P10364042Specs_Reduced.pdf
PDF 20 MB Posted
- Attached to
- USCG AIRSTATION CLEARWATER: Major Repairs AIRSTA Clearwater and Repair Water Intrusion - Annex
- Solicitation number
- 70Z0G119BBF2221000
About this file
Specification - Major Repairs
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Abstract_19-B-BF2221.pdf | ||
| Amendment0002_19-B-BF2221.pdf | ||
| Amendment0001_19-B-BF2221.pdf | ||
| P10364042Dwgs1-31.pdf | ||
| P10364042Dwgs32-62.pdf | ||
| P10276005Dwgs.pdf | ||
| P10276005Specs.pdf | ||
| IFB_70Z0G119BBF222100.pdf | ||
| General_Decision_Number_FL190222_02012019.pdf | ||
| Standard_Form_24.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF HOMELAND SECURITY
UNITED STATES COAST GUARD
SHORE INFRASTRUCTURE LOGISTICS CENTER
SPECIFICATIONS
FOR
MAJOR REPAIRS
PSN 10364042
AT
USCG AIR STATION CLEARWATER
CLEARWATER, FLORIDA
(PINELLAS COUNTY)
Leo Grenier, RA - Design Project Manager. Gerry Gosselin, PE - Design Branch Chief
G. GOSSELIN, BY DIRECTION
COMMANDING OFFICER
UNITED STATES COAST GUARD
CIVIL ENGINEERING UNIT PROVIDENCE
475 KILVERT STREET SUITE 100
WARWICK, RHODE ISLAND 02886
GOSSELIN.GERAL
D.G.1271179576
Digitally signed by
GOSSELIN.GERALD.G.1271179576
Date: 2019.05.28 11:43:21 -04'00'
Irma Major Repairs 10364042
CG AIRST CLEARWATER
Major Repairs 10364042
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 22 00.00 10 PRICE AND PAYMENT PROCEDURES
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 29 SAFETY AND OCCUPATIONAL HEALTH REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 35 SPECIAL INSPECTIONS
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19.00 20 TEMPORARY ENVIRONMENTAL CONTROLS
01 77 00.00 20 CLOSEOUT PROCEDURES
01 78 23 OPERATION AND MAINTENANCE DATA
01 80 00 FACILITIES PREVENTATIVE MAINTENANCE PROGRAM
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
DIVISION 05 - METALS
05 12 00 STRUCTURAL STEEL
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 22 00 ROOF AND DECK INSULATION
07 27 36 SPRAY FOAM AIR BARRIERS
07 41 13 METAL ROOF PANELS
07 52 00 MODIFIED BITUMINOUS MEMBRANE ROOFING
07 60 00 FLASHING AND SHEET METAL
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 91 00 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 24 23 CEMENT STUCCO
09 29 00 GYPSUM BOARD
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 90 00 PAINTS AND COATINGS
DIVISION 12 - FURNISHINGS
12 93 00 SITE FURNISHINGS
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
PROJECT TABLE OF CONTENTS Page 1
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 01 30.41 HVAC SYSTEM CLEANING
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS
23 05 48.00 40 VIBRATION CONTROLS FOR HVAC PIPING AND EQUIPMENT
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 53.00 20 SPACE TEMPERATURE CONTROL SYSTEMS
23 31 13.00 40 METAL DUCTS
23 34 23.00 40 HVAC POWER VENTILATORS
23 74 33.00 40 PACKAGED, OUTDOOR, HEATING AND COOLING MAKEUP
AIR-CONDITIONERS
23 81 00.00 20 UNITARY AIR CONDITIONING EQUIPMENT
DIVISION 26 - ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 41 00 LIGHTNING PROTECTION SYSTEM
26 56 00 EXTERIOR LIGHTING
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 31 13 CHAIN LINK FENCES AND GATES
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 2
SECTION 01 11 00
SUMMARY OF WORK
01/08
PART 1 GENERAL
1.1 WORK COVERED BY CONTRACT DOCUMENTS
1.1.1 Project Description
The work includes repairs for 13 facilities at USCG Airstation Clearwater due to Hurricane Irma, and incidental related work:
A. RPUID 7904 - Exchange Building B. RPUID 67087 - Safety Trailer C. RPUID 7902 - Fixed Wing Hanger D. RPUID 7903 - Rotary Hanger E. RPUID 810701 - Armory F. RPUID 67090 - C130 Aircraft Equipment Shed G. RPUID 7908 - BEQ - Base Enlisted Barracks G. RPUID 7907 - BOQ - Base Officer Barracks I. RPUID 7906 - Galley J. RPUID 7905 - Dispensary/ MED Clinic K. RPUID 7933 - Water Survival Training Facility L. RPUID 7958 - Exchange Office
1.1.2 Location
The work shall be located at the the USCG Air Station Clearwater at Clearwater, Pinellas County, Florida, approximately as indicated. The exact location will be shown by the Contracting Officer.
1.2 EXISTING WORK
In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements":
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work shall be in a condition equal to or better than that which existed before new work started.
1.3 LOCATION OF UNDERGROUND FACILITIES
Obtain digging permits prior to start of excavation by contacting the Contracting Officer 15 calendar days in advance. Verify the elevations of existing piping, utilities, and any type of underground obstruction not indicated to be specified or to be removed but indicated in locations to be traversed by piping, ducts, and other work to be conducted or installed.
SECTION 01 11 00 Page 1
1.3.1 Notification Prior to Excavation
Notify the Contracting Officer at least 15 days prior to starting excavation work. Contact a utility locating service 48 hours prior to excavating. Contractor is responsible for marking all utilities not marked by the utility locating service.
1.4 SUPERVISION
Have at least one qualified supervisor capable of reading, writing and conversing fluently in the English language on the job site during working hours. In addition, if a Quality Control (QC) representative is required on the contract, then that individual shall also have fluent English communication skills.
1.5 PRECONSTRUCTION CONFERENCE
After award of the contract but prior to commencement of any work at the site, meet with the Contracting Officer to discuss and develop a mutual understanding relative to the administration of the value engineering and safety program, preparation of the schedule prices, shop drawings, and other submittals, scheduling programming, and prosecution of the work.
Major subcontractors who will engage in the work shall also attend.
1.6 INSPECTION
The Contractor shall keep the Contracting Officer or duly appointed representative fully informed of contract operations and plans so that a representative may arrange at various times that work is being performed.
1.6.1 Contractor's Daily Log
The Contractor shall complete the USCG Daily Log form at the end of each working day and deliver it to the Government Inspector. The Government Inspector will attest to its accuracy by initiating the form and forwarding that form to CEU Providence. The form will be provided to the Contractor by the Contracting Officer's representative.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Section --
SECTION 01 11 00 Page 2
SECTION 01 14 00
WORK RESTRICTIONS
07/07
PART 1 GENERAL
1.1 CONTRACTOR ACCESS AND USE OF PREMISES
1.1.1 Activity Regulations
Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. Do not enter any restricted areas unless required to do so and until cleared for such entry. The Contractor's equipment shall be conspicuously marked for identification.
