6.0 FINDINGS AND ASSESSMENTS (LEAD BASED PAINT)
PAINT FILM QUALITY
Intact (surface deterioration is <2 SF or 10%)
Deteriorated (surface deterioration is >2 SF or 10%)
CATEGORIES OF PAINT DETERIORATION
Surface Coat Failure: top layer of paint is flaking, peeling, or otherwise detaching from layers below
Multi-Layer Coat Failure: several top layers are delaminating from layers below, i.e. blistering, flaking, peeling
Paint Failure: due to unsound substrate, i.e. rotted wood, rust
Paint Abrasion: paint is rubbing from mechanical or human friction
Chipped Paint: pieces of paint are loosened or broken due to impact
6.1 Tender One Hold
Location Paint Film Quality Categories of Paint Deterioration
Intact Deteriorated Surface
Coat Failure
Multi Coat
Failure
Paint Failure
Paint Abrasion
Chipped Paint
Overhead X X X X
Deck X X X
Forward Bulkhead X X X X
AFT Bulkhead X X X X
Port Bulkhead X X X X
Starboard Bulkhead X X X X
Lead Dust Wipe Sampling Sample # Sample Location Material
Description Sample Result
(microgram/ft2) Greater than
SFLC 0000
Notes
OH – LW01 One Hold Starboard Floor
Wipe 15.5 No
OH – LW02 One Hold Starboard Overhead
Wipe 11 No
OH – LW03 One Hold Starboard Bulkhead
Wipe 15.7 No
OH – LW04 One Hold Forward Bulkhead
Wipe <10 No
OH – LW05 One Hold Port Bulkhead
Wipe 13.5 No
OH – LW06 One Hold Port Forward Floor
Wipe 43.8 No
OH – LW07 One Hold Starboard Bilge
Wipe 26.4 No
OH – LW08 One Hold Center Waste Pipe
Wipe <10 No
OH – LW09 One Hold Forward Exhaust Fan
Wipe 115 No
OH – LW10 One Hold Center AFT Light
Wipe 16 No
Note: SFLC Standard Specification 000 threshold for lead wipe sampling is 40 microgram/ft2 for berthing and food prep areas and 200 micrograms/ft2 for all other areas.
Recommendations
Throughout Area:
• Panel vibration has the potential to cause lead dust.
• Due to potential lead dust hazards, it is recommended that the area be regularly cleaned using HEPA vacuums and wet wipes to ensure levels of lead dust do not exceed the permissible exposure limit.
• If other materials are found and suspected to contain lead they should be tested before disturbed. Deteriorated areas should be abated or stabilized if found to contain lead.
Overhead:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
Deck:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
Aft Bulkhead:
• No sampling was performed.
• Recommend bulk paint chip sampling.
Starboard Bulkhead:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
Forward Bulkhead:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
Port Bulkhead:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
Other:
• Center Waste Pipe o Lead Dust Wipe sampling was performed and results were lower than SFLC Standard
Specification 0000.
o Recommend bulk paint chip sampling.
• Forward Exhaust Fan o Lead Dust Wipe sampling was performed and results were lower than SFLC Standard
Specification 0000.
o Recommend bulk paint chip sampling.
• Center Aft Light o Lead Dust Wipe sampling was performed and results were lower than SFLC Standard o Recommend bulk paint chip sampling.
6.2 Barge BOSN Hole
Coat Failure
Multi Coat
Failure
Paint Failure
Paint Abrasion
Chipped Paint
Overhead X X X
Deck X X X
Forward Bulkhead X X X
AFT Bulkhead X X X
Port Bulkhead X X X
Starboard Bulkhead X X X
Description Sample Result
(microgram/ft2) Greater than
SFLC 0000
Notes
BH – LW01 BOSN Hole AFT Port Floor
Wipe 31.3 No
BH – LW02 BOSN Hole AFT Port Overhead
Wipe <10 No
BH – LW03 BOSN Hole AFT Port Bulkhead
Wipe <10 No
BH – LW04 BOSN Hole AFT Center Floor
Wipe 19.3 No
BH – LW05 BOSN Hole AFT Center Overhead
Wipe <10 No
BH – LW06 BOSN Hole Forward Starboard
Floor
Wipe 186.3 No
BH – LW07 BOSN Hole Forward Starboard
Bulkhead
Wipe <10 No
BH – LW08 BOSN Hole Forward Center Floor
Wipe 19.8 No
BH – LW09 BOSN Hole Yellow Locker
Wipe <10 No
BH – LW10 BOSN Hole Forward Center Locker
Wipe <10 No
Note: SFLC Standard Specification 000 threshold for lead wipe sampling is 40 microgram/ft2 for berthing and
• Panel vibration has the potential to cause lead dust.
• Due to potential lead dust hazards, it is recommended that the area be regularly cleaned using HEPA vacuums and wet wipes to ensure levels of lead dust do not exceed the permissible exposure limit.
• If other materials are found and suspected to contain lead they should be tested before
Overhead:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
Deck:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
• New deck plates have recently been installed in many of the areas.
Aft Bulkhead:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
Starboard Bulkhead:
• No sampling was performed.
• Recommend bulk paint chip sampling.
Forward Bulkhead:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
Port Bulkhead:
• No sampling was performed.
• Recommend bulk paint chip sampling.
Other:
• Yellow Locker o Lead Dust Wipe sampling was performed and results were lower than SFLC Standard
Specification 0000.
o Recommend bulk paint chip sampling.
• Forward Center Locker o Lead Dust Wipe sampling was performed and results were lower than SFLC Standard
6.3 Barge Engine Room
Coat Failure
Multi Coat
Failure
Paint Failure
Paint Abrasion
Chipped Paint
Overhead X X X
Deck X X X
Forward Bulkhead X X X
AFT Bulkhead (I-Beams & L-Beams)
X X X
Description
Sample Result (microgram/ft2)
Greater than
SFLC 0000
Notes
BER – LW01 Barge Engine Room Port AFT Floor
Wipe 11.2 No
BER – LW02 Barge Engine Room Port AFT Bulkhead
Wipe <10 No
BER – LW03 Barge Engine Room Port AFT Overhead
Wipe <10 No
BER – LW04 Barge Engine Room AFT Center Floor
Wipe 15.6 No
BER – LW05 Barge Engine Room AFT Center Overhead
Wipe <10 No
BER – LW06 Barge Engine Room Port Forward Floor
Wipe 18.6 No
BER – LW07 Barge Engine Room Starboard AFT Floor
Wipe 45.5 No
BER – LW08 Barge Engine Room Forward Center
Overhead
Wipe <10 No
BER – LW09 Barge Engine Room Forward Starboard
Floor
Wipe 45.2 No
BER – LW10 Barge Engine Room Forward Center Exhaust Tube
Wipe 152.6 No
Note: SFLC Standard Specification 000 threshold for lead wipe sampling is 40 microgram/ft2 for berthing and
• Panel vibration has the potential to cause lead dust.
