we can mitigate the possibility of 0 inventory of an item.

10 Will dedicated, locked storage space be provided on-site for the contractor's equipment, cleaning carts, and logs?

The space is not locked there are closets in BLDG 48 and the UPH that house the materials.

Category 3: Work Hours, Scheduling, and Operations by requiring unit)

11 Does the 0730–1530 requirement establish an allowable performance window, or does it require continuous on-site staffing/minimum daily labor hours?

Arriving in the morning is preferred.

However, once the daily tasks are completed the contractor can leave.

12 Is after-hours work prohibited, or are periodic tasks (such as the Friday afternoon carpet steam cleaning) approved exceptions? If so, what are the access and security arrangements?

Yes, work will only be performed during the specified hours.

13 How are hurricane closures, federal holidays, base operational restrictions, and subsequent service rescheduling handled for performance and monthly invoicing?

This is per our discretion. However, typically we give the federal holidays off for the contractors.

Category 4: Staffing, Labor, and On-site Supervision by requiring unit)

14 Does the Government have an estimated or mandatory minimum daily staffing level, headcount, or total labor hours per week required for this contract?

N/A

15 Can the required on-site shift leader also perform regular janitorial duties while overseeing the work, or must they be dedicated exclusively to supervision?

Non-issue on our end we just require the work be completed.

Q# Consolidated Vendor Question Government Response (To be completed by requiring unit)

16 Section K.10.0 mentions a minimum ratio of 2 contractors per vehicle aboard Sector Key West. Does this prohibit a single janitor from driving onto the installation alone, or does it only limit the overall number of contractor vehicles on-site?

Please contact Boca Chica Pass and ID office if there are any issues. On our end this is not an issue.

17 Are the SOW's COVID-19 provisions (face coverings and six-foot social distancing) still active requirements?

No

Category 5: Subcontracting, Prime-Sub Arrangements, and Set-Asides by requiring unit)

18 Is a prime/subcontractor arrangement permitted for this requirement, and may a subcontractor perform most or all of the on-site cleaning services?

This is a 100% Small Business Set-Aside (NAICS 561720). Under FAR 52.219-14 (Limitations on Subcontracting), for a service contract (except construction), the prime contractor must perform at least 50 percent of the cost of contract performance with its own employees.

19 Does FAR 52.219-14 (Limitations on Subcontracting) apply to this solicitation? If so, does work performed by a similarly situated small-business subcontractor count toward the prime’s performance?

Any work performed by a subcontractor that is also a small business under the same NAICS code (561720) and meets the same size standard counts toward the prime contractor's 50% performance requirement.

If the subcontractor is not a small business (or is not similarly situated), then the prime contractor (along with any other similarly situated subcontractors) must perform at least 50% of the work themselves, and the non-similarly situated subcontractor is limited to performing a maximum of 50% of the work.

Q# Consolidated Vendor Question Government Response (To be completed by requiring unit)

20 Must the prime contractor provide its own on-site supervisor, or may the subcontractor supply this personnel under the prime’s oversight?

The subcontractor may provide on-site supervisory personnel, provided that the prime contractor maintains ultimate oversight, contractual responsibility, and satisfies the Limitations on Subcontracting (if applicable).

Category 6: Procurement Timeline, Evaluation, and Submission Requirements by requiring unit)

21 Is this selection strictly Lowest Price Technically Acceptable (LPTA) with no scored tradeoff factors, and is this a Firm-Fixed-Price contract?

Evaluation Method: Yes, this is a Lowest Price Technically Acceptable (LPTA) style selection. Page 3 lists the evaluation factors as:

1. Technical Acceptability (meeting/exceeding SOW)

2. Price (Base + 3 Options)

3. Past Performance (if applicable) There are no scored tradeoff factors.

Contract Type: This is strictly a Firm- Fixed-Price (FFP) Services contract.

22 Are past performance references mandatory, and can a newer firm receive a neutral rating if they have no prior federal contracts?

Past performance is requested ("3 recent relevant contracts") but is qualified as "if applicable"

Yes, in accordance with FAR 15.305(a)(2)(iv), a newer firm with no prior federal contracts or past performance history cannot be evaluated favorably or unfavorably and must receive a neutral rating.

23 Can an offeror submit past performance references from their proposed subcontractor to satisfy the three required references?

Yes, offerors may submit past performance references from their proposed subcontractor to establish technical experience, particularly for

Q# Consolidated Vendor Question Government Response (To be completed by requiring unit) the portions of the SOW the subcontractor is slated to perform.

24 Is a Technical Volume required with the quote (and is there a page limit/format), or must offerors only submit the SF-1449, pricing, and the Quality Control Plan?

Offerors are required to submit a Technical approach or capability statement.

The solicitation does not specify a page limit or strict formatting rules for this technical submission, but it should be concise and clearly demonstrate the capability to meet all SOW requirements.

25 Is the Quality Control Plan (QCP) required with the initial quote submission, or only after the contract is awarded?

The Statement of work states Contractor shall submit with the proposal a Quality Control Plan (QCP)delineating the contractor’s quality control program to monitor and control their performance of services so that they meet the requirements of the

PWS.

26 Is an active SAM.gov registration required at the time of quote submission, or only prior to award?

An ACTIVE System for Award Management (SAM.gov) registration is strictly required prior to the close of this solicitation on November 20, 2026, at 3:00 PM EST (Page 2), and not just prior to award.

27 Is any bid guarantee/bond (e.g., “Individual Surety — Pledge of Assets”) or specific insurance limits (General Liability, Workers' Comp, Auto) required for this solicitation?

Bid Bond/Guarantee: No bid guarantee or surety bond is required for this simplified service acquisition.