1.1.2 Working Hours
Regular working hours shall consist of an 8 1/2 hour period established by the Contracting Officer Monday through Friday, excluding Government holidays.
1.1.3 Work Outside Regular Hours
Work outside regular working hours requires Contracting Officer approval.
Make application 15 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours and location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours. During periods of darkness, the different parts of the work shall be lighted in a manner approved by the Contracting Officer. Make utility cutovers after normal working hours or on Saturdays, Sundays, and Government holidays unless directed otherwise.
1.1.4 Exclusionary Period
No work shall be performed during the period TBD by the COR, inclusive, without prior written approval of the Contracting Officer. This period has not been considered in computing the time allowed for the performance of the work.
1.1.5 Occupied and Existing Buildings
The Contractor shall be working in an existing buildings which are occupied. Do not enter the buildings without prior approval of the Contracting Officer.
The existing buildings and their contents shall be kept secure at all times. Provide temporary closures as required to maintain security as directed by the Contracting Officer.
Provide dust covers or protective enclosures to protect existing work that remains and Government material located in the buildings during the construction period.
Relocate movable furniture away from the Contractor's working area as required to perform the work, protect the furniture, and replace the furniture in their original locations upon completion of the work. Leave attached equipment in place, and protect them against damage, or temporarily disconnect, relocate, protect, and reinstall them at the completion of the work.
The Government will remove and relocate other Government property in the areas of the buildings scheduled to receive work.
1.1.6 Utility Cutovers and Interruptions
a. Make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and Government holidays. Conform to procedures required in the paragraph "Work Outside Regular Hours."
b. Ensure that new utility lines are complete, except for the connection, before interrupting existing service.
c. Interruption to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, heating, fire alarm, and compressed air shall be considered utility cutovers pursuant to the paragraph entitled "Work Outside Regular Hours."
d. Operation of Station Utilities: The Contractor shall not operate nor disturb the setting of control devices in the station utilities system, including water, sewer, electrical, and steam services. The Government will operate the control devices as required for normal conduct of the work. The Contractor shall notify the Contracting Officer giving reasonable advance notice when such operation is required.
1.2 SECURITY REQUIREMENTS
AIR STATION Clearwater (ASCW) security procedures shall be followed,and include the following:
(1) In order to gain access to AIR Station Clearwater, all contractor personnel shall obtain and present RAPIDGate clearance documentation.
(2) Upon arrival at ASCW, contractor personnel shall present RAPIDGate credentials to Base Security Personnel. Once access is granted, personnel will be granted unescorted access to areas where the work of the contract conducted.
(3) Failure to follow any ASCW safety, security or other AIRSTATION regulations will result in immediate revocation of base access privileges.
(4) Additionally, ASCW may deny access to any personnel based on the Force
Protection Condition (FP-CON) in effect.
1.2.1 Areas Not Covered by Contract
The Contractor will not be permitted to enter buildings or areas not covered by this contract, except on prior approval of the Commanding Officer of the facility.
1.2.2 Parking and Driving on Flight Line
Prohibited on any flight line area (aprons, taxiways, clear areas). Do not park on or block the marked fire lanes at any time.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
SECTION 01 22 00.00 10
PRICE AND PAYMENT PROCEDURES
08/15
PART 1 GENERAL
1.1 UNIT PRICE PAYMENT ITEMS
Unit price is an amount proposed by bidders, stated on the Bid Form, as a price per unit of measurement for materials or services added to or deducted from the Contract Sum by appropriate modification, if estimated quantities of Work required by the Contract Documents are increased or decreased.
Payment items for the work of this contract on which the contract unit price payments will be made are listed in the BIDDING PROPOSAL SCHEDULE and described below. The unit price and payment made for each item listed constitutes full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for each of the unit price items.
1.1.1 Unit Price Number 1
Provide price per square foot for repairing damaged plywood roof sheathing. Remove damaged wood decking to the closest beam centerline on either side of the damaged area. Provide 5/8 inch thick plywood roof sheathing, nail to wood framing or screw to metal framing as per exposed conditions. Comply with section 06 10 00, ROUGH CARPENTRY.
1.1.1.1 Estimated Quantity
Include quantity under the base bid as indicated for each building. Only quantities above the base bid will be considered for payment under the unit prices.
1.1.2 Unit Price Number 2
Provide price per board foot for replacement of dimensional lumber which is indicated for reuse, and found to be deteriorated upon uncovering during demolition. Replacement lumber shall comply with the specification section 061000, Rough Carpentry. Finish the exposed side of lumber to match the surrounding lumber.
1.1.2.1 Estimated Quantity
Include quantity under the base bid as indicated for each building. Only quantities above the base bid will be considered for payment under the unit prices.
1.1.3 Unit Price Number 3
Provide price per linear foot for removing and replacing corroded cold-formed metal channel in of sizes indicated. Remove full length of corroded cold-formed metal channels between existing supports and replace with new galvanized cold-formed metal channels to match existing sizes.
SECTION 01 22 00.00 10 Page 1
Attachment to existing supports shall match the existing attachment configuration.
1.1.3.1 Estimated Quantity
Include quantity under the base bid as indicated for each building. Only quantities above the base bid will be considered for payment under the unit prices.
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
3.1 MEASUREMENT AND PAYMENT
Prior to commencing the work under Unit Prices, the Contractor shall notify the Owner at least 72 hours prior to commencement of work to permit proper inspection and measurements. Only quantities, which have been approved in writing by the Owner will be considered for the adjustments to the Contract Amount.
Performance of work not required by the Contract Documents or which is not authorized by the Change Order or Field Order, whether or not such work is set forth under as a Unit Price Item, shall not be considered cause for extra payment. The Contractor will be held fully responsible such unauthorized work, including the performance of all corrective measures required by the Owner.
Owner reserves the right to reject Contractor's measurement of work-in-place that involves use of established unit prices and to have this work measured, at Owner's expense, by an independent surveyor acceptable to Contractor.
SECTION 01 22 00.00 10 Page 2
SECTION 01 32 01.00 10
PROJECT SCHEDULE
07/07
PART 1 GENERAL
1.1 SUBMITTALS
Submit the following:
SD-01 Preconstruction Submittals
Construction Schedule/Schedule of Values
1.2 CONSTRUCTION SCHEDULE
At the Pre-Construction Conference, submit a Construction Schedule and Schedule of Values in accordance with FAR Clause 52.236.15. The Schedule of Values shall be based on the actual breakdown of the bid price. The cost of insurance shall not be listed as a separate item but included as part of each item of work. The actual cost of bonds may be paid as the first progress payment when a receipt from the bonding company is presented to the Contracting Officer. For contracts under $25,000, a Schedule of Values is not required. In addition, keep the Government Inspector informed daily of the expected delivery dates for major pieces of equipment and materials.
