SPAR,_Specification,_Rev_2.pdf
PDF 4 MB Posted
- Attached to
- DOCKSIDE REPAIR FOR USCGC SPAR FY19
- Solicitation number
- 70Z085-19-Q-P4502000
About this file
Amendment 01, Revised Specification
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 20181005_091139.jpg | JPG image | |
| 20181005_181256.jpg | JPG image | |
| 20181003_141540.jpg | JPG image | |
| 20181005_175741.jpg | JPG image | |
| Amendment_04-SAPR_DS,_FY19.doc | DOC document | |
| 20181005_180210.jpg | JPG image | |
| 20181005_173957.jpg | JPG image | |
| Amendment_4_Questions_and_Answers.xlsx | XLSX spreadsheet | |
| Amendment_03-SAPR_DS,_FY19.doc | DOC document | |
| Amendment_02-SAPR_DS,_FY19.doc | DOC document | |
| Attachment_1,_Work_Item_Price_List.xls | XLS spreadsheet | |
| Attachment_2,_SPAR,_Specification,_Rev_3.pdf | ||
| Amendment_2_Questions_&_Answers.xlsx | XLSX spreadsheet | |
| Amendment_01-SAPR_DS,_FY19.doc | DOC document | |
| Attachment_1,_SPAR,_Work_Item_Price_List.xls | XLS spreadsheet | |
| Attachment_2,_SPAR,_Specification.pdf | ||
| Attachment_5,_SPAR,_USCG_Ombudsman_Notice.doc | DOC document | |
| Attachment_1,_SPAR,_Work_Item_Price_List.xls | XLS spreadsheet | |
| Attachment_3,_SPAR,_Past_Performance_Information_Form.doc | DOC document | |
| Attachment_4,_SPAR,_Request_for_Clarification.docx | DOCX document | |
| SPAR_FY19_DD,_RFQ-20SEP2018,_updated.doc | DOC document |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC SPAR (WLB 206)
SPECIFICATION FOR DOCKSIDE REPAIRS
FY2019
Developed By: Bronson L Suyat
(Rev-02, 01 October 2018)
USCGC SPAR (WLB-225B) DOCKSIDE AVAILABILITY FY2019
ii (Rev-02)
TABLE OF CONTENTS
Revisions Record .......................................................................................................................................... iv Consolidated List of References ................................................................................................................... vi Consolidated List of Government-furnished Property ............................................................................... xii Consolidated List of Critical Inspection Items ............................................................................................ xx Principal Characteristics ............................................................................................................................. xxi General Requirements WORK ITEM 1: Tanks (Hydraulic Oil Stowage And Service), Clean And Inspect WORK ITEM 2: Tanks (Potable Water), Clean and Inspect WORK ITEM 3: Tanks (Lube Oil), Clean and Inspect WORK ITEM 4: Hydraulically Operated Cargo Hatch, Inspect and Service WORK ITEM 5: Vent Ducts (All Other), Commercial Cleaning WORK ITEM 6: Hull Fittings (Weight Handling Rigging Hardware), Inspect and Test WORK ITEM 7: Hydraulic Chain Stoppers, Inspect And Service WORK ITEM 8: Crossdeck Winches, Inspect and Service WORK ITEM 9: Hydraulic Inhaul Winch, Inspect And Service WORK ITEM 10: Mechanical Chain Stoppers, Inspect and Service WORK ITEM 11: Warping Capstan, Inspect and Service WORK ITEM 12: Single Point Davit, Inspect and Service WORK ITEM 13: Twin Pivot Arm Davit, Inspect and Service WORK ITEM 14: Buoy Crane, Appleton EB4806040, Inspect and Service WORK ITEM 15: Tanks (Potable Water), Preserve “100%” WORK ITEM 16: Tanks (Potable Water), Preserve “Partial” WORK ITEM 17: Superstructure, Preserve “100%” WORK ITEM 18: Superstructure, Preserve “Partial” WORK ITEM 19: Temporary Services, Provide - Cutter WORK ITEM 20: Buoy Deck Auxiliary Cleat & Snubbing Winch Install WORK ITEM 21: Buoy Deck Led Flood Lights, Replace WORK ITEM 22: Links, Gripes, Binders and Jacks, Service, Inspect and Test WORK ITEM 23: Xdeck Inhaul Winch Foundation Repair WORK ITEM 24: Pad Eye Installation WORK ITEM 25: Deck Covering (Interior Wet/Dry), Renew (Various Compartments) WORK ITEM 26: Fuel Transfer Stations, Renew WORK ITEM 27: Air Service Stations, Renew WORK ITEM 28: Sewage Shore Tie Valves, Renew WORK ITEM 29: Auxiliary Sea Water (ASW) System Sea Bay Isolation Valve, Renew WORK ITEM 30: Potable Water Pump Room Deck, Preserve WORK ITEM 31: Water Supply Equipment Room Deck, Partial Preserve WORK ITEM 32: Ladder, Repair WORK ITEM 33: Escape Trunk Cover, Preserve & Repair WORK ITEM 34: Deck Covering, Carpeting, Renew WORK ITEM 35: Exhaust System and Fan Mounts, Renew WORK ITEM 36: Pilot House Windows Framing and Gaskets, Renew WORK ITEM 37: Welin Lambie David Electrical Kickpipes, Renew WORK ITEM 38: Oily Water Separator Oil Content Detector (OCD), Replace WORK ITEM 39: Hydraulic Oil Storage Tank, Blast to Bare Metal WORK ITEM 40: SORS Cargo Hatch, Inspect and Repair WORK ITEM 41: Main Reduction Gear, Repairs WORK ITEM 42: P-100 Heater Installation iii (Rev-02)
WORK ITEM 43: Deck Covering (Interior Wet/Dry), Renew (Various Compartments) WORK ITEM 44: Towing Services, Provide WORK ITEM 45: Drydock iv (Rev-02)
REVISIONS RECORD
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE REV# WORK
ITEM#
CHANGES MADE
23AUG18 01 44 ADDED: TOWING SERVICES, PROVIDE
01OCT18 02 19 TABLE 1 – SERVICE SELECTION 3.3.6 & 3.3.10.3
01OCT18 02 41 2. REFERENCES, COAST GUARD DRAWINGS
01OCT18 02 41 2. REFERENCES, COAST GUARD PUBLICATIONS
01OCT18 02 41 2. REFERENCES, OTHER REFERENCES
01OCT18 02 41 Paragraph 3.1.2 Tech Rep
01OCT18 02 41 Paragraph 3.8.4 Drifting propulsion shaft aft.
