12.a. P3173693 Drawings.pdf
PDF 31 MB Posted
- Attached to
- STA Eatons Neck Major Maintenance and Repair
- Solicitation number
- 70Z0G126BSLISSW01
About this file
This is a set of design and construction drawings for a Major Maintenance and Repair (M&R) project at the U.S. Coast Guard Station Eatons Neck in Northport, New York. The project involves comprehensive renovation of the Multi-Mission Building (MMB), a four-story mixed-use facility serving as office, residential, and storage space for the Coast Guard. The scope of work encompasses hazardous materials abatement (asbestos, lead-based paint, and universal waste), complete renovation of building systems and finishes, exterior improvements, and infrastructure upgrades.
The drawings detail specific renovation tasks including removal and replacement of exterior wooden siding, doors, and windows; demolition and installation of new HVAC systems including dedicated outside air systems (DOAS) and variable refrigerant flow (VRF) condensing units; replacement of hydronic heating systems; installation of complete fire protection systems with sprinklers and updated fire alarm systems with smoke and carbon monoxide detection; foundation and roof repairs; replacement of all interior finishes, flooring, and bathroom fixtures; upgrade to LED lighting with dark sky compliance; and replacement of telecommunications infrastructure. Additional work extends to the Boat Maintenance Facility (BMF), Galley, and Unoccupied Personnel Housing (UPH) buildings for fire protection connections and system installations. The project includes site utility work, erosion and sedimentation control measures, contractor access planning, and coordination with ongoing Coast Guard operations. The drawings are issued for construction as of July 15, 2025, with the consulting A/E firm being Colby Company Engineering & Design based in Portland, Maine, and USCG Civil Engineering Unit Providence providing oversight.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DE
SI
GN
ED
B Y:
DE
SC
RI
PT
IO
N
M
AR
K
ED
IT
ED
B Y:
DA
TE
CH
EC
KE
D
BY
DR
AW
N
BY
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
TECHNICAL DIRECTOR
BRANCH CHIEF
APPROVING OFFICIAL DATE
SH
EE
T
OF
US
CG
P
RO
JE
CT
N
UM
BE
R
US
CG
F
IL
EN
AM
E
A/ E
CO
M
PA
NY
CO
NS
UL
TI
NG
A
/E
US
CG
P
RO
JE
CT
M
AN
AG
ER
A/
E
PR
OJ
EC
T
NO
SHEET ID
M
EA
SU
RE
M
EN
T
BA
R:
1"
HA
LF
S
IZ
E
1/ 2"
US
CG
D
RA
W
IN
G
SE
RI
ES
N
UM
BE
R
VICINITY MAP
SCALE: NTS
LOCATION MAP
SCALE: NTS
USCG PROJECT NUMBER: 3173693
MAJOR M&R MMB (FY24 CPOP)
CG STATION EATONS NECK, NORTHPORT, NY
47A York St Portland, ME
04101 207.553.7753
NORTH
STATION EATON'S NECK
BLOCK
ISLAND
LONG ISLAND
LONG ISLAND SOUND
PROVIDENCE
R.I.CONN.
MASS.
HU
DS
ON
R
IV
ER
HARTFORD
N.Y.
N.J.
PA.
NORTH
SCOPE OF WORK
HSG LANDSCAPING
EQUIP SHED
BOAT MAINT
FACILITY
TE
NN
IS
C
OU
RT
IJA SHED
(BM/DC/MK
STORAGE)
UPH BLDG
PARKING
SUBSISTENCE BLDG
ASPHALT DRIVEWAY
ASPHALT DRIVEW
AY
PARKING & DRIVEWAY
MULTIMISSION
BUILDING
M
AJ
OR
M
&R M
M B
(F Y2
CP
OP
CG
S
TA
TI
ON
E
AT
ON
S
NE
CK
NO
RT
HP
OR
T
NY
GE
NE
RA
L
CO
VE
R
SH
EE
T
MULTIMISSION
BUILIDING
G-001
P3
P3
G-
1.
dw g
US
CG
C
EU
P
RO
VI
DE
NC
E
KI
LV
ER
T
ST
RE
ET
, S
UI
TE
W
AR
W
IC
K, R
I 0
Ke rri e Gr ee n
TJ
G
TJ
G
TJ
G
BC
T
M.P. Carosotto P.E. 07/15/25
M.P. Carosotto P.E.
D.C. Dill P.E.
CO
LB
Y
CO
M
PA
NY
E
NG
IN
EE
RI
NG
D
ES
IG
N
PO
RT
LA
ND
, M
AI
NE
7-
3-
1.
5.
CO
NS
UL
TI
NG
C
OM
PA
NY
N
AM
E
CO
NS
UL
TA
NT
'S
C
IT
Y, S
TA
TE
IS
SU
ED
F
OR
C
ON
ST
RU
CT
IO
N
/1 5/
U.S. COAST GUARD
CIVIL ENGINEERING
LIST OF DRAWINGS
SHEET DRAWING TITLE SHEET NO.
G-001 COVER SHEET 001
G-101 CONTRACTOR SITE LAYDOWN AND
ACCESS PLAN 002
H-001 LEGEND, ABBREVIATIONS & NOTES 003
H-101 HAZMAT FLOOR PLANS 004
LS001 LIFE SAFETY CODE SUMMARY 005
LS002 LIFE SAFETY OCCUPANCY USE PLAN 006
LS101 BASEMENT LIFE SAFETY PLAN 007
LS102 FIRST FLOOR LIFE SAFETY PLAN 008
LS103 SECOND FLOOR LIFE SAFETY PLAN 009
LS104 THIRD FLOOR LIFE SAFETY PLAN 010
C-001 LEGEND, ABBREVIATIONS & NOTES 011
CJ101 EXISTING CONDITIONS AND SITE LAYOUT
PLAN 012
CD101 DEMOLITION PLAN 013
C-101 SITE LAYOUT AND UTILITY PLAN 014
C-102 EROSION AND SEDIMENTATION
CONTROL PLAN 015
C-501 EROSION AND SEDIMENTATION
CONTROL NOTES 016
C-502 EROSION AND CONSTRUCTION DETAILS 017
C-503 CONSTRUCTION DETAILS 018
S-001 ABBREVIATIONS & NOTES 019
SD101 FOUNDATION & SLAB DEMOLITION PLAN 020
SD102 FIRST FLOOR DEMOLITION PLAN 021
SD103 SECOND FLOOR DEMOLITION PLAN 022
SD104 THIRD FLOOR DEMOLITION PLAN 023
S-101 FOUNDATION AND SLAB PLANS 024
S-102 FIRST FLOOR PLAN 025
S-103 PORCH AND SECOND FLOOR PLAN 026
S-104 THIRD FLOOR PLAN 027
S-501 SECTIONS AND DETAILS 028
S-502 SECTIONS AND DETAILS 029
S-503 SECTIONS AND DETAILS 030
A-001 LEGEND, ABBREVIATIONS & NOTES 031
AD101 BASEMENT DEMO FLOOR PLAN 032
AD102 FIRST FLOOR DEMOLITION PLAN 033
AD103 SECOND FLOOR DEMOLITION PLAN 034
AD104 THIRD FLOOR DEMOLITION PLAN 035
AD105 BASEMENT DEMOLITION RCP 036
AD106 FIRST FLOOR DEMOLITION RCP 037
AD107 SECOND FLOOR DEMOLITION RCP 038
AD108 THIRD FLOOR DEMOLITION RCP 039
AD201 EXTERIOR ELEVATIONS-DEMOLITION 040
AD202 EXTERIOR ELEVATIONS-DEMOLITION 041
A-101 BASEMENT FLOOR PLAN 042
A-102 FIRST FLOOR PLAN 043
A-103 SECOND FLOOR PLAN 044
A-104 THIRD FLOOR PLAN 045
A-105 BASEMENT RCP 046
A-106 FIRST FLOOR RCP 047
LIST OF DRAWINGS
SHEET DRAWING TITLE SHEET NO.
A-107 SECOND FLOOR RCP 048
A-108 THIRD FLOOR RCP 049
A-201 EXTERIOR ELEVATIONS 050
A-202 EXTERIOR ELEVATIONS 051
A-301 BUILDING SECTION 052
A-401 PART PLANS & INT. ELEVATIONS 053
A-402 PART PLANS & INT. ELEVATIONS 054
A-403 PORCH PLAN AND DETAILS 055
A-501 ARCHITECTURAL DETAILS 056
A-502 ARCHITECTURAL DETAILS 057
A-601 FINISH SCHEDULE & DETAILS 058
A-602 DOOR SCHEDULE 059
A-901 EXISTING PHOTOS - EXTERIOR 060
A-902 EXIST. PHOTOS-EXTERIOR/INTERIOR 061
A-903 EXISTING PHOTOS - INTERIOR 062
FP001 LEGEND, ABBREVIATIONS & NOTES 063
FD101 BASEMENT DEMOLITION PLAN 064
FD102 FIRST FLOOR DEMOLITION PLAN 065
FD103 SECOND FLOOR DEMOLITION PLAN 066
FD104 THIRD FLOOR DEMOLITION PLAN 067
FP101 BASEMENT PLAN 068
FP102 FIRST FLOOR PLAN 069
FP103 SECOND FLOOR PLAN 070
FP104 THIRD FLOOR PLAN 071
FP301 BUILDING SECTION 072
FA001 LEGEND & NOTES 073
FA101 BASEMENT DEMOLITION PLAN 074
FA102 FIRST FLOOR DEMOLITION PLAN 075
FA103 SECOND FLOOR DEMOLITION PLAN 076
FA104 THIRD FLOOR DEMOLITION PLAN 077
FA105 BASEMENT PLAN 078
FA106 FIRST FLOOR PLAN 079
FA107 SECOND FLOOR PLAN 080
FA108 THIRD FLOOR PLAN 081
FA121 DEMOLITION FLOOR PLANS 082
FA122 FLOOR PLANS 083
FA131 DEMOLITION FLOOR PLANS 084
FA132 FLOOR PLANS 085
FA141 FIRST FLOOR DEMOLITION PLAN 086
FA142 SECOND FLOOR DEMOLITION PLAN 087
FA143 FIRST FLOOR PLAN 088
FA144 SECOND FLOOR PLAN 089
FA151 DEMOLITION PLAN 090
FA501 FIRE ALARM RISER DETAIL 091
FA502 FIRE ALARM DETAILS 092
P-001 LEGEND, ABBREVIATIONS & NOTES 093
PD101 BASEMENT FLOOR DEMOLITION PLAN 094
PD102 FIRST FLOOR DEMOLITION PLAN 095
PD103 SECOND FLOOR DEMOLITION PLAN 096
LIST OF DRAWINGS
SHEET DRAWING TITLE SHEET NO.
PD104 THIRD FLOOR DEMOLITION PLAN 097
P-101 BASEMENT FLOOR PLAN 098
P-102 FIRST FLOOR PLAN 099
P-103 SECOND FLOOR PLAN 100
P-104 THIRD FLOOR PLAN 101
P-501 DETAILS 102
P-601 SCHEDULES 103
M-001 LEGEND, ABBREVIATIONS & NOTES 104
MD101 BASEMENT FLOOR DEMOLITION PLAN 105
MD102 FIRST FLOOR DEMOLITION PLAN 106
MD103 SECOND FLOOR DEMOLITION PLAN 107
MD104 THIRD FLOOR DEMOLITION PLAN 108
M-101 BASEMENT DUCTWORK PLAN 109
M-102 FIRST FLOOR DUCTWORK PLAN 110
M-103 SECOND FLOOR DUCTWORK PLAN 111
M-104 THIRD FLOOR DUCTWORK PLAN 112
MP101 BASEMENT PIPING PLAN 113
MP102 FIRST FLOOR PIPING PLAN 114
MP103 SECOND FLOOR PIPING PLAN 115
MP104 THIRD FLOOR PIPING PLAN 116
M-501 DETAILS 117
M-502 DETAILS 118
M-503 DETAILS 119
M-601 SCHEDULES 120
M-602 SCHEDULES 121
E-001 LEGEND, ABBREVIATIONS & NOTES 122
ED101 BASEMENT DEMOLITION PLAN 123
ED102 FIRST FLOOR DEMOLITION PLAN 124
ED103 SECOND FLOOR DEMOLITION PLAN 125
ED104 THIRD FLOOR DEMOLITION PLAN 126
EP101 BASEMENT POWER FLOOR PLAN 127
EP102 FIRST FLOOR POWER PLAN 128
EP103 SECOND FLOOR POWER PLAN 129
EP104 THIRD FLOOR POWER PLAN 130
EL101 BASEMENT LIGHTING FLOOR PLAN 131
EL102 FIRST FLOOR LIGHTING PLAN 132
EL103 SECOND FLOOR LIGHTING PLAN 133
EL104 THIRD FLOOR LIGHTING PLAN 134
E-501 DETAILS 135
E-601 SCHEDULES - PANELS A & B 136
E-602 SCHEDULES - PNLS C, SBCP & 2LDPB 137
E-603 SCHEDULE - PNL EDP & TR 138
E-604 SCHEDULES - FIXTURE & CONTROL 139
E-605 DIAGRAMS - ONE LINES 140
T-001 LEGEND, ABBREVIATIONS & NOTES 141
TD101 BASEMENT DEMOLITION PLAN 142
TD102 FIRST FLOOR DEMOLITION PLAN 143
TD103 SECOND FLOOR DEMOLITION PLAN 144
TD104 THIRD FLOOR DEMOLITION PLAN 145
LIST OF DRAWINGS
SHEET DRAWING TITLE SHEET NO.