Construction Schedule and Schedule of Values shall be incorporated into one form which clearly indicates the start and completion dates and unit value of all major work components. The sample form provided in this section may be used. Optional forms may be used provided they include at a minimum all information conveyed on the sample form.
Construction Schedule/Schedule of Values form shall incorporate at a minimum the following activities:
a. Bonds
b. Mobilization
c. Demobilization
d. Pre-Construction Submittals
e. Work Activities
f. In-Progress Submittals
g. Final Government Inspection
h. Close-Out Submittals; i.e. Testing Balancing Reports, Warranties, Operation and Maintenance Manuals, Posted Instructions
i. As-Built Drawings
j. Factors which Constitute Potential Interruptions to Station
SECTION 01 32 01.00 10 Page 1
Operations
Pre-Construction Submittals are those activities which encompass the obtaining, submission, review and approval of submittals necessary prior to the start of the related site work. Contractor shall annotate all such activities into the progress schedule with their forecasted time periods.
These activity periods shall not be exclusive of the contract performance period. No site work shall commence until the respective submittals have been approved.
The value of all major work components within the project shall be identified on the Construction Schedule/Schedule of Values on a unit quantity and unit coast basis, e.g. number of squares and cost per square of roofing, number of lineal feet and cost per lineal foot of conduit, number of panels and cost per panel etc. Lump sum items shall only be paid for when 100% complete.
The Construction Schedule/Schedule of Values as approved by the Government is not a substitute for quantities conveyed by the specification and drawings and those required for a complete job. Omissions and errors on the Construction Schedule/Schedule of Values are the responsibility of the Contractor.
Payments will not be made until the schedule of prices has been submitted to and approved by the Contracting Officer.
1.3 UPDATED SCHEDULES
Update the construction schedule and equipment delivery schedule at monthly intervals or when schedule has been revised. Reflect any changes occurring since the last update. Submit copies of the purchase orders and confirmation of the delivery dates as directed.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
3.1 PROGRESS UPDATES
3.1.1 General
A revised Construction Schedule/Schedule of Values shall be issued by the Contractor on a monthly basis. In addition, any revisions to the Construction Schedule/Schedule of Values such as modifications or delays shall be reflected by Contractor submission of an updated Construction Schedule/Schedule of Values.
3.1.2 Modifications
When a modification is issued by the Government, record the modification as the last activity of the Construction Schedule/Schedule of Values and include the value of the modification. Adjust the Schedule of Values to reflect the inclusion of the modification. Revise the Construction Schedule portion of the form to annotate the progress change. Enter all modifications in this manner in sequential order.
SECTION 01 32 01.00 10 Page 2
SECTION 01 32 01.00 10 Page 3
This Page Intentionally Blank
SECTION 01 33 00
SUBMITTAL PROCEDURES
01/08
PART 1 GENERAL
1.1 DEFINITIONS
1.1.1 Submittal
Shop drawings, product data, samples, and administrative submittals presented for review and approval. Contract Clauses "FAR 52.236-5, Material and Workmanship," paragraph (b) and "FAR 52.236-21, Specifications and Drawings for Construction," paragraphs (d), (e), and
(f) apply to all "submittals."
1.1.2 Types of Submittals
All submittals are classified as indicated in paragraph "Submittal Descriptions (SD)". Submittals also are grouped as follows:
a. Shop drawings: As used in this section, drawings, schedules, diagrams, and other data prepared specifically for this contract, by contractor or through contractor by way of subcontractor, manufacturer, supplier, distributor, or other lower tier contractor, to illustrate portion of work.
b. Product data: Preprinted material such as illustrations, standard schedules, performance charts, instructions, brochures,k diagrams, manufacturer's descriptive literature, catalog data and other data to illustrate a portion of work, but not prepared exclusively for this contract.
c. Samples: Physical examples of products, materials, equipment, assemblies, or workmanship that are physically identical to portion of work, illustrating portion of work or establishing standards for evaluating appearance of finished work or both.
d. Administrative submittals: Data presented for reviews and approval to ensure that administrative requirements of project are adequately met but not to ensure directly that work is in accordance with design concept and in compliance with contract documents.
1.1.3 Submittal Descriptions (SD)
SD-01 Preconstruction Submittals
Construction Progress Schedule Submittal register Schedule of values Health and safety plan Work plan Quality control(QC) plan Environmental protection plan
SD-02 Shop Drawings
SECTION 01 33 00 Page 1
Drawings, diagrams and schedules specifically prepared to illustrate some portion of the work.
Diagrams and instructions from a manufacturer or fabricator for use in producing the product and as aids to the Contractor for integrating the product or system into the project.
Drawings prepared by or for the Contractor to show how multiple systems and interdisciplinary work will be coordinated.
SD-03 Product Data
Catalog cuts, illustrations, schedules, diagrams, performance charts, instructions and brochures illustrating size, physical appearance and other characteristics of materials, systems or equipment for some portion of the work.
Samples of warranty language when the contract requires extended product warranties.
SD-04 Samples
Fabricated or unfabricated physical examples of materials, equipment or workmanship that illustrate functional and aesthetic characteristics of a material or product and establish standards by which the work can be judged.
Color samples from the manufacturer's standard line (or custom color samples if specified) to be used in selecting or approving colors for the project.
Field samples and mock-ups constructed on the project site establish standards by which the ensuring work can be judged. Includes assemblies or portions of assemblies which are to be incorporated into the project and those which will be removed at conclusion of the work.
SD-05 Design Data
Design calculations, mix designs, analyses or other data pertaining to a part of work.
SD-06 Test Reports
Report signed by authorized official of testing laboratory that a material, product or system identical to the material, product or system to be provided has been tested in accord with specified requirements. (Testing must have been within three years of date of contract award for the project.)
Report which includes findings of a test required to be performed by the Contractor on an actual portion of the work or prototype prepared for the project before shipment to job site.
Report which includes finding of a test made at the job site or on sample taken from the job site, on portion of work during or after installation.
Investigation reports.
SECTION 01 33 00 Page 2
Daily logs and checklists.
Final acceptance test and operational test procedure.
SD-07 Certificates
Statements printed on the manufacturer's letterhead and signed by responsible officials of manufacturer of product, system or material attesting that product, system or material meets specification requirements. Must be dated after award of project contract and clearly name the project.
Document required of Contractor, or of a manufacturer, supplier, installer or subcontractor through Contractor, the purpose of which is to further quality of orderly progression of a portion of the work by documenting procedures, acceptability of methods or personnel qualifications.
Confined space entry permits.
SD-08 Manufacturer's Instructions
Preprinted material describing installation of a product, system or material, including special notices and Material Safety Data sheets concerning impedances, hazards and safety precautions.
SD-09 Manufacturer's Field Reports
Documentation of the testing and verification actions taken by manufacturer's representative at the job site, in the vicinity of the job site, or on a sample taken from the job site, on a portion of the work, during or after installation, to confirm compliance with manufacturer's standards or instructions. The documentation must be signed by an authorized official of a testing laboratory or agency and must state the test results; and indicate whether the material, product, or system has passed or failed the test.