• Due to potential lead dust hazards, it is recommended that the area be regularly cleaned permissible exposure limit.
• If other materials are found and suspected to contain lead they should be tested before disturbed. Deteriorated areas should be abated or stabilized if found to contain lead.
Overhead:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
Deck:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
• New deck plates have recently been installed in many of the areas.
AFT Bulkhead:
• No sampling was performed.
• Recommend bulk paint chip sampling.
Starboard Bulkhead:
• No sampling was performed.
• Recommend bulk paint chip sampling.
Forward Bulkhead:
• No sampling was performed.
• Recommend bulk paint chip sampling.
Port Bulkhead:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
Other:
• Forward Center Exhaust Tube o Lead Dust Wipe sampling was performed and results were lower than SFLC Standard
6.4 Barge Forward Engineering
Coat Failure
Multi Coat
Failure
Paint Failure
Paint Abrasion
Chipped Paint
Overhead X X X X
Deck X X X X X
Forward Bulkhead X X X
AFT Bulkhead X X X
Description
Sample Result (microgram/ft2)
Greater than
SFLC 0000
Notes
FE – LW01 Forward Engineering Forward Center Floor
Wipe 37.6 No
FE – LW02 Forward Engineering Forward Center
Overhead
Wipe <10 No
FE – LW03 Forward Engineering Forward Center
Bulkhead
Wipe <10 No
FE – LW04 Forward Engineering Center Floor
Wipe 46.9 No
FE – LW05 Forward Engineering Starboard Center Bilge
Wipe 82.7 No
FE – LW06 Forward Engineering Port AFT Bulkhead
Wipe 10.9 No
FE – LW07 Forward Engineering Forward Eng Locker
Wipe 35.7 No
FE – LW08 Forward Engineering AFT Center Floor
Wipe 89.4 No
FE – LW09 Forward Engineering AFT Red Toolbox
Wipe 90.8 No
FE – LW10 Forward Engineering Overhead Red Pipe
Wipe <10 No
Note: SFLC Standard Specification 000 threshold for lead wipe sampling is 40 microgram/ft2 for berthing and
• Panel vibration has the potential to cause lead dust.
• Due to potential lead dust hazards, it is recommended that the area be regularly cleaned
Overhead:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
Deck:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
AFT Bulkhead:
• No sampling was performed.
• Recommend bulk paint chip sampling.
Starboard Bulkhead:
• No sampling was performed.
• Recommend bulk paint chip sampling.
Forward Bulkhead:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
Port Bulkhead:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
Other:
• Forward Eng. Locker o Lead Dust Wipe sampling was performed and results were lower than SFLC Standard
Specification 0000.
o Recommend bulk paint chip sampling.
• AFT Red Toolbox o Lead Dust Wipe sampling was performed and results were lower than SFLC Standard
Specification 0000.
o Recommend bulk paint chip sampling.
• Overhead Red Pipe o Lead Dust Wipe sampling was performed and results were lower than SFLC Standard
6.5 Barge Line Locker
Coat Failure
Multi Coat
Failure
Paint Failure
Paint Abrasion
Chipped Paint
Overhead X X X X
Deck X X X
Forward Bulkhead X X X
AFT Bulkhead X X X X
Description
Sample Result (microgram/ft2)
Greater than
SFLC 0000
Notes
LL – LW01 Barge Line Locker AFT Starboard Floor
Wipe 319.2 Yes
LL – LW02 Barge Line Locker AFT Starboard Pipe
Wipe 24.9 No
LL – LW03 Barge Line Locker Center Floor
Wipe 220.5 Yes
LL – LW04 Barge Line Locker Center Overhead
Wipe <10 No
LL – LW05 Barge Line Locker Center Bilge
Wipe 364.5 Yes
LL – LW06 Barge Line Locker Port Forward Bilge
Wipe 114.2 No
LL – LW07 Barge Line Locker Starboard Forward
Bulkhead
Wipe <10 No
LL – LW08 Barge Line Locker Port Forward Vent Pipe
Wipe 10.2 No
LL – LW09 Barge Line Locker Port Forward Bulkhead
Wipe 14.2 No
LL – LW10 Barge Line Locker Forward Center Light
Wipe 12.3 No
Note: SFLC Standard Specification 000 threshold for lead wipe sampling is 40 microgram/ft2 for berthing and
• Panel vibration has the potential to cause lead dust.
• Due to potential lead dust hazards, it is recommended that the area be regularly cleaned using HEPA vacuums and wet wipes to ensure levels of lead dust do not exceed the permissible exposure limit.
Specification 0000.
• Recommend bulk paint chip sampling.
Deck:
• Lead Dust Wipe sampling was performed and results were above than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
• The entire compartment should be HEPA vacuumed and wet wiped.
AFT Bulkhead:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
Starboard Bulkhead:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
Forward Bulkhead:
• No sampling was performed.
• Recommend bulk paint chip sampling.
Port Bulkhead:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard
• Recommend bulk paint chip sampling.
