Attach_2_to_Amend_03-HICKORY_(WLB_225B)_DD_SPEC_Rev1_26Jul19.pdf
PDF 6 MB Posted
- Attached to
- USCGC HICKORY Dry Dock Repair Services FY20
- Solicitation number
- 70Z085-20-Q-P4501300
About this file
Attachment 2 to Amendment 3 HICKORY DryDock Specifications - Revision 1, dated 26Jul19
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC HICKORY (WLB 212)
SPECIFICATION FOR DRYDOCK REPAIRS
FY2020
Developed By: Bronson L. Suyat
(Rev-1, 26 Jul 2019)
USCGC HICKORY (WLB-225B) DRYDOCK AVAILABILITY FY2020
ii (Rev-1)
TABLE OF CONTENTS
Revisions Record ........................................................................................................................................... v Consolidated List of References ................................................................................................................... vi Consolidated List of Government-furnished Property ............................................................................... xiv Consolidated List of Critical Inspection Items ......................................................................................... xvii Principal Characteristics ............................................................................................................................. xix General Requirements WORK ITEM 1: Hull Plating (Side Scan), Ultrasonic Testing WORK ITEM 2: Hull Plating (U/W Body), Inspect WORK ITEM 3: Buoy Cargo Hold Deck, Preserve 100% WORK ITEM 4: U/W Body, Preserve (100%) WORK ITEM 5: Hull Plating Freeboard, Preserve – Partial WORK ITEM 6: Hull Plating Freeboard, Preserve “100%” WORK ITEM 7: Hull and Structural Plating (General) -10.2-Pound Steel, Renew WORK ITEM 8: Hull and Structural Plating (General) - 12.75-Pound Steel Plate, Renew WORK ITEM 9: Hull and Structural Plating (General) - 15.3-Pound Steel Plate, Renew WORK ITEM 10: Hull And Structural Plating (General) - 20.4-Pound Steel Plate, Renew WORK ITEM 11: Hull and Structural Plating (General) - 7.5-Pound (3/16") Steel Plate, Renew WORK ITEM 12: Hull and Structural Plating (General) - 7.65- Pound Steel Plate, Renew WORK ITEM 13: Hull And Structural Plating (General) - Cracked Steel Welds, Repairs WORK ITEM 14: Hull And Structural Plating (General) - Degraded Weld (Steel), Repair WORK ITEM 15: Appendages (U/W), Leak Test WORK ITEM 16: Propulsion Shaft Fairwaters and Rope Guards, Inspect WORK ITEM 17: Appendages (U/W) - Internal, Preserve WORK ITEM 18: Chain Locker(s), Clean and Inspect WORK ITEM 19: Voids (Non-Accessible), Leak Test WORK ITEM 20: Voids (Non-Accessible), Internal Surfaces, Preserve WORK ITEM 21: Tanks (MP Fuel Service), Clean And Inspect WORK ITEM 22: Tanks (Potable Water), Clean and Inspect WORK ITEM 23: Tanks (Ballast), Clean and Inspect WORK ITEM 24: Tanks (Dirty Oil and Waste), Clean and Inspect WORK ITEM 25: Propulsion Shafting; Remove, Inspect, and Reinstall WORK ITEM 26: Propulsion Shaft Seals, Mechanical Overhaul And Inflatable Renewal WORK ITEM 27: Propulsion Tail Shaft Sleeve, Skim Cut WORK ITEM 28: Propulsion Shaft Bearings (External), Check Clearances WORK ITEM 29: Stern Tube Interior Surfaces, Preserve 100% WORK ITEM 30: Controllable Pitch Propellers, Clean and Inspect WORK ITEM 31: Controllable Pitch Propeller, System Maintenance WORK ITEM 32: Controllable Pitch Propeller Hub, General Maintenance, Perform WORK ITEM 33: Heat Exchangers; Clean, Inspect And Hydro WORK ITEM 34: Fathometer Transducer, Renew WORK ITEM 35: Fwd Scan Sonar Transducer, General Maintenance, Perform WORK ITEM 36: Sea Valves and Waster Pieces, Overhaul or Renew WORK ITEM 37: Sea Strainers (All Sizes), Renew WORK ITEM 38: Sea Strainers - Duplex (All Sizes), Overhaul WORK ITEM 39: Sea Strainers - Simplex (All Sizes), Clean and Inspect WORK ITEM 40: Sea Bay, Clean and Inspect WORK ITEM 41: Sea Bay, Preserve 100% WORK ITEM 42: Fixed CO2 FF Bottles, Inspect and Hydrostatic Test iii (Rev-1)
WORK ITEM 43: Rudder(s), Preserve (“100%”) WORK ITEM 44: Rudder, Inspect And Repair WORK ITEM 45: Rudder and Rudder Stock, Remove and Inspect WORK ITEM 46: Rudder Bearings, Renewal WORK ITEM 47: Thruster Units (Bow And Stern), Overhaul WORK ITEM 48: Anchor Windlass, Inspect and Service WORK ITEM 49: Anchor Chain(s) and Ground Tackle, Inspect and Repair WORK ITEM 50: Hull Fittings (Mooring and Towing), Inspect and Test WORK ITEM 51: Accessible Void(s), Preserve “100%” WORK ITEM 52: Tanks (Ballast), Preserve “100%” WORK ITEM 53: Tanks (Ballast), Preserve “Partial” WORK ITEM 54: Chain Locker, Preserve 100% WORK ITEM 55: Chain Lockers, Preserve – Partial WORK ITEM 56: Tanks (Dirty Oil and