SLEDGE_(WLIC_75B)_DD_FQ2_DBB_19ER0_BLANK.xls

XLS spreadsheet 53 KB Posted

Attached to
DRY DOCK REPAIRS FOR USCGC SLEDGE AND BARGE
Solicitation number
70Z085-19-Q-P4503300
Issued by

About this file

Revised SOS Section B

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOS&S

PRICING SCHEDULE FOR:
USCGC SLEDGE (WLIC-75B) DRYDOCK AVAILABILITY FY2019
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
D-001Hull Plating (U/W Body), Inspect - TenderJOB1$0.00
D-002Hull Plating (U/W Body), Ultrasonic Testing - TenderJOB1$0.00
D-003Hull Plating (Freeboard), Ultrasonic Testing - TenderJOB1$0.00
O-004U/W Body, Preserve (100%) - TenderJOB1$0.00
O-005U/W Body, Preserve (Partial - Condition A)JOB1$0.00
O-006U/W Body, Preserve (Partial - Condition B) - TenderJOB1$0.00
O-007U/W Body, Preserve (Partial - Condition C) - TenderJOB1$0.00
O-008Hull Plating Freeboard, Preserve – Partial - TenderJOB1$0.00
O-009Hull Plating Freeboard, Preserve “100%” - TenderJOB1$0.00
O-010Hull and Structural Plating (General) -10.2-Pound Steel, Renew - TenderJOB1$0.00
O-011Hull and Structural Plating (General) - 15.3-Pound Steel Plate, Renew - TenderJOB1$0.00
O-012Hull and Structural Plating (General) - 7.5-Pound (3/16") Steel Plate, Renew - TenderJOB1$0.00
O-013Hull And Structural Plating (General) - Cracked Steel Welds, Repairs - TenderJOB1$0.00
O-014Hull And Structural Plating (General) - Degraded Weld (Steel), Repair - TenderJOB1$0.00
D-015Propulsion Shaft Rope Guards, InspectJOB1$0.00
D-016Voids (Non-Accessible), Leak Test - TenderJOB1$0.00
O-017Voids (Non-Accessible), Internal Surfaces, PreserveJOB1$0.00
D-018Tanks (Mp Fuel Service), Clean And Inspect - TenderJOB1$0.00
D-019Propellers, Clean And InspectJOB1$0.00
D-020Keel Coolers, Clean, Inspect and HydroJOB1$0.00
D-021Fathometer Transducer, Renew – TenderJOB1$0.00
D-022Compressed Air Receivers and System Valves (All), Clean, Inspect, Hydro and Lift - TenderJOB1$0.00
O-023Rudder(s), Preserve (“100%”)JOB1$0.00
D-024Rudder Stock Bearings Clearances, CheckJOB1$0.00
O-025Rudder Stock Housing (Lower), RenewJOB1$0.00
O-026Rudder Stock Housing (Upper), RenewJOB1$0.00
D-027Traction Winches, Inspect and Service - TenderJOB1$0.00
D-028Boat Boom, Inspect and Service - TenderJOB1$0.00
O-029Tanks (Fuel), Preserve “100%” - TenderJOB1$0.00
O-030Tanks (Fuel), Preserve “Partial” - TenderJOB1$0.00
D-031Superstructure, Preserve “100%”JOB1$0.00
D-032Cathodic Protection / Zinc Anodes, Renew - TenderJOB1$0.00
D-033Drydock - TenderJOB1$0.00
D-034Temporary Services, Provide - TenderJOB1$0.00
D-035Sea Trial Performance, Support, ProvideJOB1$0.00
D-036Hull Plating (U/W Body), Inspect - BargeJOB1$0.00
D-037Hull Plating (U/W Body), Ultrasonic Testing - BargeJOB1$0.00
D-038Hull Plating (Freeboard), Ultrasonic Testing - BargeJOB1$0.00
O-039U/W Body, Preserve (100%) - BargeJOB1$0.00
O-040U/W Body, Preserve (Partial - Condition A)JOB1$0.00
O-041U/W Body, Preserve (Partial - Condition B) - BargeJOB1$0.00
O-042U/W Body, Preserve (Partial - Condition C) - BargeJOB1$0.00
O-043Hull Plating Freeboard, Preserve – Partial - BargeJOB1$0.00
O-044Hull Plating Freeboard, Preserve “100%” - BargeJOB1$0.00
O-045Hull and Structural Plating (General) -10.2-Pound Steel, Renew - BargeJOB1$0.00
O-046Hull and Structural Plating (General) - 15.3-Pound Steel Plate, Renew - BargeJOB1$0.00
O-047Hull and Structural Plating (General) - 7.5-Pound (3/16") Steel Plate, Renew - BargeJOB1$0.00
O-048Hull And Structural Plating (General) - Cracked Steel Welds, Repairs - BargeJOB1$0.00
O-049Hull And Structural Plating (General) - Degraded Weld (Steel), Repair - BargeJOB1$0.00
D-050Compressed Air Receivers and System Valves (All), Clean, Inspect, Hydro and Lift - BargeJOB1$0.00
D-051Crossdeck Winch, Inspect & Service- BargeJOB1$0.00
O-052Spud Wells, Preserve - BargeJOB1$0.00
D-053Spud Winches, Inspect & Service - BargeJOB1$0.00
D-054Spud Wells, Inspect - BargeJOB1$0.00
D-055Tanks (Fuel), Preserve “100%” - BargeJOB1$0.00
D-056Decks – Exterior (Buoy or Construction Deck), Preserve 100%JOB1$0.00
D-057Cathodic Protection / Zinc Anodes, Renew - BargeJOB1$0.00
D-058Drydock - BargeJOB1$0.00
D-059Temporary Services, Provide - BargeJOB1$0.00
O-060Lead Dust, CleanJOB1$0.00
O-061Lead-Based Paint and Asbestos-Containing Material, Perform Spot AbatementJOB1$0.00
D-062Winches’ Protective Guards , RenewJOB1$0.00
D-063Barge, Fuel Day Tank, RenewJOB1$0.00
D-064Lead-Based Paint and Asbestos-Containing Material, 100% Abatement, PerformJOB1$0.00
D-065Fuel Oil Tank Valves, RenewJOB1$0.00
D-066Firemain Piping, RenewJOB1$0.00
D-067Sea Strainers, OverhaulJOB1$0.00
D-068Lead-Based Paint and Asbestos-Containing Material, Perform Partial AbatementJOB1$0.00
D-069Rudder Angle Indicator, RenewJOB1$0.00
O-070Propeller, Minor Repairs and Reconditioning, PerformJOB1$0.00
D-071Sewage Holding Tank(s), Clean and Inspect - TenderJOB1$0.00
D-072Sewage Piping, Clean And FlushJOB1$0.00
D-073Voids (Non-Accessible), Leak TestJOB1$0.00
O-074Voids (Non-Accessible), Internal Surfaces, PreserveJOB1$0.00
O-075Sewage Piping, RenewJOB1$0.00
D-07601 Level Deck Bulwark, RepairJOB1$0.00
D-077Hull Repair, BargeJOB1$0.00
D-078Life Rail Stanchion Renew, BargeJOB1$0.00
D-079BARGE Potable Water Piping, RenewJOB1$0.00
D-080Hull Plate Lap Weld RepairJOB1$0.00
D-081Potable Water Piping, RenewJOB1$0.00
D-082Rudder Assembly; Remove, Inspect And ReinstallJOB1$0.00
D-083Piping, RemoveJOB1$0.00
D-084Hull Plating Barge (Construction Deck), Ultrasonic TestingJOB1$0.00
O-085Internal Structural Members, Renew (Barge)JOB1$0.00
O-086Lead-Based Paint and Asbestos-Containing Material, 100% Abatement, PerformJOB1$0.00
O-087Propellers, Remove, Inspect, ReinstallJOB1
O-00AComposite Labor RateHour11400
O-00BGFP ReportNSPEANSP
D-00ZLaydaysDay5$0.00
Total Price of Definite Items$0.00
Total Price of Option Items$0.00
Total Price of Definite and Optional Items$0.00