T-101 BASEMENT FLOOR PLAN 146
T-102 FIRST FLOOR PLAN 147
T-103 SECOND FLOOR PLAN 148
T-104 THIRD FLOOR PLAN 149
T-501 DETAILS 150
U.S. COAST GUARD
CIVIL ENGINEERING
CEU PROVIDENCE
THE PROJECT SCOPE IS TO REPAIR THE MULTI MISSION BUILDING (MMB) LOCATED AT THE EATONS
NECK, NORTHPORT, NEW YORK COAST GUARD STATION.
THE BASE BID INCLUDES ALL WORK IDENTIFIED IN THE DRAWINGS AND SPECIFICATIONS. THE SCOPE OF WORK INCLUDES ALL WORK NECESSARY TO COMPLETE THE MAJOR WORK TASKS IDENTIFIED BELOW AND ALL
ANCILLARY TASKS.
- ABATEMENT OF HAZARDOUS MATERIALS: LEAD BASED PAINT, PAINT CONTAINING LEAD, ASBESTOS CONTAINING MATERIALS, AND UNIVERSAL WASTES. COMPLY WITH ALL LOCAL, STATE, NATIONAL
AND OSHA REGULATIONS FOR SAFETY PROCEDURES FOR ABATEMENT ACTIVITIES.
- COMPLY WITH ALL BUY AMERICA ACTS.
- OTHER WORK AS SPECIFIED.
1. MMB
1.1 REMOVE AND REPLACE ROTTED AREAS OF EXTERIOR WOODEN SIDING (AND DAMAGED
SHEATHING/INSULATION). REPAINT DAMAGED SIDING.
1.2 REMOVE AND REPLACE ALL EXTERIOR DOORS AND DOOR FRAMES EXCEPT THE WATCH TOWER
DOOR.
1.3 REMOVE AND REPLACE ALL INTERIOR DOORS, DOOR FRAMES, AND HARDWARE.
1.4 PATCH/REPLACE ROOF SHINGLES AS NEEDED FOR AREAS IMPACTED BY OTHER WORK.
1.5 DEMOLITION OF HVAC SYSTEM INCLUDING THE AIR HANDLING UNIT, ASSOCIATED CONDENSING
UNITS AND DUCTING THROUGHOUT.
1.6 DEMOLITION OF THE HYDRONIC SYSTEM INCLUDING THE OIL-FIRED BOILER, FIN TUBE
RADIATORS AND ASSOCIATED PIPING THROUGHOUT.
1.7 INSTALLATION OF AN EXTERNAL DEDICATED OUTSIDE AIR SYSTEM(DOAS) WITH CONCRETE PAD
AND ASSOCIATED DUCTING AND PICKET FENCE.
1.8 INSTALLATION OF FOUR EXTERNAL VRF CONDENSING UNITS WITH CONCRETE PAD.
1.9 REMOVE THE FIRE ALARM SYSTEM.
1.10 REMOVE AND REPLACE MANUAL FIRE ALARM SYSTEMS WITH ADDITIONAL SMOKE DETECTION
AND CARBON MONOXIDE DETECTORS.
1.11 PROVIDE COMPLETE SPRINKLER FIRE PROTECTION COVERAGE.
1.12 INSTALL FIRE PROTECTION MONITORING/INITIATING CONNECTIONS FOR BUILDINGS TO MMB.
1.13 INSTALL A NEW WATER MAIN TO THE BASEMENT AND RELOCATE FIRE SUPPRESSION EQUIPMENT
IN THE BASEMENT.
1.14 REMOVE FIRE ESCAPE LANDINGS AND STAIRS FROM SECOND AND THIRD FLOOR WINDOWS.
1.15 REPAIR FOUNDATION WALLS FOR LEAKS.
1.16 REPLACE PORTICO ROOF, DRAINAGE, RAILINGS AND POSTS.
1.17 REPAIR CONCRETE PORCH DECK.
1.18 REPLACE ALL FINISHES AND FIXTURES IN THE BATHROOMS.
1.19 REMOVE AND REPLACE CEILINGS IN KIND UNLESS OTHERWISE SPECIFIED ON DRAWINGS.
1.20 REMOVE AND REPLACE ALL FLOORING/BASE TRIM.
1.21 REPAINT THE ENTIRETY OF INTERIOR SPACES.
1.22 REMOVE AND REPLACE ALL EXTERIOR LIGHTING WITH LED AND DARK SKY COMPLIANT FIXTURES.
1.23 REMOVE AND REPLACE ALL LIGHTING CONTROL SYSTEMS AS IDENTIFIED ON THE DRAWING.
1.24 FURNITURE AND EQUIPMENT SHALL BE MOVED AND STORED BY THE CONTRACTOR, TO THE
SATISFACTION OF THE COR. ITEMS INCLUDE FURNITURE AND EQUIPMENT GREATER THAN 50
POUNDS. ALL EQUIPMENT WILL BE MOVED TO A STORAGE UNIT. FURNITURE WILL BE STORED IN
AN ONSITE STORAGE UNIT, MOVED TO THE USCG'S TEMPORARY FACILITY ON STATION, OR
PLACED IN A DUMPSTER AS SPECIFIED BY COR AND REINSTALLED AFTER CONSTRUCTION IS
COMPLETE.
1.25 REMOVE AND REPLACE PUBLIC ADDRESS SYSTEM EQUIPMENT AND ASSOCIATE CABLING.
1.26 REMOVE TELECOMMUNICATIONS SYSTEM AND REPLACE CABLING, CONNECTIVITY, PATHWAYS, CABLE SUPPORTS, RACKS, CABINETS, AND ADDITIONAL TELECOMMUNICATION ROOMS. EXTEND
SERVICE TO 2ND AND 3RD LEVEL. NETWORK SWITCHES, WIFI ACCESS POINTS AND TELEPHONE
EQUIPMENT BY OTHERS.
1.27 INSTALL A TEMPORARY CONDITIONED OUTDOOR TELECOMMUNICATIONS CABINET ADJACENT
THE MMB PRIOR TO RENOVATION OF THE MMB AND DEMOLITION OF THE CABINET AFTER THE
EQUIPMENT HAS BEEN REMOVED.
1.28 CONTRACTOR TO PROVIDE (1) MEDIA CONVERTER TO CONNECT RESCUE21 SYSTEM FROM
TEMPORARY OUTDOOR CABINET TO STATION FIBER OPTIC CABLING. MEDIA CONVERTER TO
SUPPORT 1000MBPS ETHERNET TRANSMISSION AND BE COMPATIBLE WITH THE FIBER OPTIC
CABLE CURRENTLY IN PLACE BETWEEN THE MMB AND THE BMF.
1.29 RELOCATION OF THE TELECOMMUNICATIONS EQUIPMENT LOCATED IN THE BASEMENT OF THE
MMB TO THE TEMPORARY TELECOMMUNICATIONS CABINET AND SUBSEQUENT REINSTALLATION
IN THE MMB IS NOT INCLUDED IN THE SCOPE OF THIS PROJECT AND WILL BE PERFORMED BY
OTHERS.
1.30 REMOVE AND REPLACE ALL GUTTERS AND DOWNSPOUTS.
2. BMF
2.1 REMOVE THE FIRE ALARM SYSTEM.
2.2 INSTALL FIRE PROTECTION MONITORING/INITIATING CONNECTIONS TO MMB.
2.3 INSTALL UNDERGROUND CABLING TO THE MMB TO CONNECT THE GENERATOR FOR EMERGENCY
POWER AND TO PROVIDE POWER FOR THE MMB ERVS.
3. GALLEY
3.1 REMOVE THE FIRE ALARM SYSTEM.
3.2 INSTALL FIRE PROTECTION MONITORING/INITIATING CONNECTIONS TO MMB.
3.3 REPLACE COMMUNICATION CABLING AND MEANS OF SUPPORT FROM MMB TO GALLEY.
4. UPH
4.1 INSTALL MANUAL FIRE ALARM SYSTEMS WITH ADDITIONAL SMOKE DETECTION AND CARBON
MONOXIDE DETECTORS
4.2 INSTALL FIRE PROTECTION MONITORING/INITIATING CONNECTIONS TO MMB.
ACCESS ROAD EASEMENT
EXERCISE EXTREME CAUTION WHEN TRANSITING THE LONG DIRT
ACCESS ROAD DUE TO ONGOING OPERATIONS OF THE FARM AND ITS
RESIDENTS. EXERCISE EXTREME CAUTION TO AVOID INJURY TO
CHILDREN AND COAST GUARD FAMILY HOUSING OCCUPANTS AT
STATION EATONS NECK. DELIVERIES ARE STRICTLY PROHIBITED
DURING SCHOOL BUS DROP-OFF AND PICK-UP TIMES AND SHOULD
BE COORDINATED WITH THE LLC. ADHERE TO THE POSTED SPEED
LIMIT ON THE ACCESS ROAD. MAINTAIN DUST CONTROL MEASURES
ON THE ACCESS ROAD.
07-15-20
C
A ES
WOT.
BE
NJ
N WE
KROYFOETATS
S
PROFE
LANOIS
R E
E
NI
GNE
N E
CI
L
DES
594201
N D
MIN N
E
E E
E E
E E
E E
E E
E E EE E E
E E
E
E E
E E
E E
E
E E
E E
E E
E
SAN
E
E
E
E
E
E
LPG
LPG
LPG
LPG
LPG LPG LPG
E E
E E E
E
E
E
E
LP
G
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
E
LPG LPG LPG LPG LPG
LPG
LPG
LPG
E
E
E
E
E
E
E
E
E
LPG
LPG
LPG
LP
G
E
EEEE
E
LPG LPG
LPG
SA
N
E
E
E
E
SAN SAN
LPG
LPG
LPG
LPG
LPG
LPG
LPG
LPG
SAN
SAN
LPG
S
C O
N C
. S .W
W W
W W
W W
W
W
W
W
W
W
LPG
FF
.47
#1
SD
SD
SD
SD
W
W
W
W
W W
W W
W W
W W
W W
W W
W W
W W
W W
S
S
CO
M
M
CO
M
M
CO
M
M
CO
M
M
CO
M
M
SD
E E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
SAN
SAN
SAN
SAN
SAN
SAN
E E
E
E
E
E E
E E E E E E E E E E E E
E
LPG
LPG
E
E
E
E
E
E
E
E
E
E
E
E
E
W
W W
W W
W W
W W
W W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
ELECTRIC
HANDHOLE
MULTI-MISSION
BUILDING
UPH BUILDING
GALLEY
BOAT MAINTENANCE FACILITY
APPROXIMATE
LOCATION OF
SEPTIC FIELD
TENNIS
COURT
CO
NC
RE
TE
D
RA
IN
AG
E
DI
TC
H
PROPERTY
BOUNDARY
W W W W W
W
W W
W W
W
W
W
W
W
W
W
W
LP
G
W
LIGHTHOUSE ROAD
HYDRANT
WOODDECK
AST-5 FUEL OIL
LP
G
LP
G
LP
G
LP
G
W
W
W
W
W
W
W
W
W
W
W
APPROXIMATE LOCATION
OF STORAGE BUILDING
E
E
E
E E
E
EEEEEEEEEEEE
S
S
S
S
S
S
W W
FUEL TANK
E E E E
HYDRANT
CONCRETE
STEPPED ASPHALT
PAVED
PAVED
CONCRETE
APPROXIMATE
LOCATION OF
CONCRETE PAD
CONTRACTOR ACCESS
THROUGH MAIN GATE
APPROXIMATE CONTRACTOR PARKING,
LAYDOWN, AND STORAGE AREA.