Waste), Preserve “100%” WORK ITEM 57: Tanks (Dirty Oil and Waste), Preserve “Partial” WORK ITEM 58: Accessible Void(s), Preserve “Partial” WORK ITEM 59: Tanks (Potable Water), Preserve “100%” WORK ITEM 60: Tanks (Potable Water), Preserve “Partial” WORK ITEM 61: Decks – Exterior (Buoy or Construction Deck), Preserve 100% WORK ITEM 62: Hull Plating Freeboard (Buoy Port Areas), Preserve WORK ITEM 63: Superstructure, Preserve “100%” WORK ITEM 64: Superstructure, Preserve “Partial” WORK ITEM 65: Exhaust Stacks (Exterior), Preserve WORK ITEM 66: Exhaust Stacks (Exterior), Preserve - Partial WORK ITEM 67: Cathodic Protection / Zinc Anodes, Renew WORK ITEM 68: Impressed Current Cathodic Protection System, Inspect and Maintain WORK ITEM 69: Impressed Current Cathodic Protection System Reference Cells, Renew WORK ITEM 70: Drydock WORK ITEM 71: Temporary Services, Provide - Cutter WORK ITEM 72: Sea Trial Performance, Support, Provide WORK ITEM 73: Buoy Deck Auxiliary Cleat & Snubbing Winch Install WORK ITEM 74: Buoy Deck Led Flood Lights, Replace WORK ITEM 75: Oily Water Separator, Overhaul WORK ITEM 76: Fuel Oil Purifier (FOP) and Lube Oil Purifier (LOP) Depot-Level Four Year
Maintenance, Accomplish WORK ITEM 77: Propulsion Shaft Bearing Shell, Renewal WORK ITEM 78: Jack Staff, Preserve, 100% WORK ITEM 79: Foc’sle Weather Deck, Preserve (“Non-Skid Broadcast Grit” System) WORK ITEM 80: Hawse Pipe Repair WORK ITEM 81: Fire Pumps, Renew WORK ITEM 82: Pilothouse Windows, Renew WORK ITEM 83: Sea Water System Piping, Clean and Flush WORK ITEM 84: Fuel Transfer Stations, Renew WORK ITEM 85: Oily Waste Piping, Renew WORK ITEM 86: Watertight Doors and Scuttles (External), Renew WORK ITEM 87: Flex Hose Assemblies, Renew WORK ITEM 88: Sewage Piping, Clean Flush and Repair WORK ITEM 89: Bilges, Partial Preserve WORK ITEM 90: Superstructure Surfaces (Buoy Deck Area), Preserve WORK ITEM 91: Sewage Holding Tank(s), Clean and Inspect WORK ITEM 92: Main Diesel Engine (MDE) Governors, Renew iv (Rev-1)
WORK ITEM 93: Controllable Pitch Propeller Hub, Remove and Reinstall v (Rev-1)
REVISIONS RECORD
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE REV# WORK
ITEM#
CHANGES MADE
26JUL19 1 47 1.2 Government-furnished property UPDATE QTY
26JUL19 1 47 3.4 Fluid disposal UPDATE QTY
26JUL19 1 61 3.6.1 Inhaul winch/Hydraulic Chain Stopper
26JUL19 1 75 3.5 Restoration and Cleaning DELETE
26JUL19 1 93 Controllable Pitch Propeller Hub, Remove and Reinstall
26JUL19 1 47 Consolidated list of Government-furnished Property
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
vi (Rev-1)
CONSOLIDATED LIST OF REFERENCES
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.
All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.
COAST GUARD DRAWINGS
APM: If editing a WI's References, change the same reference in the Spec's Consolidated List of
References and send feedback to the WI's Developer.
Coast Guard Drawing 225B WLB 633-002, Rev A, Cathodic Protection Passive
Coast Guard Drawing 225 WLB 184-001, Rev B, CRP-V850 Transducer Adapter Ring
Coast Guard Drawing 225 WLB 256-001, Rev P, Seawater Cooling System Diagram
Coast Guard Drawing 225 WLB 424-001, Rev G, Acoustic Navigation System Block & Isometric
Coast Guard Drawing 225 WLB 581-001, Rev E, Anchor Handling System Arrangement
Coast Guard Drawing 225 WLB 601-001, Rev M, General Arrangement Inboard & Outboard Profiles
Coast Guard Drawing 225 WLB 801-020, Rev B, Tank CAPACITY - 95% Curves
Coast Guard Drawing 225B WLB 114-001, Rev C, Shell Appendages
Coast Guard Drawing 225B WLB 114-002, Rev, Flow Accelerating Fin
Coast Guard Drawing 225B WLB 541-007, Rev D; Incinerator Fuel Oil Service Tank
Coast Guard Drawing 225B WLB 568-001, Rev A, Bow Thruster A & D
Coast Guard Drawing 225B WLB 801-006, Rev E, Docking Drawing
Coast Guard Drawing 225B WLB 111-001, Rev A, Shell Expansion
Coast Guard Drawing 225B WLB 114-001, Rev C, Shell Appendages
Coast Guard Drawing 225B WLB 162-1, Rev G, Stacks and Updates
Coast Guard Drawing 225B WLB 201-001, Rev D, Machinery Spaces Arrangement
Coast Guard Drawing 225B WLB 243-001, Rev J, Propulsion Shafting Arrangement
Coast Guard Drawing 225B WLB 243-002, Rev G, Stern Tube and Bearings A&D
Coast Guard Drawing 225B WLB 528-001, Rev E, Plumbing and Interior Deck Drains
Coast Guard Drawing 225B WLB 541-001, Rev J, Fuel Oil System Diagram
Coast Guard Drawing 225B WLB 555-005, Rev D, CO2 System A/D, Fr 48 Aft, Block 930, 940, 950, 960A
Coast Guard Drawing 225B WLB 555-006, Rev A, CO2 System, A/D, Flammable Liquid Storeroom, Blk
901, 910
Coast Guard Drawing 225B WLB 555-007, Rev B, CO2 System, A/D, Emergency Generator Rm, Block