6.6 Forward ATON Hold
Coat Failure
Multi Coat
Failure
Paint Failure
Paint Abrasion
Chipped Paint
Overhead X X X X
Deck X X X
Forward Bulkhead X X X X
AFT Bulkhead X X X X
Description
Sample Result (microgram/ft2)
Greater than
SFLC 0000
Notes
FA – LW01 Forward ATON Center Bilge
Wipe 67.7 No
FA – LW02 Forward ATON Center Overhead
Wipe <10 No
FA – LW03 Forward ATON Forward Bulkhead
Wipe <10 No
FA – LW04 Forward ATON Port Forward Bulkhead
Wipe 19 No
FA – LW05 Forward ATON AFT Center Light
Wipe 27.4 No
FA – LW06 Forward ATON AFT Bilge Center
Wipe 141.6 No
FA – LW07 Forward ATON Starboard Bulkhead
Wipe <10 No
FA – LW08 Forward ATON AFT Vent Pipe
Wipe 16.1 No
FA – LW09 Forward ATON AFT Bulkhead
Wipe <10 No
FA – LW10 Forward ATON AFT Hanging Shelf
Wipe <10 No
Note: SFLC Standard Specification 000 threshold for lead wipe sampling is 40 microgram/ft2 for berthing and
• Panel vibration has the potential to cause lead dust.
• Due to potential lead dust hazards, it is recommended that the area be regularly cleaned using HEPA vacuums and wet wipes to ensure levels of lead dust do not exceed the permissible exposure limit.
• If other materials are found and suspected to contain lead they should be tested before
• Recommend bulk paint chip sampling.
Deck:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
AFT Bulkhead:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
Starboard Bulkhead:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
Forward Bulkhead:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
Port Bulkhead:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
Other:
• AFT Center Light o Lead Dust Wipe sampling was performed and results were lower than SFLC Standard
Specification 0000.
o Recommend bulk paint chip sampling.
• AFT Vent Pipe o Lead Dust Wipe sampling was performed and results were lower than SFLC Standard
Specification 0000.
o Recommend bulk paint chip sampling.
• AFT Hanging Shelf o Lead Dust Wipe sampling was performed and results were lower than SFLC Standard
6.7 Barge Rigging Hold
Coat Failure
Multi Coat
Failure
Paint Failure
Paint Abrasion
Chipped Paint
Overhead X X X
Deck X X X
Forward Bulkhead X X X
AFT Bulkhead X X X
Description
Sample Result (microgram/ft2)
Greater than
SFLC 0000
Notes
RH – LW01 Barge Rigging Hold Port Bilge
Wipe 17 No
RH – LW02 Barge Rigging Hold Port Forward Bulkhead
Wipe <10 No
RH – LW03 Barge Rigging Hold Port Bulkhead
Wipe <10 No
RH – LW04 Barge Rigging Hold Center Bilge Floor
Wipe 20 No
RH – LW05 Barge Rigging Hold AFT Center Pipe
Wipe <10 No
RH – LW06 Barge Rigging Hold Center Overhead
Wipe <10 No
RH – LW07 Barge Rigging Hold Starboard Bulkhead
Wipe <10 No
RH – LW08 Barge Rigging Hold Forward Heater
Wipe 13.2 No
RH – LW09 Barge Rigging Hold Starboard Forward
Bulkhead
Wipe <10 No
RH – LW10 Barge Rigging Hold AFT Center Bulkhead
Wipe <10 No
Note: SFLC Standard Specification 000 threshold for lead wipe sampling is 40 microgram/ft2 for berthing and
• Panel vibration has the potential to cause lead dust.
• Due to potential lead dust hazards, it is recommended that the area be regularly cleaned using HEPA vacuums and wet wipes to ensure levels of lead dust do not exceed the permissible exposure limit.
Specification 0000.
• Recommend bulk paint chip sampling.
Deck:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
AFT Bulkhead:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
Starboard Bulkhead:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
Forward Bulkhead:
• No sampling was performed.
• Recommend bulk paint chip sampling.
Port Bulkhead:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
Other:
• AFT Center Pipe o Lead Dust Wipe sampling was performed and results were lower than SFLC Standard
Specification 0000.
o Recommend bulk paint chip sampling.
• Forward Heater o Lead Dust Wipe sampling was performed and results were lower than SFLC Standard
6.8 Barge EM Shop
Coat Failure
Multi Coat
Failure
Paint Failure
Paint Abrasion
Chipped Paint
Overhead X X X X X
Deck X X X X X
Forward Bulkhead X X X
AFT Bulkhead X X X
Description
Sample Result (microgram/ft2)
Greater than
SFLC 0000
Notes
ES – LW01 EM Shop Forward Overhead
Hatch
Wipe 38.1 No
ES – LW02 EM Shop Starboard Forward
Bilge
Wipe 59.8 No
ES – LW03 EM Shop Forward Center Floor
Wipe 19.3 No
ES – LW04 EM Shop Forward Center
Overhead
Wipe <10 No
ES – LW05 EM Shop Port Forward Bulkhead
Wipe <10 No
ES – LW06 EM Shop Forward Heater
Wipe 16.3 No
ES – LW07 EM Shop AFT Port Floor
Wipe 84.4 No
ES – LW08 EM Shop AFT Center Bulkhead
Wipe <10 No
ES – LW09 EM Shop Starboard AFT Light
Wipe 341.9 Yes
ES – LW10 EM Shop Port AFT Overhead
Wipe <10 No
Note: SFLC Standard Specification 000 threshold for lead wipe sampling is 40 microgram/ft2 for berthing and
• Panel vibration has the potential to cause lead dust.
• Due to potential lead dust hazards, it is recommended that the area be regularly cleaned
Overhead:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
Deck:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
AFT Bulkhead:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
Starboard Bulkhead:
• No sampling was performed.
• Recommend bulk paint chip sampling.
Forward Bulkhead
• No sampling was performed.
• Recommend bulk paint chip sampling.
Port Bulkhead:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
Other:
• Forward Heater o Lead Dust Wipe sampling was performed and results were lower than SFLC Standard
Specification 0000.
o Recommend bulk paint chip sampling.
• Starboard AFT Light o Lead Dust Wipe sampling was performed and results were above than SFLC Standard
Specification 0000.
o The entire compartment should be HEPA vacuumed and wet wiped.