Factory test reports.
SD-10 Operation and Maintenance Data
Data that is furnished by the manufacturer, or the system provider, to the equipment operating and maintenance personnel, including manufacturer's help and product line documentation necessary to maintain and install equipment. This data is needed by operating and maintenance personnel for the safe and efficient operation, maintenance and repair of the item.
This data is intended to be incorporated in an operations and maintenance manual or control system.
SD-11 Closeout Submittals
Documentation to record compliance with technical or administrative requirements or to establish an administrative mechanism.
Special requirements necessary to properly close out a construction contract. For example, Record Drawings and as-built drawings. Also, SECTION 01 33 00 Page 3 submittal requirements necessary to properly close out a major phase of construction on a multi-phase contract.
1.1.4 Approving Authority
Person authorized to approve submittal.
1.1.5 Work
As used in this section, on- and off-site construction required by contract documents, including labor necessary to produce submittals, construction, materials, products, equipment, and systems incorporated or to be incorporated in such construction.
1.2 SUBMITTALS
Submit the following:
SD-01 Preconstruction Submittals
Submittal register
1.3 USE OF SUBMITTAL REGISTER
Prepare and maintain submittal register, as the work progresses. Do not change data in columns (c), (d), (e), and (f) as delivered the by Government.
1.3.1 Submittal Register
Submit submittal register. Do not change data in columns (c), (d), (e), and (f) as delivered by the Government. Verify that all submittals required for the project are listed and add missing submittals. Complete the following on the register:
Column (a) Activity Number: Activity number from the project schedule.
Column (b) Transmittal Number: Contractor assigned list of consecutive numbers.
Column (g) Contractor Submit Date: Scheduled date for approving authority to receive submittals.
Column (h) Contractor Approval Date: Date Contractor needs approval of submittal.
Column (i) Contractor Material: Date that Contractor needs material delivered to Contractor control.
1.4 PROCEDURES FOR SUBMITTALS
1.4.1 Reviewing, Certifying, Approving Authority
Government organizations shall be responsible for reviewing and certifying that submittals are in compliance with contract requirements. Approving authority on submittals is the Project Manager unless otherwise specified for specific submittal.
SECTION 01 33 00 Page 4
1.4.2 Constraints
a. Submittals listed or specified in this contract shall conform to provisions of this section, unless explicitly stated otherwise.
b. Submittals shall be complete for each definable feature of work;
components of definable feature interrelated as a system shall be submitted at the same time.
c. When acceptability of a submittal is dependant on conditions, items, or materials included in separate subsequent submittals, submittal will be returned without review.
d. Approval of a separate material, product, or component does not imply approval of assembly in which item functions.
1.4.3 Scheduling
a. Coordinate scheduling, sequencing, preparing and processing of submittals with performance of work so that work will not be delayed by submittal processing. Allow for potential requirements to resubmit.
1.4.4 Variations
Variations from contract requirements require Government approval pursuant to contract Clause entitled "FAR 52.236-21, Specifications and Drawings for Construction" and will be considered where advantageous to Government.
1.4.4.1 Considering Variations
Discussion with Contracting Officer prior to submission, will help ensure functional and quality requirements are met and minimize rejections and re-submittals. When contemplating a variation which results in lower cost, consider submission of the variation as a Value Engineering Change Proposal (VECP).
1.4.4.2 Proposing Variations
When proposing variation, deliver written request to the Contracting Officer, with documentation of the nature and features of the variation and why the variation is desirable and beneficial to Government. If lower cost is a benefit, also include an estimate of the cost savings. In addition to documentation required for variation, include the submittals required for the item. Clearly mark the proposed variation in all documentation.
1.4.4.3 Warranting That Variation Are Compatible
When delivering a variation for approval, Contractor warrants that this contract has been reviewed to establish that the variation, if incorporated, will be compatible with other elements of work.
1.4.4.4 Review Schedule Is Modified
In addition to normal submittal review period, a period of 5 working days will be allowed for consideration by the Government of submittals with variations.
SECTION 01 33 00 Page 5
1.4.5 Contractor's Responsibilities
a. Determine and verify field measurements, materials, field construction criteria; review each submittal; and check and coordinate each submittal with requirements of the work and contract documents.
b. Transmit submittals to Contracting Officer in accordance with schedule on approved Submittal Register, and to prevent delays in the work, delays to the Government, or delays to separate Contractors.
c. Advise Contracting Officer of variation, as required by paragraph entitled "Variations."
d. Correct and resubmit submittal as directed by approving authority. When resubmitting disapproved transmittals or transmittals noted for resubmittal, the Contractor shall provide copy of that previously submitted transmittal including all reviewer comments for use by approving authority. Direct specific attention in writing or on resubmitted submittal, to revisions not requested by approving authority on previous submissions.
e. Furnish additional copies of submittal when requested by the Contracting Officer, to a limit of 20 copies per submittal.
f. Complete work which must be accomplished as basis of a submittal time to allow submittal to occur as scheduled.
g. Ensure no work has begun until submittals for that work have been returned as "approved," except to the extent that a portion of the work must be accomplished as basis of submittal.
1.4.6 Government Responsibilities
a. Note date on which submittal was received from Contractor on each Contract Item Approval Request Form.
b. Review each submittal; and check and coordinate each submittal with requirements of work and contract documents.
c. Review submittals for conformance with project design concepts and compliance with contract documents.
d. Ensure that material is clearly legible.
e. Review submittals for approval within scheduling period specified and only for conformance with project design concepts and compliance with contract documents.
f. Identify returned submittals with one of the actions defined in paragraph entitled "Actions Possible" and with markings appropriate for action indicated.
1.4.7 Actions Possible
Submittals will be returned with one of the following notations:
a. Submittals marked "approved" "approved as submitted" authorize
SECTION 01 33 00 Page 6
Contractor to proceed with work covered.
b. Submittals marked "approved" "see below" authorize Contractor to proceed with work as noted provided Contractor takes no exception to the notations.
c. Submittals marked "disapproved" indicate submittal is incomplete or does not comply with design concept or requirements of the contract documents and shall be resubmitted with approved changes. No work shall proceed for this item until resubmittal is approved.
1.5 FORMAT OF SUBMITTALS
1.5.1 Transmittal Form
Transmit electronically each submittal, except sample installations and sample panels, to office of approving authority. Transmit submittals with transmittal form prescribed by Contracting Officer and standard for project. On the transmittal form identify Contractor, indicate date of submittal, and include information prescribed by transmittal form and required in paragraph entitled "Identifying Submittals." Process transmittal forms to record actions regarding sample installations and panels.
1.5.2 Identifying Submittals
Identify submittals, except sample installations and sample panels, with the following information on each separate component of each submittal and transmittal form. The maximum file size for electronic submittals shall be no larger than 10 MB. Identify each copy of each submittal identically, with the following:
a. Project title and location.
b. Construction contract number.
c. Section number of the specification section by which submittal is required.
d. Submittal description (SD) number of each component of submittal.
e. When a resubmission, add alphabetic suffix on submittal description, for example, SD-10A, to indicate resubmission.
f. Name, address, and telephone number of subcontractor, supplier, manufacturer and any other second tier Contractor associated with submittal.
f. Project identification and location in project.