Coast Guard Drawing 225B WLB 556-001, Rev F, Hydraulic System Diagram
Coast Guard Drawing 225B WLB 568-002, Rev A, Stern Thruster Arrangement and Detail vii (Rev-1)
Coast Guard Drawing 225B WLB 581-001 Rev C, Anchor Handling System Arrangement
Coast Guard Drawing 225B WLB 582-001, Rev -, Mooring and Towing A & D
Coast Guard Drawing 225B WLB 593-001, Rev D, Sewage and Waste Water System
Coast Guard Drawing 225B WLB 601-001, Rev N, General Arrangements, Inboard & Outboard Profiles
Coast Guard Drawing 225B WLB 601-002. Rev M, Booklet of General Drawings
Coast Guard Drawing 225B WLB 633-001, Rev B, Cathodic Protection System Arrangement, Block
Diagram, Wiring Deck Plan, and Elementary Diagrams
Coast Guard Drawing 225B WLB 635-001, Rev E, Hull, Thermal, & Acoustic Insulation Schedule
Coast Guard Drawing 225B WLB 801-001, Rev A, Lines and Offsets
Coast Guard Drawing 225B WLB 801-003, Rev, Curves of Forms and Cross Curves of Stability
Coast Guard Drawing 225B WLB 801-005, Rev A Tank CAPACITY - 95% Curves
Coast Guard Drawing 225B WLB 901-003, Rev A, Hull Block 901 Block Assembly
Coast Guard Drawing 225B WLB 940-001, Rev E; Hull Block 940 - Modules
Coast Guard Drawing 225B-WLB 233-001, Rev D, Propulsion Train Installation Drawing
Coast Guard Drawing 225B-WLB 521-001, Rev E, Firemain System Diagram
Coast Guard Drawing 225B-WLB 541-001, Rev G, Fuel Oil System Diagram
Coast Guard Drawing 225B-WLB 556-008, Rev C, CPP Hydraulic System Diagram
Coast Guard Drawing 225B-WLB 593-002, Rev C, Oily Bilge Water System Diagram
Coast Guard Drawing 225B-WLB 593-008, Rev, Oily Bilge Water System A/D, FR 48 Aft Block
930,940
Coast Guard Drawing 225B-WLB 601-001, Rev F, General Arrangements, Inboard and Outboard Profiles
Coast Guard Drawing 225B-WLB 601-002, Rev M, Booklet of General Drawings
Coast Guard Drawing 225B-WLB 611-001, Rev D, Lifting Pads - Main and Aux Machinery Room
Coast Guard Drawing 225B-WLB 111-001, Rev A, Shell Expansion
Coast Guard Drawing 225B-WLB 167-001, Rev M; Structural Closures
Coast Guard Drawing 225B-WLB 170-001, Rev J; Mast A & D
Coast Guard Drawing 225B-WLB 201-001, Rev C, Machinery Spaces Arrangement
Coast Guard Drawing 225B-WLB 243-001, Rev J, Propulsion Shafting Arrangement
Coast Guard Drawing 225B-WLB 243-002, Rev G; Stern Tube and Bearing A & D
Coast Guard Drawing 225B-WLB 541-001, Rev G, Fuel Oil System Diagram
Coast Guard Drawing 225B-WLB 556-008, Rev C, CPP Hydraulic System Diagram
Coast Guard Drawing 225B-WLB 561-003, Rev B; Steering Gear Arrangement
Coast Guard Drawing 225B-WLB 562-001, Rev G; Steering Components A/D
Coast Guard Drawing 225B-WLB 562-002, Rev D; Rudder - Struct A & D
Coast Guard Drawing 225B-WLB 562-003, Rev; Thordon Lower Rudder Stock Bearing
Coast Guard Drawing 225B-WLB 562-004, Rev; Pintle Bearing
Coast Guard Drawing 225B-WLB 581-001, Rev C, Anchor Handling System Arrgt
Coast Guard Drawing 225B-WLB 601-001, Rev J, General Arrangements, Inbd & Outbd Profiles
Coast Guard Drawing 225B-WLB 601-002, Rev M, Booklet of General Drawings
Coast Guard Drawing 225B-WLB 625-001, Rev C, Windows and Portlights
Coast Guard Drawing 225B-WLB 631-001, Rev G, Painting Schedule
Coast Guard Drawing 225B-WLB 635-001, Rev E, Hull Thermal & Acoustic Insulation Schedule viii (Rev-1)
Coast Guard Drawing 225B-WLB 801-013, Rev B, Midship Section & Typical Sections
Coast Guard Drawing 225B-WLB 801-015, Rev B, Scantling, Decks, & Platforms
Coast Guard Drawing 225B-WLB 801-016, Rev, Scantlings, Watertight Bulkheads
Coast Guard Drawing 225B-WLB 801-006, Rev C; Docking Drawing
Coast Guard Drawing 225B-WLB 901-002, Rev D, Hull Block 901 Modules
Coast Guard Drawing 225-WLB 244-203, Rev E, Stern Tube Split Dovetail Carrier Casting
Coast Guard Drawing 225-WLB 601-001, Rev T, Gen Arrangements Inbd & Outboard Profiles
Coast Guard Drawing 225-WLB 330-002, Rev H, Lighting System Forward of FR. 30 Hill Block 910/901
Coast Guard Drawing 225-WLB 330-007, Rev R, Lighting System 02 Level & Above Hull Block
960B/975 & 970 Partial
Coast Guard Drawing 225-WLB 573-001, Rev P, Buoy Handling System
Coast Guard Drawing FL 1204-003. Rev A, Welded Padeyes and Links
Coast Guard Drawing FL-1602-89, Rev -, 26” x 66” Weathertight Door
Coast Guard Fleet Drawing FL 2804-12, Rev -, U.S.C.G. Emblem
Coast Guard Fleet Drawing FL 2804-22, Rev-, Consolidated Visual ID for Cutters
NAVSEA Drawing 2803-980209, Plates, Label
NAVSEA Drawing 803-5001104, Rev -; Rudder Stock Bearings and Seals
NAVSEA Dwg 803-1385664, Bearings, Stern Tube & Strut
NAVSEA Dwg 803-2145807, Propulsion Shafting & Components
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors
Manual
Coast Guard Drawing 225B WLB 633-001, Rev B, Cathodic Protection System Arrangement, Block
Diagram, Wiring Deck Plan, and Elementary Diagrams
Coast Guard Technical Publication (TP) 2718, SWBS 555, Jun 2006, Fire Extinguishing Systems (270
WMEC A-Class)
Coast Guard Technical Publication (TP) 3498, Section A, Jul 2015, Buoy Chain Winch
Coast Guard Technical Publication (TP) 3518, Oct 2007, MDE Model 3608/1
Coast Guard Technical Publication (TP) 3523, Apr 2002, SWBS 241-A, Reduction Gear - Model
96DHCMG-Cp
Coast Guard Technical Publication (TP) 3523, SWBS 241-B, Nov 2007, Reduction Gear - Model
96DHCMGH-CP
Coast Guard Technical Publication (TP) 3524, 2013, Manufacturer's Instruction Book-SWBS Group(s)
243-262
Coast Guard Technical Publication (TP) 3524, 07-JAN-97, Manufacturer's Instruction Book-SWBS
Group(s) 243-262
Coast Guard Technical Publication (TP) 3524, SWBS 245-B, Aug 2005, Instruction Manual for the
Model 102 B Class Controllable Pitch Propeller and Shafting System
Coast Guard Technical Publication (TP) 3524, SWBS 245-B, May 2009, Propeller System, CPP - Model
110251007
Coast Guard Technical Publication (TP) 3525, Section 262-A, Nov 2001, Purifier, Lube/CPP Oil – Model
MMPX-303
ix (Rev-1)
Coast Guard Technical Publication (TP) 3550, 21-MAY-96, Manufacturer's Instruction Book-SWBS
Group(s) 521-531
Coast Guard Technical Publication (TP) 3552, Section 541-A, Aug 2004, Purifier, Fuel Oil (FOP) –
Model WHPX-405
Coast Guard Technical Publication (TP) 3556, Jun 2009, Manufacturer’s Instruction Book-SWBS
Group(s) 568, Bow and Stern Thruster – Model 125/3 STAY/FP
Coast Guard Technical Publication (TP) 3559, SWBS 581B, Jan 1997, Anchor Windlass, P/S - Model
BMD-478
Coast Guard Technical Publication (TP) 3564, 21-APR-97, Manufacturer's Instruction Book-SWBS
Group(s) 593
Coast Guard Technical Publication (TP) 3574, Mar 2009, SWBS Group 633-638
Coast Guard Technical Publication (TP) 3574, May 1996, Manufacturer's Instruction Book-SWBS
Group(s) 633-638
Coast Guard Technical Publication (TP) 5458, SWBS 573, Oct 2012, Winch, Radial – Model 50.2PT
Coast Guard Technical Publication (TP) E-424-006, Version WLB97-1, Wesmar 3060-08/M-8/AC
Forward Scan Sonar
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 20114, General
Requirements
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General
Requirements
Surface Forces Logistics Center Standard Specification 0000(SFLC Std Spec 0000), 2014, General
Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and
Allied Processes
Surface Forces Logistics Center Standard Specification 0740(SFLC Std Spec 0740), 2014, Welding and
Allied Processes
Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2014, Shipboard
Electrical Cable Test
Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2014, Shipboard
Electrical Cable Removal, Relocation, Splice, Repair, and Installation
Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2014, Auxiliary
Machine Systems Installation Details
Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2014, Auxiliary
Machine Systems
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Preserve Ship
Structures
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
Surface Forces Logistics Center Standard Specification 8634 (SFLC Std Spec 8634), 2014, Drydocking
Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), 2014, Temporary
Services
Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), 2014, Temporary
Hull Accesses
OTHER REFERENCES
«OTHERREF»
x (Rev-1)
American Bureau of Shipping (ABS) Approved Chain, Accessory and Bar Manufacturing Facilities List, Oct 2016
American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2011, Disinfection of Water-Storage Facilities
American National Standards Institute/NSF International (ANSI/NSF) 61, 2008, Drinking Water System
Components - Health Effects
American National Standards Institute/NSF International (ANSI/NSF) 61, 2015, Drinking Water System
Components - Health Effects
American Society for Nondestructive Testing (ASNT) SNT-TC-1A, 2013, Recommended Practice for
Personal Qualification and Certification in Nondestructive Testing
American Society of Mechanical Engineers (ASME) B16.34, 2004, Valves-Flanged, Threaded, and
Welding End
ASTM International (ASTM) D1330, 2004, Standard Specification for Rubber Sheet Gaskets
ASTM International (ASTM) D1330, 2010, Standard Specification for Rubber Sheet Gaskets
ASTM International (ASTM) D3359, 2009, Standard Test Methods for Measuring Adhesion by Tape
Test
ASTM International (ASTM) D4138, 2013, Standard Practices for Measurement of Dry Film Thickness of Protective Coating Systems by Destructive, Cross-Sectioning Means