6.9 Tender Ventilation
Coat
Failure
Multi Coat
Failure
Paint Failure
Paint Abrasion
Chipped Paint
Three Ducts Facing FWD X N/A N/A N/A N/A N/A
Three Ducts Facing AFT X N/A N/A N/A N/A N/A
Description
Sample Result (microgram/ft2)
Greater than
SFLC 0000
Notes
VT – LW01 Ventilation Tender Starboard Forward
Vent
Wipe 16.2 No
VT – LW02 Ventilation Tender Forward Center Vent
Wipe 67.1 No
VT – LW03 Ventilation Tender Port Discharge Vent
Wipe 22.4 No
VT – LW04 Ventilation Tender Starboard Ex Vent AFT
Wipe 18.7 No
VT – LW05 Ventilation Tender Venter Ex Vent AFT
Wipe 37.3 No
VT – LW06 Ventilation Tender Port Ex Vent Pipe
Wipe 15.5 No
VT – LW07 Ventilation Tender Port AFT Vent Pipe
Wipe 28.9 No
VT – LW08 Ventilation Tender Starboard Duct Blanket
Wipe 18.5 No
VT – LW09 Ventilation Tender Forward Duct Pipe
Wipe 52.7 No
VT – LW10 Ventilation Tender AFT Duct Pipe Cover
Wipe 17.7 No
Note: SFLC Standard Specification 000 threshold for lead wipe sampling is 40 microgram/ft2 for berthing and
• Panel vibration has the potential to cause lead dust.
• Due to potential lead dust hazards, it is recommended that the area be regularly cleaned using HEPA vacuums and wet wipes to ensure levels of lead dust do not exceed the permissible exposure limit.
• If other materials are found and suspected to contain lead they should be tested before disturbed. Deteriorated areas should be abated or stabilized if found to contain lead.
Ventilation Ducts (6 ducts were not painted):
6.10 Tender Mess Deck & Galley
Coat Failure
Multi Coat
Failure
Paint Failure
Paint Abrasion
Chipped Paint
Overhead X X X X
Deck X X X
Forward Bulkhead X X X
AFT Bulkhead X X X
Description
Sample Result (microgram/ft2)
Greater than
SFLC 0000
Notes
MD – LW01 Mess Deck Forward Floor Port
Wipe 10.8 No
MD – LW02 Mess Deck Port Forward
Overhead
Wipe <10 No
MD – LW03 Mess Deck Port Forward Bulkhead
Wipe <10 No
MD – LW04 Mess Deck AFT Prep Table
Wipe <10 No
MD – LW05 Mess Deck Port Heater Vent
Intake
Wipe <10 No
MD – LW06 Mess Deck Port Heater Ex Vent
Wipe 10 No
MD – LW07 Mess Deck Center Floor
Wipe 12 No
MD – LW08 Mess Deck Center AFT Bulkhead
Wipe <10 No
MD – LW09 Mess Deck Starboard Bulkhead
Wipe <10 No
MD – LW10 Mess Deck Starboard Floor
Wipe 11 No
Note: SFLC Standard Specification 000 threshold for lead wipe sampling is 40 microgram/ft2 for berthing and
• Panel vibration has the potential to cause lead dust.
• Due to potential lead dust hazards, it is recommended that the area be regularly cleaned using HEPA vacuums and wet wipes to ensure levels of lead dust do not exceed the
• Area was difficult to assess due to the paneling.
Overhead:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
Deck:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
• The coaming had a large amount of chipping from impact but still considered intact.
AFT Bulkhead:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
Forward Bulkhead:
• No sampling was performed.
• Recommend bulk paint chip sampling.
Port Bulkhead:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
Starboard Bulkhead:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
Other:
• AFT Prep Table o Lead Dust Wipe sampling was performed and results were lower than SFLC Standard
Specification 0000.
o Recommend bulk paint chip sampling.
• Port Heater Vent Intake o Lead Dust Wipe sampling was performed and results were lower than SFLC Standard
Specification 0000.
o Recommend bulk paint chip sampling.
• Port Heater Ex Vent o Lead Dust Wipe sampling was performed and results were lower than SFLC Standard
6.11 Tender CO Berthing Area
Coat Failure
Multi Coat
Failure
Paint Failure
Paint Abrasion
Chipped Paint
Overhead X X X
Deck X X X
Forward Bulkhead X X X
AFT Bulkhead X X X
Description
Sample Result (microgram/ft2)
Greater than
SFLC 0000
Notes
CO – LW01 CO Berthing Area Center Floor
Wipe <10 No
CO – LW02 CO Berthing Area Port Bulkhead
Wipe <10 No
CO – LW03 CO Berthing Area Forward Bulkhead
Wipe <10 No
CO – LW04 CO Berthing Area Center Overhead
Wipe 13.3 No
CO – LW05 CO Berthing Area Left Desk Top
Wipe <10 No
CO – LW06 CO Berthing Area AFT Bulkhead
Wipe <10 No
CO – LW07 CO Berthing Area Forward Starboard
Bulkhead
Wipe <10 No
CO – LW08 CO Berthing Area Forward Heater Vent
Wipe <10 No
CO – LW09 CO Berthing Area Forward Heater Intake
Wipe <10 No
CO – LW10 CO Berthing Area AFT Center Floor
Wipe <10 No
Note: SFLC Standard Specification 000 threshold for lead wipe sampling is 40 microgram/ft2 for berthing and
• Panel vibration has the potential to cause lead dust.
• Due to potential lead dust hazards, it is recommended that the area be regularly cleaned using HEPA vacuums and wet wipes to ensure levels of lead dust do not exceed the
• Area was difficult to assess due to the paneling and carpeting.
Overhead:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
Deck:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
AFT Bulkhead:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
Forward Bulkhead:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
Port Bulkhead:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
Starboard Bulkhead:
• No sampling was performed.
• Recommend bulk paint chip sampling.
Other:
• Left Desk Top o Lead Dust Wipe sampling was performed and results were lower than SFLC Standard
Specification 0000.
o Recommend bulk paint chip sampling.
• Forward Heater Vent o Lead Dust Wipe sampling was performed and results were lower than SFLC Standard
Specification 0000.
o Recommend bulk paint chip sampling.