EXACT AREA TO BE CONFIRMED AT
PRE-CONSTRUCTION MEETING
APPROXIMATE
LOCATION OF
RADIO TOWER
CONTRACTOR
ACCESS ROUTE
CONTRACTOR
ACCESS ROUTE
E
EEE
E
E E
E E
E E
E E
E
E
E
E
E
E
E
E E
W
E
EE
E E
AREA OF WORK
SNOW STOARGE
SNOW STOARGE
EXTENT OF
PAVED AREA
NOTES:
1. THE CONTRACTOR SHALL COORDINATE THE EXACT LOCATION OF
LAYDOWN, STORAGE, PARKING, AND OVERALL ACCESS TO THE
SITE WITH THE CONTRACTING OFFICERS REPRESENTATIVE
PRIOR TO MOBILIZATION ON THE SITE
DE
SI
GN
ED
B Y:
DE
SC
RI
PT
IO
N
M
AR
K
ED
IT
ED
B Y:
DA
TE
CH
EC
KE
D
BY
DR
AW
N
BY
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
SH
EE
T
OF
US
CG
P
RO
JE
CT
N
UM
BE
R
US
CG
F
IL
EN
AM
E
A/ E
CO
M
PA
NY
CO
NS
UL
TI
NG
A
/E
US
CG
P
RO
JE
CT
M
AN
AG
ER
A/
E
PR
OJ
EC
T
NO
SHEET ID
M
EA
SU
RE
M
EN
T
BA
R:
1"
HA
LF
S
IZ
E
1/ 2"
US
CG
D
RA
W
IN
G
SE
RI
ES
N
UM
BE
R
M
AJ
OR
M
&R M
M B
(F Y2
CP
OP
CG
S
TA
TI
ON
E
AT
ON
S
NE
CK
NO
RT
HP
OR
T
NY
GE
NE
RA
L
CO
NT
RA
CT
OR
S
IT
E
LA
YD
OW
N
AN
D
AC
CE
SS
P
LA
N
MULTIMISSION
BUILIDING
G-101
P3
P3
93G
-1
.d wg
US
CG
C
EU
P
RO
VI
DE
NC
E
KI
LV
ER
T
ST
RE
ET
, S
UI
TE
W
AR
W
IC
K, R
I 0
Ke rri e Gr ee n
DP
L
DP
L
DP
L
LD
A
CO
LB
Y
CO
M
PA
NY
E
NG
IN
EE
RI
NG
D
ES
IG
N
PO
RT
LA
ND
, M
AI
NE
7-
3-
1.
5.
CO
NS
UL
TI
NG
C
OM
PA
NY
N
AM
E
CO
NS
UL
TA
NT
'S
C
IT
Y, S
TA
TE
IS
SU
ED
F
OR
C
ON
ST
RU
CT
IO
N
/1 5/
US COAST GUARD
N/A N/A
A1 LAYDOWN AND ACCESS
CONTRACTOR SITE
SCALE: 1" = 20' 20' 40'0
LEGEND
AREA OF WORK
CONTRACTOR ACCESS PATH
CONTRACTOR LAYDOWN AREA
GN
ED
B Y:
DE
SC
RI
PT
IO
N
M
AR
K
ED
IT
ED
B Y:
DA
TE
CH
EC
KE
D
BY
DR
AW
N
BY
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
SH
EE
T
OF
US
CG
P
RO
JE
CT
N
UM
BE
R
US
CG
F
IL
EN
AM
E
A/ E
CO
M
PA
NY
CO
NS
UL
TI
NG
A
/E
US
CG
P
RO
JE
CT
M
AN
AG
ER
A/
E
PR
OJ
EC
T
NO
SHEET ID
M
EA
SU
RE
M
EN
T
BA
R:
1"
HA
LF
S
IZ
E
1/ 2"
US
CG
D
RA
W
IN
G
SE
RI
ES
N
UM
BE
R
SOLICITATION NO.: CONTRACT NO.:
M
AJ
OR
M
&R M
M B
(F Y2
CP
OP
CG
S
TA
TI
ON
E
AT
ON
S
NE
CK
NO
RT
HP
OR
T
NY
HA
ZM
AT
LE
GE
ND
, A
BB
RE
VI
AT
IO
NS
N
OT
ES
MULTIMISSION
BUILIDING
H-001
P3
P3
H-
1.
dw g
US
CG
C
EU
P
RO
VI
DE
NC
E
KI
LV
ER
T
ST
RE
ET
, S
UI
TE
W
AR
W
IC
K, R
I 0
Ke rri e Gr ee n
NJ
C
NJ
C
SN
P
EA
C
CO
LB
Y
CO
M
PA
NY
E
NG
IN
EE
RI
NG
D
ES
IG
N
PO
RT
LA
ND
, M
AI
NE
7-
3-
1.
5.
CO
NS
UL
TI
NG
C
OM
PA
NY
N
AM
E
CO
NS
UL
TA
NT
'S
C
IT
Y, S
TA
TE
IS
SU
ED
F
OR
C
ON
ST
RU
CT
IO
N
/1 5/
N/A N/A
ASBESTOS-CONTAINING MATERIALS:
1. PERFORM ASBESTOS ABATEMENT WORK IN STRICT ACCORDANCE WITH THE SPECIFICATIONS, AND FEDERAL, STATE AND LOCAL LAWS INCLUDING BUT NOT LIMITED TO THE NEW YORK ASBESTOS OCCUPATIONS
ACCREDITATION AND CERTIFICATION ACT.
2. PRIOR TO THE START OF WORK PROVIDE A DETAILED ASBESTOS REMOVAL AND DISPOSAL WORK PLAN IN
ACCORDANCE WITH THE REQUIREMENTS OF THE SPECIFICATIONS.
3. HOLD AND DOCUMENT A PRE-ABATEMENT SAFETY MEETING, WITH PROJECT MONITORS, APPROPRIATE REPRESENTATIVES OF THE CONTRACTING OFFICER, THE AUTHORITIES HAVING JURISDICTION, AND THE GC TO REVIEW SAFE WORK PRACTICES AND EMERGENCY COMMUNICATION PROGRAM FOR THE PROJECT ENSURE PROPER FIRE EXTINGUISHING EQUIPMENT IS PRESENT, A COMPETENT PERSON IS KNOWLEDGEABLE IN THE USE OF FIRE EXTINGUISHING EQUIPMENT, AND EMERGENCY EXIT PLANS AND PHONE NUMBERS ARE POSTED IN THE
IMMEDIATE VICINITY OF WORK AREAS.
4. POST APPROVED "ASBESTOS WARNING" SIGNS. DESIGNATE THE AREA OFF LIMITS TO UNAUTHORIZED PERSONNEL.
5. NO ASBESTOS-CONTAINING MATERIALS SHALL BE DISTURBED UNTIL ALL ENGINEERING CONTROLS ARE ESTABLISHED, ALL REQUIRED NOTICES ARE POSTED AND ALL REQUIRED APPROVALS ARE OBTAINED FROM THE
AUTHORITIES HAVING JURISDICTION.
6. CERTIFIED ASBESTOS WORKERS & SUPERVISORS SHALL WEAR ½-FACE NEGATIVE PRESSURE RESPIRATORS
DURING PREPARATION WORK.
7. INSTALL AND MAINTAIN PUBLIC PROTECTION DEVICES AND TEMPORARY SIGNAGE, AS REQUIRED.
8. COORDINATE PROJECT PHASING WITH THE CONTRACTING OFFICER'S REPRESENTATIVE AND REPRESENTATIVES OF THE AUTHORITY HAVING JURISDICTION IN SUCH A WAY AS TO MINIMIZE DISRUPTION OF ONGOING OPERATIONS.
POWER TO THE WORK AREA MUST BE GFCI PROTECTED.
9. THESE ASBESTOS ABATEMENT DRAWINGS IDENTIFY ASBESTOS-CONTAINING MATERIALS AND SUSPECT ASBESTOS-CONTAINING MATERIALS THAT ARE EXPECTED TO BE AFFECTED WITHIN THE FOOTPRINT OF THE
PROPOSED SCOPE.
10. ASBESTOS-CONTAINING MATERIALS AND SUSPECT ASBESTOS-CONTAINING MATERIALS ARE KNOWN TO EXIST IN AREAS ADJACENT TO THE BOUNDARIES OF THE SCOPE, AND HAVE POTENTIAL TO BE IMPACTED BY THE PROPOSED CONSTRUCTION ACTIVITIES. PROVIDE ASBESTOS ABATEMENT WORK PLANS FOR APPROVAL BY THE CONTRACTING OFFICER'S REPRESENTATIVE, IN DIRECT COORDINATION AND IN CONJUNCTION WITH THE PROPOSED RENOVATION
WORK ASSOCIATED WITH THE PROPOSED PROJECT SCOPE.
11. HAVE APPLICABLE APPROVED PERMITS AND PROOF OF REQUIRED NOTIFICATIONS IN HAND AND ON-SITE PRIOR TO START OF ANY ABATEMENT WORK AND HAVE ISSUED NOTIFICATIONS AND COMPLIED WITH MANDATORY WAITING
PERIODS.
12. COMPLY WITH THE REQUIREMENTS OF OSHA HAZARD COMMUNICATION STANDARD 29 CFR 1910 1200.
13. MANAGE, TRANSPORT AND DISPOSE OF ASBESTOS-CONTAINING WASTE IN ACCORDANCE WITH FEDERAL, STATE
AND LOCAL REGULATIONS.
14. ABATEMENT AND CONSTRUCTION WORK SHALL COMPLY WITH THE NATIONAL EMISSION STANDARDS FOR HAZARD
AIR POLLUTION (NESHAP) (CITED AS 40 CFR PART 61 SUBPART M).
15. THE ASBESTOS CONTRACTOR SHALL PROVIDE OSHA AIR SAMPLING FOR HIS PERSONNEL. THIS OSHA AIR SAMPLING SHALL BE PERFORMED IN THE WORKER'S BREATHING ZONE, AS REQUIRED BY CURRENT OSHA
REGULATIONS.
16. DURING CONSTRUCTION, EACH TRADE SUBCONTRACTOR (INCLUDING BUT NOT LIMITED TO ARCHITECTURE, CIVIL, STRUCTURAL, MECHANICAL, FIRE PROTECTION, PLUMBING AND ELECTRICAL) IS RESPONSIBLE FOR NOTIFYING THE GENERAL CONTRACTOR IN ADVANCE IF SUSPECT ASBESTOS-CONTAINING MATERIAL IS OBSERVED IN THE PATH OF
SYSTEMS.
17. TRADE SUBCONTRACTORS (INCLUDING BUT NOT LIMITED TO STRUCTURAL, ARCHITECTURAL, MECHANICAL, ELECTRICAL, PLUMBING AND FIRE PROTECTION) MUST NOT DISTURB, IMPACT OR DAMAGE ASBESTOS CONTAINING MATERIALS THAT ARE NOT DESIGNATED FOR REMOVAL. ASBESTOS-CONTAINING MATERIALS NOT DESIGNATED FOR
REMOVAL ON THE DRAWINGS MUST NOT BE DISTURBED AND MUST BE ABANDONED IN PLACE.
18. IF THE CONTRACTOR PROCEEDS TO WORK WITHOUT NOTIFYING THE OWNER OF THESE KNOWN OR SUSPECT ASBESTOS-CONTAINING MATERIALS ENCOUNTERED OR OTHER DISCREPANCIES, THE CONTRACTOR WILL BE RESPONSIBLE FOR COSTS ASSOCIATED WITH THE CONTAINMENT, CLEAN UP, AND OTHER COSTS AND DAMAGES RESULTING THEREFROM. THE CONTRACTING OFFICER'S REPRESENTATIVE RESERVES THE RIGHT TO UTILIZE ITS
ASBESTOS CONTRACTORS TO CONDUCT ANY SUCH CLEAN-UP AT THE CONTRACTOR'S EXPENSE.
19. DO NOT UNLAWFULLY IMPACT EXISTING LIFE SAFETY EQUIPMENT AND SYSTEMS THAT PASS THROUGH, ARE
EXCLUSIVELY ACCESSIBLE FROM, AND/OR SERVE AREAS OF WORK.
20. SEQUENCE WORK TO PREVENT CROSS CONTAMINATION IN ACCORDANCE WITH PROJECT SCHEDULE SO AS NOT TO
DELAY OTHER SUBSEQUENT WORK.
21. IF ANY AIR SAMPLES COLLECTED OUTSIDE CONTAINMENT AREA DURING ABATEMENT MEET OR EXCEED 0.01 FIBER PER CUBIC CENTIMETER OR THE BACKGROUND LEVEL, WHICHEVER IS GREATER, STOP WORK AND ALTER
METHODS TO REDUCE THE ASBESTOS FIBER CONCENTRATION TO THE AFOREMENTIONED LEVEL.
22. FIELD VERIFY THE AMOUNT OF ACM AND BECOME FAMILIAR WITH VARIABLE FIELD CONDITIONS AT THE SITE BEFORE THE SUBMISSION OF THE BID. FAILURE TO BECOME FAMILIAR WITH ACTUAL AND PLANNED CONDITIONS AFFECTING THE WORK WILL NOT BE GROUNDS FOR ADDITIONAL COSTS OR TIME TO COMPLETE THE WORK.
23. IN ADDITION TO THE AUTHORITIES HAVING JURISDICTION, THE CONTRACTING OFFICER'S REPRESENTATIVE AND THE CONTRACTING OFFICERS'S ENVIRONMENTAL CONSULTANT SHALL HAVE THE AUTHORITY TO STOP THE ABATEMENT WORK AT ANY TIME A DETERMINATION IS MADE THAT CONDITIONS ARE NOT WITHIN SPECIFICATION AND APPLICABLE REGULATIONS. THE STOPPAGE OF WORK SHALL CONTINUE UNTIL CONDITIONS HAVE BEEN CORRECTED TO THE SATISFACTION OF THE CONTRACTING OFFICER'S REPRESENTATIVE AND CONTRACTING OFFICER'S ENVIRONMENTAL CONSULTANT. STANDBY TIME TO RESOLVE THE PROBLEMS SHALL BE AT THE
CONTRACTOR'S EXPENSE.