01OCT18 02 41 Paragraph 3.8.4.1
01OCT18 02 41 Paragraph 3.8.4.2
01OCT18 02 41 Paragraph 3.8.4.3
01OCT18 02 41 Paragraph 3.8.4.3
01OCT18 02 41 Paragraph 3.8.4.4
01OCT18 02 41 Paragraph 3.8.4.5
01OCT18 02 41 Paragraph 3.8.4.6
01OCT18 02 41 Paragraph 3.8.4.7
01OCT18 02 41 Paragraph 3.8.4.8
01OCT18 02 41 Re-numbered paragraph 3.8.5 to 3.8.6.4
01OCT18 02 41 Paragraph 3.11.4 (TEP 2190)
01OCT18 02 41 Paragraph 3.11.7 TEP 2190
01OCT18 02 45 ADDED: DRYDOCK
v (Rev-02)
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
vi (Rev-02)
CONSOLIDATED LIST OF REFERENCES
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.
All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.
COAST GUARD DRAWINGS
Coast Guard Drawing 225 WLB 167-001, Rev T, Structural Closures Coast Guard Drawing 225 WLB 259-005, Rev C, Combustion Intake & Exhaust A&D Hull Block 940 Coast Guard Drawing 225 WLB 549-001, Rev H, Onboard Lubrication Requirements Coast Guard Drawing 225 WLB 601-002, Rev K, Booklet of General Drawings Coast Guard Drawing 225 WLB 801-020, Rev A, Tank Capacity Curves (WLB 203, 204, and 205) Coast Guard Drawing 225 WLB 801-020, Rev B, Tank CAPACITY - 95% Curves Coast Guard Drawing 225B WLB 573-001, Rev P, Buoy Handling System Arrangement Coast Guard Drawing 225B WLB 201-001, Rev D, Machinery Spaces Arrangement Coast Guard Drawing 225B WLB 512-001, Rev K, HVAC Diagram Coast Guard Drawing 225B WLB 512-007, Rev B, HVAC A&D, Fr 66-92, Innerbttm & 1st Platform Coast Guard Drawing 225B WLB 528-002, Rev D, Weather Deck Drains Diagram Coast Guard Drawing 225B WLB 549-001, Rev C, Onboard Lubrication Requirements Coast Guard Drawing 225B WLB 556-001, Rev F, Hydraulic System Diagram Coast Guard Drawing 225B WLB 573-001, Rev P, Buoy Handling System Arrangement Coast Guard Drawing 225B WLB 573-002, Rev -, Weight Handling System Arrangement Coast Guard Drawing 225B WLB 573-009, Rev E, Bi-Dir Ch Stopper With Retractable Roller Stopper Coast Guard Drawing 225B WLB 573-011, Rev -, ATON Tie Downs Coast Guard Drawing 225B WLB 593-002, Rev C, Oily Bilge System Diagram Coast Guard Drawing 225B WLB 601-001, Rev N, General Arrangement Inboard & Outboard Profiles Coast Guard Drawing 225B WLB 601-001, Rev T, General Arrangement Inboard & Outboard Profiles Coast Guard Drawing 225B WLB 601-001, Rev T; General Arrangement Inboard and Outboard Profiles Coast Guard Drawing 225B WLB 601-002, Rev H, Booklet of General Drawings Coast Guard Drawing 225B WLB 601-002, Rev K, Booklet of General Drawings Coast Guard Drawing 225B WLB 601-002, Rev M, Booklet of General Drawings Coast Guard Drawing 225B WLB 635-001, Rev E, Hull, Thermal, & Acoustic Insulation Schedule Coast Guard Drawing 225B WLB 672-001, Rev C, Storerooms, Cargo Stowage and Ship Store
Arrangement and Details Coast Guard Drawing 225B WLB 801-005, Rev A Tank CAPACITY - 95% Curves Coast Guard Drawing 225B-WLB 162-1, Rev D, Stack A & D vii (Rev-02)
Coast Guard Drawing 225B-WLB 259-1, Rev B, Combustion Intake & Exhaust Diagram Coast Guard Drawing 225B-WLB 262-1, Rev E, Lube Oil System Diagram Coast Guard Drawing 225B-WLB 262-2, Rev D, Waste Oil Diagram Coast Guard Drawing 225B-WLB 541-1, Rev G, Fuel Oil System Diagram Coast Guard Drawing 225B-WLB 551-1, Rev G, Compressed Air System Diagram Coast Guard Drawing 225B-WLB 556-1, Rev F, Hydraulic System Diagram Coast Guard Drawing 225B-WLB 573-001, Rev P, Buoy Handling System Arrangement Coast Guard Drawing 225B-WLB 573-2, Rev -, Weight Handling System Arrangement Coast Guard Drawing 225B-WLB 593-1, Rev D, Sewage and Waste Water System Diagram Coast Guard Drawing 225B-WLB 601-1, Rev F, General Arrangements, Inboard and Outboard Profiles Coast Guard Drawing 225B-WLB 180-012, Rev B, Foundations Buoy Deck Coast Guard Drawing 225B-WLB 256-001, Rev P, Seawater System Cooling Diagram Coast Guard Drawing 225B-WLB 549-001, Rev C, Onboard Lubrication Requirements Coast Guard Drawing 225B-WLB 601-001, Rev J, Gen Arr, Inboard and Outboard Profiles Coast Guard Drawing 225B-WLB 601-1, Rev N, General Arrangements – Inboard & Outboard Profiles Coast Guard Drawing 225B-WLB 601-2, Rev M, Booklet of General Drawings Coast Guard Drawing 225B-WLB 634-1, Rev F, Deck Covering Schedule Coast Guard Drawing 225B-WLB 635-001, Rev -, Hull, Thermal, Acoustic Insulation Schedule Coast Guard Drawing 225B-WLB 635-1, Rev E, Hull Thermal & Acoustic Insulation Schedule Coast Guard Drawing 225B-WLB 801-015, Rev B, Scantlings, Decks and Platforms Coast Guard Drawing 225B-WLB 910-002, Rev D, Hull Block 910 – Modules Coast Guard Drawing 225B-WLB-320-001, Electrical One-Line Diagram, Revision AC Coast Guard Drawing 225B-WLB-320-1, Rev AC, Electrical One-Line Wiring Diagram Coast Guard Drawing 225B-WLB-320-7, Rev J, Power Sys. Deck Plan, 02 Level & Above, Hull BLK