• Forward Heater Intake o Lead Dust Wipe sampling was performed and results were lower than SFLC Standard
6.12 Tender EPO/XPO Berthing Area
Coat Failure
Multi Coat
Failure
Paint Failure
Paint Abrasion
Chipped Paint
Overhead X X X
Deck X X X
Forward Bulkhead X X X
AFT Bulkhead X X X
Description
Sample Result (microgram/ft2)
Greater than
SFLC 0000
Notes
EPO – LW01 EPO Berthing Area Forward Port Floor
Wipe <10 No
EPO – LW02 EPO Berthing Area Port Forward
Overhead
Wipe 10.9 No
EPO – LW03 EPO Berthing Area State Room Door
Wipe <10 No
EPO – LW04 EPO Berthing Area Starboard Bulkhead
Wipe <10 No
EPO – LW05 EPO Berthing Area Port Bulkhead
Wipe <10 No
EPO – LW06 EPO Berthing Area AFT Bulkhead
Wipe <10 No
EPO – LW07 EPO Berthing Area Heater Intake
Wipe <10 No
EPO – LW08 EPO Berthing Area Heater Exhaust Vent
Wipe <10 No
EPO – LW09 EPO Berthing Area Starboard Light
Wipe <10 No
EPO – LW10 EPO Berthing Area Storage Locker Top
Wipe <10 No
Note: SFLC Standard Specification 000 threshold for lead wipe sampling is 40 microgram/ft2 for berthing and
• Panel vibration has the potential to cause lead dust.
• Due to potential lead dust hazards, it is recommended that the area be regularly cleaned using HEPA vacuums and wet wipes to ensure levels of lead dust do not exceed the
• Area was difficult to assess due to the paneling and carpeting.
Overhead:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
Deck:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
AFT Bulkhead:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
Forward Bulkhead:
• No sampling was performed.
• Recommend bulk paint chip sampling.
Port Bulkhead:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
Starboard Bulkhead:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
Other:
• State Room Door o Lead Dust Wipe sampling was performed and results were lower than SFLC Standard
Specification 0000.
o Recommend bulk paint chip sampling.
• Heater Intake o Lead Dust Wipe sampling was performed and results were lower than SFLC Standard
Specification 0000.
o Recommend bulk paint chip sampling.
• Heater Exhaust Vent o Lead Dust Wipe sampling was performed and results were lower than SFLC Standard
Specification 0000.
o Recommend bulk paint chip sampling.
• Starboard Light o Lead Dust Wipe sampling was performed and results were lower than SFLC Standard
• Storage Locker Top o Lead Dust Wipe sampling was performed and results were lower than SFLC Standard
6.13 Tender Crew Berthing Area
Coat Failure
Multi Coat
Failure
Paint Failure
Paint Abrasion
Chipped Paint
Overhead X X X
Deck X X X
Forward Bulkhead X X X
AFT Bulkhead X X X
Description
Sample Result (microgram/ft2)
Greater than
SFLC 0000
Notes
CB – LW01 Crew Berthing Port Door
Wipe <10 No
CB – LW02 Crew Berthing Port Forward Floor
Wipe <10 No
CB – LW03 Crew Berthing AFT Locker
Wipe <10 No
CB – LW04 Crew Berthing Center Aft Floor
Wipe <10 No
CB – LW05 Crew Berthing Center Overhead
Wipe <10 No
CB – LW06 Crew Berthing Starboard Bulkhead
Wipe <10 No
CB – LW07 Crew Berthing Forward Bulkhead
Wipe <10 No
CB – LW08 Crew Berthing Starboard Center Floor
Wipe <10 No
CB – LW09 Crew Berthing AFT Center Bunk
Wipe <10 No
CB – LW10 Crew Berthing Heater Ex Vent
Wipe <10 No
Note: SFLC Standard Specification 000 threshold for lead wipe sampling is 40 microgram/ft2 for berthing and
• Panel vibration has the potential to cause lead dust.
• Due to potential lead dust hazards, it is recommended that the area be regularly cleaned using HEPA vacuums and wet wipes to ensure levels of lead dust do not exceed the permissible exposure limit.
• Area was difficult to assess due to the paneling, bunks, lockers, etc.
Specification 0000.
• Recommend bulk paint chip sampling.
Deck:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
AFT Bulkhead:
• No sampling was performed.
• Recommend bulk paint chip sampling.
Forward Bulkhead:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
Port Bulkhead:
• No sampling was performed.
• Recommend bulk paint chip sampling.
Starboard Bulkhead:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
Other:
• Port Door o Lead Dust Wipe sampling was performed and results were lower than SFLC Standard
Specification 0000.
o Recommend bulk paint chip sampling.
• AFT Locker o Lead Dust Wipe sampling was performed and results were lower than SFLC Standard
Specification 0000.
o Recommend bulk paint chip sampling.
• AFT Center Bunk o Lead Dust Wipe sampling was performed and results were lower than SFLC Standard
Specification 0000.
o Recommend bulk paint chip sampling.
• Heater Ex Vent o Lead Dust Wipe sampling was performed and results were lower than SFLC Standard
6.14 Tender Engine Room
Coat Failure
Multi Coat
Failure
Paint Failure
Paint Abrasion
Chipped Paint
Overhead X X X X
Deck X X X
Forward Bulkhead X X X
AFT Bulkhead X X X
Description
Sample Result (microgram/ft2)
Greater than
SFLC 0000
Notes
TER – LW01 Tender Engine Room Center Floor
Wipe 17 No
TER – LW02 Tender Engine Room Center Overhead
Wipe 19 No
TER – LW03 Tender Engine Room Port Bulkhead
Wipe 16.5 No
TER – LW04 Tender Engine Room Forward Bulkhead
Wipe 11.3 No
TER – LW05 Tender Engine Room Port Electric Panel Top
Wipe 14.2 No
TER – LW06 Tender Engine Room Starboard F. O. Tank
Door
Wipe 12.8 No
TER – LW07 Tender Engine Room AFT Bulkhead
Wipe 12.5 No
TER – LW08 Tender Engine Room AFT Center Floor
Wipe 28.4 No
TER – LW09 Tender Engine Room Middle Step
Wipe 23.9 No
TER – LW10 Tender Engine Room Starboard Bulkhead
Wipe 22.2 No
Note: SFLC Standard Specification 000 threshold for lead wipe sampling is 40 microgram/ft2 for berthing and
• Panel vibration has the potential to cause lead dust.
• Due to potential lead dust hazards, it is recommended that the area be regularly cleaned using HEPA vacuums and wet wipes to ensure levels of lead dust do not exceed the
• Area was difficult to assess due to the paneling.
