Attachment 1, Price Schedule A5
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Schedule
| ATTACHMENT 1: Price Schedule | ||||||
| USCGC HEALY DRY DOCK FY19 | ||||||
| 70Z08519RP4500800 | ||||||
| Contract Line Item (CLIN) | Funding Code | Oct | Unit Price | Unit | Quantity | Extended Price |
| D-001 | 45 | Hull Plating (U/W Body), Inspect | $ - 0 | Job | 1 | $0.00 |
| D-002 | 45 | Hull Plating (U/W Body), Ultrasonic Testing | $ - 0 | Job | 1 | $0.00 |
| D-003 | 45 | Appendages (U/W), Leak Test | $ - 0 | Job | 1 | $0.00 |
| D-004 | 45 | Appendages (U/W) - Internal, Preserve | $ - 0 | Job | 1 | $0.00 |
| D-005 | 45 | Tanks (Grey & Black Water Holding), Preserve 100% | $ - 0 | Job | 1 | $0.00 |
| D-006 | 45 | Tanks (Aviation Fuel Stowage and Overflow), Clean and Inspect | $ - 0 | Job | 1 | $0.00 |
| D-007 | 30 | Tanks (Potable Water), Clean and Inspect | $ - 0 | Job | 1 | $0.00 |
| D-008 | 45 | Propulsion Shaft Alignment(DD), Check | $ - 0 | Job | 1 | $0.00 |
| D-009 | 45 | Propulsion Stern Tube Bearings, Check Clearances | $ - 0 | Job | 1 | $0.00 |
| D-010 | 45 | Fuel Oil Purifier (FOP) Overhaul | $ - 0 | Job | 1 | $0.00 |
| D-011 | 45 | Lube Oil Purifier (LOP) Overhaul | $ - 0 | Job | 1 | $0.00 |
| D-012 | 45 | U/W Body, Preserve (Partial) | $ - 0 | Job | 1 | $0.00 |
| D-013 | 42 | Acoustic Windows, Renew | $ - 0 | Job | 1 | $0.00 |
| D-014 | 45 | Multibeam Ice Windows, Remove and Reinstall | $ - 0 | Job | 1 | $0.00 |
| D-015 | 42 | Fathometer Transducer, Renew | $ - 0 | Job | 1 | $0.00 |
| D-016 | 42 | Underwater (Speed) Log Transducer(s), Service and Inspect | $ - 0 | Job | 1 | $0.00 |
| D-017 | 30 | Rtd Sensors And Thermocouples, Calibrate | $ - 0 | Job | 1 | $0.00 |
| D-018 | 30 | Boiler Annual Maintenance | $ - 0 | Job | 1 | $0.00 |
| D-019 | 45 | Main Seawater Strainer, Overhaul | $ - 0 | Job | 1 | $0.00 |
| D-020 | 45 | Main Seawater Strainer, Cover Groove Repairs | $ - 0 | Job | 1 | $0.00 |
| D-021 | 45 | Valves, Overhaul | $ - 0 | Job | 1 | $0.00 |
| D-022 | 45 | Valves, Renew | $ - 0 | Job | 1 | $0.00 |
| D-023 | 45 | Sea Valves and Waster Pieces, Overhaul or Renew | $ - 0 | Job | 1 | $0.00 |
| D-024 | 45 | Evaporators (General) Overhaul | $ - 0 | Job | 1 | $0.00 |
| D-025 | 30 | Potable Water Hydro- Pneumatic Tank(s), Clean and Inspect | $ - 0 | Job | 1 | $0.00 |
| D-026 | 45 | Rudder(s), Preserve 100% | $ - 0 | Job | 1 | $0.00 |
| D-027 | 30 | Internal Hoist, Level 1 Inspect and Test | $ - 0 | Job | 1 | $0.00 |
| D-028 | 30 | A-Frames, Annual Inspect and Repair | $ - 0 | Job | 1 | $0.00 |
| D-029 | 45 | Miranda Davits (Port & Starboard), Biennial Inspect and Repair | $ - 0 | Job | 1 | $0.00 |
| D-030 | 45 | 04 Deck Crane (Port) TB 100-55, Biennial Inspection | $ - 0 | Job | 1 | $0.00 |
| D-031 | 30 | 04 Deck Crane (Starboard) TB 100-55, Annual Inspect and Test | $ - 0 | Job | 1 | $0.00 |
| D-032 | 30 | Aft Crane (Starboard), Annual Inspect and Test | $ - 0 | Job | 1 | $0.00 |
| D-033 | 30 | Aft Crane (Port), Annual Inspect and Test | $ - 0 | Job | 1 | $0.00 |
| D-034 | 30 | Bow Crane, HPU Overhaul and Annual Inspect and Test | $ - 0 | Job | 1 | $0.00 |
| D-035 | 45 | Tanks (Ballast), Preserve 100% | $ - 0 | Job | 1 | $0.00 |
| D-036 | 45 | Chain Lockers, Preserve 100% | $ - 0 | Job | 1 | $0.00 |
| D-037 | 45 | Decks - Exterior, Preserve (“Non-Skid Broadcast Grit” System) | $ - 0 | Job | 1 | $0.00 |
| D-038 | 30 | Damage Control and Firefighting Systems, PMS | $ - 0 | Job | 1 | $0.00 |
| D-039 | 45 | Impressed Current Cathodic Protection System Anodes and Reference Cells, Inspection and Anode Renewal | $ - 0 | Job | 1 | $0.00 |
| D-040 | 30 | Deck Covering (Electrical Matting), Renew | $ - 0 | Job | 1 | $0.00 |