960B, 975 & 970 Coast Guard Drawing 225B-WLB-437-7, Rev. N, DK MCHRY Control Sys. Block WRG PLAN &
ELEM WRG DIAG
Coast Guard Drawing 225B-WLB-623-001, Rev H, Ladders, Vertical Coast Guard Drawing 225B-WLB-625-1, Rev C, Windows & Portlights Coast Guard Drawing 225-WLB 243-001, Rev B; PROPULSION SHAFTING ARRANGEMENT Coast Guard Drawing 225-WLB 597-15, Rev C, SORS Structural Detail Coast Guard Drawing 225-WLB 601-001, Rev T, Gen Arrangements Inbd & Outboard Profiles Coast Guard Drawing 225-WLB 601-01, Rev T, Gen Arrangements Inboard & Outboard Profiles Coast Guard Drawing 225-WLB_330_002, Rev H, Lighting System Forward of FR. 30 Hill Block
910/901 Coast Guard Drawing 225-WLB_330_007, Rev R, Lighting System 02 Level & Above Hull Block
960B/975 & 970 Partial Coast Guard Drawing 225-WLB-320-001, Electrical One-Line Diagram, Revision AC Coast Guard Drawing 225-WLB-573-001, Rev P, Buoy Handling System Coast Guard Drawing FL 1602-90, Rev -, Flush Cargo Hatch with Scupper Drains Coast Guard Drawing FL 2605-031, Rev D, Mechanical Chain Stopper, 1-7/8" Buoy Chain viii (Rev-02)
Coast Guard Drawing FL 2605-034, Rev C, Mechanical Chain Stopper Repair Kit: 1-7/8", 1-5/8" & 1- 1/4"
Coast Guard Drawing FL 7101-573, Rev L, Buoy Chain Winch Assy Model CW1 Coast Guard Drawing FL-1702-11, Rev -, Inspection of Sheaves Coast Guard Fleet Drawing FL-2605-29, Rev H, Chain Stopper System – Rising Sheave Assembly NAVSEA Drawing 2803-980209, Plates, Label
COAST GUARD PUBLICATIONS
Coast Guard Technical Publication (TP) 3762, 15-OCT-04, Dual Point Davit - ATON Workboat - Model
TWPIV5-0A 5
\General Requirements Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors
Manual Coast Guard Technical Publication (TP) 3498, Section A, Jul 2015, Buoy Chain Winch Coast Guard Technical Publication (TP) 3523-241-A&B, 225 WLB MIB, VOL 5, SWBS 241, GEAR, REDUCTION, MMC PN 241-01-01
Coast Guard Technical Publication (TP) 3557, Section 573-C, Feb 2010, Manufacturer's Instruction
Book-SWBS Group 568-573, Buoy Crane – Model EB-480-60-40 (Hulls 206, 207, 208, 209, 210, 211, 212, 213, 214, 215, 216)
Coast Guard Technical Publication (TP) 3558, Apr 2008, Manufacturer’s Instruction Book-SWBS Group(s) 573, Section B, Cross Deck Winch – Model BMD-471
Coast Guard Technical Publication (TP) 3559, Section 582B, Apr 2009, Aft Capstan, 21” - Model BMD-
Coast Guard Technical Publication (TP) 3562, Sep 2013, Manufacturer's Instruction Book - SWBS Group(s) 583-589, Section B, Davit, RHIB P/S – Model RAD30-15.5
Coast Guard Technical Publication (TP) 3717, Jun 2003, Hydraulic Cargo Hatch Coast Guard Technical Publication (TP) 3749, 26-APR-05, 1-7/8 Inch ATON Mechanical Chain Stopper Coast Guard Technical Publication (TP) 3750, SWBS 573-A, Dec 2012, Rising Sheave Chain Stopper Coast Guard Technical Publication (TP) 3796, Section A, Aug 2006, Galley Hood – Model NBDL-60
(13’-4”) Coast Guard Technical Publication (TP) 4937, SWBS 593, Oct 2009, Oil Content Detector Bilge Alarm –
Model OCD Coast Guard Technical Publication (TP) 5458, SWBS 573, Oct 2012, Winch, Radial – Model 50.2PT NAVSEA Drawing 804-5773931, Rev A, Acoustic & Thermal Insulation For Compartments Installation
Details NAVSEA Dwg 2803-980209, Plates, Label Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0000, 2014, General
Requirements Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0740, 2014, Welding and Allied
Processes Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 3041, 2014, Shipboard
Electrical Cable Test Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 3042, 2014, Shipboard
Electrical Cable Removal, Relocation, Splice, Repair, and Installation ix (Rev-02)
Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 6310, 2014, Requirements for Preservation of Ship Structures
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General
Requirements Surface Forces Logistics Center Standard Specification 0000(SFLC Std Spec 0000), 2014, General
Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and
Allied Processes Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Surface Forces Logistics Center Standard Specification 0740(SFLC Std Spec 0740), 2014, Welding and
Allied Processes Surface Forces Logistics Center Standard Specification 3020 (SFLC Std Spec 3020), 2014, Overhaul AC
Electrical Motors Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2014, Shipboard