Overhead:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
Deck:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
AFT Bulkhead:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
Forward Bulkhead:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
Port Bulkhead:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
Starboard Bulkhead:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
Other:
• Port Electrical Panel Top o Lead Dust Wipe sampling was performed and results were lower than SFLC Standard
Specification 0000.
o Recommend bulk paint chip sampling.
• Starboard F. O. Tank Door o Lead Dust Wipe sampling was performed and results were lower than SFLC Standard
Specification 0000.
o Recommend bulk paint chip sampling.
• Middle Step o Lead Dust Wipe sampling was performed and results were lower than SFLC Standard
6.15 Tender Shaft Alley
Coat Failure
Multi Coat
Failure
Paint Failure
Paint Abrasion
Chipped Paint
Overhead X X X
Deck X X X X
Forward Bulkhead X X X
AFT Bulkhead X X X
Lead Bulk Sampling
Description
Sample Result (By Weight)
Greater than HUD Standard
(0.5 % by weight)
Notes
SA – L01 Shaft Alley Port Bulkhead
Forward
Multi-Layer Paint
<0.0084% No See Note A
SA – L02 Shaft Alley Forward Bulkhead
Forward
Multi-Layer Paint
<0.0091% No See Note A
Note A: Although the sample is less than the Permissible Exposure Limit, the paint still contains lead and should be handled accordingly.
Description
Sample Result (microgram/ft2)
Greater than
SFLC 0000
Notes
SA – LW01 Shaft Alley Starboard Forward
Floor
Wipe 23.9 No
SA – LW02 Shaft Alley Hydraulic Steering
Tank
Wipe <10 No
SA – LW03 Shaft Alley Starboard Forward
Bulkhead
Wipe <10 No
SA – LW04 Shaft Alley AFT Floor
Wipe 21.7 No
SA – LW05 Shaft Alley Forward Starboard
Heater
Wipe 17.7 No
SA – LW06 Shaft Alley Potable Water Tank
Wipe <10 No
SA – LW07 Shaft Alley Forward Center Floor
Wipe 22.4 No
SA – LW08 Shaft Alley Forward Center Bilge
Wipe 11.8 No
SA – LW09 Shaft Alley AFT Center Overhead
Wipe <10 No
SA – LW10 Shaft Alley Port Bulkhead
Wipe <10 No
Note: SFLC Standard Specification 000 threshold for lead wipe sampling is 40 microgram/ft2 for berthing and
• Panel vibration has the potential to cause lead dust.
• Due to potential lead dust hazards, it is recommended that the area be regularly cleaned using HEPA vacuums and wet wipes to ensure levels of lead dust do not exceed the permissible exposure limit.
• Area was difficult to assess due to insulation.
• If other materials are found and suspected to contain lead they should be tested before disturbed. Deteriorated areas should be abated or stabilized if found to contain lead.
Overhead:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
Deck:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Bulk paint chip sampling was not performed because Lt. Troch indicated that it was already confirmed to contain lead. If the area begins to deteriorate, the deck should be abated or stabilized.
AFT Bulkhead:
• No sampling was performed.
• Recommend bulk paint chip sampling.
Forward Bulkhead:
• No Lead Dust Wipe sampling was performed.
• Bulk sampling was performed and the results were lower than HUD standards (0.5% by weight).
Port Bulkhead:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Bulk sampling was performed and the results were lower than HUD standards (0.5% by weight).
Starboard Bulkhead:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard
Other:
• Hydraulic Steering Tank o Lead Dust Wipe sampling was performed and results were lower than SFLC Standard
Specification 0000.
o Recommend bulk paint chip sampling.
• Forward Starboard Heater o Lead Dust Wipe sampling was performed and results were lower than SFLC Standard
Specification 0000.
o Recommend bulk paint chip sampling.
• Potable Water Tank o Lead Dust Wipe sampling was performed and results were lower than SFLC Standard
6.16 Tender Main Deck Passageways & Ladders
Coat Failure
Multi Coat
Failure
Paint Failure
Paint Abrasion
Chipped Paint
Overhead X X X
Deck X X X
Forward Bulkhead X X X
AFT Bulkhead X X X
Description
Sample Result (microgram/ft2)
Greater than
SFLC 0000
Notes
MP – LW01 Main Passage AFT Door
Wipe <10 No
MP – LW02 Main Passage AFT Overhead Panel
Wipe <10 No
MP – LW03 Main Passage AFT Port Bulkhead
Wipe <10 No
MP – LW04 Main Passage Center Floor
Wipe <10 No
MP – LW05 Main Passage Heating Unit Vent
Wipe <10 No
MP – LW06 Main Passage Starboard Center
Bulkhead
Wipe <10 No
MP – LW07 Main Passage Fire Ext. Center
Wipe <10 No
MP – LW08 Main Passage Forward Floor
Wipe <10 No
MP – LW09 Main Passage Forward Overhead
Panel
Wipe 10.3 No
MP – LW10 Main Passage Starboard Forward
Bulkhead
Wipe <10 No
MP – LW11 Main Passage Starboard Fuse Panel
Cover
Wipe <10 No
MP – LW12 Main Passage Overhead Smoke Det.
Wipe <10 No
MP – LW13 Main Passage AFT Floor
Wipe <10 No
MP – LW14 Main Passage Port Bulletin Board
Wipe <10 No
MP – LW15 Main Passage Top Starboard Bulletin
Board
Wipe <10 No
MP – LW16 Main Passage Port Side Vent
Wipe <10 No
MP – LW17 Main Passage Forward Port Window
Sill
Wipe <10 No
MP – LW18 Main Passage Forward Port Combing
Wipe <10 No
MP – LW19 Main Passage Em. Light Unit
Wipe <10 No
MP – LW20 Main Passage Center Overhead Light
Wipe <10 No
Note: SFLC Standard Specification 000 threshold for lead wipe sampling is 40 microgram/ft2 for berthing and
• Panel vibration has the potential to cause lead dust.
• Due to potential lead dust hazards, it is recommended that the area be regularly cleaned using HEPA vacuums and wet wipes to ensure levels of lead dust do not exceed the permissible exposure limit.
• Area was difficult to assess due to the paneling.
• If other materials are found and suspected to contain lead they should be tested before disturbed. Deteriorated areas should be abated or stabilized if found to contain lead.