| D-041 | 45 | Drydock Service, Temporary Fuel Off-Load | $ - 0 | Job | 1 | $0.00 |
| D-042 | 45 | Drydock | $ - 0 | Job | 1 | $0.00 |
| D-043 | 45 | Temporary Services, Provide - Cutter | $ - 0 | Job | 1 | $0.00 |
| D-044 | 45 | Sea Trial Performance, Support, Provide - Price CLIN for four (4) weekdays1. Insert price per day for weekend days2 here: $_________ to be used in a change request. | $ - 0 | Day | 4 | $0.00 |
| D-045 | 30 | Compartment Insulation (General), Renew | $ - 0 | Job | 1 | $0.00 |
| D-046 | 45 | Deck Covering (Interior Wet/Dry), Renew | $ - 0 | Job | 1 | $0.00 |
| D-047 | 30 | Deck Covering (Carpeting) Renew | $ - 0 | Job | 1 | $0.00 |
| D-048 | 45 | Deck Covering (Magnesite), Repair | $ - 0 | Job | 1 | $0.00 |
| D-049 | 30 | Flex Hose Assemblies, Renew | $ - 0 | Job | 1 | $0.00 |
| D-050 | 45 | Anchor Chain(s) and Ground Tackle, Inspect and Repair | $ - 0 | Job | 1 | $0.00 |
| D-051 | 30 | Piping Insulation, Renew | $ - 0 | Job | 1 | $0.00 |
| D-052 | 45 | Bilge Surfaces, Preserve | $ - 0 | Job | 1 | $0.00 |
| D-053 | 45 | Bridge Window Heater Repair | $ - 0 | Job | 1 | $0.00 |
| D-054 | 45 | Boiler Blowdown Overboard, Inspect and Renew Waster Piece | $ - 0 | Job | 1 | $0.00 |
| D-055 | 45 | Uncontaminated Science Seawater System, Hydrojet Cleaning | $ - 0 | Job | 1 | $0.00 |
| D-056 | 45 | Oceanographic Winch Motors, Remove and Reinstall | $ - 0 | Job | 1 | $0.00 |
| D-057 | 45 | Oceanographic Winches Electric Motors, Overhaul | $ - 0 | Job | 1 | $0.00 |
| D-058 | 45 | No. 1 Oceanographic Winch Gearbox, Overhaul | $ - 0 | Job | 1 | $0.00 |
| D-059 | 45 | No. 2 Oceanographic Winch Gearbox, Overhaul | $ - 0 | Job | 1 | $0.00 |
| D-060 | 45 | Vent Damper, Service | $ - 0 | Job | 1 | $0.00 |
| D-061 | 45 | Bow Thruster, Modify | $ - 0 | Job | 1 | $0.00 |
| D-062 | 45 | Aft Grey Water Pump Replacement | $ - 0 | Job | 1 | $0.00 |
| D-063 | 45 | Wave Protection for Roller Doors | $ - 0 | Job | 1 | $0.00 |
| D-064 | Deleted | XXX | ||||
| O-065 | 30 | Deck Socket, Modify (Optional) | $ - 0 | Job | 1 | $0.00 |
| O-066 | 45 | Deck Socket Renewal (Optional) | $ - 0 | Job | 1 | $0.00 |
| O-00A3 | 45/30/424 | Growth Work - Composite Labor Rate Unit Price: $________; Quantity:20,000; Unit of Issue: Hour; Extended Price: [20,000 X hourly rate quoted] $____________ . |
All inclusive mark-up/loading rate for materials and subcontractors: _____%. Unit Price: $750,000.00; Quantity: 1; Unit of Issue: Percent; Extended Price: [$750,000.00 X percentage quoted]: $______________ .
| The lump sum amount to be entered for this item is the combined extended prices for composite labor and percentage markup for materials and subcontractors. The above rate and percentage will be incorporated into the contract and used on change requests (CRs). Work is ordered against this CLIN on authorized CRs by the Contracting Officer. | $ - 0 | Lump Sum | 1 | $ - 0 | |||
| O-00B5 | 45 | Lay Days | $ - 0 | Day | 45 | $ - 0 | |
| Total price of Definite items | $0.00 | ||||||
| Total price of Optional items | $0.00 | ||||||
| Total Price of Definite and Optional items | $0.00 | ||||||
| 1 Weekday is Monday, Tuesday, Wednesday, Thursday and Friday. | |||||||
| 2 Weekend day is Saturday and Sunday | |||||||
| 3 Estimated Quantity. The quantity shown is an estimate only and may be exceeded at the unit prices offered. | |||||||
| 4 Funding code correlates to original CLIN work is to be performed under. | |||||||
| 5 Estimated Quantity. Period of Performance is after dry dock work completion. The quantity shown is an estimate only and may be exceeded at the unit prices offered. |