ASTM International (ASTM) D5363, 2008, Standard Specification for Anaerobic Single Component
Adhesives (An)
ASTM International (ASTM) D5363, 2008; Standard Specification for Anaerobic Single-Component
Adhesives (An)
ASTM International (ASTM) F992, 2006, Standard Specification for Valve Label Plates
Commercial Item Description (CID) A-A-59313, Nov 2003, Thread Compound; Anti-seize, Zinc Dust-
Petrolatum
Commercial Item Description (CID) A-A-59316, 2003, Abrasive Materials for Blasting
Commercial Item Description (CID) A-A-59588, 2013, Rubber Silicone
Commercial Item Description (CID), A-A-59323, Mar 2005, Cloths, Cleaning, Low-Lint
Commercial Item Descriptions (CID) A-A-59323, Rev A; Cloths, Cleaning, Low-Lint
DOD-STD-2187, Aug 1987, Chemical Cleaning of Salt Water Piping Systems
Federal Specification (Fed Spec) HH-P-151, Mar 1991, Packing; Rubber-Sheet, Cloth-Insert
Federal Specification (Fed Spec) RR-C-271, Rev E, Mar 2016, Chains and Attachments, Carbon and
Alloy Steel
Federal Standard (FED-STD) 595, 2008, Colors Used in Government Procurement
Federal Standard (FED-STD) 595, 2008, Colors Used In Government Procurement
Harken Installation and Maintenance Manual for Radial Winch 50.2PT, MRW-01
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2003 Edition, Pressure Testing Of Steel Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2002 Edition, Butterfly Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72, 1999 Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service
Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2008 Edition, Bronze Gate, Globe, Angle and Check Valves xi (Rev-1)
MIL PRF-16173, Sep 2006, Corrosion Prevention Compound, Solvent Cut Back, Cold Application
MIL-A-18001, May 2005, Anodes, Sacrificial Zinc Alloy (Commercially Accepted - ASTM B418)
MIL-A-22262, Mar 1996; Abrasive Blasting Media Ship Hull Blast Cleaning
MIL-A-46106, Jun 1992, Adhesive-Sealants, Silicone, Rtv, One-Component
MIL-C-24633, Oct 2014, Chain, Stud Link, Anchor, Low Alloy Steel, Flash Butt Welded
MIL-DTL-1222, Dec 2000, Studs, Bolts, Screws and Nuts for Applications Where a High Degree of
Reliability Is Required
MIL-DTL-23549, Sep 2016, Grease, General Purpose
Military Standard MIL-S-19622/17D, Dec 1992, Stuffing Tube, Nylon, and Packing Assemblies, General
Specification for
Military Standard MIL-STD-2003/3A (SH), Sep 2009, Electrical Plant Installation Standard Methods for
Surface Ships and Submarines
MIL-PRF-1149, Jun 1998, Gasket Materials, Synthetic Rubber, 50 and 65 Durometer Hardness
MIL-PRF-16173, 2006, Corrosion Prevention Compound, Solvent Cut-Back, Cold-Application
MIL-PRF-16173, Sep 2006, Corrosion Prevention Compound, Solvent Cut-Back, Cold-Application
MIL-PRF-24176, 2004, Cement, Epoxy, Metal Repair and Hull Smoothing (Metric)
MIL-PRF-24647, 2013, Paint System, Anticorrosive and Antifouling, Ship Hull
MIL-PRF-24647, Apr 2013, Paint System, Anticorrosive and Antifouling, Ship Hull
MIL-PRF-24647, Jun 2006, Paint System, Anticorrosive and Antifouling, Ship Hull
MIL-PRF-24647, Jun 2006, Paint System, Anticorrosive and Antifouling, Ship Hull
MIL-S-22473, Rev E(8); Sealing, Locking, and Retaining Compounds: (Single Component), 01/21/04
MIL-S-45180, 1998; Sealing Compound, Gasket, Hydrocarbon Fluid and Water Resistant
Naval Sea Systems Command (NAVSEA) S9243-AW-TRS-011, Surface Ships Main Propulsion Shafting
Refurbishment Procedures, Volume I, Part 1
Naval Sea Systems Command (NAVSEA) S9243-AW-TRS-012, Surface Ships Main Propulsion Shafting
Examination, Test and Repair Action Record, Volume 1, Part 2
Naval Sea Systems Command (NAVSEA) Underwater Ship Husbandry Manuals (UWSH) S0600-AA-
PRO-160, Jan 2006, Chapter 16, Cofferdams
Naval Sea Systems Command (NAVSEA) Underwater Ship Husbandry Manuals (UWSH) S0600-AA-
PRO-160, Jan 2011, Chapter 16, Cofferdams
NAVSEA Drawing 803-1401892, Rev H, Scuttle, WT Quick Acting, 21” Diameter
NAVSEA Drawing 804-5773931, Rev A, Acoustic & Thermal Insulation For Compartments Installation
Details
ODOM Echotrac DF3200 MKII, Rev 2, Technical Manual
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2013, Cork and
Rubber Composition Sheet; For Aromatic Fuel and Oil Resistant Gaskets
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2013, Cork and
Rubber Composition Sheet; For Aromatic Fuel And Oil Resistant Gaskets
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) G-6032, 2014 Grease, Plug Valve, Gasoline and Oil Resistant, NATO Code Number G-363, Metric