&C(8/8/2018) Rev-0 - Page &P of &N

CostEstimateBreakdowns

Composite Labor Rate55
Assumed G&A Factor15%
Assumed Profit Factor10%Direct LaborDirect Material/Subs Cost
ITEMDESCRIPTIONUNIT PRICESub-Contracted (put a "1" in the blank)Total Labor HoursTotal Material & Subs (cost + G&A + profit)Eng TechMachinest/Pipe FitterElectricianShipfitterWelderFirewatchInsulator/LaggerPainterGen Labor/Helper/RiggerSupt/QA/NDTMat/Sub Cost 1Mat/Sub Cost 2Mat/Sub Cost 3Mat/Sub Cost 4Lab RateAreaWorkItemIDWIFileIDLoadData
D-00162Baltimore, MD
D-00252Biloxi, MS
D-00356Boston, MA
O-00450Charleston, SC
O-00560Corpus Christi, TX
O-00651Hampton Roads
O-00764Honolulu, HI
O-00855Houston, TX
O-00956Los Angeles, CA
O-01055Median Rate
O-01149Miami
O-01250Narragansett Bay, RI
O-01355New London, CN
O-01445New Orleans
D-01562NYNY
D-01649Panama City, FL
O-01760Philadelphia, PA
D-01851Portland, ME
D-01957Portland, OR
D-02055San Diego, CA
D-02167San Francisco, CA
D-02255Santa Barbara, CA
O-02355SE North Carolina
D-02465Seattle, WA
O-02548Tampa-St. Petersburg
O-02660Wilmington, DE
D-027
D-028
O-029
O-030
D-031
D-032
D-033
D-034
O-035
D-036
D-037
D-038
D-039
O-040
O-041
O-042
O-043
O-044
O-045
O-046
O-047
O-048
O-049
O-050
D-051
D-052
O-053
D-054
D-055
D-056
D-057
D-058
D-059
D-060
O-061
O-062
D-063
D-064
D-065
D-066
D-067
D-068
D-069
D-070
O-071
D-072
D-073
D-074
O-075
O-076
D-077
D-078
D-079
D-080
D-081
D-082
D-083
D-084
D-085
O-086
O-00A
O-00B
D-00C
D-00Z

&C(09/28/2009)_x000D_ Page &P of &N

CostEstimateTemplate

File details come from the government source that posted it.