PWS Amendment Summary.docx
DOCX document 14 KB Posted
- Attached to
- HVAC Cleaning Services - Cape Cod
- Solicitation number
- 70Z08425QDL950012
About this file
This document is a Performance Work Statement (PWS) Amendment for an HVAC Cleaning Services contract with the United States Coast Guard, dated 6/12/2025. The amendment includes several key updates to the original solicitation, specifically focusing on HVAC systems assessment and site survey requirements. Notable changes include establishing contact procedures with the Contracting Officer Representative (COR) Albert J. Pulsifer, defining annual mobilization expectations, requiring contractors to supply aerial lifts, and specifying project scheduling constraints that mandate work be performed during spring and fall seasons.
The related federal contract opportunity (Solicitation Number 70Z08425QDL950012) is for HVAC duct cleaning services in the Cape Cod area, set aside exclusively for small businesses. The contract has a performance start date of June 15th, 2025, with provisions for 4 additional option years. The PWS amendment provides detailed operational guidelines, including provisions for accessing work sites, coordinating project schedules, and performing necessary infrastructure modifications such as cutting into hard surfaces to complete contracted work. The solicitation is being issued by the Department of Homeland Security's US Coast Guard.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 3_PWS_70Z08425QDL950012-2.2.1-Attachment 1.docx | DOCX document | |
| HVAC Solicitation Q and As.docx | DOCX document | |
| Floor Plans_HVAC Cape Cod.pdf | ||
| JBCC Vetting Form.pdf | ||
| Amendment 2 Summary_70Z08425QDL9500120002_US.pdf | ||
| HVAC Drawings.pdf | ||
| Amendment 2 Solicitation_70Z08425QDL950012_2.pdf | ||
| Amendment 1_70Z08425QDL950012.pdf | ||
| 70Z08425QDL950012_0_US.pdf | ||
| 70Z08425QDL950012-2.2.1-Attachment 3.txt | TXT text file | |
| 70Z08425QDL950012-2.2.1-Attachment 2.xlsx | XLSX spreadsheet | |
| 70Z08425QDL950012-2.2.1-Attachment 1.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PWS Amendment, Dated 6/12/2025. PWS updates:
1) Part 3 – EXECUTION - 3.1 - Part A - HVAC Systems Assessment and Site Survey – Item # 1 - Arrangements for access shall be made by contacting the COR, Albert J. Pulsifer, at albert.j.pulsifer@uscg.mil, 508-968-6648, any questions regarding this specification or the work shall be addressed in writing and directed to the Contracting Officer.
2) Part 3 – EXECUTION – 3.1 - Part A - HVAC Systems Assessment and Site Survey – Item # 4 - Mobilization: It is the intent of the Coast Guard that there is (1) mobilization annually. The Contractor shall determine the applicable mobilization fee.
3) Part 3 – EXECUTION – 3.1 - Part A - HVAC Systems Assessment and Site Survey – Item # 5 - The Contractor shall supply aerial lifts necessary to complete the contracted work.
4) Part 3 – EXECUTION - 3.1 - Part B – Work Plans – Item # 1 - Project Schedule: Outline starting date, dates, and times when work will take place, and completion date. Determine sequence of cleaning each system or portion of the work and coordinate with work of other trades and activities. It is the Coast Guards intent that all work shall be performed in the Spring and Fall seasons.
5) Part 3 – EXECUTION – 3.3 HVAC SYSTEMS PREPARATION - Part A - Item 2 - A - When necessary, the Contractor shall cut into hard surfaces to perform contracted work.
File details come from the government source that posted it. Updated .