This is Amendment 0003 to solicitation 70Z0G126BSNNEDW01, issued on February 11, 2026, by the U.S. Coast Guard Contracting Officer at CEU Providence in Warwick, Rhode Island. The amendment is not extending the offer receipt deadline and must be acknowledged by offerors prior to submission.

The amendment provides responses to six contractor questions regarding specification requirements. Response 16 clarifies window specifications by directing contractors to specification sections 08.51.13 (Aluminum Windows) and revised 08.81.00 (Glazing), with the revised glazing specification included as a separate attachment. Response 27 instructs that inconsistencies in fire alarm system bid documents should be addressed through an RFI, with the most stringent requirements applying where discrepancies exist between drawings, specifications, and applicable codes. Response 45 confirms that staking data points will not be required given the limited site work scope. Response 63 clarifies that hurricane resistance is not required for windows, directing contractors to referenced specification sections for 08.51.13 (Aluminum Windows) and 08.81.00 (Glazing). Response 68 confirms the second-floor structure consists of steel joists. The amendment indicates that the revised specification section 08.81.00 is attached and applicable to the contract requirements.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

1 2

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

02/11/2026

4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

6. ISSUED BY CODE CODE

Contracting Officer CEU Providence 475 Kilvert Street, Suite 100 Warwick, RI 02886

7. ADMINISTERED BY (If other than Item 6)

Christopher L. Hunsberger Contract Specialist 206-815-1827

8. NAME AND ADDRESS OF CONTRACTOR (NO., STREET, COUNTY, STATE AND ZIP CODE)

THIS AMENDMENT MUST BE

ACKNOWLEDGED WITH YOUR OFFER

9A. AMENDMENT OF SOLICITATION NO.

70Z0G126BSNNEDW01

9B. DATED (SEE ITEM 11)

01/9/2026

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE REFERENCED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (SPECIFY TYPE OF MODIFICATION AND AUTHORITY)

E. IMPORTANT: Contractor is not, is required to sign this document and return ____ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The solicitation referenced in block 9A above is hereby amended as follows:

01 - Response to questions

Question 16: IAW Spec 08.51.13 Northern Climate Windows installed within Climate Zone 6 will have a U-Factor of 0.27 BTU/h.ft2.degrees F or less and a SHGC of 0.41 or less. Our company has solicited several large architectural grade window manufacturers for aluminum windows. They are unable to meet the U-Factor of 0.27 with an operable double-hung system and the hurricane resistance requirement. Would USCG please provide any further clarification if window specs cannot be met completely? Will there be any consideration of variances?

15A. NAME AND TITLE OF SIGNER (Type or Print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Sean E. Waldron, Contracting Officer

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B UNITED STATES OF AMERICA

BY

(Signature of Contracting Officer)

16C. DATE SIGNED

NSN 7540-01-152-8070 STANDARD FORM 30 (Rev. 10-83) PREVIOUS EDITION UNUSABLE Prescribed by GSA

X

Amendment 0003 February 11, 2026

Response 16: See specification sections 08 51 13 and and revised 08 81 00.

Question 27: The fire alarm system bid documents provided do not appear to have been produced by a licensed fire protection engineer; they are very inconsistent and contain numerous conflicts, and they are not signed by an FPE. Please confirm that the QFPE required by Sections 21 13 16 and 28 31 70 should, in addition to the construction-phase requirements in these sections, include time to complete the analysis and design phase.

Response 27: If there are inconsistencies or conflicts suspected in the bid documents, issue an RFI. Where discrepancies arise between the contract drawings, contract specifications and applicable codes and standards, the most stringent requirements shall apply to the contract.

Question 45: Please provide staking data points for the project.

Response 45: Given the scope of work for the project and limited site work, staking data points will not be required to be provided for the project.

Question 63: The drawings reference the windows as being Hurricane Resistant; does this project truly require hurricane resistant windows/glass? If so, please designate large or small missile impact and revise the spec to reflect hurricane product. The specified window model is not a hurricane product nor is the glazing spec for a hurricane resistant product.

Response 63: Hurricane resistance is not required for the windows - reference the requirements in the specification sections for 085113 - Aluminum Windows and revised 088100 - Glazing.

Question 68: Can you confirm the second-floor structure to be steel joists and a wood subfloor?

Response 68: Steel joists.

02 - Per Response 16, Revise spec section 08 81 00 is included with this amendment as a separate attachment, and is applicable for this requirement.

12b. AMENDMENT 0001 70Z0G125RCCOD0114.pdf
12b. Amendment 0001 Page 2
Blank Page
Blank Page
Blank Page
Blank Page
Blank Page
Blank Page
Blank Page
Blank Page

File details come from the government source that posted it. Updated .