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) G-6032, 2014, Grease, Plug Valve, Gasoline and Oil Resistant, NATO Code Number G-363, Metric
The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 1 (SSPC-SP 1), 2004, Solvent Cleaning xii (Rev-1)
The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 1 (SSPC-SP 1), 2015, Solvent Cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 11 (SSPC-SP 11), 2007, Power Tool Cleaning to Bare Metal
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.1 (SSPC-SP 1), 2004, Solvent Cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.1 (SSPC-SP 1), 2015, Solvent Cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2004, Power Tool Cleaning to Bare Metal
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2012, Power Tool Cleaning to Bare Metal
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.3 (SSPC-SP 3), 2004, Power Tool Cleaning
The Society for Protective Coatings (SSPC), January 2015, Paint Application Specification No. 2 (PA-2), Procedure for Determining Conformance to Dry Coating Thickness Requirements
The Society for Protective Coatings (SSPC)/NACE International (NACE) 2006, Joint Surface Preparation
Standard SSPC-SP 10/NACE No.2, Near-White Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP 10/NACE No.2, 2007, Near-White Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP 10/NACE No.2, 2007, Near-White Metal Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP 12/NACE No.5, 2002, Surface Preparation and Cleaning of Metals by
Waterjetting Prior to Recoating
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP 6/NACE No. 3, 2007, Commercial Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP 7/NACE No.4, 2007, Brush-Off Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP WJ-2, 2012, Waterjet Cleaning of Metals – Very Thorough Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP WJ-2/NACE WJ-2, 2012, Waterjet Cleaning of Metals – Very Thorough
Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP WJ-2/NACE WJ-2, 2012, Waterjet Cleaning of Metals – Very Thorough
Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP WJ-4/NACE WJ-4, 2012, Waterjet Cleaning of Metals – Light Cleaning
The Society for Protective Coatings (SSPC)/NACE Joint Surface Preparation Standard SSPC-SP
10/NACE No.2, 2004, Near-White Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation
Standard SSPC-SP 10/NACE No. 2, 2004, Near-White Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation
Standard SSPC-SP 10/NACE No. 2, 2007, Near-White Blast Cleaning xiii (Rev-1)
The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation
Standard SSPC-SP 12/NACE No. SSPC-SP 12/NACE No.5, Surface Preparation and Cleaning of
Steel & Other Hard Materials by High and Ultrahigh Pressure Water Jetting Prior to Recoating
The Society for Protective Coatings (SSPC)-SP 3, Power Tool Cleaning, 11-1-2004 xiv (Rev-1)
CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
WORK
ITEM
MTI ITEM
DESCRIPTION
NSN/PN QTY ESTIMATED
COST
($/UNIT)
25 Y **Propeller shaft NSN: 2010-01-399-5912 1ea. $165,000.00
25 N **Grounding Silver
Strip
NSN: 5340-01-126-4569 1ea. $1,889.00
25 N **SST Straps NSN: 5340-01-126-4570 4ea. $28.00
25 N **SST Bailing Seals NSN: 5330-01-284-3686 4ea. $6.00
26 N 225' WLB Major
Overhaul Kit
NSN: 5330-01-520-5284 1 ea. $35,249.00
26 N **225' WLB Seat
(Split)
NSN: 5330-01-645-3665 1 ea. $12,500.00
26 Y *Seal Compression
Tool
Onboard Tool 1 ea. $200.00
31 N Stat-O-Seal Washers NSN: 5310-01-212-5987
PN: 0-4-3-5
12 ea. $55.61
31 N O-Ring, Hub Flange
Bolt Cover
NSN: 5331-00-983-9878
PN: 0-2-2-5
12 ea. $50.00
32 Y **Blade Bolts NSN: 5306-01-410-6893 4 ea. $1,854.12
32 N Blade Bolt O-rings NSN: 5330-01-408-7251 (0-
3-2-11)
48 ea. $2.25
32 N Blade Seal NSN: 5331-01-623-0621 (2-
472 KA174-75)
4 ea. $55.00
32 Y *Lifting Device, Propeller Blade
NSN: 2020-01-F02-6825 1 ea. $100.00
34 N *** Fathometer
Transducer, shallow water, 50-200 kHz
(Airmar Technology
SS505)
NSN: 5845-01-518-7231
PN: SS505
2 ea. $343.63
34 Y ***Fathometer
Transducer, Deep
Water, 24kHZ
NSN: 5845-01-496-9770
PN: TH28/20-41-516CG
1 ea. $7,709.21
45 N Upper bearing NSN: 3110-01-466-9924 1 ea. $5,002.41
45 N Rudder Seal Kit NSN: 5330-01-565-8083 1 ea. $2,000.00
46 N Lower bearing NSN: 3120-21-912-7635 1 ea. $5,478.00
46 N Pintle bearing NSN: 3120-21-912-7634 1 ea. $2,610.00
47 N Seal Kit, Bow
Thruster
NSN: 2010-01-555-9048 2 ea. $3,634.00
47 N Seal Spacer PN: B125SM44178 2 ea. $2,014.50
47 N Sleeve, propulsion shaft, ship
NSN: 01-495-2638
PN: C125SM44185
4 ea. $3,965.28 xv (Rev-1)
69 N Reference electrode, silver & silver chloride Siemens
Water Technologies
W3T105012
(Electrocatalytic
32622)