Overhead:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
Deck:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
AFT Bulkhead:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
Forward Bulkhead:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
Port Bulkhead:
Starboard Bulkhead:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
Other:
• AFT Door o Lead Dust Wipe sampling was performed and results were lower than SFLC Standard
Specification 0000.
o Recommend bulk paint chip sampling.
• Heating Unit Vent o Lead Dust Wipe sampling was performed and results were lower than SFLC Standard
Specification 0000.
o Recommend bulk paint chip sampling.
• Fire Ext Center o Lead Dust Wipe sampling was performed and results were lower than SFLC Standard
Specification 0000.
o Recommend bulk paint chip sampling.
• STBD Fuse Panel Cover o Lead Dust Wipe sampling was performed and results were lower than SFLC Standard
Specification 0000.
o Recommend bulk paint chip sampling.
• Port Side Vent o Lead Dust Wipe sampling was performed and results were lower than SFLC Standard
Specification 0000.
o Recommend bulk paint chip sampling.
• EM Light Unit o Lead Dust Wipe sampling was performed and results were lower than SFLC Standard
Specification 0000.
o Recommend bulk paint chip sampling.
• Center Overhead Light o Lead Dust Wipe sampling was performed and results were lower than SFLC Standard
6.17 Tender 01 Deck Passageways & Ladders
Coat Failure
Multi Coat
Failure
Paint Failure
Paint Abrasion
Chipped Paint
Overhead X X X
Deck X X X
Forward Bulkhead X X X
AFT Bulkhead X X X
Port Bulkhead X X X
Ladders X
Description
Sample Result (microgram/ft2)
Greater than
SFLC 0000
Notes
01P – LW01 01 Passage Starboard Bulkhead
Wipe <10 No
01P – LW02 01 Passage Center Overhead
Wipe 13.3 No
01P – LW03 01 Passage Center Floor
Wipe 10.3 No
01P – LW04 01 Passage Port Bulkhead
Wipe <10 No
01P – LW05 01 Passage Stairwell to Pilothouse
Wipe 12 No
01P – LW06 01 Passage Lower Hand Rail
Wipe <10 No
01P – LW07 01 Passage Lower Stairs
Wipe 12.3 No
01P – LW08 01 Passage Overhead Light
Wipe <10 No
01P – LW09 01 Passage Port Side Combing
Wipe 15.5 No
01P – LW10 01 Passage Port Floor
Wipe <10 No
01P – LW11 01 Passage Port AFT Bulkhead
Wipe <10 No
01P – LW12 01 Passage Starboard AFT
Bulkhead
Wipe <10 No
01P – LW13 01 Passage AFT Floor
Wipe 10.3 No
01P – LW14 01 Passage Bottom Step Lower
Wipe 26.7 No
01P – LW15 01 Passage Portrait on AFT
Bulkhead
Wipe <10 No
01P – LW16 01 Passage Forward Port Combing
Wipe <10 No
01P – LW17 01 Passage Upper Hand Rail
Wipe <10 No
01P – LW18 01 Passage Upper Bottom Step
Wipe 37.1 No
01P – LW19 01 Passage Upper Step Top
Stairwell
Wipe <10 No
01P – LW20 01 Passage Emergency Light
Wipe 16 No
Note: SFLC Standard Specification 000 threshold for lead wipe sampling is 40 microgram/ft2 for berthing and
• Panel vibration has the potential to cause lead dust.
• Due to potential lead dust hazards, it is recommended that the area be regularly cleaned using HEPA vacuums and wet wipes to ensure levels of lead dust do not exceed the permissible exposure limit.
• Area was difficult to assess due to the paneling.
• If other materials are found and suspected to contain lead they should be tested before disturbed. Deteriorated areas should be abated or stabilized if found to contain lead.
Overhead:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
Deck:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
AFT Bulkhead:
• No sampling was performed.
• Recommend bulk paint chip sampling.
Forward Bulkhead:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
Port Bulkhead:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
Starboard Bulkhead:
• Stairwell to Pilot House o Lead Dust Wipe sampling was performed and results were lower than SFLC Standard
Specification 0000.
o Recommend bulk paint chip sampling.
• Lower Handrail o Lead Dust Wipe sampling was performed and results were lower than SFLC Standard
Specification 0000.
o Recommend bulk paint chip sampling.
• Lower Stairs o Lead Dust Wipe sampling was performed and results were lower than SFLC Standard
Specification 0000.
o Recommend bulk paint chip sampling.
• Overhead Light o Lead Dust Wipe sampling was performed and results were lower than SFLC Standard
Specification 0000.
o Recommend bulk paint chip sampling.
• Bottom Step Lower o Lead Dust Wipe sampling was performed and results were lower than SFLC Standard
Specification 0000.
o Recommend bulk paint chip sampling.
• Upper Handrail o Lead Dust Wipe sampling was performed and results were lower than SFLC Standard
Specification 0000.
o Recommend bulk paint chip sampling.
• Upper Bottom Step o Lead Dust Wipe sampling was performed and results were lower than SFLC Standard
Specification 0000.
o Recommend bulk paint chip sampling.
• Upper Step Top Stairwell o Lead Dust Wipe sampling was performed and results were lower than SFLC Standard
Specification 0000.
o Recommend bulk paint chip sampling.
• Emergency Light o Lead Dust Wipe sampling was performed and results were lower than SFLC Standard
6.18 Lazarette
Coat Failure
Multi Coat
Failure
Paint Failure
Paint Abrasion
Chipped Paint
Overhead X X X X
Deck X X X X X
Forward Bulkhead X X X
AFT Bulkhead X X X
Description
Sample Result (By Weight)
Greater than HUD Standard
(0.5 % by weight)
Notes
LAZ – L01 Lazarette Overhead Center
Multi-Layer Paint
<0.0071% No See Note A
LAZ – L02 Lazarette Port Bulkhead
Forward
Multi-Layer Paint
<0.0369% No See Note A
LAZ - 03 Lazarette AFT Bulkhead
Center
Multi-Layer Paint
<0.0331% No See Note A
Note A: Although the sample is less than the Permissible Exposure Limit, the paint still contains lead and should be
Description
Sample Result (microgram/ft2)
Greater than
SFLC 0000
Notes
LAZ – LW01 Lazarette Starboard Forward
Bilge
Wipe 28.4 No
LAZ – LW02 Lazarette Starboard Forward
Bulkhead
Wipe 148.3 No
LAZ – LW03 Lazarette Starboard Overhead
Wipe 20 No
LAZ – LW04 Lazarette Center Ingot Cover
Wipe 44.3 No
LAZ – LW05 Lazarette Forward Center Pipe
Wipe 78.5 No
LAZ – LW06 Lazarette Starboard Rudder
Housing
Wipe 18.2 No
LAZ – LW07 Lazarette Starboard AFT
Bulkhead
Wipe 24.7 No
LAZ – LW08 Lazarette Port Bilge
Wipe 18.7 No
LAZ – LW09 Lazarette Port Overhead
Wipe 433.7 Yes
LAZ – LW10 Lazarette Port AFT Bulkhead
Wipe 156.2 No
Note: SFLC Standard Specification 000 threshold for lead wipe sampling is 40 microgram/ft2 for berthing and
• Panel vibration has the potential to cause lead dust.