Electrical Cable Test Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2014, Shipboard
Electrical Cable Removal, Relocation, Splice, Repair, and Installation Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2014, Auxiliary
Machine Systems Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2014, Auxiliary
Machine Systems Installation Details Surface Forces Logistics Center Standard Specification 5100 (SFLC Std Spec 5100), 2014, Clean
Shipboard Ventilation Systems Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Preserve Ship
Structures Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures Surface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341), 2014, Install Interior
Deck Covering Systems Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), 2014, Temporary
Services Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), 2014, Temporary
Hull Accesses United States Coast Guard Commandant Instruction (COMDIST) M10360.3D, 2014 Welding and Allied Processes
OTHER REFERENCES
A-A-59323, Rev -; CLOTHS, CLEANING, LOW-LINT , 6/30/99 American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2011, Disinfection of Water-Storage Facilities American National Standards Institute/NSF International (ANSI/NSF) 61, 2015, Drinking Water System
Components - Health Effects American Society of Mechanical Engineers (ASME) B16.34, 2004, Valves-Flanged, Threaded, and
Welding End x (Rev-02)
ASTM International (ASTM) D5363, 2008, Standard Specification for Anaerobic Single Component Adhesives (AN)
ASTM International (ASTM) F992, 2006, Standard Specification for Valve Label Plates Coast Guard P100 Plate HPN Cord Literature & Instructions 2017 Coffin World Water Systems, Installation, Operation, and Maintenance Manual – Oil Content Detector –
Bilge Alarm Model OCD-CM, Manual No. BAMNOCD CM Federal Specification (Fed Spec) DDD-C-95, Mar 1972, Carpets and Rugs, Wool, Nylon, Acrylic, Modacrylic Federal Standard (FED-STD) 595, 2008, Colors Used in Government Procurement Federal Standard (FED-STD) 595, 2008, Colors Used In Government Procurement Harken Installation and Maintenance Manual for Radial Winch 50.2PT, MRW-01 Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2003 Edition, Pressure Testing Of Steel Valves Manufacturers Standardization Society of the Valve and Fittings Industry (MSS), SP-58, 2009, Pipe
Hangers and Supports – Materials, Design, Manufacture, Selection, Application and Installation MIL-A-22262, Mar 1996; Abrasive Blasting Media Ship Hull Blast Cleaning MIL-A-46106, Jun 1992, Adhesive-Sealants, Silicone, RTV, One-Component MIL-D-16791, Jan 1993, Detergents, General Purpose (Liquid, Nonionic) MIL-I-3064, Mar 1991, Insulation, Electrical, Plastic-Sealer Military Standard MIL-S-19622/17D, Dec 1992, Stuffing Tube, Nylon, and Packing Assemblies, General
Specification for Military Standard MIL-STD-2003/3A (SH), Sep 2009, Electrical Plant Installation Standard Methods for
Surface Ships and Submarines MIL-PRF-1149, Jun 1998, Gasket Materials, Synthetic Rubber, 50 and 65 Durometer Hardness MIL-PRF-24176 , Oct 2004, Cement, Epoxy, Metal Repair And Hull Smoothing (Metric) MIL-PRF-24613, Dec 1990, Deck Covering Materials, Interior, Cosmetic Polymeric MIL-PRF-9000, Rev H; Lubricating Oil, Shipboard Internal Combustion Engine, High Output Diesel, 9/16/87 Mil-S-24235/9E, Dec 1992, Stuffing Tubes, Metal, And Packing Assemblies For Electric Cables, Brass and Steel, for Decks and Bulkhead With Pipe Protection MIL-S-45180, 1998; Sealing Compound, Gasket, Hydrocarbon Fluid and Water Resistant MIL-STD-2003-3A, Sep 2009, Electric Plant Installation Standard Methods for Surface Ships &
Submarines (Penetrations) Naval Ships' Technical Manual, Chapter 241, Propulsion Reduction Gears, Couplings, Clutches, and
Associated Components P100 Portable Pump Unit Technical Manual Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2013, Cork and
Rubber Composition Sheet; For Aromatic Fuel and Oil Resistant Gaskets The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 1 (SSPC-SP 1), 2004, Solvent Cleaning The Society for Protective Coatings (SSPC) Surface Preparation Specification No.1 (SSPC-SP 1), 2004, Solvent Cleaning The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2004, Power Tool Cleaning to Bare Metal xi (Rev-02)
The Society for Protective Coatings (SSPC), SSPC-SP 1/No. SP-1, Solvent Cleaning The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP 10/NACE No.2, 2007, Near-White Blast Cleaning The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP 6/NACE No. 3, 2007, Commercial Blast Cleaning The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation
Standard SSPC-SP 12/NACE No. SSPC-SP 12/NACE No.5, Surface Preparation and Cleaning of Steel & Other Hard Materials by High and Ultrahigh Pressure Water Jetting Prior to Recoating xii (Rev-02)
CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
WORK
ITEM
MTI ITEM
DESCRIPTION
NSN/PN QTY ESTIMATED
COST
($/UNIT)
4 N Cargo Hatch Gasket Walz & Krenzer P/N D-
WK-837-1-4 or equivalent 2 $200
7 N Repair Kit, HYD Chain Stopper
Rising Sheave (for Para. 3.2, Tasks #2 and #3)
NSN: 2040-01-483-3947 2 ea. 2,631.46
8 N Hand Pump SS NSN: 4320-01-517-1444 1 ea 1,499.66 8 N Pressure Gauge -
Model BMD-471 NSN: 6685-01-437-2519 4 ea 43.79
8 N Wire rope Assembly NSN: 4010-01-643-2077 4 ea 900.00 8 N Hydraulic brake repair kit - Model
BMD-471
NSN: 3950-01-526-9090 4 ea. 913.00
8 N Counter balance valve - Model BMD-
NSN: 4810-01-353-0586 4 ea. 150.00
8 N **Shuttle valve - Model BMD-471
NSN: 4820-01-317-2748 4 ea. 35.00
8 N Needle valve - Model BMD-471
NSN: 4820-01-329-0051 4 ea. 82.00
8 N Hydraulic motor seal kit - Model BMD-
NSN: 5330-01-475-4566 8 ea. 84.00
8 N Clutch shoe - Model
BMD-471
NSN: 4910-01-475-4125 4 ea. 56.90
8 N Drum bushing - Model BMD-471
NSN: 3950-01-631-0884 8 ea. 272.00
8 N Shaft bushing - Model BMD-471
NSN: 3950-01-631-0771 4 ea. 298.00
8 N ** Gear boxSeal kit(for Winch
Gearbox Assemblies) - Model
BMD-471
NIIN: XFC343225 PN:
YMD-8194-R
4 ea. 70.00
8 N Control Station Repair Parts. Kit
NSN: 6110-01-644-9898 4 ea. 438.00
8 N Flag Block Bearing Kit
NSN: 3940-01-526-5592 2 ea. 180.00
8 N Valve, Safety Relief NSN: 4820-01-324-4269 4 ea. 69.19 xiii (Rev-02)
(Included as a Component of Manifold Replacement Parts
Kit (PN: YMD-8192-R)) 8 N Plug, Pipe NSN: 4730-01-426-7736
(Included as a Component of Manifold Replacement Parts
Kit (PN: YMD-8192-R))
4 ea. 17.15
8 N Valve, Globe NSN: 4820-01-329-0051 (Included as a Component of Manifold Replacement Parts
Kit (PN: YMD-8192-R))
4 ea. 37.14
8 N O-Ring NSN: 5331- 00-165-1941 (Included as a Component of Manifold Replacement Parts
Kit (PN: YMD-8192-R))
4 ea. 0.34
8 N Valve, Shuttle NSN: 4820-01-317-2748 (Included as a Component of Manifold Replacement Parts
Kit (PN: YMD-8192-R))
4 ea. 18.51
8 N Flag Block Bearing Cup, Sheave
NSN: 3110-01-644-9670 2 ea. 231.00
8 N Flag Block Bearing Cone, Sheave
NSN: 3110-01-013-4036 2 ea. 182.00
8 N Seal NSN: 5330-01-287-2826 2 ea. 104.00 8 N Valve, Globe NSN: 4820-01-329-0051 4 ea. 38.11 9 N Roller bearing Unit NSN: 3130-01-504-4363 2 ea. 4,012.00 9 N Grease seal NSN: 5330-01-462-5544 4 ea. 79.25 9 N Level wind pivot bushing NSN: 3120-01-621-2293 1 ea. 1,139.00
9 N Level wind thrust bearing
NSN: 3120-01-621-2300 2 ea. 483.30
9 N Rexroth DCV NSN: 4810-01-507-0037 1 ea. 208.29 9 N Rexroth Sandwich
Flow Control NSN: 4810-01-505-9289 1 ea. 250.00
9 N Sun Sandwich Relief Valves
NSN: 4820-01-439-2451 2 ea. 900.00
9 N Rexroth Tandem Center Proportional Directional Valve
NSN: 4810-01-506-3841 1 ea. 300.00
9 Y Level Wind Hydraulic Cylinder
NSN: 3040-01-441-3721 1 ea. 7,423.00
9 N 3:1 Pilot Ratio, Vented
Counterbalance Valve Assembly
NSN: 4820-01-563-5841 1 ea 98.70
9 N Fully Adjustable Needle Valve
NSN: 4820-01-416-0579 1 ea 48.75
9 N Wire Rope Assembly
NSN: 4010-01-646-6972 1 ea. 500.00
9 Y **Hydraulic Motor NSN: 4320-01-445-2248 1 ea 23,998 xiv (Rev-02)
9 N **Pump, Hydraulic Ram, Hand Driven
NSN: 4320-01-286-4065 1 ea. 419.77
9 N Cylinder Pin NSN: 5315-01-515-9847 1 ea 500.00 9 N Cylinder Pin NSN: 5315-01-515-9912 1 ea 520.00
10 N Hardware Kit NSN: 5430-01-494-2479 2 ea. 618.54 10 N Hardware Kit, Mechanical NSN: 2030-01-485-7215 2 ea. 784.35
12 N Swing Brake Seal Kit
NSN: 5330-01-390-3514
PN: 90-016-2011
2 ea 68.45
12 N Swing Brake Disc & Bearing Kit
NSN: 3010-01-464-1040
PN: 90-016-2131
2 ea 187.20
12 N Swing Holding Valve
NSN: 4820-01-466-4918
PN: CBEA-LHV-YHL (Sun
Hydraulics)
1 ea 251.50
12 N Shuttle Valve NSN: 4820-01-417-1911
PN: YMD-1288
1 ea 35.00
12 N Accumulator Assembly
NSN: 3040-01-F16-4868
PN: YMD-6840
1 ea 1,200.00
12 N Wire Rope Assembly
NSN: 4010-01-620-9604
PN: JWCG062100PL
1 ea 660.00
13 N Wire Rope Renewal Kit
NSN: 3950-01-F13-3314
PN: 892-02060
1 ea. 5,302.00
13 N Check Winch Gearbox Oil Kit
NSN: 5330-01-F13-3315
PN: 892-02061
1 ea. 64.00
13 N Hydraulic Fluid Filter Renewal Kit
NSN: 3950-01-F13-3316
PN: 892-02063
1 ea. 2,108.00
13 N Main Winch Brake and Centrifugal
Brake Inspection Kit
NSN: 3950-01-F13-3299
PN: 892-02064
1 ea. 908.00
13 N Hydraulic Breather Replacement Kit
NSN: 4310-01-F13-3300