LEAD-CONTAINING MATERIALS:
1. PERFORM WORK THAT AFFECTS LEAD CONTAINING PAINT IN STRICT ACCORDANCE WITH THE CONTRACT SPECIFICATIONS, OSHA LEAD IN CONSTRUCTION STANDARD 29 CFR 1926 62, FEDERAL, STATE AND LOCAL LAWS.
2. PRIOR TO THE START OF WORK, PROVIDE A DETAILED LEAD MANAGEMENT WORK PLAN IN ACCORDANCE WITH THE
REQUIREMENTS OF THE SPECIFICATIONS.
3. LEAD-CONTAINING PAINT IS EXPECTED TO BE AFFECTED WITHIN THE FOOTPRINT OF THE PROPOSED SCOPE OF WORK.
PAINT IS ASSUMED TO CONTAIN LEAD.
4. COMPLY WITH THE REQUIREMENTS OF OSHA HAZARD COMMUNICATION STANDARD 29 CFR 1910 1200,
5. CONTAIN THE LEAD WORK AREA IN ACCORDANCE WITH SSPC GUIDE 6 - GUIDE FOR CONTAINING DEBRIS GENERATED
DURING PAINT REMOVAL OPERATIONS AND THE CONTRACT SPECIFICATIONS.
6. ON ANY STRUCTURES WHERE TORCH CUTTING, OPEN FLAME BURNING, RIVET/BOLT BUSTING, WELDING, OR OTHER IMPACT MAY BE ASSUMED TO CAUSE LEAD PARTICULATE RELEASES, THE WORK SHALL BE PERMITTED ONLY AFTER VISIBLE PAINT HAS BEEN REMOVED FROM ALL SIDES OF THE STRUCTURE DOWN TO THE SUBSTRATE SURFACE FOR A MINIMUM OF FOUR INCHES ON BOTH SIDES OF THE CUT LINE WHERE CUTTING, BURNING, WELDING, OR RIVET/BOLT
BUSTING WILL TAKE PLACE.
7. DESIGNATE A COMPETENT PERSON WITH CREDENTIALS, CERTIFICATION AND EXPERIENCE AS DEFINED BY DISTURBANCE OF LEAD CONTAINING SURFACE COATINGS SPECIFICATION. THIS PERSON MUST ENFORCE OSHA LEAD REQUIREMENTS
AND PERFORM DAILY INSPECTIONS OF THE WORK AREA.
8. LEAD ABATEMENT CONTRACTOR LICENSE: THIS LICENSE IS FOR COMPANIES THAT PERFORM LEAD HAZARD REDUCTION THROUGH ABATEMENT. CERTIFIED LEAD ABATEMENT SUPERVISORS: THESE INDIVIDUALS OVERSEE LEAD ABATEMENT ACTIVITIES AND MUST COMPLETE AN APPROVED NEW YORK-APPROVED TRAINING COURSE, A THIRD-PARTY EXAM, AND OBTAIN A CERTIFICATE FROM THE NEW YORK DEPARTMENT OF PUBLIC HEALTH (DPH). CERTIFIED LEAD ABATEMENT WORKERS: THESE INDIVIDUALS PERFORM LEAD ABATEMENT ACTIVITIES AND MUST COMPLETE A NEW YORK-APPROVED TRAINING COURSE AND OBTAIN A CERTIFICATE FROM THE DPH. THEY MUST BE EMPLOYED BY A LICENSED LEAD
ABATEMENT CONTRACTOR.
9. PROVIDE OSHA INITIAL EXPOSURE ASSESSMENT AIR SAMPLING FOR THEIR PERSONNEL. THIS OSHA AIR SAMPLING SHALL BE PERFORMED IN THE WORKER'S BREATHING ZONE, AS REQUIRED BY CURRENT OSHA REGULATIONS.
10. CLEAN ACCUMULATIONS OF DUST OR DEBRIS CONTAINING LEAD DAILY AND CONDUCT CLEANING WITH HEPA (HIGH EFFICIENCY PARTICULATE AIR) FILTERED VACUUMS. CONTAIN THE DEBRIS FOR PROPER DISPOSAL. LABEL BAGS AND
CONTAINERS AS LEAD-CONTAINING WASTE.
11. ESTABLISH RESTRICTED ZONES AROUND AREAS OR ACTIVITIES THAT MIGHT GENERATE AIRBORNE EMISSIONS OF LEAD IN EXCESS OF THE OSHA ACTION LEVEL, AND POST CAUTION SIGNS AROUND EACH RESTRICTED ZONE.
12. CONDUCT DAILY ASSESSMENTS OF VISIBLE EMISSIONS AND RELEASES FROM THE WORK AREA AND UNDERTAKE
NECESSARY CORRECTIVE ACTION TO CONTROL EMISSIONS.
13. COLLECT, HANDLE, STORE, TRANSPORT AND DISPOSE OF HAZARDOUS WASTES GENERATED FROM THIS WORK. THE CONTRACTING OFFICER WILL PROVIDE THE EPA IDENTIFICATION NUMBER FOR LEAD WASTE DISPOSAL FOR PERMITTING
PURPOSES.
14. MANAGE, TRANSPORT AND DISPOSE OF LEAD-CONTAINING WASTE IN ACCORDANCE WITH CONTRACT DOCUMENTS, FEDERAL, STATE AND LOCAL REGULATIONS.
15. DO NOT UNLAWFULLY IMPACT EXISTING LIFE SAFETY EQUIPMENT AND SYSTEMS THAT PASS THROUGH, ARE
EXCLUSIVELY ACCESSIBLE FROM, AND/OR SERVE AREAS OF WORK.
16. SEQUENCE WORK TO PREVENT CROSS CONTAMINATION IN ACCORDANCE WITH PROJECT SCHEDULE SO AS NOT TO
DELAY OTHER SUBSEQUENT WORK.
17. THE SCOPE OF WORK FOR LEAD-CONTAINING PAINT INCLUDES WORK AS NOTED ON DRAWINGS AND SPECIFICATIONS AND AS-NEEDED FOR THE PROTECTION OF WORKERS, GENERAL PUBLIC AND ENVIRONMENT TO IMPLEMENT DEMOLITION
AND CONSTRUCTION WORK.
UNIVERSAL WASTE:
1. COMPLY WITH THE REQUIREMENTS OF OSHA HAZARD COMMUNICATION STANDARD 29 CFR 1910 1200.
2. COMPLY WITH EPA 40 CFR PART 273 - STANDARDS FOR UNIVERSAL WASTE MANAGEMENT/REGULATED MATERIALS THAT MAY BE IMPACTED, INCLUDING BUT NOT LIMITED TO REFRIGERANT, MERCURY SWITCHES, FLUORESCENT LIGHTING WITH PCB CONTAINING BALLASTS, POTENTIAL RADIOACTIVE ISOTOPES IN SMOKE DETECTORS AND CARBON MONOXIDE
DETECTORS AND UNIVERSAL WASTES.
3. OBTAIN REQUIRED PERMITS AND/OR APPROVALS FOR SELECTED REFRIGERANT, PCB, MERCURY, MIXED WASTE AND
UNIVERSAL WASTE MANAGEMENT METHOD(S).
4. ENSURE THAT SUBCONTRACTORS INVOLVED IN THE WORK POSSESS PERMITS, CERTIFICATIONS AND/OR LICENSES REQUIRED UNDER FEDERAL, STATE, AND LOCAL LAWS, RULES, AND REGULATIONS, AS WELL AS ANY STATE OR LOCAL PERMITS OR LICENSES REQUIRED FOR REMOVAL, REPACKAGING, TRANSPORTATION, TREATMENT, AND OFF-SITE DISPOSAL
OF REFRIGERANT, PCB, MERCURY AND UNIVERSAL WASTE.
5. MANAGE, TRANSPORT AND DISPOSE OF UNIVERSAL WASTE IN ACCORDANCE WITH FEDERAL, STATE AND LOCAL
REGULATIONS.
6. DO NOT NEGATIVELY IMPACT EXISTING LIFE SAFETY EQUIPMENT AND SYSTEMS THAT PASS THROUGH, ARE EXCLUSIVELY
ACCESSIBLE FROM, AND/OR SERVE AREAS OF WORK.
7. SEQUENCE WORK TO PREVENT CROSS CONTAMINATION IN ACCORDANCE WITH PROJECT SCHEDULE SO AS NOT TO DELAY
OTHER SUBSEQUENT WORK.
UP
UP
DN
DN
DN
DN
4444 4444
DN
UP
2 22
DN
5 55
DE
SI
GN
ED
B Y:
DE
SC
RI
PT
IO
N
M
AR
K
ED
IT
ED
B Y:
DA
TE
CH
EC
KE
D
BY
DR
AW
N
BY
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
SH
EE
T
OF
US
CG
P
RO
JE
CT
N
UM
BE
R
US
CG
F
IL
EN
AM
E
A/ E
CO
M
PA
NY
CO
NS
UL
TI
NG
A
/E
US
CG
P
RO
JE
CT
M
AN
AG
ER
A/
E
PR
OJ
EC
T
NO
SHEET ID
M
EA
SU
RE
M
EN
T
BA
R:
1"
HA
LF
S
IZ
E
1/ 2"
US
CG
D
RA
W
IN
G
SE
RI
ES
N
UM
BE
R
GENERAL NOTES
SOLICITATION NO.: CONTRACT NO.:
SHEET KEYNOTES
ASBESTOS CONTAINING MATERIALS (ACM) IN 12"X12" BLUE CARPET TILES IN
BASEMENT RECREATION ROOM.
ACM DETECTED IN 12"X12" BLUE CARPET TILES ON THE 3RD FLOOR.
ACM DETECTED IN FIRE DOORS.
LEAD BASED PAINT (LBP) IN WOOD PORCH COLUMNS
LPB IN INTERIOR WOOD WINDOW JAMB, SILL AND SASH.
LPB IN WOOD EXIT DOOR AND CASING.
LPB IN WALKWAY HANDRAIL.
LPB IN EXTERIOR WOOD WINDOW JAMB.
M
AJ
OR
M
&R M
M B
(F Y2
CP
OP
CG
S
TA
TI
ON
E
AT
ON
S
NE
CK
NO
RT
HP
OR
T
NY
HA
ZM
AT
HA
ZM
AT
F
LO
OR
P
LA
NS
MULTIMISSION
BUILIDING
H-101
P3
P3
H-
1.
dw g
US
CG
C
EU
P
RO
VI
DE
NC
E
KI
LV
ER
T
ST
RE
ET
, S
UI
TE
W
AR
W
IC
K, R
I 0
Ke rri e Gr ee n
NJ
C
NJ
C
NJ
C
EA
C
CO
LB
Y
CO
M
PA
NY
E
NG
IN
EE
RI
NG
D
ES
IG
N
PO
RT
LA
ND
, M
AI
NE
7-
3-
1.
5.
CO
NS
UL
TI
NG
C
OM
PA
NY
N
AM
E
CO
NS
UL
TA
NT
'S
C
IT
Y, S
TA
TE
IS
SU
ED
F
OR
C
ON
ST
RU
CT
IO
N
/1 5/
N/A N/A
A1 BASEMENT HAZMAT PLAN
SCALE: 1/8" = 1'-0" 0 8'4' 16'
1. SEE DRAWING H-001 FOR GENERAL NOTES, ABBREVIATIONS, AND LEGEND.
2. REFER TO THE HAZARDOUS MATERIALS REPORTS IN THE SPECIFICATIONS (02 82 00) FOR
ADDITIONAL INFORMATION. THE HAZARDOUS MATERIALS REPORT INCLUDES DESCRIPTIONS
AND GENERAL LOCATIONS OF HAZARDOUS MATERIALS. QUANTITIES OF HAZARDOUS
MATERIALS IN THE REPORT ARE FOR INFORMATION ONLY AND DO NOT REPRESENT THE
QUANTITY OF HAZARDOUS MATERIALS TO BE REMOVED.
3. THE CONTRACTOR MUST ADDRESS ASBESTOS CONTAINING MATERIALS THAT ARE
IMPACTED BY THE PROJECT IN ACCORDANCE WITH SPECIFICATION 02 82 00 ASBESTOS
REMEDIATION. SEE DISCIPLINE SPECIFIC DRAWINGS TO DETERMINE EXTENT OF
DEMOLITION AND NEW WORK IN REGARDS TO HAZARDOUS MATERIALS.
4. THE CONTRACTOR MUST ADDRESS SURFACES CONTAINING LEAD BASED PAINTS THAT ARE
IMPACTED BY THE PROJECT IN ACCORDANCE WITH SPECIFICATION 02 83 00 LEAD
REMEDIATION. REFER TO ANY APPLICABLE STATE OF NEW YORK LAWS/ REGULATIONS FOR
THE DEMOLITION AND RENOVATION OF PAINTED COMPONENTS OR SURFACE COATINGS.