Insurance Limits: Standard FAR 52.228- 5 insurance limits for service contracts on government installations apply:

Workers' Compensation: Statutory limits.

General Liability: Minimum of $500,000 per occurrence for bodily injury.

by requiring unit)

Automobile Liability: $200,000 per person / $500,000 per occurrence for bodily injury; $20,000 for property damage.

Category 7: Site Visit and Existing Conditions by requiring unit)

28 Are the site visits scheduled for November 10 and November 12 mandatory for a quote to be considered eligible?

No.

29 What are the RSVP requirements, check-in gate locations, required ID, vehicle screening, and advance clearance deadlines for the site visit?

Contractors must coordinate with Boca Chica pass and ID office prior to arrival.

30 May a subcontractor representative attend the site visit in place of, or in addition to, the prime contractor's representative?

Yes, as long as they can be vetted through the pass and id office. No other site visits will be provided.

31 Are there any existing conditions that require initial heavy restorative cleaning or floor restoration beyond routine maintenance?

No

Category 8: Contract History, Pricing, Wages, and Funding by requiring unit)

32 Can the Government provide the incumbent contractor's name, contract number, current annual/monthly contract price, and historical staffing hours?

70Z02825PMIAM0105, Riomar Group

LLC.

33 Are there any significant scope or material changes between the previous janitorial contract and this new solicitation?

No.

Q# Consolidated Vendor Question Government Response (To be completed by requiring unit)

34 Which Service Contract Labor Standards (SCLS) Wage Determination governs this solicitation (the one dated August 12, 2026, or August 17, 2026)?

The Service Contract Labor Standards (SCLS) Wage Determination that governs this solicitation is WD 2015- 4583, Revision 34, dated 08/17/2026.

35 Should offerors price health and welfare benefits at the standard SCLS rate ($5.92/hr) or the Executive Order 13706 rate ($5.42/hr)? Does EO 13706 (Paid Sick Leave) apply?

Yes, Executive Order 13706 (Paid Sick Leave) standardly applies to federal service contracts subject to SCLS.

Under WD 2015-4583, Rev. 34, offerors must price health and welfare benefits at the EO 13706 rate ($5.42/hr) because the contractor is required to provide paid sick leave. The higher standard rate ($5.92/hr) only applies if EO 13706 is determined not to apply.

36 Will FAR 52.222-43 (Fair Labor Standards Act and Service Contract Labor Standards—Price Adjustment) be incorporated to adjust for option-year wages and fringe benefits?

yes. FAR 52.212-5 is incorporated by reference (Page 3). For SCLS-applicable service contracts containing options, FAR 52.222-43 (Fair Labor Standards Act and Service Contract Labor Standards—Price Adjustment) is standardly selected within FAR 52.212- 5 to adjust for option-year SCLS wage and fringe benefit increases.

37 Please confirm the base-year and option-year funding status under FAR 52.232-18 and 52.232-19, and provide the “funds available” date that was left blank in FAR 52.232-19.

Base-year funding is subject to FAR 52.232-18 (Availability of Funds).

FAR 52.232-18 governs, meaning the Government's obligation is contingent upon the availability of appropriated funds

38 Given that the solicitation requests four option periods, can you confirm if the SOW's limitation to only December 2026 – November 2027 was a typographical error and that option years indeed apply?

The solicitation is for one base year of 12/01/2026-11/30/2027 and 3 optional years.

39 What is the estimated processing timeline for issuing commercial access credentials/badges, and is the December 1 start date adjustable if badging delays occur through no fault of the contractor?

Once awarded contract, Please coordinate with Boca Chica Pass and ID office and work with the unit point of contacts at unit to obtain access.

PICTURES:

In total there are two bottom floor heads which include showers in BLDG 48 (Command Building). In addition, there are two heads on the second floor of BLDG 48 with a separate shower area.

The two other heads are at the UPH bottom floor. In addition, the gym and cardio room are cleaned as well.

Building 48 – Hallway right of supply

2 female heads in BLDG 48 (top and bottom) 2 male heads BLDG 48 (top and bottom) 1 male and 1 female head at the UPH 1 shower area on the second floor of BLDG 48

Building 48 – Opposite side next to supply

Building 48 – Hallway leading away from Supply

Building 48 – Main entry area

Building 48 – Forward of main entry

Building 48 – Hallway to the Gym

Building 48 – Hallway to the right of the gym

Building 48 – Stairs leading to second floor

Building 48 – Second set of stairs leading to second floor

Building 48 - Main entry area on the second floor

Building 48 – 2nd floor hallway on the right

Building 48 – 2nd floor hallway on the left

Building 48 – Male head second floor

Building 48 – Male head second floor

Building 48 – 2nd floor shower

Building 48 – First floor – Cardio Room (Gym)

Building 48 – First Floor - Gym

UPH – First Floor – lobby

UPH – First Floor lobby facing heads (restrooms)

UPH – First Floor male head

UPH – First Floor Male head

UPH – Foyer area first floor (both sides x2)

Building 48 – Male head first floor

Table of Contents
I. Questions and Answers
Category 1: Facility Measurements, Flooring Types, and Scope of Areas
Category 2: Equipment, Supplies, and Materials (GFE vs. CFE)
Category 3: Work Hours, Scheduling, and Operations
Category 4: Staffing, Labor, and On-site Supervision
Category 5: Subcontracting, Prime-Sub Arrangements, and Set-Asides
Category 6: Procurement Timeline, Evaluation, and Submission Requirements
Category 7: Site Visit and Existing Conditions
Category 8: Contract History, Pricing, Wages, and Funding

File details come from the government source that posted it. Updated .