PN: 892-02065
1 ea. 228.00
13 N Hydraulic Hose Replacement Kit
NSN: 4720-99-553-9143
PN: 892-02066
1 ea. 1,600.00
14 N Swing Gear Gearbox Seal Kit
NSN: 5330-01-434-3776
PN: YMD-6847-R
5 ea 3,250.00
14 N Swing Gear Brake O-Ring Kit
NSN: 5330-01-315-7384
PN: 12-501-002 (Mico Inc)
5 ea 1,235.00
14 N Swing Gear Brake Lining Kit
NSN: 2530-01-315-3927
PN: 12-501-004 (Mico Inc)
5 ea 3,085.00
14 N Swing Gear Brake Bearing Kit
NSN: 3120-01-320-9669
PN: 12-501-006 (Mico Inc)
5 ea 1,190.00
14 N Swing Gear Brake Spring Kit
NSN: 5360-01-316-4410
PN: 12-501-008 (Mico Inc)
5 ea 1,635.00
14 N Swing Brake, Wet Type
NSN: 3040-01-536-3596
PN: YMD-9629
5 ea 3,432.65
14 N Parts Kit, Hydraulic Motor
NSN: 4320-01-475-1857
PN: YMD-6847-R
5 ea 845.00
14 N Valve, Counterbalance
NSN: 4820-01-478-5117
PN: CBIH-LJN (Sun
Hydraulics)
2 ea 260.93 xv (Rev-02)
14 N Valve, Shuttle NSN: 4820-01-317-2748 PN: CSAD-XXN (Sun
Hydraulics)
2 ea 18.51
14 N Valve, Logic (DCV) NSN: 4820-01-478-5149 PN: DKFC-XHN (Sun
Hydraulics)
1 ea 143.29
14 N Counterbalance Valve Cartridge
(Luff & Extension Cylinder)
NSN: 01-527-2750 PN:
MBGA-LHN (Sun
Hydraulics) YMD9612 (Appleton
Marine)
4 ea 694.00
14 N Seal Kit, Luff Cylinder
NSN: 5330-01-F16-4854
PN: SK-8690 (HSI Corp)
2 ea 1756.00
14 N Luff Cylinder Pin NSN: 5315-01-632-8114
PN: MMD-3214
4 ea 740.00
14 N Luff Cylinder Bushing
NSN: 3120-01-424-1044
PN: MMD-2020
8 ea 344.00
14 N Seal Kit, Extension Cylinder
NSN: 5330-01-475-1975
PN: YMD-8261-R
1 ea 169.00
14 N Extension Cylinder Bushing
NSN: 5365-01-632-8144
PN: MMD-2875
4 ea 620.00
14 N Extension Cylinder Pin
NSN: 5315-01-632-7973
PN: MMD-3216
2 ea 655.00
14 N Heel Pin NSN: 5315-01-631-1699
PN: MMD-2873
2 ea 1,1410.00
14 Y Main Hoist Block Repair Kit
NSN: 3940-01-543-9872
PN: YMD-8267-R
1 ea 2,144.00
14 N Overhaul Ball Swivel Assembly
NSN: 2020-01-F16-4853
PN: 2009246 (Crosby
Group)
1 ea 100.00
14 N Sheave Bearings NSN: 3020-01-507-3247
PN: YMD-8269-R
3 ea 1,896.75
14 N Sheave, 24” OD- M/F
NSN: 3020-01-506-8814
PN: YMD-8370
1 ea 2,086.00
14 N Sheave, 18” OD-A/F NSN: 3020-01-506-9078
PN: YMD-8371
1 ea 1,949.50
14 N Replacement Filter Elements
NSN: 4330-01-346-4729
PN: KZ3 (Schroeder)
12 ea 44.30
14 N Anti-Two Block Limit Switch
NSN: 5930-01-527-7845
PN: YMD-7378
2 ea 394.00
14 N Grease Fitting NSN: 4730-00-367-6890
PN: YMD-6033
18 ea 9.26
14 N Clamp Seal NSN: 5330-01-640-7138
PN: MMD-3280
1 ea 30.00
14 N Clamp Seal NSN: 5330-01-640-7077
PN: MMD-3279
1 ea 30.00
14 N Slide Pad/Shim Set Kit
NSN: 5365-01-506-8728
PN: YMD-8956
1 ea 2,101.67
14 N Electrical Connector NSN: 5935-01-640-6747
PN: YMD-5956
1 ea 19.00 xvi (Rev-02)
14 N Emergency Release Manifold Cartridge
NSN: 4730-01-507-3516
PN: YMD-6895-R
3 ea 1,145.21
14 N Pressure Gauge NSN: 6685-01-437-2519
PN: YMD-6822
2 ea 58.96
14 N Cab Penetration Gasket
NSN: 5330-01-524-3389
PN: MMD-2753
3 ea 14.09
14 N Winch Seal Kit NSN: 5330-01-372-3524
PN: YMD-7038-R
1 ea 135.00
14 N Winch, Hydraulic Motor
NSN: 4320-01-440-6236
PN: YMD-8318
1 ea 1,394.68
14 N Hydraulic Swivel Repair Kit
NSN: 4320-01-651-9493
PN: YMD-8273-R
1 ea 2,424.00
14 N Load Pin (Main) NSN: 6670-01-516-0022
PN: YMD-8275
1 ea 6,434.00
14 N Load Pin (Aux Fall) NSN: 6670-01-516-0024
PN: YMD-8276
1 ea 3,837.25
14 N Turntable Bearing Bolt
NSN: 3950-01-516-5810
PN: YMD-8953
115 ea 35.00
14 N Thrust Washer NSN: 3120-01-216-4036
PN: WMD-1100
8 ea 96.00
14 N Thrust Washer NSN: 3120-01-632-7953
PN: MMD-1363
4 ea 504.00
14 N Snap Ring NSN: 5340-01-F16-4852
PN: WSM-700-S02
(Smalley Steel Ring Co)
4 ea 500.00
14 N Sealing Washers NSN: 5310-01-310-5968
PN: YMD-1828
8 ea 8.00
14 N Gauge Snubber NSN: 4820-01-193-7276
PN: YMD-6201
2 ea 33.01
14 N Shuttle Valve NSN: 4820-01-417-1911
PN: YMD-1288
2 ea 70.00
14 N Main Fall Wire Rope
NSN: 4010-01-486-0047
PN: JWCG13001919PL
1 ea 3,000.00
14 N Aux Fall Wire Rope NSN: 4010-01-594-2228
PN: JWCG75200637PL
1 ea 2,500.00
20 N Winch, Radial NSN: 3950-01-623-8912
PN: 50.2 PTA
6 ea. $2,181.60
20 N Cleat, 15 in.; Steel NSN: 2040-01-614-2587
PN: 7254
8 ea. $135
21 N Floodlight, LED*** NSN: 6120-01-661-5675
PN: STL-HI-45-UNIV-
10CG
8 $619.00
24 Y 20,000LB WLL
ATON D-Ring & Hold Down Strap
NSN 5365-01-612-1273 PN
AJ12A00-DS110
2 $40.55
24 Y 2,000LB WLL
ATON Flush Deck Padeye (Buoy Tie-down)
NSN/PN Schoellhorn- Albrecht S299
5 $125
24 Y D-Ring, (Tie-down) Peck-Hale F187-2/5340-01- 2 $40.00 xvii (Rev-02)
Rated Load 6,000 lbs.
614-1511
35 N Christie Grey Mounts For AMR ventilation
Manufactured by
FABREEKA PN:CRM2.45
8 ea.
35 N Christie Grey Mounts For MMR ventilation
Manufactured by
FABREEKA PN:CRM2.55
8 ea.
