Price Schedule
| ATTACHMENT 1: Price Schedule | ||||||
| USCGC HEALY DOCKSIDE FY21 | ||||||
| 70Z08521RP4501400 | ||||||
| Contract Line Item (CLIN) | Funding Code | Title | Unit Price | Unit of Issue | Quantity | Extended Price |
| 001 | 45 | NACE Inspector (Level 3), Provide | Job | 1 | $0.00 | |
| 002 | 45 | Hull Plating (U/W Body), Diver's Inspection, Perform | Job | 1 | $0.00 | |
| 003 | 45 | Propulsion Shaft Bulkhead Seals, Annual Maintenance | Job | 1 | $0.00 | |
| 004 | 45 | Fuel Oil Purifier (FOP) Overhaul | Job | 1 | $0.00 | |
| 005 | 45 | Lube Oil Purifier (LOP) Overhaul | Job | 1 | $0.00 | |
| 006 | 45 | Boiler, Annual Maintenance | Job | 1 | $0.00 | |
| 007 | 45 | A-Frames, Annual Inspection | Job | 1 | $0.00 | |
| 008 | 45 | Port & Starboard Miranda Davit, Annual Inspect and Repair | Job | 1 | $0.00 | |
| 009 | 45 | 04 Deck Crane (Port) TB 100-55, Biennial Overhaul and HPU Repairs | Job | 1 | $0.00 | |
| 010 | 45 | 04 Deck Crane (Starboard) TB 100-55, Annual Inspect and Test | Job | 1 | $0.00 | |
| 011 | 45 | Aft Crane (Port), Biennial Overhaul | Job | 1 | $0.00 | |
| 012 | 45 | Aft Crane (Starboard), Biennial Overhaul | Job | 1 | $0.00 | |
| 013 | 45 | Instrumented Science Winch Sheaves, Inspect | Job | 1 | $0.00 | |
| 014 | 45 | Bow Crane, Annual Inspect and Test | Job | 1 | $0.00 | |
| 015 | 45 | Temporary Services, Provide - Cutter | Job | 1 | $0.00 | |
| 016 | 45 | Sea Trial Performance, Support, Provide Price CLIN for four (4) weekdays1. Insert price per day for weekend days2 here: $______________to be used in a change request. | Day | 4 | $0.00 | |
| 017 | 45 | Flex Hose Assemblies, Renew | Job | 1 | $0.00 | |
| 018 | 30 | Damage Control and Firefighting Systems, PMS | Job | 1 | $0.00 | |
| 019 | 45 | Internal Hoist, Level 1 Inspect and Test | Job | 1 | $0.00 | |
| 020 | 30 | Deck Socket, Modify | Job | 1 | $0.00 | |
| 021 | 45 | Helo Talon Grids, Overhaul | Job | 1 | $0.00 | |
| 022 | 45 | Decks, Helicopter Operating Areas, Preserve | Job | 1 | $0.00 | |
| 023 | 30 | Antenna Foundations, Preserve | Job | 1 | $0.00 | |
| 024 | 45 | Thrust Bearing, Inspection | Job | 1 | $0.00 | |
| 025 | 45 | HVAC Exterior Exhaust, Partial Preserve | Job | 1 | $0.00 | |
| 026 | 45 | Ventilation Ducting, Clean and Inspect | Job | 1 | $0.00 | |
| 027 | 45 | Roller Curtain Door, Replace | Job | 1 | $0.00 | |
| 028 | 45 | Gear Box (Bow Thruster), Replace | Job | 1 | $0.00 | |
| 029 | 45 | Deck Covering, Magnesite, Renew | Job | 1 | $0.00 | |
| 030 | 45 | High Pressure Breathing Air Compressor (HPBAC), Replace | Job | 1 | $0.00 | |
| 031 | 45 | Obstruction Lights, Install | Job | 1 | $0.00 | |
| 032 | 45 | Valves, Overhaul | Job | 1 | $0.00 | |
| 033 | 45 | Decks - Exterior, Preserve (“Non-Skid Broadcast Grit” System) | Job | 1 | $0.00 | |
| 034 | 45 | Chain Locker Sump Access Trunk, Preserve 100% | Job | 1 | $0.00 | |
| 035 | 45 | Hull Plating Freeboard, Preserve "Partial" | Job | 1 | $0.00 | |
| 036 | 45 | Tenting, Provide | Job | 1 | $0.00 | |
| 037 | 45 | Cofferdam, Install | Job | 1 | $0.00 | |
| 038 | 45/303,4 | Additional Work - Composite Labor Rate Unit Price: $_________ ; Quantity:20,000; Unit of Issue: Hour; Extended Price: [20,000 X hourly rate quoted]: _______________ . |
All inclusive mark-up/loading rate for materials and subcontractors: ____%. Unit Price: $500,000.00; Quantity: 1; Unit of Issue: Percent; Extended Price: [$500,000.00 X percentage quoted]: ___________ .
| The lump sum amount to be entered for this item is the combined extended prices for composite labor and percentage markup for materials and subcontractors. The above rate and percentage will be incorporated into the contract and used on task order/s for change requests (CRs). Work is ordered against this CLIN on authorized CRs by the Contracting Officer. | Lump Sum | 1 | $ - 0 | |
| Contract Total Evaluated Price | $0.00 | |||
| 1 Weekday is Monday, Tuesday, Wednesday, Thursday and Friday. | ||||
| 2 Weekend day is Saturday and Sunday | ||||
| 3 Estimated Quantity. The quantity shown is an estimate only and may be exceeded at the unit prices offered. | ||||
| 4 Funding code correlates to original CLIN work is to be performed under. |