NSN: 5977-01-346-0750 2 ea. $1,300.02
70 Y *Transducer Cover
Plate
N/A 4 ea. $50.00
73 N Winch, Radial NSN: 3950-01-623-8912
PN: 50.2 PTA
6 ea. $2,181.60
73 N Cleat, 15 in.; Steel NSN: 2040-01-614-2587
PN: 7254
8 ea. $135.00
74 N Floodlight, LED*** NSN: 6120-01-661-5675
PN: STL-HI-45-UNIV-
10CG
8 $619.00
76 N WHPX-405
Intermediate Service
Kit; 547037-01
NSN: 01-415-8426 2 ea. $971.00
76 N WHPX-405 Major
Service Kit; 548542-
NSN: 4330-01-447-2972 2 ea. $1,123.00
76 N WHPX-405
Reconditioning
Service Kit; 47040-
NSN: 4330-01-415-9704 2 ea. $13,006.00
76 N MMPX-303
Intermediate Service
Kit; 546669-01
NSN: 4330-01-414-8878 1 ea. $210.00
76 N MMPX-303 Major
Service Kit; 546670-
NSN: 4330-01-414-3820 1 ea. $1,288.00
76 N Friction Coupling
Ball Bearings;
233211-06
NSN: 3110-01-233-2327 2 ea. $219.00
76 N Frame Feet; 545892-
NSN: 5342-01-441-9787 4 ea. $67.00
77 Y 225 Propulsion
Shafting Bearing
Shell
3120-01-561-3151 1 ea. $115,000.00
81 Y Fire Pumps NSN:01-467-6631 Pump, Fire – Model 60066187
2 ea. $3000.00
82 Y Window, Heated, Sliding, 52 5/16”W x
34 7/8”H, bronze, heat treated clear. 03-
56-0-C 6 Port
ES Marine Type 101SS or equivalent
1 ea. $3000.00
82 Y Window, Heated, Sliding, 52 5/16”W x
34 7/8”H, bronze, ES Marine Type 101SS or equivalent
1 ea. $3000.00 xvi (Rev-1) heat treated clear. 03-
56-0-C 6 Starboard
82 Y Window, Heated, Fixed, 42 1/4”W x
28”H, bronze, heat treated clear. 03-56-
0-C 8 Port
ES Marine Type K-325-F or equivalent
1 ea. $3000.00
82 Y Window, Heated, Fixed, 42 1/4”W x
28”H, bronze, heat treated clear. 03-56-
0-C 8 Starboard
ES Marine Type K-325-F or equivalent
1 ea. $3000.00
86 N 21” Diameter Quick-
Acting Watertight
Scuttle, Steel, 3-Dog, Fwd Hinge
(including associated coaming)
1 ea. $6,000.00
86 N 26” x 66” C.O., WEAT, LH W/ 14”
X 18” C.O.
WINDOW
W/LEVER TYPE
KNOBS AND
MORTISE
1 ea. $6,000.00
86 N 26” x 66” C.O., WEAT, RH W/ 14”
X 18” C.O.
WINDOW
W/LEVER TYPE
KNOBS AND
MORTISE LOCKS
1 ea. $6,000.00
92 Y Woodward EGB-13P
Governor
NSN: 2910-01-424-1185
PN: 8241-685 (Woodward), 6I-1837 (CAT)
2 ea. $50,173.00
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT Service Center xvii (Rev-1)
CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS
The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5
(Inspection report particulars)):
Work
Item Title
1 Hull Plating (Side Scan), Ultrasonic Testing
4 U/W Body, Preserve (100%)
15 Appendages (U/W), Leak Test
19 Voids (Non-Accessible), Leak Test
21 Tanks (MP Fuel Service), Clean And Inspect
23 Tanks (Ballast), Clean and Inspect
25 Propulsion Shafting; Remove, Inspect, and Reinstall
26 Propulsion Shaft Seals, Mechanical Overhaul And Inflatable Renewal
28 Propulsion Shaft Bearings (External), Check Clearances
30 Controllable Pitch Propellers, Clean and Inspect
31 Controllable Pitch Propeller, System Maintenance
32 Controllable Pitch Propeller Hub, General Maintenance, Perform
38 Sea Strainers - Duplex (All Sizes), Overhaul
39 Sea Strainers - Simplex (All Sizes), Clean and Inspect
40 Sea Bay, Clean and Inspect
44 Rudder, Inspect And Repair
45 Rudder and Rudder Stock, Remove and Inspect
48 Anchor Windlass, Inspect and Service
49 Anchor Chain(s) and Ground Tackle, Inspect and Repair
51 Accessible Void(s), Preserve “100%” xviii (Rev-1)
58 Accessible Void(s), Preserve “Partial”
61 Decks-Exterior (Buoy or Construction Deck), Preserve 100%
68 Impressed Current Cathodic Protection System, Inspect and Maintain
Fuel Oil Purifier (FOP) and Lube Oil Purifier (LOP) Depot-Level Four Year Maintenance, Accomplish
89 Bilges, Partial Preserve xix (Rev-1)
PRINCIPAL CHARACTERISTICS
225' WLB (B-CLASS)
PHYSICAL
Length overall 225' 0"
Length between perpendiculars 206' 0"
Maximum beam 46'
Designed draft 13' 0"
Full load displacement 1905.6 Long Tons SW
Light ship displacement 1500.7 Long Tons SW
Minimum operating displacement 1869.2 Long Tons SW
Mast height (above 12' waterline) 67' 5"
Anchor Two 4000 lb standard Navy stockless anchors, 8 shots each, port and starboard, 1-
3/8 die lock chain
HULL
Bilge keels (port & starboard) Frames 42-79
Frame spacing
FR 0 to 12 21"
FR 12 to 30 22"
FR 30 to 102 24"
MACHINERY
Main propulsion Diesel Reduction
Diesel engines Two Caterpillar 3608, TA, 3100 BHP each @ 900 RPM
Number of propellers 1
Number of blades 4
Diameter 10'
Pitch Controllable
RPM 254
Ship's service diesel generators Two Caterpillar 3508 TA, 450 KW
Emergency diesel generator One Caterpillar 3406 DITA, 280 KW
Shore tie Two 450 VAC, 400 Amp, 3-wire
Shaft bearing, forward Cooper Bearing 01-BCP-1400-EX-TL
Shaft bearing, aft Water Lubricated Cutless Bearing
TANK CAPACITIES
Diesel oil 76,498 gal.