• Due to potential lead dust hazards, it is recommended that the area be regularly cleaned using HEPA vacuums and wet wipes to ensure levels of lead dust do not exceed the permissible exposure limit.
• If other materials are found and suspected to contain lead they should be tested before disturbed. Deteriorated areas should be abated or stabilized if found to contain lead.
Overhead:
• Lead Dust Wipe sampling was performed and results were above the SFLC Standard Specification 0000.
• Bulk sampling was performed and the results were lower than HUD standards (0.5% by weight).
• The entire compartment should be HEPA vacuumed and wet wiped.
Deck:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
AFT Bulkhead:
• No Lead Dust Wipe sampling was performed.
• Bulk sampling was performed and the results were lower than HUD standards (0.5% by weight).
Forward Bulkhead:
• No sampling was performed.
• Recommend bulk paint chip sampling.
Port Bulkhead:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Bulk sampling was performed and the results were lower than HUD standards (0.5% by weight).
Starboard Bulkhead:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard
• Starboard Rudder Housing o Lead Dust Wipe sampling was performed and results were lower than SFLC Standard
Specification 0000.
o Recommend bulk paint chip sampling.
• Forward Center Pipe o Lead Dust Wipe sampling was performed and results were lower than SFLC Standard
Specification 0000.
o Recommend bulk paint chip sampling.
• Center Ingot Cover o Lead Dust Wipe sampling was performed and results were lower than SFLC Standard
6.19 MSD Space
Coat Failure
Multi Coat
Failure
Paint Failure
Paint Abrasion
Chipped Paint
Overhead X X X X
Deck X X X X
Forward Bulkhead X X X
AFT Bulkhead X X X
Port Bulkhead X X X
Sewage Tank X X X X
Description
Sample Result (By Weight)
Greater than HUD Standard
(0.5 % by weight)
Notes
MSD – L01 MSD Space Overhead Pipe
Center
Multi-Layer Paint
0.9227% Yes
Note A: Although the sample is less than the Permissible Exposure Limit, the paint still contains lead and should be
Description
Sample Result (microgram/ft2)
Greater than
SFLC 0000
Notes
MSD – LW01 MSD
Entry Way Step
Wipe 15.2 No
MSD – LW02 MSD
Center AFT Bulkhead
Wipe 20.2 No
MSD – LW03 MSD
Port AFT Floor
Wipe 44.3 No
MSD – LW04 MSD
Top of Waste Tank
Wipe 25.4 No
MSD – LW05 MSD
Forward Bulkhead Port
Wipe 49.7 No
MSD – LW06 MSD
Starboard Bilge
Wipe 43.5 No
MSD – LW07 MSD
AFT Center Overhead
Pipe
Wipe 19.2 No
MSD – LW08 MSD
Starboard Bulkhead
Wipe 34.6 No
MSD – LW09 MSD
Starboard Floor
Wipe 14 No
MSD – LW10 MSD
Starboard Overhead
Wipe 11.3 No
Note: SFLC Standard Specification 000 threshold for lead wipe sampling is 40 microgram/ft2 for berthing and
• Panel vibration has the potential to cause lead dust.
• Due to potential lead dust hazards, it is recommended that the area be regularly cleaned using HEPA vacuums and wet wipes to ensure levels of lead dust do not exceed the permissible exposure limit.
• If other materials are found and suspected to contain lead they should be tested before disturbed. Deteriorated areas should be abated or stabilized if found to contain lead.
Overhead:
• Lead Dust Wipe sampling was performed and results were lower than the SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
Deck:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
AFT Bulkhead:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
Forward Bulkhead:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
Port Bulkhead:
• No sampling was performed.
• Recommend bulk paint chip sampling.
Starboard Bulkhead:
• Lead Dust Wipe sampling was performed and results were lower than SFLC Standard Specification 0000.
• Recommend bulk paint chip sampling.
Other:
• Entry Way Step o Lead Dust Wipe sampling was performed and results were lower than SFLC Standard
Specification 0000.
o Recommend bulk paint chip sampling.
• Top of Waste Tank o Lead Dust Wipe sampling was performed and results were lower than SFLC Standard
• AFT Center Overhead Pipe o Lead Dust Wipe sampling was performed and results were lower than SFLC Standard
Specification 0000.
o Recommend bulk paint chip sampling.
• Overhead Pipe Center o Bulk sampling was performed and the results were above HUD standards (0.5% by weight).
o Piping in this area should be abated or stabilized.
6.20 Barge Forward Rake
Coat Failure
Multi Coat
Failure
Paint Failure
Paint Abrasion
Chipped Paint
Overhead X X X
Deck X X X
Forward Bulkhead X X X
AFT Bulkhead X X X
Description
Sample Result (By Weight)
Greater than HUD Standard
(0.5 % by weight)
Notes
FR – L01 Forward Rake Deck
Forward Center
Multi-Layer Paint
<0.0074% No See Note A
FR – L02 Forward Rake Starboard Bulkhead
Center
Multi-Layer Paint
<0.0033% No See Note A
FR – L03 Forward Rake Overhead Starboard
Multi-Layer Paint
0.0079% No See Note A
FR – L04 Forward Rake Overhead Starboard
Multi-Layer Paint
0.0084% No See Note A
Note A: Although the sample is less than the Permissible Exposure Limit, the paint still contains lead and…