SEE DISCIPLINE SPECIFIC DRAWINGS TO DETERMINE EXTENT OF DEMOLITION AND NEW
WORK IN REGARDS TO HAZARDOUS MATERIALS.
5. THE CONTRACTOR WILL TAKE ALL THE NECESSARY PRECAUTIONS TO REMOVE AND DUMP
HAZARDOUS MATERIALS OFF SITE AT NO ADDITIONAL COST TO THE GOVERNMENT. REFER
TO SPECIFICATION 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS FOR INSTRUCTIONS
ON THE PROPER HANDLING AND DISPOSAL OF LEAD CONTAINING COMPONENTS AND
OTHER HAZARDOUS MATERIALS.
D1 FIRST FLOOR HAZMAT PLAN
SCALE: 1/8" = 1'-0" 0 8'4' 16'
NORTH
PLAN
TR
UE
NA5 SECOND FLOOR HAZMAT PLAN
SCALE: 1/8" = 1'-0" 0 8'4' 16'
D5 THIRD FLOOR HAZMAT PLAN
SCALE: 1/8" = 1'-0" 0 8'4' 16'
F6 WATCHTOWER HAZMAT PLAN
SCALE: 1/8" = 1'-0" 0 8'4' 16'
GN
ED
B Y:
DE
SC
RI
PT
IO
N
M
AR
K
ED
IT
ED
B Y:
DA
TE
CH
EC
KE
D
BY
DR
AW
N
BY
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
SH
EE
T
OF
US
CG
P
RO
JE
CT
N
UM
BE
R
US
CG
F
IL
EN
AM
E
A/ E
CO
M
PA
NY
CO
NS
UL
TI
NG
A
/E
US
CG
P
RO
JE
CT
M
AN
AG
ER
A/
E
PR
OJ
EC
T
NO
SHEET ID
M
EA
SU
RE
M
EN
T
BA
R:
1"
HA
LF
S
IZ
E
1/ 2"
US
CG
D
RA
W
IN
G
SE
RI
ES
N
UM
BE
R
GENERAL NOTES
SOLICITATION NO.: CONTRACT NO.:
M
AJ
OR
M
&R M
M B
(F Y2
CP
OP
CG
S
TA
TI
ON
E
AT
ON
S
NE
CK
NO
RT
HP
OR
T
NY
LI
FE
S
AF
ET
Y
LI
FE
S
AF
ET
Y
CO
DE
S
UM
M
AR
Y
MULTIMISSION
BUILIDING
LS001
P3
P3
LS
1.
dw g
US
CG
C
EU
P
RO
VI
DE
NC
E
KI
LV
ER
T
ST
RE
ET
, S
UI
TE
W
AR
W
IC
K, R
I 0
Ke rri e Gr ee n
NJ
C
NJ
C
SN
P
EA
C
CO
LB
Y
CO
M
PA
NY
E
NG
IN
EE
RI
NG
D
ES
IG
N
PO
RT
LA
ND
, M
AI
NE
7-
3-
1.
5.
CO
NS
UL
TI
NG
C
OM
PA
NY
N
AM
E
CO
NS
UL
TA
NT
'S
C
IT
Y, S
TA
TE
IS
SU
ED
F
OR
C
ON
ST
RU
CT
IO
N
/1 5/
N/A N/A
APPLICABLE CODES:
1. IBC, INTERNATIONAL BUILDING CODE, 2024
2. IEBC, INTERNATIONAL EXISTING BUILDING CODE, 2024
3. NFPA 101 - LIFE SAFETY CODE, 2024
NOTES:
1. SEE DRAWING A-001 FOR NOTES, LEGEND AND ABBREVIATIONS.
2. RETAIN CLEAR PATHS TO BUILDING EXITS AND FIRE EXTINGUISHERS AT ALL TIMES
DURING CONSTRUCTION
3. FIRE PROTECTION: CONFORM TO THE REQUIREMENTS OF THE IBC FOR MARKING AND
IDENTIFICATION OF FIRE WALLS, BARRIERS, FIRE PARTITIONS, SMOKE BARRIERS,
SMOKE PARTITIONS. STENCILING MUST BE SPACED NO MORE THAN 15 FEET IN
ACCORDANCE WITH IBC. REFER TO FIRESTOPPING SPECIFICATION FOR ADDITIONAL
INFORMATION.
4. PROVIDE LISTED AND LABELED SYSTEMS FOR PENETRATIONS OF FIRE RATED AND
FIRE/SMOKE RATED ASSEMBLIES. THESE MUST BE INSTALLED IN ACCORDANCE WITH
LISTED SYSTEM. PENETRATIONS THROUGH RATED ASSEMBLIES ARE GENERALLY
IDENTIFIED ON THE MECHANICAL, PLUMBING, ELECTRICAL, FIRE PROTECTION AND FIRE
ALARM FLOOR PLANS, FOR REFERENCE. FIRESTOPPING SUBCONTRACTOR MUST ALSO
COORDINATE WITH LIFE SAFETY DRAWINGS, MECHANICAL, PLUMBING, ELECTRICAL,
FIRE PROTECTION AND FIRE ALARM DRAWINGS TO CONFIRM NECESSARY
PENETRATION FIRESTOPPING PRIOR TO CONSTRUCTION. REFER TO FIRESTOPPING
SPECIFICATION FOR ADDITIONAL INFORMATION.
5. PER IBC, PLYWOOD BACKBOARDS MUST BE FIRE RETARDANT TREATED WOOD
WEARING THE MANUFACTURER'S STAMP. IF PAINTED, THE MANUFACTURER'S FIRE
RATED STAMP MUST REMAIN VISIBLE.
3. OCCUPANCY USE AND LOAD - (PER IBC TABLE 1004.5 & NFPA 101 TABLE 7.3.1.2)
OCCUPANCY CLASSIFICATION SPECIFIC USE SQUARE FOOTAGE OCCUPANT LOAD FACTOR
PER SF OCCUPANT LOAD
BASEMENT
BUSINESS LAUNDRY ROOM, OFFICE,
RESTROOM 377 150 3
MECHANICAL/STORAGE
STORAGE ROOMS, UTILITY ROOM,
FP ROOM, TELECOM ROOM,
CORRIDORS
1375 MP* 1
BASEMENT OCCUPANT LOAD 1752 4
FIRST FLOOR
BUSINESS COAST GUARD OPERATIONS, STAFF
OFFICES, RESTROOM, CORRIDOR 1848 150 12
LEVEL 1 OCCUPANT LOAD 1848 12
SECOND FLOOR
RESIDENTIAL BERTHING ROOMS, COMMON AREA,
RESTROOM, CORRIDOR 1381 200 7
STORAGE IT CLOSET 14 500 1
LEVEL 2 OCCUPANT LOAD 1395 8
THIRD FLOOR
RESIDENTIAL BERTHING ROOMS, CORRIDOR 885 200 4
STORAGE SUPPLY ROOM 151 500 1
LEVEL 3 OCCUPANT LOAD 1036 5
BUILDING TOTAL
BUILDING TOTAL 5,985 29
*MP - THE OCCUPANT LOAD IS THE MAXIMUM PROBABLE NUMBER OF OCCUPANTS PRESENT AT ANY TIME. (NFPA 101, TABLE 7.3.1.2)
4A. MEANS OF EGRESS - PER NFPA 101
4A. TRAVEL DISTANCES - PER NFPA 101 TABLE A.7.6
TRAVEL DISTANCES
(FULLY SPRINKLERED)
MAX. ALLOWED
(PER NFPA 101) PROVIDED
COMMON PATH
BUSINESS (B) = NL*
RESIDENTIAL (R-1) = N/A
STORAGE (S-1) = 100'
BUSINESS (B) = 48'-9"
RESIDENTIAL (R-1) = N/A
STORAGE (S-1) = N/A
DEAD END
BUSINESS (B) = 50'
RESIDENTIAL (R-1) = N/A
STORAGE (S-1) = 100'
BUSINESS (B) = N/A
RESIDENTIAL (R-1) = N/A
STORAGE (S-1) = 17'-3"
MAXIMUM TRAVEL DISTANCE
BUSINESS (B) = 300'
RESIDENTIAL (R-1) = 75'
STORAGE (S-1) = 400'
BUSINESS (B) = 51'-9"
RESIDENTIAL (R-1) = 26'-1"
STORAGE (S-1) = 46'-4"
*NL - NOT LIMITED
4B. EXIT REQUIREMENTS - PER NFPA 101
REQUIRED (PER NFPA 7.3.3.1)
CAPACITY FACTOR OCCUPANTS WIDTH
REQ'D
PROVIDED
(LOCATION)
DOORS AND COORIDORS 0.2 X OCCUPANT LOAD
MIN: 32" NET CLEAR 29 32"
EXIT 1: 32"
EXIT 2: 32"
EXIT 3: 32"
STAIRS
0.3 X OCCUPANT LOAD
44" SERVING MORE THAN 49 OCCUPANTS
36" SERVING 49 OR FEWER
29 36" STAIR 1: 41"
STAIR 2: 42"
2A. BUILDING CODE ANALYSIS
BUILDING OCCUPANCY CLASSIFICATION
MIXED-USE, SEPARATED, COMPRISING OF LEVELS 2 AND 3: R-1 (LODGING OR ROOMING HOUSE), WITH ACCESSORY STORAGE AREAS; LEVEL 1: GROUP B (BUSINESS), WITH ACCESSORY STORAGE AREAS; AND BASEMENT: MIXED OCCUPANCY NON SEPARATED GROUP S-1 (STORAGE), AND GROUP
B (BUSINESS.
CONSTRUCTION TYPE TYPE VB - UNPROTECTED COMBUSTIBLE
REQUIRED FIRE RATINGS
BUILDING ELEMENT REQUIRED RATING PROVIDED UL/IBC/NFPA STANDARD USED &
SHOWN ON DESIGN DETAIL
PRIMARY STRUCTURAL FRAME 0 HOURS 0 HOURS N/A
BEARING EXTERIOR WALLS 0 HOURS 0 HOURS N/A
BEARING INTERIOR WALLS 0 HOURS 0 HOURS N/A
NONBEARING EXTERIOR WALLS 0 HOURS 1 HOURS UL U419
NONBEARING INTERIOR WALLS 0 HOURS 0 HOURS N/A
FLOOR/CEILING ASSEMBLY 0 HOURS 2 HOURS UL L511
ROOF CONSTRUCTION AND ASSOCIATED SECONDARY
MEMBERS 0 HOURS 0 HOURS N/A
MECHANICAL CHASE/SHAFT WALLS 2 HOURS 2 HOURS UL U415
STAIR ENCLOSURE 1 HOURS 1 HOURS N/A
DRAFT STOPS 0 HOURS 0 HOURS N/A
ROOF ASSEMBLY 0 HOURS 0 HOURS N/A
ROOF COVERING CLASSIFICATION (A OR B OR C) A OR B B N/A
EXTERIOR WALL ASSEMBLY 0 HOURS 0 HOURS N/A
2B. ALLOWABLE BUILDING HEIGHT & AREAS (IBC 2024 TABLES 504.3, 504.4, 506.2)
ALLOWABLE PROVIDED
NUMBER OF STORIES ABOVE GRADE (SPRINKLERED)
3 STORIES
B - 3 STORIES,
R-1 -3 STORIES,
S-1 -2 STORIES
3 STORIES
B - 1 STORIES,
R-1 - 3 STORIES,
S-1 - O STORIES
BUILDING HEIGHT (SPRINKLERED) 60' 40'
BUILDING AREA (SPRINKLERED)
27,000 SF (BUSINESS) 5,985 SF (TOTAL)
21,000 SF (R-1) 5,985 SF (TOTAL)
27,000 SF (S-1) 5,985 SF (TOTAL)
2C. REQUIRED SEPARATION OF OCCUPANCIES (SPRINKLERED) (IBC 2024 TABLE 508.4)
OCCUPANCY CLASSIFICATION GROUP B GROUP R-1 GROUP S-1
GROUP B (BUSINESS) - 1 HOUR N/A
GROUP R-1 (RESIDENTIAL) 1 HOUR - 1 HOUR
GROUP S-1 (STORAGE) N/A 1 HOUR -
1. GENERAL BUILDING INFORMATION
EXISTING BUILDING CONSTRUCTION - INTERIOR RENOVATION OF EXISTING OFFICE/RESIDENTIAL SPACES WITH THE RECONFIGURATION OF WALLS AND DOORS;
EXTERIOR RENOVATION OF BUILDING SIDING AND OPENINGS.
AN AUTOMATIC SPRINKLER SYSTEM WILL BE PROVIDED IN ACCORDANCE WITH IBC 903.3, UFC 3-600-01, AND NFPA 13.
THE BUILDING IS PROTECTED BY AN ADDRESSABLE FIRE ALARM SYSTEM IN ACCORDANCE WITH NFPA 72.
