This is a technical specification document for glazing materials and installation requirements for the Major Maintenance & Repair project at USCG Sector Field Office in Southwest Harbor, Maine (Project No. 2728557).

The specification establishes comprehensive requirements for fabricating and installing watertight and airtight glazing systems that must withstand thermal movement and wind loading without glass breakage, gasket failure, or deterioration. Glass products must comply with ANSI Z97.1 safety standards and ASTM E1300 wind/snow loading requirements. Required glass types include clear tempered glass (1/4 inch thick for interior applications), annealed glass (Type I, Class 1, 90% light transmittance), and fully tempered glass per ASTM C1048. Insulating glass units must feature three panes separated by dehydrated airspaces filled with argon gas, with maximum U-factor of 0.27 Btu per square foot per hour per degree F and Solar Heat Gain Coefficient (SHGC) maximum of 0.41. The outer glazing must be laminated DP35 large-missile hurricane-rated glass with 0.100-inch PVB interlayer. Setting and sealing materials must include elastomeric sealants per ASTM C920 (Type S, Grade NS, white color), structural sealants per ASTM C1184, preformed glazing tapes, closed-cell neoprene setting blocks conforming to ASTM C509, and glazing gaskets of extruded virgin neoprene. All materials must be delivered in unopened, labeled containers and stored in dry locations. Glazing work requires outdoor temperatures above 40 degrees F with rising conditions and prohibition during damp or rainy weather. A 10-year warranty is required for insulating glass units against hermetic seal failure, with replacement within 45 working days of notice. Submittals requiring government approval include product data, samples, manufacturer's instructions, and closeout warranties.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2728557 Revised 2/10/2026 Major M&R, SFO Southwest Harbor

SECTION 08 81 00 Page 1

PART 1 GENERAL

1.1 REFERENCES

SECTION 08 81 00

GLAZING

05/19

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN ARCHITECTURAL MANUFACTURERS ASSOCIATION (AAMA)

AAMA 800 (2016) Voluntary Specifications and Test Methods for Sealants

AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)

ANSI Z97.1 (2015) Safety Glazing Materials Used in Buildings - Safety Performance Specifications and Methods of Test

ASTM INTERNATIONAL (ASTM)

ASTM C509(2006; R 2021) Standard Specification for Elastomeric Cellular Preformed Gasket and Sealing Material
ASTM C864(2005; R 2015) Dense Elastomeric Compression Seal Gaskets, Setting Blocks, and Spacers
ASTM C920(2018) Standard Specification for Elastomeric Joint Sealants
ASTM C1021(2008; R 2014) Standard Practice for Laboratories Engaged in Testing of Building Sealants
ASTM C1036(2021) Standard Specification for Flat Glass
ASTM C1048(2018) Standard Specification for

Heat-Strengthened and Fully Tempered Flat Glass ASTM C1087 (2016) Standard Test Method for Determining Compatibility of Liquid-Applied Sealants with Accessories Used in Structural Glazing Systems

ASTM C1184(2023) Standard Specification for Structural Silicone Sealants
ASTM C1281(2016) Standard Specification for Preformed Tape Sealants for Glazing

Applications

ASTM D395(2016; E 2017) Standard Test Methods for Rubber Property - Compression Set
ASTM D2287(2019) Nonrigid Vinyl Chloride Polymer and Copolymer Molding and Extrusion Compounds
ASTM E1300(2024) Standard Practice for Determining Load Resistance of Glass in Buildings
ASTM E2190(2010) Standard Specification for Insulating Glass Unit Performance and Evaluation

GLASS ASSOCIATION OF NORTH AMERICA (GANA)

GANA Glazing Manual(2008) Glazing Manual
GANA Sealant Manual(2008) Sealant Manual
GANA Standards Manual(2008) Engineering Standards Manual INSULATING GLASS MANUFACTURERS ALLIANCE (IGMA)
IGMA TB-1200(1983; R 2016) Guidelines for Insulating Glass Dimensional Tolerances
IGMA TB-3001(2001) Guidelines for Sloped Glazing
IGMA TM-3000(1990; R 2016) North American Glazing Guidelines for Sealed Insulating Glass Units for Commercial & Residential Use