1.5.3 Format for Product Data
a. Present product data submittals for each section. Include table of contents, listing page and catalog item numbers for product data.
b. Indicate, by prominent notation, each product which is being
SECTION 01 33 00 Page 7 submitted; indicate specification section number and paragraph number to which it pertains.
c. Supplement product data with material prepared for project to satisfy submittal requirements for which product data does not exist. Identify this material as developed specifically for project.
1.5.4 Format for Shop Drawings
a. Shop drawings are not to be less than 8 1/2 by 11 inches nor more than 30 by 42 inches.
b. Present 8 1/2 by 11 inches sized shop drawings as part of the submittals required by section. Present larger drawings in sets.
c. Include on each drawing the drawing title, number, date, and revision numbers and dates, in addition to information required in paragraph entitled "Identifying Submittals."
d. Dimension drawings, except diagrams and schematic drawings;
prepare drawings demonstrating interface with other trades to scale. Use the same unit of measure for shop drawings as indicated on the contract drawings. Identify materials and products for work shown.
1.5.5 Format of Samples
a. Furnish samples in sizes below, unless otherwise specified or unless the manufacturer has prepackaged samples of approximately same size as specified:
(1) Sample of Equipment or Device: Full size.
(2) Sample of Materials Less Than 2 by 3 inches: Built up to 8 1/2 by 11 inches.
(3) Sample of Materials Exceeding A4 8 1/2 by 11 inches: Cut down to 8 1/2 by 11 inches and adequate to indicate color, texture, and material variations.
(4) Sample of Linear Devices or Materials: 10 inch length or length to be supplied, if less than 10 inches. Examples of linear devices or materials are conduit and handrails.
(5) Sample of Non-Solid Materials: Pint. Examples of non-solid materials are sand and paint.
(6) Color Selection Samples: 2 by 4 inches.
(7) Sample Panel: 4 by 4 feet.
(8) Sample Installation: 100 square feet.
b. Samples Showing Range of Variation: Where variations are unavoidable due to nature of the materials, submit sets of samples of not less than three units showing extremes and middle of range.
c. Reusable Samples: Incorporate returned samples into work only if
SECTION 01 33 00 Page 8 so specified or indicated. Incorporated samples are to be in undamaged condition at time of use.
d. Recording of Sample Installation: Note and preserve the notation of area constituting sample installation but remove notation at final clean up of project.
e. When color, texture or pattern is specified by naming a particular manufacturer and style, include one sample of that manufacturer and style, for comparison.
1.5.6 Format of Administrative Submittals
a. When submittal includes a document which is to be used in project or become part of project record, other than as a submittal, do not apply Contractor's approval stamp to document, but do a separate sheet accompanying document.
b. Operation and Maintenance Manual Data: Submit in accordance with Section 01 78 23, "Operation and Maintenance Data." Include components required in that section and the various technical sections.
1.6 QUANTITY OF SUBMITTALS
1.6.1 Number of Copies of Product Data
a. Submit four copies of submittals of product data.
1.6.2 Number of Copies of Shop Drawings
Submit shop drawings in compliance with quantity requirements specified for product data.
1.6.3 Number of Samples
a. Submit two samples, or two sets of samples showing range of variation, of each required item. One approved sample or set of samples will be retained by approving authority and one will be returned to Contractor.
b. Submit one sample panel. Include components listed in technical section or as directed.
c. Submit one sample installation, where directed.
d. Submit one sample of non-solid materials.
1.6.4 Number of Copies SD-05 Design Data and SD-07 Certificates
Submit in compliance with quantity requirements specified for shop drawings.
1.6.5 Number of Copies Administrative Submittals
a. Unless otherwise specified, submit administrative submittals compliance with quantity requirements specified for product data.
b. Submit administrative submittals required under "SD-19 Operation
SECTION 01 33 00 Page 9 and Maintenance Manuals" to conform to Section 01 78 23, "Operation and Maintenance Data."
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
SECTION 01 33 00 Page 10
S U
B M
IT
T
A L
F O
R M
,J a n
P
R E
V
IO
U S
E D
IT
IO
N I
S O
B S
O L
E T
E P
A G
E
O F
P A
G E
S
M a jo r
R e p a ir s
.0
S D
-0