5. INTERIOR - PER NFPA 101 (TABLE A.10.2.2)
OCCUPANCY
CLASSIFICATION COMPONENT EXIT ENCLOSURES EXIT ACCESS CORRIDORS OTHER SPACES
BUSINESS
WALL A OR B A OR B A, B, OR C
FLOOR - - -
LODGING OR ROOMING
HOUSE
WALL A, B, OR C A, B, OR C A, B, OR C
FLOOR - - -
STORAGE
WALL A OR B A, B, OR C A, B, OR C
FLOOR NOT LESS THAN II I OR II NA
W
D D
W
STAIR NO. 2
TOILET
CORRIDOR NO. 1
STORAGE013
UTILITY ROOM
STORAGE
CORRIDOR NO. 2
CORRIDOR NO. 3
TEL/DATA/MECH
CLOSET
ELECTRIC &
TELEPHONE
ROOM
OFFICE
STORAGE
STORAGE
LAUNDRY
OFFICE
UP
DN
DN
DN
DN
VESTIBULE
DN
SLOPE = 1/4":12
DOAS
STAIR NO. 1
TOILET
CLOSET
VESTIBULE
O.D. ROOM
OFFICE
GENERAL
OFFICE NO. 2 108
XPO OFFICE
COMMANDING
OFFICER107
CORRIDOR NO. 4
CORRIDOR NO. 4
OPERATIONS
GENERAL
OFFICE NO. 1
ROOF ROOF
ROOF
DN
UP
SLOPE = 6:12 SLOPE = 6:12
SLOPE = 6:12SLOPE = 6:12
SLOPE = 1:12
SLOPE = 1:12 SLOPE = 1:12
STAIR NO. 2B
TOILET
BERTHING ROOM NO.4
CREW LOUNGE
CORRIDOR NO. 5
TELE/DATA
BERTHING ROOM NO.1
BERTHING ROOM NO.3
TOILET
ROOF
ROOF
DN
UP
STOR. NO. 4
STOR. NO. 1
TOILET
STOR. NO. 2
TOILET
SUPPLY ROOM
FEMALE BERTHING
STAIR
HALL NO. 6
SENIOR PETTY
OFFICER BERTHING
STOR. NO. 3
R-1 RESIDENTIAL OCCUPANCY/
STORAGE USE DE
SI
GN
ED
B
Y:
DE
SC
RI
PT
IO
N
M
AR
K
ED
IT
ED
B Y:
DA
TE
CH
EC
KE
D
BY
DR
AW
N
BY
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
SH
EE
T
OF
US
CG
P
RO
JE
CT
N
UM
BE
R
US
CG
F
IL
EN
AM
E
A/ E
CO
M
PA
NY
CO
NS
UL
TI
NG
A
/E
US
CG
P
RO
JE
CT
M
AN
AG
ER
A/
E
PR
OJ
EC
T
NO
SHEET ID
M
EA
SU
RE
M
EN
T
BA
R:
1"
HA
LF
S
IZ
E
1/ 2"
US
CG
D
RA
W
IN
G
SE
RI
ES
N
UM
BE
R
OCCUPANCY CLASSIFICATION LEGEND
SOLICITATION NO.: CONTRACT NO.:
S / STORAGE OCCUPANCY/USE
B / BUSINESS OCCUPANCY/USE
R-1 / RESIDENTIAL OCCUPANCY/USE
M
AJ
OR
M
&R M
M B
(F Y2
CP
OP
CG
S
TA
TI
ON
E
AT
ON
S
NE
CK
NO
RT
HP
OR
T
NY
AR
CH
IT
EC
TU
RA
L
LI
FE
S
AF
ET
Y
OC
CU
PA
NC
Y
US
E
PL
AN
MULTIMISSION
BUILIDING
LS002
P3
P3
LS
2.
dw g
US
CG
C
EU
P
RO
VI
DE
NC
E
KI
LV
ER
T
ST
RE
ET
, S
UI
TE
W
AR
W
IC
K, R
I 0
Ke rri e Gr ee n
NJ
C
NJ
C
SN
P
EA
C
CO
LB
Y
CO
M
PA
NY
E
NG
IN
EE
RI
NG
D
ES
IG
N
PO
RT
LA
ND
, M
AI
NE
7-
3-
1.
5.
CO
NS
UL
TI
NG
C
OM
PA
NY
N
AM
E
CO
NS
UL
TA
NT
'S
C
IT
Y, S
TA
TE
IS
SU
ED
F
OR
C
ON
ST
RU
CT
IO
N
/1 5/
N/A N/A
A1 BASEMENT OCCUPANCY PLAN
SCALE: 1/8" = 1'-0" 0 8'4' 16'
C1 FIRST FLOOR OCCUPANCY PLAN
SCALE: 1/8" = 1'-0" 0 8'4' 16'
A5 SECOND FLOOR OCCUPANCY PLAN
SCALE: 1/8" = 1'-0" 0 8'4' 16'
C5 THIRD FLOOR OCCUPANCY PLAN
SCALE: 1/8" = 1'-0" 0 8'4' 16'
STAIR NO. 2
CORRIDOR NO. 3
LAUNDRY
TOILET
STORAGE
ELECTRIC &
TELEPHONE ROOM
CLOSET
CORRIDOR NO. 1
CORRIDOR NO. 2
FP ROOM
UTILITY ROOM
STORAGE
CONFERENCE ROOM
OFFICE STORAGE
TEL/
DATA/MECH
W
D D
W
MAXIMUM TRAVEL = 43'-8"
MAXIMUM TRAVEL = 46'-4"
DE = 17'-3"
DE = 15'-7"
FEFE
CP = 15'-2"
CP = 21'-0"
1 1
DE
SI
GN
ED
B Y:
DE
SC
RI
PT
IO
N
M
AR
K
ED
IT
ED
B Y:
DA
TE
CH
EC
KE
D
BY
DR
AW
N
BY
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
SH
EE
T
OF
US
CG
P
RO
JE
CT
N
UM
BE
R
US
CG
F
IL
EN
AM
E
A/ E
CO
M
PA
NY
CO
NS
UL
TI
NG
A
/E
US
CG
P
RO
JE
CT
M
AN
AG
ER
A/
E
PR
OJ
EC
T
NO
SHEET ID
M
EA
SU
RE
M
EN
T
BA
R:
1"
HA
LF
S
IZ
E
1/ 2"
US
CG
D
RA
W
IN
G
SE
RI
ES
N
UM
BE
R
GENERAL LIFE SAFETY NOTES
SOLICITATION NO.: CONTRACT NO.:
1. SEE DRAWING A-001 FOR NOTES, ABBREVIATIONS, AND LEGEND.
2. RETAIN CLEAR PATHS TO BUILDING EXITS AND FIRE EXTINGUISHERS
AT ALL TIMES DURING CONSTRUCTION.
EGRESS LEGEND
1-HOUR FIRE RATING
2-HOUR FIRE RATING
FIRE EXTINGUISHER
STARTING POINT
EXIT
COMMON PATH
DECISION POINT
DEAD END
EXISTING EXIT LIGHTS
M
AJ
OR
M
&R M
M B
(F Y2
CP
OP
CG
S
TA
TI
ON
E
AT
ON
S
NE
CK
NO
RT
HP
OR
T
NY
AR
CH
IT
EC
TU
RA
L
BA
SE
M
EN
T
LI
FE
S
AF
ET
Y
PL
AN
MULTIMISSION
BUILIDING
LS101
P3
P3
LS
1.
dw g
US
CG
C
EU
P
RO
VI
DE
NC
E
KI
LV
ER
T
ST
RE
ET
, S
UI
TE
W
AR
W
IC
K, R
I 0
Ke rri e Gr ee n
NJ
C
NJ
C
SN
P
EA
C
CO
LB
Y
CO
M
PA
NY
E
NG
IN
EE
RI
NG
D
ES
IG
N
PO
RT
LA
ND
, M
AI
NE
7-
3-
1.
5.
CO
NS
UL
TI
NG
C
OM
PA
NY
N
AM
E
CO
NS
UL
TA
NT
'S
C
IT
Y, S
TA
TE
IS
SU
ED
F
OR
C
ON
ST
RU
CT
IO
N
/1 5/
N/A N/A
A1 BASEMENT LIFE SAFETY PLAN
SCALE: 1/4" = 1'-0"
NORTH
PLAN
TR
UE
N
0 4' 8'2'
FE
CP
DE
SHEET KEYNOTES##
1 2 HR FIRE RATED GWB CEILING, EXPOSED, SEE A1/A-501
DN
DN
DN
OPERATIONS
CORRIDOR NO. 4
WATCH STANDER
OFFICE
O.D. ROOM
STAIR NO. 1
GENERAL
OFFICE NO. 2
EPO OFFICE
CORRIDOR NO. 5
XPO OFFICE
OIC OFFICE
TOILET
CLOSET
VESTIBULE
DN
SLOPE = 1/4":12
DOAS
EXIT 2
CAPACITY = 10 PERSONS
CP = 48'-9"
EXIT 1
CAPACITY =
18 PERSONS
EXIT 3
CAPACITY =
1 PERSON
MAXIMUM TRAVEL = 51'-9"
MAXIMUM TRAVEL = 51'-7"
MAXIMUM TRAVEL = 45'-6"
CP = 35'-0"
CP = 43'-10"
FE
DE
SI
GN
ED
B Y:
DE
SC
RI
PT
IO
N
M
AR
K
ED
IT
ED
B Y:
DA
TE
CH
EC
KE
D
BY
DR
AW
N
BY
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
SH
EE
T
OF
US
CG
P
RO
JE
CT
N
UM
BE
R
US
CG
F
IL
EN
AM
E
A/ E
CO
M
PA
NY
CO
NS
UL
TI
NG
A
/E
US
CG
P
RO
JE
CT
M
AN
AG
ER
A/
E
PR
OJ
EC
T
NO
SHEET ID
M
EA
SU
RE
M
EN
T
BA
R:
1"
HA
LF
S
IZ
E
1/ 2"
US
CG
D
RA
W
IN
G
SE
RI
ES
N
UM
BE
R
GENERAL LIFE SAFETY NOTES
SOLICITATION NO.: CONTRACT NO.:
EGRESS LEGEND
M
AJ
OR
M
&R M
M B
(F Y2
CP
OP
CG
S
TA
TI
ON
E
AT
ON
S
NE
CK
NO
RT
HP
OR
T
NY
AR
CH
IT
EC
TU
RA
L
FI
RS
T
FL
OO
R
LI
FE
S
AF
ET
Y
PL
AN
MULTIMISSION
BUILIDING
LS102
P3
P3
LS
2.
dw g
US
CG
C
EU
P
RO
VI
DE
NC
E
KI
LV
ER
T
ST
RE
ET
, S
UI
TE
W
AR
W
IC
K, R
I 0
Ke rri e Gr ee n
NJ
C
NJ
C
SN
P
EA
C
CO
LB
Y
CO
M
PA
NY
E
NG
IN
EE
RI
NG
D
ES
IG
N
PO
RT
LA
ND
, M
AI
NE
7-
3-
1.
5.
CO
NS
UL
TI
NG
C
OM
PA
NY
N
AM
E
CO
NS
UL
TA
NT
'S
C
IT
Y, S
TA
TE
IS
SU
ED
F
OR
C
ON
ST
RU
CT
IO
N
/1 5/
N/A N/A
A1 FIRST FLOOR LIFE SAFETY PLAN
SCALE: 1/4" = 1'-0" 0 4' 8'2'
NORTH
PLAN
TR
UE
N
1. SEE DRAWING A-001 FOR NOTES, ABBREVIATIONS, AND LEGEND.
2. RETAIN CLEAR PATHS TO BUILDING EXITS AND FIRE EXTINGUISHERS
AT ALL TIMES DURING CONSTRUCTION.