38 N OCD-CM NSN: 6630-01-530-9508
PN: BARK0520-CMR
1 ea. 4,652.72
40 N SORS Cargo Hatch Gasket
Walz & Krenzer P/N D- WK-837-1-4 or equivalent
2 $200
41 N HS pinion bearing, DWG 01070-0353 item 04
Philadelphia Gear Corporation P/N 31000-
2 ea. 3880
41 N HS pinion bearing, DWG 01070-0353 item 05
Philadelphia Gear Corporation P/N 31000-
2 ea. 1781
41 N HS pinion bearing, DWG 01070-0353 item 06
Philadelphia Gear Corporation P/N 31000-
2 ea. 1438
41 N HS pinion bearing, DWG 01070-
0353item 07
Philadelphia Gear Corporation P/N 31000-
2 ea. 1129
41 N HS pinion bearing, , DWG 01070-0353 item 15
Philadelphia Gear Corporation P/N 31000-
2 ea. 1001
41 N PTO CPP bearing, DWG 01070-0353 item 63
Philadelphia Gear Corporation P/N 31000-
2 154
41 N ALOP bearing, DWG 01070-0353 item 63
Philadelphia Gear Corporation P/N 31000-
2 154
41 N LS shaft bearing
DWG 01070-0353
Item 33
Philadelphia Gear Corporation P/N 31000-
1 13552
41 N LS shaft bearing
DWG 01070-0353
Item 59
Philadelphia Gear Corporation P/N 31000-
1 6856
41 N Clutch end quill shaft bearing DWG 01070-0353 Item 27
Philadelphia Gear Corporation P/N 31000-
2 198
41 N Turning Gear/Generator Pinion Bearing
DWG 01070-0353
Item 74
Philadelphia Gear Corporation P/N 31000-
1 1471
41 N Turning Gear/Generator Pinion Bearing
Philadelphia Gear Corporation P/N 31000-
1 616 xviii (Rev-02)
DWG 01070-0353
Item 75
41 N Turning Gear/Generator Pinion Bearing
DWG 01070-0353
Item 76
Philadelphia Gear Corporation P/N 31000-
1 964
41 N Turning Gear/Generator Pinion Bearing
DWG 01070-0353
Item 77
Philadelphia Gear Corporation P/N 31000-
1 803
41 N Turning gear internal bearing cone
DWG 01070-0317
Item 21
Philadelphia Gear Corporation P/N 31000-
2 591
41 N Turning gear internal bearing cup
DWG 01070-0317
Item 21
Philadelphia Gear Corporation P/N 31000-
2 312
41 N Oil Seal Dwg 010170-0317; 408
P/N 36000-0409 2 78
41 N Plate, Seal Dwg 010170-0317;426
DH1259K-4
P/N 34000-8834 1 400
41 N Oil Seal Dwg 010170-0317; 431
P/N 36000-2344 1 29
41 N Gasket Dwg 010170-0317; 449
DH25K
P/N 34000-8742 1 11
41 N Oil Seal Dwg 010170-0317; 450
P/N 36000-1279 1 13
41 N Seal, Oil Dwg 010170-0353; 11
P/N 36000-0049 4 104
41 N Seal, Oil Dwg 010170-0353; 12
P/N 36000-2541 2 126
41 N Spacer, Oil Dwg 010170-0353; 14
P/N 50315-9672 2 591
41 N Retainer, Seal Dwg 010170-0353; 16
P/N 50085-3146 2 385
41 N Seal, Oil Dwg 010170-0353; 20
P/N 36000-2277 2 60
41 N Spacer, Seal Dwg 010170-0353; 21
P/N 50315-9030 2 1199
41 N Seal, Oil Dwg 010170-0353; 22
P/N 36000-1752 2 368
41 N Spacer, Seal Dwg 010170-0353; 35
P/N 50315-9031 1 1185
41 N Oil Seal Dwg 010170-0353; 36
P/N 3600-1231 2 368 xix (Rev-02)
41 N Retainer, Seal Dwg 010170-0353; 47
P/N 50085-3186 1 400
41 N Retainer, Seal Dwg 010170-0353; 49
P/N 50085-2850 1 400
41 N Oil Seal Dwg 010170-0353; 55
P/N 36000-1531 2 104
41 N Spacer, Seal Dwg 010170-0353; 56
P/N 50315-9032 1 934
41 N Oil Seal Dwg 010170-0353; 80
P/N 36000-0739 2 35
41 N Spacer, Seal DWG 010170-0353; 81
P/N 50315-9033 1 471
41 N O-Ring DWG 010170-0353; 96
P/N 36000-1760 1 2
41 N Gasket DWG 010170-0353; 98
P/N 40225-0562 2 29
41 N Seal DWG 010170- 0353; 307
P/N 36000-0030 1 40
41 N Seal DWG 010170- 0353; 311
P/N 50085-2865 1 330
41 N Gasket DWG 010170-0109; 609
P/N 36000-1788 3 30
41 N Gasket DWG 010170-0131; 277
P/N 36000-1957 3 33
41 N Gasket DWG 010170-0131; 516
P/N 36000-1786 4 25
41 N DWG 010170-0131;
P/N 36000-1958 2 45
41 N Gasket DWG 010170-0131; 546
P/N 36000-2662 1 25
41 N Gasket DWG 010170-0131; 556
P/N 36000-1787 1 25
41 N Gasket DWG 010170-0131; 565
P/N 36000-1788 1 30
41 N Gasket DWG 010170-0131; 501
P/N 36000-1956 6 167
42 N **P100 Universal PreHeater
NSN: 4320 01-LG8-3815 Or
PN: UN-42.5 SLWD
1 ea. 150.00
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter xx (Rev-02)
CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS
The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5 (Inspection report particulars)):
Work Item Title
4 Hydraulically Operated Cargo Hatch, Inspect and Service
7 Hydraulic Chain Stoppers, Inspect And Service
8 Crossdeck Winches, Inspect and Service
9 Hydraulic Inhaul Winch, Inspect And Service
10 Mechanical Chain Stoppers, Inspect and Service
11 Warping Capstan, Inspect and Service
12 Single Point Davit, Inspect and Service
13 Twin Pivot Arm Davit, Inspect and Service
14 Buoy Crane, Appleton EB4806040, Inspect and Service
22 Links, Gripes, Binders and Jacks, Service, Inspect and Test
30 Potable Water Pump Room Deck, Preserve
31 Water Supply Equipment Room Deck, Partial Preserve xxi (Rev-02)
PRINCIPAL CHARACTERISTICS
225' WLB (B-CLASS)
PHYSICAL
Length overall 225' 0" Length between perpendiculars 206' 0" Maximum beam 46' Designed draft 13' 0" Full load displacement 1905.6 Long Tons SW Light ship displacement 1500.7 Long Tons SW Minimum operating displacement 1869.2 Long Tons SW Mast height (above 12' waterline) 67' 5" Anchor Two 4000 lb standard Navy stockless anchors, 8 shots each, port and starboard, 1-
3/8 die lock chain
HULL
Bilge keels (port & starboard) Frames 42-79 Frame spacing FR 0 to 12 21" FR 12 to 30 22" FR 30 to 102 24"
MACHINERY
Main propulsion Diesel Reduction Diesel engines Two Caterpillar 3608, TA, 3100 BHP each @ 900 RPM Number of propellers 1 Number of blades 4 Diameter 10' Pitch Controllable
RPM 254
Ship's service diesel generators Two Caterpillar 3508 TA, 450 KW Emergency diesel generator One Caterpillar 3406 DITA, 280 KW Shore tie Two 450 VAC, 400 Amp, 3-wire Shaft bearing, forward Cooper Bearing 01-BCP-1400-EX-TL Shaft bearing, aft Water Lubricated Cutless Bearing
TANK CAPACITIES
Diesel oil 76,498 gal.