P re c o n s tr u c ti o n S u b m it ta ls
.2
C o n s tr u c ti o n S c h e d u le
/S c h e d u le o f
V a lu e s
S D
-0
P re c o n s tr u c ti o n S u b m it ta ls
.3
.1 S u b m it ta l re g is te r
S D
-0
C e rt if ic a te s
.3
.2 .1
A c c id e n t P re v e n ti o n P la n
A
P P
S D
-1
C lo s e o u t S u b m it ta ls
.4
.1 R e p o rt s
.4
.1 C ra n e R e p o rt s
.4
.2 C ra n e C ri ti c a l L if t
P la n
S D
-0
T e s t
R e p o rt s
.1
.2 D a ily
R e p o rt s
.1
.1 B iw e e k ly
R e p o rt s
S D
-0
C e rt if ic a te s
.1
F a b ri c a ti o n P la n t
.1
A C
A c c re d it a ti o n
.1
C e rt if ic a te o f
C o m p lia n c e
.5
S p e c ia l In s p e c to r
S D
-1
C lo s e o u t S u b m it ta ls
.1
.2 C o m p re h e n s iv e F in a l R e p o rt
S D
-0
P re c o n s tr u c ti o n S u b m it ta ls
.3
C o n s tr u c ti o n s it e p la n
.0
S D
-0
P re c o n s tr u c ti o n S u b m it ta ls
.4
D ir t a n d D u s t
C o n tr o l P la n
S D
-0
T e s t
R e p o rt s
S U
B M
IT
T
A L
R E
G
IS
T E
R C
O N
T R
A C
T N
O
T
IT
L E
A N
D L
O C
A T
IO
N
C O
N T
R A
C T
O R
C O
N T
R A
C T
O R
S
C H
E D
U L
E D
A T
E S
C O
N T
R A
C T
O R
A C
T
IO
N A
P P
R O
V
IN
G A
U T
H O
R
IT
Y
A C T I V I T Y N O
T R A N S M I T T A L N O
S P E C S E C T
D E
S C
R
IP
T
IO
N
IT
E
M S
U B
M
IT
T E
D
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T O R A / E R E V W R S
U B
M
IT
A P
P R
O V
A L
N E
E D
E D
B Y
M A
T E
R
IA
L N
E E
D E
D B
Y
A C T I O N C O D E
D A
T E
O F
A C
T
IO
N
D A
T E
F W
D T
O A
P P
R A
U T
H
D A
T E
R C
D F
R O
M C
O N
T R
D A
T E
F W
D T
O O
T H
E R
R E
V
IE
W E
R
D A
T E
R C
D F
R O
M O
T H
R E
V
IE
W E
R
A C T I O N C O D E
D A
T E
O F
A C
T
IO
N
M A
IL
E
D T
O C
O N
T R
D A
T E
R C
D F
R M
A P
P R
A U
T H
R E
M A
R K
S
(a
(b
(c
(d
(e
(f
(g
(h
(i
(j
(k
(l
(m
(n
(o
(p
(q
(r
B M
IT
T
A L
F O
R M
,J a n
P
R E
V
IO
U S
E D
IT
IO
N I
S O
B S
O L
E T
E P
A G
E
O F
P A
G E
S
M a jo r
R e p a ir s
.0
.5
L a b o ra to ry A n a ly s is
S D
-1
C lo s e o u t S u b m it ta ls
.6
.1 P re c o n s tr u c ti o n S u rv e y
.6
.2 S o lid
W a s te
D is p o s a l P e rm it
.6
.3 W a s te
D e te rm in a ti o n
D o c u m e n ta ti o n
.6
.4 D is p o s a l D o c u m e n ta ti o n f o r
H a z a rd o u s a n d
R e g u la te d W a s te
.6
.5 C o n tr a c to r
C
F R
E m p lo y e e
T ra in in g R e c o rd s
.6
.7 R e g u la to ry
N o ti fi c a ti o n
.6
.8 E ro s io n a n d
S e d im e n t C o n tr o l
In s p e c ti o n
.6
.9 S o lid
W a s te
D is p o s a l R e p o rt
.1
C o n tr a c to r H a z a rd o u s M a te ri a l
In v e n to ry L o g
.0
S D
-1
O p e ra ti o n a n d
M a in te n a n c e
D a ta
.4
.1 E q u ip m e n t/ P ro d u c t
W a rr a n ty
L is t
S D
-1
C lo s e o u t S u b m it ta ls
.3
.1 A s -B u ilt
D ra w in g s
.2
H a z a rd o u s M a te ri a l R e p o rt in g
.2
H a z a rd o u s M a te ri a l R e p o rt in g
S D
-0
P ro d u c t
D a ta
.1
F a c ili ti e s P re v e n ta ti v e
M a in te n a n c e
P ro g ra m
F P
M P
S U
B M
IT
T
A L
R E
G
IS
T E
R C
O N
T R
A C
T N
O
T
IT
L E
A N
D L
O C
A T
IO
N
C O
N T
R A
C T
O R
C O
N T
R A
C T
O R
S
C H
E D
U L
E D
A T
E S
C O
N T
R A
C T
O R
A C
T
IO
N A
P P
R O
V
IN
G A
U T
H O
R
IT
Y
A C T I V I T Y N O
T R A N S M I T T A L N O
S P E C S E C T
D E
S C
R
IP
T
IO
N
IT
E
M S
U B
M
IT
T E
D
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T O R A / E R E V W R S
U B
M
IT
A P
P R
O V
A L
N E
E D
E D
B Y
M A
T E
R
IA
L N
E E
D E
D B
Y
A C T I O N C O D E
D A
T E
O F
A C
T
IO
N
D A
T E
F W
D T
O A
P P
R A
U T
H
D A
T E
R C
D F
R O
M C
O N
T R
D A
T E
F W
D T
O O
T H
E R
R E
V
IE
W E
R
D A
T E
R C
D F
R O
M O
T H
R E
V
IE
W E
R
A C T I O N C O D E
D A
T E
O F
A C
T
IO
N
M A
IL
E
D T
O C
O N
T R
D A
T E
R C
D F
R M
A P
P R
A U
T H
R E
M A
R K
S
(a
(b
(c
(d
(e
(f
(g
(h
(i
(j
(k
(l
(m
(n
(o
(p
(q
B M
IT
T
A L
F O
R M
,J a n
P
R E
V
IO
U S
E D
IT
IO
N I
S O
B S
O L
E T
E P
A G
E
O F
P A
G E
S
M a jo r
R e p a ir s
S D
-0
P re c o n s tr u c ti o n S u b m it ta ls
.2
.1 D e m o lit io n
P la n
.9
E x is ti n g C o n d it io n s
S D
-0
C e rt if ic a te s
.6
N o ti fi c a ti o n
S D
-1
C lo s e o u t S u b m it ta ls
.3
.4 R e c e ip ts
S D
-0
P re c o n s tr u c ti o n S u b m it ta ls
.6
.3 .1
C o n c re te C u ri n g P la n
.6
.5 Q u a lit y C o n tr o l P la n
.6
.6 Q u a lit y C o n tr o l P e rs o n n e l
C e rt if ic a ti o n s
.6
.6 Q u a lit y C o n tr o l O rg a n iz a ti o n a l
C h a rt
.6
.8 L a b o ra to ry
A c c re d it a ti o n
S D
-0
S h o p
D ra w in g s
.6
.2 .1
R e in fo rc in g S te e l
S D
-0
P ro d u c t
D a ta
.4
.7 J o in t
S e a la n ts
.4
.6 J o in t
F ill e r
.1
M a te ri a ls f o r
F o rm s
.4
.1 C e m e n ti ti o u s M a te ri a ls
.3