1-HOUR FIRE RATING
2-HOUR FIRE RATING
FIRE EXTINGUISHER
STARTING POINT
EXIT
COMMON PATH
DECISION POINT
EXISTING EXIT LIGHTS
EXIT LIGHTS
CP
SHEET KEYNOTES##
1 2 HOUR FIRE RATED GWB CEILING, CONCEALED ABOVE NON RATED ACT CEILING, SEE
A1/A-501
2 HOUR FIRE RATED GWB CEILING, EXPOSED, SEE A1/A-5012
ROOF ROOF
ROOF
DN
UP
CORRIDOR NO. 6
BERTHING ROOM
BERTHING ROOM
BERTHING ROOM
BERTHING ROOM
STAIR NO. 2B
SLOPE = 6:12 SLOPE = 6:12
SLOPE = 6:12SLOPE = 6:12
TELE/DATA
TOILET
SLOPE = 1:12
SLOPE = 1:12 SLOPE = 1:12
MAXIMUM TRAVEL = 26'-1"
MAXIMUM TRAVEL = 24'-9"
DE
SI
GN
ED
B Y:
DE
SC
RI
PT
IO
N
M
AR
K
ED
IT
ED
B Y:
DA
TE
CH
EC
KE
D
BY
DR
AW
N
BY
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
SH
EE
T
OF
US
CG
P
RO
JE
CT
N
UM
BE
R
US
CG
F
IL
EN
AM
E
A/ E
CO
M
PA
NY
CO
NS
UL
TI
NG
A
/E
US
CG
P
RO
JE
CT
M
AN
AG
ER
A/
E
PR
OJ
EC
T
NO
SHEET ID
M
EA
SU
RE
M
EN
T
BA
R:
1"
HA
LF
S
IZ
E
1/ 2"
US
CG
D
RA
W
IN
G
SE
RI
ES
N
UM
BE
R
GENERAL LIFE SAFETY NOTES
SOLICITATION NO.: CONTRACT NO.:
EGRESS LEGEND
M
AJ
OR
M
&R M
M B
(F Y2
CP
OP
CG
S
TA
TI
ON
E
AT
ON
S
NE
CK
NO
RT
HP
OR
T
NY
AR
CH
IT
EC
TU
RA
L
SE
CO
ND
F
LO
OR
L
IF
E
SA
FE
TY
P
LA
N
MULTIMISSION
BUILIDING
LS103
P3
P3
LS
3.
dw g
US
CG
C
EU
P
RO
VI
DE
NC
E
KI
LV
ER
T
ST
RE
ET
, S
UI
TE
W
AR
W
IC
K, R
I 0
Ke rri e Gr ee n
NJ
C
NJ
C
SN
P
EA
C
CO
LB
Y
CO
M
PA
NY
E
NG
IN
EE
RI
NG
D
ES
IG
N
PO
RT
LA
ND
, M
AI
NE
7-
3-
1.
5.
CO
NS
UL
TI
NG
C
OM
PA
NY
N
AM
E
CO
NS
UL
TA
NT
'S
C
IT
Y, S
TA
TE
IS
SU
ED
F
OR
C
ON
ST
RU
CT
IO
N
/1 5/
N/A N/A
A1 SECOND FLOOR LIFE SAFETY PLAN
SCALE: 1/4" = 1'-0"
NORTH
PLAN
TR
UE
N
0 4' 8'2'
1. SEE DRAWING A-001 FOR NOTES, ABBREVIATIONS, AND LEGEND.
2. RETAIN CLEAR PATHS TO BUILDING EXITS AND FIRE EXTINGUISHERS
AT ALL TIMES DURING CONSTRUCTION.
1-HOUR FIRE RATING
2-HOUR FIRE RATING
FIRE EXTINGUISHER
STARTING POINT
EXIT
EXISTING EXIT LIGHTS
SHEET KEYNOTES##
1 2 HOUR FIRE RATED GWB CEILING, CONCEALED ABOVE NON RATED ACT CEILING, SEE
A1/A-501
2 HOUR FIRE RATED GWB CEILING, EXPOSED, SEE A1/A-5012
DN
UP
STAIR HALL NO. 7
SENIOR PETTY OFFICER BERTHING
STORAGE NO. 4
STORAGE NO. 3
TOILET
SUPPLY ROOM
FEMALE BERTHING
STORAGE NO. 1
STORAGE NO. 2
TOILET
ROOF ROOF
SLOPE = 6:12 SLOPE = 6:12
SLOPE = 6:12SLOPE = 6:12
MAXIMUM TRAVEL = 23'-9"
MAXIMUM TRAVEL = 21'-10"
1 1
DE
SI
GN
ED
B Y:
DE
SC
RI
PT
IO
N
M
AR
K
ED
IT
ED
B Y:
DA
TE
CH
EC
KE
D
BY
DR
AW
N
BY
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
SH
EE
T
OF
US
CG
P
RO
JE
CT
N
UM
BE
R
US
CG
F
IL
EN
AM
E
A/ E
CO
M
PA
NY
CO
NS
UL
TI
NG
A
/E
US
CG
P
RO
JE
CT
M
AN
AG
ER
A/
E
PR
OJ
EC
T
NO
SHEET ID
M
EA
SU
RE
M
EN
T
BA
R:
1"
HA
LF
S
IZ
E
1/ 2"
US
CG
D
RA
W
IN
G
SE
RI
ES
N
UM
BE
R
GENERAL LIFE SAFETY NOTES
SOLICITATION NO.: CONTRACT NO.:
EGRESS LEGEND
M
AJ
OR
M
&R M
M B
(F Y2
CP
OP
CG
S
TA
TI
ON
E
AT
ON
S
NE
CK
NO
RT
HP
OR
T
NY
AR
CH
IT
EC
TU
RA
L
TH
IR
D
FL
OO
R
LI
FE
S
AF
ET
Y
PL
AN
MULTIMISSION
BUILIDING
LS104
P3
P3
LS
4.
dw g
US
CG
C
EU
P
RO
VI
DE
NC
E
KI
LV
ER
T
ST
RE
ET
, S
UI
TE
W
AR
W
IC
K, R
I 0
Ke rri e Gr ee n
NJ
C
NJ
C
SN
P
EA
C
CO
LB
Y
CO
M
PA
NY
E
NG
IN
EE
RI
NG
D
ES
IG
N
PO
RT
LA
ND
, M
AI
NE
7-
3-
1.
5.
CO
NS
UL
TI
NG
C
OM
PA
NY
N
AM
E
CO
NS
UL
TA
NT
'S
C
IT
Y, S
TA
TE
IS
SU
ED
F
OR
C
ON
ST
RU
CT
IO
N
/1 5/
N/A N/A
A1 THIRD FLOOR LIFE SAFETY PLAN
SCALE: 1/4" = 1'-0"
NORTH
PLAN
TR
UE
N
0 4' 8'2'
1. SEE DRAWING A-001 FOR NOTES, ABBREVIATIONS, AND LEGEND.
2. RETAIN CLEAR PATHS TO BUILDING EXITS AND FIRE EXTINGUISHERS
AT ALL TIMES DURING CONSTRUCTION.
1-HOUR FIRE RATING
2-HOUR FIRE RATING
FIRE EXTINGUISHER
STARTING POINT
EXIT
EXISTING EXIT LIGHTS
SHEET KEYNOTES##
1 2 HR FIRE RATED GWB CEILING, EXPOSED, SEE A1/A-501
GENERAL NOTES
UTILITY NOTES
1. EXISTING UTILITIES SHOWN ON THE PROJECT DRAWINGS ARE LOCATED APPROXIMATELY
AND MUST BE FIELD VERIFIED PRIOR TO CONSTRUCTION. UTILITY LOCATIONS ARE BASED
ON A COMBINATION OF FIELD SURVEY AND DRAWINGS PROVIDED BY THE OWNER.
2. ARRANGE FOR TEMPORARY UTILITY CONNECTIONS THAT MAY BE REQUIRED DURING
CONSTRUCTION.
3. EXISTING UTILITIES MUST REMAIN IN OPERATION MUST BE PROTECTED FROM DAMAGE. ANY
DAMAGE TO EXISTING UTILITIES TO REMAIN MUST BE REPAIRED AT NO COST TO THE
OWNER.
4. CALL DIG-SAFE A MINIMUM OF 72 HOURS PRIOR TO COMMENCEMENT OF CONSTRUCTION.
LOCATE PRIVATELY OWNED UTILITIES ON SITE. COST FOR LOCATING UTILITIES WITHIN THE
PROJECT AREA IS THE CONTRACTOR'S RESPONSIBILITY.
5. WHERE ENCOUNTERING EXISTING INACTIVE PIPES AND CONDUIT WITHIN THE LIMIT OF
EXCAVATION FOR THE WORK OF THE PROJECT, REMOVE THE PIPES AND CONDUIT THAT
ARE NO LONGER REQUIRED TO BE ACTIVE, WITHIN THE LIMITS OF EXCAVATION, AND PLUG
AND ABANDON REMAINING PIPES AND CONDUITS IN PLACE AT NO ADDITIONAL COST TO THE
OWNER.
6. PROVIDE HORIZONTAL AND VERTICAL LOCATIONS OF UTILITIES ENCOUNTERED OR
ABANDONED ON RECORD DRAWINGS AT THE COMPLETION OF WORK.
CONSTRUCTION NOTES
1. COORDINATE MATERIAL STORAGE AND LAYDOWN AREAS WITH THE OWNER. PARKING FOR
CONTRACTOR EMPLOYEES WITHIN THE PROJECT SITE WILL BE PERMITTED WITH THE
APPROVAL FROM OWNER.
2. THE TRANSPORTATION OF CONSTRUCTION MATERIALS TO AND FROM THE SITE MUST BE
COVERED IN ACCORDANCE WITH NEW YORK DOT REQUIREMENTS.
3. THE CONTRACTOR MUST BE RESPONSIBLE FOR MAINTAINING THEIR SECURITY DURING
CONSTRUCTION.
4. ALL SURPLUS MATERIAL, AS DETERMINED BY THE OWNER, MUST BECOME THE PROPERTY
OF THE CONTRACTOR AND MUST BE DISPOSED OF OFF THE OWNER'S PROPERTY IN
CONFORMANCE WITH LOCAL, STATE, AND FEDERAL REGULATIONS.
5. ALL CONSTRUCTION SIGNS MUST BE DESIGNED TO WITHSTAND 50 MPH VELOCITY WINDS
AND BE PREPARED BY A PROFESSIONAL SIGN COMPANY.
6. MOISTEN THE EXPOSED SOIL SURFACE PERIODICALLY WITH ADEQUATE WATER TO
CONTROL DUST.
7. MAKE THE SITE SAFE FOR NON-CONSTRUCTION PERSONNEL USERS DURING NON-WORKING
HOURS.
8. CONSTRUCTION AND HAZARDOUS MATERIAL TESTING MUST BE COORDINATED AND PAID
FOR BY THE CONTRACTOR. TESTING METHODS AND INTERVALS MUST ADHERE TO
INDUSTRY AND NEW YORK DOT STANDARDS. RESULTS OF THE TESTS MUST BE SHARED
WITH THE OWNER AND ENGINEER WITHIN 24 HOURS OF RECEIVING THE TEST RESULTS.
WITH EACH TEST RESULT, PROVIDE A SKETCH OF THE LOCATION OF THE TEST.
1. PROVIDE FIELD LAYOUT FOR ENTIRE PROJECT AREA. TAKE TIES TO UTILITY CONNECTIONS
AND PROVIDE MARKED-UP RECORD DRAWINGS FOR PROPOSED UTILITIES SHOWING TIES
TO CONNECTIONS, BENDS, VALVES, LENGTHS OF LINES AND INVERTS.
2. NOTIFY THE ENGINEER IN WRITING OF ANY CONDITIONS THAT VARY FROM THOSE SHOWN
ON THE DRAWINGS. WORK MUST NOT VARY FROM THE DRAWINGS WITHOUT THE
EXPRESSED APPROVAL FROM THE ENGINEER AND OWNER.
3. COOPERATE WITH THE OTHER CONTRACTORS PERFORMING WORK ON THIS JOB SITE
DURING THE PERFORMANCE OF THIS CONTRACT.
4. RESTORE PAVEMENT, DRIVEWAYS, CULVERTS, SIGNS AND OTHER PUBLIC OR PRIVATE
PROPERTY DAMAGED OR REMOVED TO PRE-CONSTRUCTION CONDITION DETERMINED BY
THE ENGINEER/OWNER AT THE CONTRACTOR'S EXPENSE.
5. THE OWNER WILL OBTAIN THE REQUIRED GENERAL BUILDING PERMIT. ADHERE TO THE
REQUIREMENTS OF ALL PERMITS. THE CONTRACTOR MUST BE RESPONSIBLE FOR
OBTAINING, AND INCURRING THE COST OF ALL OTHER REQUIRED PERMITS, INSPECTIONS,
CERTIFICATES, ETC.
6. PROTECT EXISTING PROPERTY LINE MONUMENTATION. REPLACE ANY MONUMENTATION
DISTURBED OR DESTROYED, AS JUDGED BY THE ENGINEER OR OWNER, AT THE
CONTRACTOR'S EXPENSE, UNDER THE SUPERVISION OF A NEW YORK STATE LICENSED
LAND SURVEYOR. SUBMIT STAMPED SURVEY PLANS FOR ALL MONUMENTS THAT ARE
MOVED AND RESET
7. EXAMINE ALL PLAN SHEETS AND SPECIFICATIONS, AND COORDINATE WORK WITH ALL
CONTRACTS FOR THE SITE.
8. ADHERE TO THE STANDARDS DETAILED IN THE "CONSTRUCTION MANAGEMENT PRACTICES
CATALOGUE FOR NONPOINT SOURCE POLLUTION PREVENTION" MANUAL BY THE NEW YORK
STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION, DATED JUNE 2000.
9. CONDUCT EXPLORATORY TEST PITS AS MAY BE REQUIRED TO DETERMINE UNDERGROUND
CONDITIONS.
10. TRENCH EXCAVATION AND REQUIRED SHEETING AND SHORING MUST BE DONE IN
ACCORDANCE WITH THE LATEST OSHA REGULATIONS FOR CONSTRUCTION.