Fresh water capacity 8056 gal.
Hydraulic oil capacity 2785 gal.
Lube oil storage 764 gal.
Grey water tank 2700 gal.
Sewage holding tank 1700 gal.
1 (Rev-1)
00000_0618_FLT
REC_00000_FLT_Commercial Project @ Contractor’ Facility (1212)
General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed at a commercial contractor’s facility for Coast Guard vessels.
1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and
'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is
Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General
Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and
Allied Processes
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.
NOTE
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
2 (Rev-1)
3.2 Contractor-provided fire watch personnel. The Contractor shall provide fire watch personnel and equipment.
3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.
3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec
6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).
3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with COMDTINST M10360.3, Chapter 6 (Cutter and Boat Colors Exterior and Interior).
NOTE
Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes
(provided in Chapter 6 of COMDTINST M10360.3) are strictly prohibited.
3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.
3.5 Environmental protection requirements. The Contractor shall adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:
3.5.1 Contractor operated (non USCG) facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix A, Requirements for Environmental Protection at
Contractor Operated (Non USCG) Facilities, as applicable, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
3.5.2 Test and procedures. The Contractor shall be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work shall be done by qualified laboratories; and where required by law, the laboratories shall be certified.
3.5.3 Regulatory notifications. The Contractor shall be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The
Contractor shall submit copies of all regulatory notifications to the Contracting Officer and the local Facility
Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications shall be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System
(NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.
3.5.4 Environmental manager. The Contractor shall appoint in writing an Environmental Manager for the project, and shall be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager shall ensure compliance with Hazardous Waste
Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the
Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, 3 (Rev-1) and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas;
ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the
Environmental Records binder and required documentation, including environmental permits compliance and close-out.
3.5.5 HW disposal. Contractor shall comply with SFLC Std Spec 0000 Appendix A, Requirements For
Environmental Protection At Contractor Operated (Non USCG) Facilities for HW disposal.
3.6 Local Policy. None.
3.7 SFLC standard specification approved changes. The Contractor shall be aware that the following are approved changes to published SFLC 2014 Edition Standard Specifications and supersede published content:
3.7.1 Change to SFLC Std Spec 0000, paragraph 1.3. ‘Acronyms and term definitions’, page 5, “PCL (Paint
Containing Lead)” definition replaced by, “Any paint or coating containing lead in excess of 0.009 percent by weight (1.0 mg/cm2 or 90 ppm). Lead Based Paint (LBP) is an interchangeable term with PCL.”
3.7.1.1 Change Std Spec 0000 paragraph 3.2.4.2.3(QP 1 inspector or tech rep duties) bullet, “Determine when applied coats have sufficiently cured for overcoating or for system service resumption (see paragraph 3.1.19 of
SFLC Std Spec 6310 (Critical drying time requirements)).” to “Determine when applied coats have sufficiently cured for overcoating or for system service resumption (see paragraph 3.1.17 of SFLC Std Spec 6310 (Critical drying time requirements)).”
3.7.2 Change to Std Spec 5000, paragraph D2.2.1.1 bullet, "For running rigging, furnish class 6x37, uncoated, independent wire rope core (IWRC), right regular lay (RRL) wire rope or Dyform-18, rotation resistant wire rope," to "For running rigging, furnish class 6x36, uncoated, independent wire rope core (IWRC), right regular lay
(RRL) wire rope or Dyform-18, rotation resistant wire rope."
3.7.2.1 Change to Std Spec 5000, page D-2, Table D-1 title from "DYFORM-18, 6X19 AND 6X37 IWRC RRL," to " DYFORM-18, 6X19 AND 6X36 IWRC RRL"
4. NOTES
4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
4 (Rev-1)
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
VESSEL NAME HULL # WORK ITEM
WORK ITEM TITLE
LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfgr.
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).
Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME
5 (Rev-1)
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
VESSEL NAME HULL #
WORK ITEM
Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.
DATE
TIME
ACTIVITY (SURFACE
PREPARATION, PRIMER COAT,
BARRIER COAT, TOP COAT,
ETC…)
LOCATION (FRAME &
DECK, RELATION TO
EQUIPMENT, ETC.)
TEMPERATURE % REL.
HUMID-
ITY
DEW
PT.
SURFACE AMBIENT ΔT
| DP -
SURFACE |
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME
6 (Rev-1)
QA-3a - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
VESSEL NAME HULL # WORK ITEM
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
PLACE SURFACE PROFILE REPLICA TAPES IN THE SPACES PROVIDED BELOW, TO SERVE AS
PERMANENT QA RECORD. MAINTAIN A SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS
DIVIDED INTO SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
MEAN MIL READING (IAW ASTM D4417-METHOD C) FOR ABOVE 15 READINGS:
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE /
7 (Rev-1)
TIME
8 (Rev-1)
QA-3b - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
VESSEL NAME HULL # WORK ITEM
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
RECORD MEASUREMENTS TAKEN IN THE SPACES PROVIDED BELOW, TO SERVE AS PERMANENT QA
RECORD…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.