.3 C o n c re te C u ri n g M a te ri a ls
.5
R e in fo rc e m e n t
.4
.5 A d m ix tu re s
S D
-0
D e s ig n D a ta
S U
B M
IT
T
A L
R E
G
IS
T E
R C
O N
T R
A C
T N
O
T
IT
L E
A N
D L
O C
A T
IO
N
C O
N T
R A
C T
O R
C O
N T
R A
C T
O R
S
C H
E D
U L
E D
A T
E S
C O
N T
R A
C T
O R
A C
T
IO
N A
P P
R O
V
IN
G A
U T
H O
R
IT
Y
A C T I V I T Y N O
T R A N S M I T T A L N O
S P E C S E C T
D E
S C
R
IP
T
IO
N
IT
E
M S
U B
M
IT
T E
D
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T O R A / E R E V W R S
U B
M
IT
A P
P R
O V
A L
N E
E D
E D
B Y
M A
T E
R
IA
L N
E E
D E
D B
Y
A C T I O N C O D E
D A
T E
O F
A C
T
IO
N
D A
T E
F W
D T
O A
P P
R A
U T
H
D A
T E
R C
D F
R O
M C
O N
T R
D A
T E
F W
D T
O O
T H
E R
R E
V
IE
W E
R
D A
T E
R C
D F
R O
M O
T H
R E
V
IE
W E
R
A C T I O N C O D E
D A
T E
O F
A C
T
IO
N
M A
IL
E
D T
O C
O N
T R
D A
T E
R C
D F
R M
A P
P R
A U
T H
R E
M A
R K
S
(a
(b
(c
(d
(e
(f
(g
(h
(i
(j
(k
(l
(m
(n
(o
(p
(q
B M
IT
T
A L
F O
R M
,J a n
P
R E
V
IO
U S
E D
IT
IO
N I
S O
B S
O L
E T
E P
A G
E
O F
P A
G E
S
M a jo r
R e p a ir s
.3
.1 M ix D e s ig n
S D
-0
T e s t
R e p o rt s
.6
.1 .1
C o n c re te M ix D e s ig n
.6
.4 .1
F ly
A s h
.6
.4 .1
P o z z o la n
.4
.3 A g g re g a te s
.1
.2
.3 C o m p re s s iv e S tr e n g th T e s ts
.1
.2
.5 U n it W e ig h t o f
S tr u c tu ra l
C o n c re te
.1
.2
.4 A ir C o n te n t
.1
.2
.1 S lu m p T e s ts
.4
.2 W a te r
S D
-0
C e rt if ic a te s
.5
.1 R e in fo rc in g
B a rs
.6
.3 .2
S a fe ty
D a ta S h e e ts
.6
.6 .2
F ie ld T e s ti n g T e c h n ic ia n a n d
T e s ti n g A g e n c y
S D
-0
M a n u fa c tu re r’ s I n s tr u c ti o n s
.3
.3 C u ri n g C o m p o u n d
S D
-0
P re c o n s tr u c ti o n S u b m it ta ls
.4
.1 .1
E re c ti o n a n d
E re c ti o n B ra c in g
D ra w in g s
S D
-0
S h o p
D ra w in g s
.4
.2 F a b ri c a ti o n D ra w in g s
S D
-0
P ro d u c t
D a ta
.6
.2 S h o p P ri m e r
S U
B M
IT
T
A L
R E
G
IS
T E
R C
O N
T R
A C
T N
O
T
IT
L E
A N
D L
O C
A T
IO
N
C O
N T
R A
C T
O R
C O
N T
R A
C T
O R
S
C H
E D
U L
E D
A T
E S
C O
N T
R A
C T
O R
A C
T
IO
N A
P P
R O
V
IN
G A
U T
H O
R
IT
Y
A C T I V I T Y N O
T R A N S M I T T A L N O
S P E C S E C T
D E
S C
R
IP
T
IO
N
IT
E
M S
U B
M
IT
T E
D
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T O R A / E R E V W R S
U B
M
IT
A P
P R
O V
A L
N E
E D
E D
B Y
M A
T E
R
IA
L N
E E
D E
D B
Y
A C T I O N C O D E
D A
T E
O F
A C
T
IO
N
D A
T E
F W
D T
O A
P P
R A
U T
H
D A
T E
R C
D F
R O
M C
O N
T R
D A
T E
F W
D T
O O
T H
E R
R E
V
IE
W E
R
D A
T E
R C
D F
R O
M O
T H
R E
V
IE
W E
R
A C T I O N C O D E
D A
T E
O F
A C
T
IO
N
M A
IL
E
D T
O C
O N
T R
D A
T E
R C
D F
R M
A P
P R
A U
T H
R E
M A
R K
S
(a
(b
(c
(d
(e
(f
(g
(h
(i
(j
(k
(l
(m
(n
(o
(p
(q
B M
IT
T
A L
F O
R M
,J a n
P
R E
V
IO
U S
E D
IT
IO
N I
S O
B S
O L
E T
E P
A G
E
O F
P A
G E
S
M a jo r
R e p a ir s
.4
.1 W e ld in g
E le c tr o d e s a n d
R o d s
.3
.1 .3
D ir e c t
T e n s io n I n d ic a to r
W a s h e rs
.4
.2 N o n
-S h ri n k G ro u t
S D
-0
D e s ig n D a ta
.4
.3 D e s ig n C a lc u la ti o n s f o r
S te e l
C o n n e c ti o n s
.4
.2 S h o ri n g a n d
T e m p o ra ry B ra c in g
S D
-0
T e s t
R e p o rt s
.3
B o lt s
N u ts a n d W a s h e rs
.7
.2 .1
D ir e c t
T e n s io n I n d ic a to r
W a s h e r
In s p e c ti o n R e p o rt s
.7
.3 .1
B o lt T e s ti n g R e p o rt s
.7
.4 E m b ri tt le m e n t T e s t
R e p o rt s
S D
-0
C e rt if ic a te s
.2
S te e l
.3
B o lt s
N u ts a n d W a s h e rs
.5
G a lv a n iz in g
.3
A
IS
C S tr u c tu ra l S te e l F a b ri c a to r
Q u a lit y C e rt if ic a ti o n
.3
A
IS
C S tr u c tu ra l S te e l E re c to r
Q u a lit y C e rt if ic a ti o n
.4
.4 .1
W e ld in g P ro c e d u re s a n d
Q u a lif ic a ti o n s
.4
.1 W e ld in g
E le c tr o d e s a n d
R o d s
.7
.1 .1
C e rt if ie d W e ld in g
I n s p e c to r
S U
B M
IT
T
A L
R E
G
IS
T E
R C
O N
T R
A C
T N
O
T
IT
L E
A N
D L
O C
A T
IO
N
C O
N T
R A
C T
O R
C O
N T
R A
C T
O R
S
C H
E D
U L
E D
A T
E S
C O
N T
R A
C T
O R
A C
T
IO
N A
P P
R O
V
IN
G A
U T
H O
R
IT
Y
A C T I V I T Y N O
T R A N S M I T T A L N O
S P E C S E C T
D E
S C
R
IP
T
IO
N
IT
E
M S
U B
M
IT
T E
D
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T O R A / E R E V W R S
U B
M
IT
A P
P R
O V
A L
N E
E D
E D
B Y
M A
T E
R
IA
L N
E E
D E
D B
Y
A C T I O N C O D E
D A
T E
O F
A C
T
IO
N
D A
T E
F W
D T
O A
P P
R A
U T
H
D A
T E
R C
D F
R O
M C
O N
T R
D A
T E
F W
D T
O O
T H
E R
R E
V
IE
W E
R
D A
T E
R C
D F
R O
M O
T H
R E
V
IE
W E
R
A C T I O N C O D E
D A
T E
O F
A C
T
IO
N
M A
IL
E
D T
O C
O N
T R
D A
T E
R C
D F
R M
A P
P R
A U
T H
R E
M A
R K
S
(a
(b
(c
(d
(e
(f
(g
(h
(i
(j
(k
(l
(m
(n
(o
(p
(q