Fresh water capacity 8056 gal.
Hydraulic oil capacity 2785 gal.
Lube oil storage 764 gal.
Grey water tank 2700 gal.
Sewage holding tank 1700 gal.
1 (Rev-02)
00000_0917_FLT
REC_00000_FLT_Commercial Project @ Contractor’ Facility (1212)
General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed at a commercial contractor’s facility for Coast Guard vessels.
1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and 'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General
Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and
Allied Processes Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.
NOTE
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
2 (Rev-02)
3.2 Contractor-provided fire watch personnel. The Contractor shall provide fire watch personnel and equipment.
3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.
3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec 6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).
3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with COMDTINST M10360.3, Chapter 6 (Cutter and Boat Colors Exterior and Interior).
NOTE
Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes (provided in Chapter 6 of COMDTINST M10360.3) are strictly prohibited.
3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDI in accordance with SFLC Std Spec 0740.
3.5 Environmental protection requirements. The Contractor shall adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:
3.5.1 Contractor operated (non USCG) facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix A, Requirements for Environmental Protection at Contractor Operated (Non USCG) Facilities, as applicable, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
3.5.2 Test and procedures. The Contractor shall be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work shall be done by qualified laboratories; and where required by law, the laboratories shall be certified.
3.5.3 Regulatory notifications. The Contractor shall be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The Contractor shall submit copies of all regulatory notifications to the Contracting Officer and the local Facility Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications shall be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System (NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.
3.5.4 Environmental manager. The Contractor shall appoint in writing an Environmental Manager for the project, and shall be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager shall ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, 3 (Rev-02) and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas;
ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the Environmental Records binder and required documentation, including environmental permits compliance and close-out.
3.5.5 HW disposal. Contractor shall comply with SFLC Std Spec 0000 Appendix A, Requirements For Environmental Protection At Contractor Operated (Non USCG) Facilities for HW disposal.
3.6 Local Policy. None.
3.7 SFLC standard specification approved changes. The Contractor shall be aware that the following are approved changes to published SFLC 2014 Edition Standard Specifications and supersede published content:
3.7.1 SFLC Standard Specification 6310, Requirements for Preservation of Ship Structures.
3.7.1.1 SFLC Std Spec 6310, page C-2, Section C1.5.1. Change from "lead-containing paint as 0.06%" to "lead-containing paint as 0.009%".
3.7.1.2 SFLC Std Spec 6310, page 4, Section 2 References, Group- Other References. Add “The Society for Protective Coatings (SSPC) Paint Application Guide No. 11, 2008, Protecting Edges, Crevices, and Irregular Steel Surfaces by Stripe Coating”
3.7.1.3 SFLC Std Spec 6310, page Appendix C-6, add "Hempel Hempadur Multi-Strength GF 35870" with FED- STD-595 color "Black/Red" under ANTI-ABRASION COATING, ICE BREAKING CAPABLE VESSELS, <235’.
3.7.1.4 Standard Spec 6310, page Appendix A-7, Under "UNDERWATER (U/W) BODY/BOOT-TOP", Add line Column 1: Option for U/W Body and Boot-Top, Steel Hulls, <154', in Salt Water. Column 2: Blank. Column 3:
SSPC-SP 10/NACE NO. 2 using grit conforming to MIL-A-22262 / (1.5-3.5) - or - SSPC-SP WJ-2(M)/NACE WJ-2(M). Columns 4 and 5: Same as "U/W Body and Boot-Top, Aluminum Hull, High Speed (>30 knots)".
3.7.1.5 SFLC Std Spec 6310, page Appendix C-8, Under "Epoxy/Primer/Mid-Coat", add line Column 2:
International Intergard 264. Column 3: Various. Under "Polysiloxane", add line Column 2: International Interfine
979. Column 3: Various.
3.7.2 SFLC Standard Specification 0000 General Requirements.
3.7.2.1 SFLC Std Spec 0000, paragraph 1.3 ‘Acronyms and term definitions’, page 5, “PCL (Paint Containing Lead)” definition replaced by, “Any paint or coating containing lead in excess of 0.009 percent by weight (1.0 mg/cm2 or 90 ppm). Lead Based Paint (LBP) is an interchangeable term with PCL.”
3.7.2.2 Change Std Spec 0000 paragraph 3.2.4.2.3(QP 1 inspector or tech rep duties) bullet, “Determine when applied coats have sufficiently cured for overcoating or for system service resumption (see paragraph
3.1.19 of SFLC Std Spec 6310 (Critical drying time requirements)).” to “Determine when applied coats have sufficiently cured for overcoating or for system service resumption (see paragraph 3.1.17 of SFLC Std Spec 6310 (Critical drying time requirements)).”
4 (Rev-02)
4. NOTES
4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
5 (Rev-02)
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
VESSEL NAME HULL # WORK ITEM # WORK ITEM TITLE
LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfgr.
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).
Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME
6 (Rev-02)
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.
DATE
TIME
ACTIVITY (SURFACE
PREPARATION, PRIMER COAT,
BARRIER COAT, TOP COAT,
ETC…)
LOCATION (FRAME &
DECK, RELATION TO
EQUIPMENT, ETC.)
TEMPERATURE % REL.
HUMID-
ITY
DEW
PT.
SURFACE AMBIENT ΔT
| DP -
SURFACE |
7 (Rev-02)
QA-3a - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
Place surface profile replica tapes in the spaces provided below, to serve as permanent QA record. Maintain a separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
MEAN MIL READING (IAW ASTM D4417-METHOD C) FOR ABOVE 15 READINGS:
8 (Rev-02)
QA-3b - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.