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

16 CFR 1201 Safety Standard for Architectural Glazing Materials

1.2 SUBMITTALS

Government approval is required for submittals with a "G" or "S" classification. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-03 Product Data Insulating Glass Plastic Glazing Glazing Accessories Sealants SD-04 Samples Insulating Glass

Plastic Sheet Glazing Compound Glazing Tape Sealing Tapes SD-07 Certificates Insulating GlassSD-08 Manufacturer's Instructions Setting and Sealing Materials Glass Setting SD-11 Closeout Submittals Warranty for Insulated Glass Units

1.3 SYSTEM DESCRIPTION

Fabricate and install watertight and airtight glazing systems to withstand thermal movement and wind loading without glass breakage, gasket failure, deterioration of glazing accessories, or defects in the work. Glazed panels must comply with the safety standards, in accordance with ANSI Z97.1, and comply with indicated wind/snow loading in accordance with ASTM E1300.

1.4 QUALITY CONTROL

Submit two 8 by 10 inch samples of each of the following: tinted glass, patterned glass, heat-absorbing glass,and insulating glass units.
Submit three samples of each other material.Samples of plastic sheets must be minimum 5 by 7 inches.

1.5 DELIVERY, STORAGE, AND HANDLING

Deliver products to the site in unopened containers, labeled plainly with manufacturers' names and brands. Store glass and setting materials in safe, enclosed dry locations and do not unpack until needed for installation. Handle and install materials in a manner that will protect them from damage.

1.6 ENVIRONMENTAL REQUIREMENTS

Do not start glazing work until the outdoor temperature is above 40 degrees F and rising, unless procedures recommended by the glass manufacturer and approved by the Contracting Officer are made to warm the glass and rabbet surfaces. Provide ventilation to prevent condensation of moisture on glazing work during installation. Do not perform glazing work during damp or rainy weather.

1.7 WARRANTY

1.7.1 Warranty for Insulated Glass Units

Warranty insulating glass units against development of material obstruction to vision (such as dust, fogging, or film formation on the inner glass surfaces) caused by failure of the hermetic seal, other than

through glass breakage, for a 10-year period following acceptance of the work.Provide new units for any units failing to comply with terms of this warranty within 45 working days after receipt of notice from the Government.
[][]PART 2PRODUCTS

2.1 GLASS

ASTM C1036, unless specified otherwise. In doors and sidelights, provide safety glazing material conforming to 16 CFR 1201.

2.1.1 Clear Glass

For interior glazing (i.e., pass and observation windows), 1/4 inch thick tempered glass should be used. Type I, Class 1 (clear), Quality q4 (A) .

Provide for glazing openings not indicated or specified otherwise. Use double-strength sheet glass or 1/8 inch float glass for openings up to and including 15 square feet, 3/16 inch for glazing openings over 15 square feet but not over 30 square feet, and 1/4 inch for glazing openings over 30 square feet but not over 45 square feet.

2.1.2 Annealed Glass

Annealed glass must be Type I transparent flat type, Class 1 - clear, Quality q3 - glazing select, 90% percent light transmittance, 1.0 percent shading coefficient, conforming to ASTM C1036.

[]2.1.3Tempered Glass
ASTM C1048, Kind FT (fully tempered), Condition A (uncoated), Type I, Class 1 (transparent), Quality q3, 3/16" inch thick, 90% percent light transmittance, 1.0 percent shading coefficient conforming to ASTM C1048 and GANA Standards Manual.Color must be clear.Provide wherever safety glazing material is indicated or specified.

2.2 INSULATING GLASS UNITS

Three panes of glass separated by dehydrated airspaces, filled with argon gas and hermetically sealed, conforming to ASTM E2190. Submit performance and compliance documentation for each type of insulating glass.

Insulated glass units must have a Solar Heat Gain Coefficient (SHGC) maximum of 0.41 determined according to NFRC 200 and a U-factor maximum of 0.27 Btu per square foot by hr by degree F in accordance with NFRC 100. See section 08 51 13 for energy performance requirements for glazed systems (glazing and frames).

Dimensional tolerances must be as specified in IGMA TB-1200. Spacer must be black, roll-formed, polyurethane and silicon foams, with bent or tightly welded or keyed and sealed joints to completely seal the spacer periphery and eliminate moisture and hydrocarbon vapor transmission into airspace through the corners. Primary seal must be compressed polyisobutylene and the secondary seal must be a specially formulated silicone.