B M
IT
T
A L
F O
R M
,J a n
P
R E
V
IO
U S
E D
IT
IO
N I
S O
B S
O L
E T
E P
A G
E
O F
P A
G E
S
M a jo r
R e p a ir s
.4
W e ld in g P ro c e d u re S p e c if ic a ti o n s
(W P
S
S D
-0
S h o p
D ra w in g s
.8
.2 M o d if ic a ti o n s o f S tr u c tu ra l
M e m b e rs
.2
.2 N a ili n g
S tr ip s
S D
-0
P ro d u c t
D a ta
.4
.3 S tr u c tu ra l-u s e a n d O
S B
P a n e ls
.3
.2 .2
S tr u c tu ra l-u s e a n d O
S B
P a n e ls
.3
O ri e n te d S tr a n d
B o a rd
S D
-0
D e s ig n D a ta
.8
.2 M o d if ic a ti o n s o f S tr u c tu ra l
M e m b e rs
S D
-0
T e s t
R e p o rt s
.4
.4 P re s e rv a ti v e
-t re a te d
S D
-0
C e rt if ic a te s
.1
.1
C e rt if ic a te s o f G ra d e
.7
P re s e rv a ti v e
T re a tm e n t
S D
-0
P ro d u c t
D a ta
.1
B la n k e t In s u la ti o n
.1
.2 S
R e c y c le d C o n te n t fo r In s u la ti o n
M a te ri a ls
.3
A c c e s s o ri e s
S D
-0
C e rt if ic a te s
.1
.4 S
In d o o r A ir Q u a lit y f o r
In s u la ti o n
M a te ri a ls
S U
B M
IT
T
A L
R E
G
IS
T E
R C
O N
T R
A C
T N
O
T
IT
L E
A N
D L
O C
A T
IO
N
C O
N T
R A
C T
O R
C O
N T
R A
C T
O R
S
C H
E D
U L
E D
A T
E S
C O
N T
R A
C T
O R
A C
T
IO
N A
P P
R O
V
IN
G A
U T
H O
R
IT
Y
A C T I V I T Y N O
T R A N S M I T T A L N O
S P E C S E C T
D E
S C
R
IP
T
IO
N
IT
E
M S
U B
M
IT
T E
D
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T O R A / E R E V W R S
U B
M
IT
A P
P R
O V
A L
N E
E D
E D
B Y
M A
T E
R
IA
L N
E E
D E
D B
Y
A C T I O N C O D E
D A
T E
O F
A C
T
IO
N
D A
T E
F W
D T
O A
P P
R A
U T
H
D A
T E
R C
D F
R O
M C
O N
T R
D A
T E
F W
D T
O O
T H
E R
R E
V
IE
W E
R
D A
T E
R C
D F
R O
M O
T H
R E
V
IE
W E
R
A C T I O N C O D E
D A
T E
O F
A C
T
IO
N
M A
IL
E
D T
O C
O N
T R
D A
T E
R C
D F
R M
A P
P R
A U
T H
R E
M A
R K
S
(a
(b
(c
(d
(e
(f
(g
(h
(i
(j
(k
(l
(m
(n
(o
(p
(q
B M
IT
T
A L
F O
R M
,J a n
P
R E
V
IO
U S
E D
IT
IO
N I
S O
B S
O L
E T
E P
A G
E
O F
P A
G E
S
M a jo r
R e p a ir s
.3
.1 S
In d o o r A ir Q u a lit y f o r
A d h e s iv e s
S D
-0
M a n u fa c tu re r’ s I n s tr u c ti o n s
.3
.1 In s u la ti o n
S D
-0
S h o p
D ra w in g s
.3
In s u la ti o n B o a rd L a y o u t
.3
V e ri fi c a ti o n o f E x is ti n g C o n d it io n s
S D
-0
P ro d u c t
D a ta
.1
In s u la ti o n
.4
C o v e r B o a rd
.3
F a s te n e rs
.1
.2 S
R e c y c le d C o n te n t F o r
In s u la ti o n
S D
-0
T e s t
R e p o rt s
.8
.1 F la m e S p re a d
R a ti n g
S D
-0
C e rt if ic a te s
.6
In s ta lle r
Q u a lif ic a ti o n s
.6
C e rt if ic a te s O f C o m p lia n c e
F o r
F e lt M a te ri a ls
.1
.3 S
In d o o r A ir Q u a lit y F o r
In s u la ti o n
S D
-0
M a n u fa c tu re r’ s I n s tr u c ti o n s
.3
F a s te n e rs
.1
In s u la ti o n
S D
-0
P re c o n s tr u c ti o n S u b m it ta ls
.8
.1 Q u a lif ic a ti o n o f M a n u fa c tu re r
.8
.2 Q u a lif ic a ti o n o f In s ta lle r
.9
Q u a lit y C o n tr o l P la n
.9
S a fe ty
P la n
S U
B M
IT
T
A L
R E
G
IS
T E
R C
O N
T R
A C
T N
O
T
IT
L E
A N
D L
O C
A T
IO
N
C O
N T
R A
C T
O R
C O
N T
R A
C T
O R
S
C H
E D
U L
E D
A T
E S
C O
N T
R A
C T
O R
A C
T
IO
N A
P P
R O
V
IN
G A
U T
H O
R
IT
Y
A C T I V I T Y N O
T R A N S M I T T A L N O
S P E C S E C T
D E
S C
R
IP
T
IO
N
IT
E
M S
U B
M
IT
T E
D
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T O R A / E R E V W R S
U B
M
IT
A P
P R
O V
A L
N E
E D
E D
B Y
M A
T E
R
IA
L N
E E
D E
D B
Y
A C T I O N C O D E
D A
T E
O F
A C
T
IO
N
D A
T E
F W
D T
O A
P P
R A
U T
H
D A
T E
R C
D F
R O
M C
O N
T R
D A
T E
F W
D T
O O
T H
E R
R E
V
IE
W E
R
D A
T E
R C
D F
R O
M O
T H
R E
V
IE
W E
R
A C T I O N C O D E
D A
T E
O F
A C
T
IO
N
M A
IL
E
D T
O C
O N
T R
D A
T E
R C
D F
R M
A P
P R
A U
T H
R E
M A
R K
S
(a
(b
(c
(d
(e
(f
(g
(h
(i
(j
(k
(l
(m
(n
(o
(p
(q
B M
IT
T
A L
F O
R M
,J a n
P
R E
V
IO
U S
E D
IT
IO
N I
S O
B S
O L
E T
E P
A G
E
O F
P A
G E
S
M a jo r
R e p a ir s
.7
.1 F ir e
P re v e n ti o n P la n
.7
.2 R e s p ir a to r
P la n
S D
-0
S h o p
D ra w in g s
.4
S p ra y F o a m A ir B a rr ie r
.9
F o a m
A ir B a rr ie r
S y s te m
.4
.1 F ir e
-R a te d
A s s e m b lie s
S D
-0
P ro d u c t
D a ta
.1
.2 O p e n C e ll
.2
P ri m e rs
A d h e s iv e s a n d M a s ti c s
.4
S e a la n ts
.4
.2 S a fe ty D a ta
S h e e ts
.1
.1 Ig n it io n B a rr ie r
C o a ti n g s
.1
.2 S
R e c y c le d C o n te n t fo r O p e n C e ll
S p ra y F o a m A ir B a rr ie r
S D
-0
S a m p le s
.4
S p ra y F o a m A ir B a rr ie r
S D
-0
T e s t
R e p o rt s
.4
.3 F ie ld
P e e l A d h e s io n T e s t
.4
.3 F ir e
-R a ti n g s O f Ig n it io n B a rr ie r
M a te ri a ls
.4
.3 F la m e S p re a d
A n d S m o k…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.