Amendment 0002 for IFB 70Z0G122BABCD0075.pdf
PDF 232 KB Posted
- Attached to
- Repair Waterfront USCG Station New York
- Solicitation number
- 70Z0G122BABCD0075
About this file
This document contains an amendment to a federal solicitation and the original solicitation. The amendment extends the bid due date to August 30th, 2022 for Solicitation Number 70Z0G122BABCD0075 issued by the U.S. Coast Guard Civil Engineering Unit in Providence, Rhode Island. The solicitation is for repair work to waterfront infrastructure at Coast Guard Station New York, including replacing floating docks C, D and E; repairing thru-rods, wear pads, and rollers; and stabilizing the listing of Pier E. The amendment adds additional scope items and a drawing. The original solicitation sought bids for base scope work replacing docks C, D and E; removing and reinstalling shore ties; replacing shore tie electrical lines; and replacing thru-rods, wales, and rubstrips. The project value is estimated between $500,000 to $1 million, with a 215-day period of performance. The solicitation is set aside fully for small businesses under NAICS code 237990.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
Sean E. Waldron, Sr. Field Contracting Officer
The purpose of this amendment is to add additional scope and add an additional drawing (see page 2).
The due date has been extended. The Bids are due: 30 AUGUST 2022 AT 2:00 PM LOCAL TIME, WARWICK, RI
All other terms and conditions remain unchanged.
Contracting Officer
USCG CIVIL ENGINEERING UNIT PROVIDENCE
475 Kilvert St., Suite 100
WARWICK, RI 02886
THIS AMENDMENT MUST BE
ACKNOWLEDGED WITH YOUR BID
51283PR220000075
70Z0G122BABCD0075
16148458
1 2
08/04/2022
07/14/2022
8/30/2022
70Z0G122BABCD0075
Amendment 0002
Repair Waterfront, USCG STA New York 08/04/2022
ADDITIONAL SCOPE TO THE SOLICITATION (IFB):
Contractor shall furnish all labor, material, equipment, transportation, disposal, supervision, and incidental related work necessary to:
1. Tighten all thru-rods throughout the Floating Dock system (with the exception of Floats C, D, and
E) and the thru-rods which tie Floats A and B to the Main Floating Dock. While performing this work, the contractor shall take inventory of those which are seized and replace them later under this project. Note 1 on sheet CD101 and C-101 still applies.
2. Replace worn UHMW wear pads located within the pile guide frames as indicated on PN 16148458 SKETCH. Estimated quantity is 27.
3. Replace missing or broken rollers and brackets within the pile guide frame on the refueling pier as indicated on PN 16148458 SKETCH. Estimated quantity is 20.
4. Repair listing of Pier E: The contractor shall make every repair and/or replacement necessary to all buoyancy blocks and encapsulated floats to correct the listing issue on Pier E to stabilize and create a safe and level walkway.
5. All work associated with this amendment shall be completed NLT 60 days after the NTP.
UPDATE/ADDITIONS TO THE SOLICITATION (IFB):
Add the following to Section J, List of Attachments:
4. Drawing PN 16148458 SKETCH, Floating Pier Overview and Wear Pads / Roller Requirements (1 sheet)