The outer glazing must be ASTM C1036, Type I, Class 1 transparent, heat-strengthened flat glass Quality q4, 1/4 inch thick outer light laminated with 0.100” PVB interlayer and 1/4" thick heat-strengthened inner light.

Glazing is to be DP35, large-missile hurricane-rated gazing.

2.2.1 Low Emissivity Coatings

Interior and exterior glass panes for Low-E insulating units must be Type I annealed flat glass, Class 1-clear with anti-reflective low-emissivity coating or heat-strengthened or fully tempered glass complying with ASTM C1048, Condition C on No. 3 surface (inside surface of interior pane), Quality q3 - glazing select, conforming to ASTM C1036. Glass performance must be U value maximum of 0.27] Btu/hr-ft2-F, Solar Heat Gain Coefficient (SHGC) maximum of 0.41. Color must be green.

2.3 SETTING AND SEALING MATERIALS

Provide as specified in the GANA Glazing Manual, IGMA TM-3000, IGMA TB-3001, and manufacturer's recommendations, unless specified otherwise herein. Do not use metal sash putty, nonskinning compounds, nonresilient preformed sealers, or impregnated preformed gaskets. Materials exposed to view and unpainted must be gray or neutral color. Sealant testing must be performed by a testing agency qualified according to ASTM C1021.

Submit glass manufacturer's recommendations for setting and sealing materials and for installation of each type of glazing material specified.

2.3.1 Glazing Compound

Use for face glazing metal sash. Do not use with insulating glass units or laminated glass.

2.3.2 Sealants

Provide elastomeric sealants.

2.3.2.1 Elastomeric Sealant

ASTM C920, Type S, Grade NS, Class 12.5, Use G. Use for channel or stop glazing metal sash. Sealants must be chemically compatible with setting blocks, edge blocks, and sealing tapes, with sealants used in manufacture of insulating glass units . Color of sealant must be white.

2.3.2.2 Structural Sealant ASTM C1184, Type S.

2.3.3 Glazing Tapes

2.3.3.1 Back-Bedding Mastic Glazing Tapes

Preformed, butyl-based, 100 percent solids elastomeric tape; nonstaining and nonmigrating in contact with nonporous surfaces; with or without spacer rod as recommended in writing by tape and glass manufacturers for application indicated; and complying with ASTM C1281 and AAMA 800 for products indicated below:

a. AAMA 804.3 tape, where indicated.

b. AAMA 806.3 tape, for glazing applications in which tape is subject to continuous pressure.

c. AAMA 807.3 tape, for glazing applications in which tape is not subject to continuous pressure.

2.3.3.2 Expanded Cellular Glazing Tapes

Closed-cell, PVC foam tapes; factory coated with adhesive on both surfaces; and complying with AAMA 800 for the following types:

a. AAMA 810.1, Type 1, for glazing applications in which tape acts as the primary sealant.

b. AAMA 810.1, Type 2, for glazing applications in which tape is used in combination with a full bead of liquid sealant.

2.3.4 Sealing Tapes

Preformed, semisolid, PVC-based material of proper size and compressibility for the particular condition, complying with ASTM D2287. Use only where glazing rabbet is designed for tape and tape is recommended by the glass or sealant manufacturer. Provide spacer shims for use with compressible tapes. Tapes must be chemically compatible with the product being set.

2.3.5 Setting Blocks and Edge Blocks

Closed-cell neoprene setting blocks must be dense extruded type conforming to ASTM C509 and ASTM D395, Method B, Shore A durometer between 70 and

90. Edge blocking must be Shore A durometer of 50 (plus or minus 5). Provide silicone setting blocks when blocks are in contact with silicone sealant. Profiles, lengths and locations must be as required and recommended in writing by glass manufacturer. Block color must be black.

2.3.6 Glazing Gaskets

Glazing gaskets must be extruded with continuous integral locking projection designed to engage into metal glass holding members to provide a watertight seal during dynamic loading, building movements and thermal movements. Glazing gaskets for a single glazed opening must be continuous one-piece units with factory-fabricated injection-molded corners free of flashing and burrs. Glazing gaskets must be in lengths or units recommended by manufacturer to ensure against pull-back at corners.

Provide glazing gasket profiles as recommended by the manufacturer for the intended application.

2.3.6.1 Fixed Glazing Gaskets

Fixed glazing gaskets must be closed-cell (sponge) smooth extruded compression gaskets of cured elastomeric virgin neoprene compounds conforming to ASTM C509, Type 2, Option 1.

2.3.6.2 Wedge Glazing Gaskets

Wedge glazing gaskets must be high-quality extrusions of cured elastomeric virgin neoprene compounds, ozone resistant, conforming to ASTM C864, Option 1, Shore A durometer between 65 and 75.

2.3.6.3 Aluminum Framing Glazing Gaskets

Glazing gaskets for aluminum framing must be permanent, elastic, non-shrinking, non-migrating, watertight and weathertight.

2.3.7 Accessories

Provide as required for a complete installation, including glazing points, clips, shims, angles, beads, and spacer strips.Provide noncorroding metal accessories.Provide primer-sealers and cleaners as recommended by the glass and sealant manufacturers.Use ASTM C1087 to determine whether priming and other specific joint preparation techniques are required to obtain rapid, optimum adhesion of glazing sealants to surface.
[]PART 3EXECUTION

Any materials that show visual evidence of biological growth due to the presence of moisture must not be installed on the building project.

3.1 PREPARATION

Preparation, unless otherwise specified or approved, must conform to applicable recommendations in the GANA Glazing Manual, GANA Sealant Manual, IGMA TB-3001, IGMA TM-3000, and manufacturer's recommendations. Determine the sizes to provide the required edge clearances by measuring the actual opening to receive the glass. Grind smooth in the shop glass edges that will be exposed in finish work. Leave labels in place until the installation is approved, except remove applied labels on heat-absorbing glass and on insulating glass units as soon as glass is installed.

Securely fix movable items or keep in a closed and locked position until glazing compound has thoroughly set.

3.2 GLASS SETTING

Shop glaze or field glaze items to be glazed using glass of the quality and thickness specified or indicated.Glazing, unless otherwise specified or approved, must conform to applicable recommendations in the
GANA Glazing Manual, GANA Sealant Manual, IGMA TB-3001, IGMA TM-3000, and manufacturer's recommendations.Aluminum windows, wood doors, and wood windows may be glazed in conformance with one of the glazing methods described in the standards under which they are produced, except that face puttying with no bedding will not be permitted.Handle and install glazing materials in accordance with manufacturer's instructions.Use beads or stops which are furnished with items to be glazed to secure the glass in place.Verify products are properly installed, connected, and adjusted.

3.2.1 Sheet Glass

Cut and set with the visible lines or waves horizontal.

3.2.2 Insulating Glass Units

Do not grind, nip, or cut edges or corners of units after the units have left the factory. Springing, forcing, or twisting of units during setting will not be permitted. Handle units so as not to strike frames or other objects. Installation must conform to applicable recommendations of IGMA TB-3001 and IGMA TM-3000.

3.3 CLEANING

Clean glass surfaces and remove labels, paint spots, putty, and other defacement as required to prevent staining. Glass must be clean at the time the work is accepted.

3.4 PROTECTION

Protect glass work immediately after installation. Identify glazed openings with suitable warning tapes, cloth or paper flags, attached with non-staining adhesives. Protect reflective glass with a protective material to eliminate any contamination of the reflective coating. Place protective material far enough away from the coated glass to allow air to circulate to reduce heat buildup and moisture accumulation on the glass. Upon removal, separate protective materials for reuse or recycling.

Remove and replace glass units which are broken, chipped, cracked, abraded, or otherwise damaged during construction activities with new units.

3.5 SCHEDULE

Some metric measurements in this section are based on mathematical conversion of inch-pound measurements, and not on metric measurement commonly agreed to by the manufacturers or other parties. The inch-pound and metric measurements are as follows:

PRODUCTS
INCH-POUND
METRIC
Glass
1/8 inch
3 mm
3/16 inch
4.5 mm
7/32 inch
6 mm
1/4 inch
6 mm
3/8 inch
10 mm
Interlayer
0.015 inch
0.38 mm
Glazing Channels
1/4 inch
6 mm

-- End of Section --