Attachment 1 - ALDER (WLB 216) DS FY20 Section B Schedule of Prices Rev3.xls
XLS spreadsheet 48 KB Posted
- Solicitation number
- 70Z085-20-Q-P4553600
About this file
This document contains a pricing schedule for various dockside repair items for the USCGC Alder (WLB 216). The schedule lists over twenty separate repair and maintenance items to be performed on the vessel, including cleaning and inspecting fuel, water, and lube oil tanks; inspecting and servicing equipment like the hydraulic inhaul winch and anchor windlass; renewing systems like deck covering, potable water piping and valves, and fire pump discharge piping; and overhauling items such as the main diesel engine coupling. Pricing is provided as unit costs per item, with quantities and extended totals. Additional details include labor rates by location and templates for cost estimates and breakdowns.
The related federal contract opportunity is a solicitation from the US Coast Guard for dock-side repair availability of the USCGC Alder. The contractor will furnish all necessary labor, materials, equipment and services to perform various dockside repairs to the vessel in accordance with the solicitation and attached specification. The scope of work includes ship repair and associated support, and may include additional items beyond those definitively listed.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC ALDER (WLB-225B) DOCKSIDE AVAILABILITY FY2020 | |||||
| REV 3 22 Apr 2020 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Chain Locker(s), Clean and Inspect | JOB | 1 | $0.00 | |
| D-002 | Tanks (MP Fuel Service), Clean and Inspect | JOB | 1 | $0.00 | |
| D-003 | Tanks (Potable Water), Clean and Inspect | JOB | 1 | $0.00 | |
| D-004 | Tanks (Lube Oil), Clean and Inspect | JOB | 1 | $0.00 | |
| D-005 | Main Diesel Engine (MDE) Exhaust Piping, Commercial Clean | JOB | 1 | $0.00 | |
| D-006 | Ship Service Diesel Generator (SSDG) Exhaust Piping, Commercial Clean | JOB | 1 | $0.00 | |
| D-007 | Hydraulic Inhaul Winch, Inspect And Service | JOB | 1 | $0.00 | |
| D-008 | Anchor Windlass, Inspect and Service | JOB | 1 | $0.00 | |
| D-009 | Twin Pivot Arm Davit, Inspect and Service | JOB | 1 | $0.00 | |
| D-010 | SSDG Isolation Mount, Renew | JOB | 1 | $0.00 | |
| D-011 | Deck Covering, Electrical Matting, Renew | JOB | 1 | $0.00 | |
| D-012 | Potable Water Pipe, Renew | JOB | 1 | $0.00 | |
| D-013 | Potable Water Valves, Renew | JOB | 1 | $0.00 | |
| D-014 | Steering Hydraulic Pipe Hanger Repair | JOB | 1 | $0.00 | |
| D-015 | Fire Pump Discharge Piping, Renew | JOB | 1 | $0.00 | |
| D-016 | LO Tank Vent Repair | JOB | 1 | $0.00 | |
| D-017 | Chain Washdown Coupling, Install | JOB | 1 | $0.00 | |
| D-018 | Main Diesel Engine, Vulkan Coupling Overhaul | JOB | 1 | $0.00 | |
| D-019 | Ship Service Diesel Generator, Clean & Inspect | JOB | 1 | $0.00 | |
| D-020 | Component, Work Description | JOB | 1 | $0.00 | |
| D-021 | Molded Case Circuit Breakers, Inspect & Test | JOB | 1 | $0.00 | |
| D-022 | Hull Fittings (Weight Handling Rigging Hardware), Inspect and Test | JOB | 1 | $0.00 | |
| D-023 | Sewage Holding Tank(s), Clean and Inspect | JOB | 1 | $0.00 | |
| D-024 | DELETED | JOB | 0 | ||
| O-00A | Composite Labor Rate | Hour | 470 | 0 | |
| D-00B | GFP Report | NSP | EA | NSP | |
| O-00Z | Laydays | Day | 5 | $0.00 | |
| Total Price of Definite Items | $0.00 | ||||
| Total Price of Option Items | $0.00 | ||||
| Total Price of Definite and Optional Items | $0.00 |
&C(11/13/2019) Draft-1 - Page &P of &N
CostEstimateBreakdowns
| Composite Labor Rate | 55 | |||||||||||||||||||||||
| Assumed G&A Factor | 15% | |||||||||||||||||||||||
| Assumed Profit Factor | 10% | Direct Labor | Direct Material/Subs Cost | |||||||||||||||||||||
| ITEM | DESCRIPTION | UNIT PRICE | Sub-Contracted (put a "1" in the blank) | Total Labor Hours | Total Material & Subs (cost + G&A + profit) | Eng Tech | Machinest/Pipe Fitter | Electrician | Shipfitter | Welder | Firewatch | Insulator/Lagger | Painter | Gen Labor/Helper/Rigger | Supt/QA/NDT | Mat/Sub Cost 1 | Mat/Sub Cost 2 | Mat/Sub Cost 3 | Mat/Sub Cost 4 | Lab Rate | Area | WorkItemID | WIFileID | LoadData |
| 62 | Baltimore, MD | |||||||||||||||||||||||
| 52 | Biloxi, MS | |||||||||||||||||||||||
| 56 | Boston, MA | |||||||||||||||||||||||
| 50 | Charleston, SC | |||||||||||||||||||||||
| 60 | Corpus Christi, TX | |||||||||||||||||||||||
| 51 | Hampton Roads | |||||||||||||||||||||||
| 64 | Honolulu, HI | |||||||||||||||||||||||
| 55 | Houston, TX | |||||||||||||||||||||||
| 56 | Los Angeles, CA | |||||||||||||||||||||||
| 55 | Median Rate | |||||||||||||||||||||||
| 49 | Miami | |||||||||||||||||||||||
| 50 | Narragansett Bay, RI | |||||||||||||||||||||||
| 55 | New London, CN | |||||||||||||||||||||||
| 45 | New Orleans | |||||||||||||||||||||||
| 62 | NYNY | |||||||||||||||||||||||
| 49 | Panama City, FL | |||||||||||||||||||||||
| 60 | Philadelphia, PA | |||||||||||||||||||||||
| 51 | Portland, ME | |||||||||||||||||||||||
| 57 | Portland, OR | |||||||||||||||||||||||
| 55 | San Diego, CA | |||||||||||||||||||||||
| 67 | San Francisco, CA | |||||||||||||||||||||||
| 55 | Santa Barbara, CA | |||||||||||||||||||||||
| 55 | SE North Carolina | |||||||||||||||||||||||
| 65 | Seattle, WA | |||||||||||||||||||||||
| 48 | Tampa-St. Petersburg | |||||||||||||||||||||||
| 60 | Wilmington, DE |
&C(09/28/2009) Page &P of &N
CostEstimateTemplate
File details come from the government source that posted it. Updated .