Amendment_4_Questions_and_Answers.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
DOCKSIDE REPAIR FOR USCGC SPAR FY19
Solicitation number
70Z085-19-Q-P4502000
Issued by

About this file

Amendment 4 questions and answers

View the file

Other files

File Type Posted
20181005_091139.jpg JPG image
20181005_181256.jpg JPG image
20181003_141540.jpg JPG image
20181005_175741.jpg JPG image
Amendment_04-SAPR_DS,_FY19.doc DOC document
20181005_180210.jpg JPG image
20181005_173957.jpg JPG image
Amendment_03-SAPR_DS,_FY19.doc DOC document
Amendment_02-SAPR_DS,_FY19.doc DOC document
Attachment_1,_Work_Item_Price_List.xls XLS spreadsheet
Attachment_2,_SPAR,_Specification,_Rev_3.pdf PDF
Amendment_2_Questions_&_Answers.xlsx XLSX spreadsheet
Amendment_01-SAPR_DS,_FY19.doc DOC document
SPAR,_Specification,_Rev_2.pdf PDF
Attachment_1,_SPAR,_Work_Item_Price_List.xls XLS spreadsheet
Attachment_2,_SPAR,_Specification.pdf PDF
Attachment_5,_SPAR,_USCG_Ombudsman_Notice.doc DOC document
Attachment_1,_SPAR,_Work_Item_Price_List.xls XLS spreadsheet
Attachment_3,_SPAR,_Past_Performance_Information_Form.doc DOC document
Attachment_4,_SPAR,_Request_for_Clarification.docx DOCX document
SPAR_FY19_DD,_RFQ-20SEP2018,_updated.doc DOC document
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

USCGC SPAR (WLB-225B) DOCKSIDE AVAILABILITY FY2019
Follow-up Questions & Answers

question # item # item title question response

1Work Item 17Superstructure Preserve, 100%Given that specified reduction gear repairs (work item 41) are incompatible with large scale sandblasting, will the USCG consider cancelling work item 17?Work Item 17 SUPERSTRUCTURE PRESERVE 100% is a optional work item. Contractor shall bid accordingly
2Work Item 18Superstructure Preserve, PartialPresuming that the existing superstructure coating is PSX 1001, our experience suggests that partial coating cannot be successfully performed. Will the USCG consider cancelling work item 18?Work Item 18 SUPERSTRUCTURE PRESERVE, PARTIAL is a optional work item. Contractor shall bid accordingly
3Work Item 26Fuel transfer Stations Renew1.1.1 Table of valves to be renewed does not specify valve #'s. Referenced prints show multiple valves on each applicable station. Will CG provide clarification as to what valves are to be renewed by referencing valve #'s Table one suggests six (6) L/O Fueling Station Valves, two (2) W/O Fueling Station valve, one (1) H/O Fueling Station Valveves, but provides no insight into how many F/O Station Valves are to be replaced.Amendment #2 response: upon arrival of cutter valves will be identified for KTR. F/O Station valves, 04 to me renewed.
4Work Item 26Fuel transfer Stations Renew1.1.1 Table of valves refers to the H/O transfer station located on the Stbd. side frame 11 (1-11-2). Referenced prints do not show frame 11. Can you provide a print or a reference that would show the 1 valve slated for renewal?awaiting info back from cutter
5Work Item 29Auxiliary Sea Water (ASW) Systems Sea Bay Isolation Valve, RenewLUDC WOULD LIKE TO RESUBMIT THE FOLLOWING QUESTION: In paragraph 1.1, it states to renew the ASW system sea bay isolation valve (6-inch). It refers us to drawing CG DWG 225B-WLB 256-001, valve ASW-V904-1. On the drawing, it shows that the piping to the valve is 14 inch. Is this valve a 14 inch valve and not 6 inch? Is valve V904-1 a 14" butterfly valve between the strainer and the sea bay?Amendment #2 response : SEA BAY ISOLATION VALVE IS A 14" BUTTERFLY VALVE
6work item 36Pilot House Windows Framing and Gaskets, RenewLUDC WOULD LIKE TO RESUBMIT THE FOLLOWING QUESTION: Specification does not specify how much framing, windows, wipers or spray nozzles are to be replaced, please provide quantities. Can government supply new framing, windows, wipers and Spray nozzles to be replaced? Based upon the USCG response in Amendment #2 is the contractor correct interpreting the specification to include removal and reinstallation of the pilot house windows, with replacement of framing, windows, spray nozzles and window wipers (if determined necessary) the subject of a change order.Amendment #2 response: we will not know extent of framing what and quantity needs to be replaced until inspection in availability complete
7Work Item 38Oily Water Separator oil Content Detector (OCD) replaceGiven that the USCG has expressed their intention to delete this item from the repair package, is an amendment reflecting this forthcoming?Work Item 38 OILY WATER SEPARATOR OIL CONTENT DETECTOR (OCD), REPLACE is a optional work item. Contractor shall bid accordingly
8Performance PeroidApplying Critical Path Scheduling and intigration of our estimates with those of OEM technical service representatives and other key subcontractors suggests that the Performance Period for the project is approximately 4 weeks too short. Can the USCG externd the performance period for this project by 4 weeks?cuttently looking at POP will advise