11. MAINTAIN SURFACE STORMWATER DRAINAGE DURING THE COURSE OF WORK.
12. PROVIDE A DETAILED SCHEDULE OF WORK TO THE OWNER. WORK MUST BE COORDINATED
TO MINIMIZE DISTURBANCE TO ONGOING OPERATIONS. PROVIDE MINIMUM NOTICE TO
OWNER IN ADVANCE OF ANY ROAD OR UTILITY SHUTDOWN, COORDINATE NOTICE
TIMEFRAME WITH OWNER.
13. SEE A-901 - A-903 FOR EXISTING BUILDING AND SITE PHOTOGRAPHS.
E E E
SURVEY NOTES
1. THE SITE'S EXISTING CONDITIONS INFORMATION WAS COMPILED FROM ON THE GROUND
SURVEY, SITE INSPECTIONS, AERIAL MAPPING, AND INFORMATION PROVIDED BY THE
OWNER.
2. THE EXISTING CONDITIONS SURVEY WAS PERFORMED BY NELSON AND POPE ENGINEERS
AND SURVEYORS ON OCTOBER 8, 2010.
3. THE BASIS OF BEARING FOR THE SURVEY IS NAD83 DATUM.
4. ELEVATIONS AND CONTOURS ARE BASED ON NAVD88 DATUM.
LEGEND
TEST BORING LOCATED
EXISTING UTILITY POLE
EXISTING CONCRETE
EXISTING EDGE OF GRAVEL DRIVEWAY
EXISTING EDGE OF PAVED DRIVEWAY
EXISTING SEWER MANHOLE
EXISTING DRAINAGE MANHOLE
EXISTING CATCH BASIN
EXISTING COMMS MANHOLE
EXISTING HYDRANT
EXISTING SIGN
EXISTING SITE MARKER
EXISTING SITE UTILITY (ELECTRIC & WATER)
EXISTING CONTOUR
PROPOSED CONTOUR
PROPOSED SPOT GRADE ELEVATION
FINISHED GRADE SLOPE
PROPOSED CURB
PROPOSED SIGN
PROPOSED SITE UTILITY HOOKUP (ELECTRIC & WATER)
PROPOSED BOLLARD
PROPOSED SEWER MANHOLE
PROPOSED DRAINAGE MANHOLE
PROPOSED CATCH BASIN
PROPOSED COMMS MANHOLE
PROPOSED ELECTRIC MANHOLE
PROPOSED PAVEMENT
PROPOSED CONCRETE
PROPOSED GRAVEL
PROPOSED RIPRAP
DEMOLISHED AREA
DEMOLISHED LINE
ABBREVIATIONS
ABND
ACP
ADA
APPROX
B.C.
CB
CMP
COMM
CONC
COND
CPP
CSTP
Ø, DIA
DMH
DWG
DWGS
ELEC
ELEV
EMH
EQUIP
ETC.
EXIST
FI
FFE
FM
GALV
HDPE
IN
LF
L
MAX
MH
MIN
N/A
NIC
NTS
OH
OHD
OHE
PIV
PVC
RCP
SD
SF
SL
SMH
SQ
SWL
SYL
T.C.
T.O.C.
TVVD
TYP
UG
UGE
VCP
VIF
W/
AT
ABANDONED
ASBESTOS CLAY PIPE
AMERICANS WITH DISABILITIES ACT
APPROXIMATELY
BOTTOM OF CURB ELEVATION
CATCH BASIN
CORRUGATED METAL PIPE
COMMUNICATION
CONCRETE
CONDUIT
CORRUGATED PLASTIC PIPE
COPPER SIZED TUBING PLASTIC
DIAMETER
DRAIN MANHOLE
DRAWING
DRAWINGS
ELECTRIC
ELEVATION
ELECTRIC MANHOLE
EQUIPMENT
ET CETERA
EXISTING
FIELD INLET
FINISH FLOOR
FORCE MAIN
GALVANIZED
HIGH-DENSITY POLYETHYLENE PIPE
INCHES
LINEAR FEET
LENGTH
MAXIMUM
MANHOLE
MINIMUM
NOT APPLICABLE
NOT IN CONTRACT
NOT TO SCALE
OVERHEAD
OVERHEAD DOOR
OVERHEAD ELECTRIC
POST INDICATOR VALVE
POLY VINYL CHLORIDE
REINFORCED CONCRETE PIPE
STORM DRAIN
SQUARE FEET
PIPE SLOPE IN FT/FT
SANITARY SEWER MANHOLE
SQUARE
SOLID WHITE LINE
SOLID YELLOW LINE
TOP OF CURB ELEVATION
TOP OF CONCRETE
TELEPHONE VIDEO VOICE AND DATA
TYPICAL
UNDERGROUND
UNDERGROUND ELECTRIC
VITRIFIED CLAY PIPE
VERIFY IN FIELD
WITH
EXISTING PROPOSED
UNDERGROUND COMMS
ELECTRIC
WATER LINE
WATER LINE-ABND
SANITARY SEWER
STORM DRAIN
STORM DRAIN-ABND
SEWER FORCE MAIN
FUEL LINE
DRAINAGE DITCH
SEDIMENT BARRIER
E E E E
DE
SI
GN
ED
B Y:
DE
SC
RI
PT
IO
N
M
AR
K
ED
IT
ED
B Y:
DA
TE
CH
EC
KE
D
BY
DR
AW
N
BY
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
SH
EE
T
OF
US
CG
P
RO
JE
CT
N
UM
BE
R
US
CG
F
IL
EN
AM
E
A/ E
CO
M
PA
NY
CO
NS
UL
TI
NG
A
/E
US
CG
P
RO
JE
CT
M
AN
AG
ER
A/
E
PR
OJ
EC
T
NO
SHEET ID
M
EA
SU
RE
M
EN
T
BA
R:
1"
HA
LF
S
IZ
E
1/ 2"
US
CG
D
RA
W
IN
G
SE
RI
ES
N
UM
BE
R
M
AJ
OR
M
&R M
M B
(F Y2
CP
OP
CG
S
TA
TI
ON
E
AT
ON
S
NE
CK
NO
RT
HP
OR
T
NY
CI
VI
L
LE
GE
ND
, A
BB
RE
VI
AT
IO
NS
N
OT
ES
MULTIMISSION
BUILIDING
C-001
P3
P3
93C
-0
.d wg
US
CG
C
EU
P
RO
VI
DE
NC
E
KI
LV
ER
T
ST
RE
ET
, S
UI
TE
W
AR
W
IC
K, R
I 0
Ke rri e Gr ee n
DP
L
DP
L
ED
IT
ED
B
Y
LD
A
CO
LB
Y
CO
M
PA
NY
E
NG
IN
EE
RI
NG
D
ES
IG
N
PO
RT
LA
ND
, M
AI
NE
7-
3-
1.
5.
CO
NS
UL
TI
NG
C
OM
PA
NY
N
AM
E
CO
NS
UL
TA
NT
'S
C
IT
Y, S
TA
TE
IS
SU
ED
F
OR
C
ON
ST
RU
CT
IO
N
/1 5/
N/A N/A
LPG LPG
SANSANSANSAN
SF
UTILITY LEGEND
E E
E E
E E
E E
E E
E E EE E E
E E
E
E E
E E
E E
E
E E
E E
E E
E
E
E
E
E
E
SAN
E
E
E
E
E
E
LPG
LPG
LPG
E E
E E E
E
E
E
E
W
W
W
W
W
W
W
W
W
W
W
W
E
LPG LPG LPG LPG LPG
LPG
LPG
LPG
E
E
E
E
E
E
E
E
E
LPG
LPG
LPG
LP
G
E
EEEE
E
LPG LPG
LPG
SA
N
E
E
E
E
SAN SAN
LPG
LPG
LPG
LPG
LPG
LPG
LPG
LPG
SAN
SAN W
W
W W
W
SD
SD
SD
SD
W
W
W
W
W W
W W
W W
W W
W W
W W
W W
W W
W W
E E E E
E
E
E
E
LPG
LPG LPG
LPG
LPG
CO
M
M
CO
M
M
CO
M
M
CO
M
M
CO
M
M
COMM
SD
E E
E E
E E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
SAN
SAN
SAN
SAN
SAN
SAN
E E E E E E E E
E
E
E
E E
E E E E E E E E E E E E
E
LPG
LPG
LPG
LPG
LPG
LPG
LPG
LPG
LPG
LPG
LPG
LPG
LPG
LPG
LPG
LPG
LPG
LPG
E
E
E
E
E E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
W
W
W
W W
W
W
W W
W W
W W
W W
W W
W W
W
W
W
W
W
W
W
W
W
W
W
W
ELECTRIC
HANDHOLE
MULTI-MISSION
BUILDING
UPH BUILDING
GALLEY
BOAT MAINTENANCE FACILITY
APPROXIMATE
LOCATION OF
SEPTIC FIELD
TENNIS
COURT
CO
NC
RE
TE
D
RA
IN
AG
E
DI
TC
H
PROPERTY
BOUNDARY
W
W
W W
W W
W W W W W
W
W W
W W
LP
G
W
LIGHTHOUSE ROAD
HYDRANT
WOODDECK
AST-5 FUEL OIL
APPROXIMATE LOCATION
OF STORAGE BUILDING
E
E
E
E E
E
EEEEEEEEEEEE
S
S
S
S
FUEL TANK
E E E E
HYDRANT
CONCRETE
STEPPED ASPHALT
PAVED
PAVED
CONCRETE
40 APPROXIMATE
LOCATION OF
CONCRETE PAD
APPROXIMATE
LOCATION OF
RADIO TOWER
DE
SI
GN
ED
B Y:
DE
SC
RI
PT
IO
N
M
AR
K
ED
IT
ED
B Y:
DA
TE
CH
EC
KE
D
BY
DR
AW
N
BY
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
SH
EE
T
OF
US
CG
P
RO
JE
CT
N
UM
BE
R
US
CG
F
IL
EN
AM
E
A/ E
CO
M
PA
NY
CO
NS
UL
TI
NG
A
/E
US
CG
P
RO
JE
CT
M
AN
AG
ER
A/
E
PR
OJ
EC
T
NO
SHEET ID
M
EA
SU
RE
M
EN
T
BA
R:
1"
HA
LF
S
IZ
E
1/ 2"
US
CG
D
RA
W
IN
G
SE
RI
ES
N
UM
BE
R
M
AJ
OR
M
&R M
M B
(F Y2
CP
OP
CG
S
TA
TI
ON
E
AT
ON
S
NE
CK
NO
RT
HP
OR
T
NY
CI
VI
L
EX
IS
TI
NG
C
ON
DI
TI
ON
S
AN
D
SI
TE
L
AY
OU
T
PL
AN
MULTIMISSION
BUILIDING
CJ101
P3
P3
93C
J1
.d wg
US
CG
C
EU
P
RO
VI
DE
NC
E
KI
LV
ER
T
ST
RE
ET
, S
UI
TE
W
AR
W
IC
K, R
I 0
Ke rri e Gr ee n
DP
L
DP
L
ED
IT
ED
B
Y
LD
A
CO
LB
Y
CO
M
PA
NY
E
NG
IN
EE
RI
NG
D
ES
IG
N
PO
RT
LA
ND
, M
AI
NE
7-
3-
1.
5.
CO
NS
UL
TI
NG
C
OM
PA
NY
N
AM
E
CO
NS
UL
TA
NT
'S
C
IT
Y, S
TA
TE
IS
SU
ED
F
OR
C
ON
ST
RU
CT
IO
N
/1 5/
N/A N/A
20' 40'0A1 AND SITE LAYOUT PLAN
EXISTING CONDITIONS
SCALE: 1" = 20'
FIRE ALARM CABLING LOCATIONS1
GENERAL SHEET NOTES
SHEET KEYNOTES
1. SEE C-001 FOR CIVIL NOTES AND ABBREVIATIONS.
2. SEE CD-101 FOR CIVIL DEMOLITION SCOPE
3. SEE C-501-C-503 FOR CIVIL SECTIONS AND DETAILS
4. VERIFY EXISTING CONDITIONS PRIOR TO STARTING WORK
E E
E E
E E
E E
E E
E E EE E E
E E
E
E E
E E
E E
E
E E
E E
E E
E
E
E
E
E
E
SAN
E
E
E
E
E
E
LPG
LPG
LPG
E E
E E E
E
E
E
E
W
W
W
W
W
W
W
W
W
W
W
W
E
LPG LPG LPG LPG LPG
LPG
LPG
LPG
E
E
E
E
E
E
E
E
E
LPG
LPG
LPG
LP
G
E
EEEE
E
LPG LPG
LPG
SA
N
E
E
E
E
SAN SAN
LPG
LPG
LPG
LPG
LPG
LPG
LPG
LPG
SAN
SAN W
W
W W
W
SD
SD
SD
SD
W
W
W
W
W W
W W
W W
W W
W W
W W
W W
W W
W W
E E…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .