HVAC Drawings.pdf
PDF 16 MB Posted
- Attached to
- HVAC Cleaning Services - Cape Cod
- Solicitation number
- 70Z08425QDL950012
About this file
These are mechanical drawings for a U.S. Coast Guard Unaccompanied Personnel Housing (UPH) facility repair project at Cape Cod, Massachusetts. The documents detail a comprehensive HVAC system renovation across multiple project phases, including boiler replacements, VAV box upgrades, exhaust fan replacements, and mechanical system modifications. The project includes both base bid work and six optional bid items (OBIs), with work spanning the basement, first floor, and roof of the facility.
Key technical elements include replacing five existing boilers, installing new hot water and chilled water pumps, upgrading variable air volume (VAV) boxes, replacing exhaust fans, implementing building management system (BMS) upgrades, and integrating new control systems. The project involves selective demolition and replacement of existing mechanical infrastructure, with careful phasing to maintain building operations. The mechanical drawings specify detailed requirements for ductwork, piping, equipment mounting, and system configurations, with specific attention to fire-rated assemblies, insulation, and code compliance. The total anticipated construction duration is 64 weeks, with work to be performed in eight primary phases plus a concurrent phase for basement and roof work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PWS Amendment Summary.docx | DOCX document | |
| Amendment 3_PWS_70Z08425QDL950012-2.2.1-Attachment 1.docx | DOCX document | |
| HVAC Solicitation Q and As.docx | DOCX document | |
| Floor Plans_HVAC Cape Cod.pdf | ||
| JBCC Vetting Form.pdf | ||
| Amendment 2 Summary_70Z08425QDL9500120002_US.pdf | ||
| Amendment 2 Solicitation_70Z08425QDL950012_2.pdf | ||
| Amendment 1_70Z08425QDL950012.pdf | ||
| 70Z08425QDL950012_0_US.pdf | ||
| 70Z08425QDL950012-2.2.1-Attachment 3.txt | TXT text file | |
| 70Z08425QDL950012-2.2.1-Attachment 2.xlsx | XLSX spreadsheet | |
| 70Z08425QDL950012-2.2.1-Attachment 1.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
EF
R
EF
R
EF
R
EF
R
EF
R
EF
R
EF
R
EF
R
EF
FEC
FECFEC
FEC
FEC
FEC
FESUITE 03
BEDROOM "A"
128A
SUITE 03
BEDROOM "B"
128B
LINEN STORAGE
COMMERCIAL
LAUNDRY
MECHANICAL
EQUIP
ELECTRICAL
EQUIP
RECREATION
ROOM
BLDG MAINT.
OFFICE, SHOP,
STOR.
1ST FL
RECYCLING AREA
WOMEN'S PUBLIC
TOILET
MEN'S PUBLIC
TOILET
FIRST FLOOR
MAIN CORRIDOR
SUITE 05
BEDROOM "A"
115A
SUITE 05
BEDROOM "B"
115B
SUITE 07
BEDROOM "A"
117A
SUITE 07
BEDROOM "B"
117B
SUITE 09
BEDROOM "A"
119A
SUITE 09
BEDROOM "B"
119B
NORTH STAIRWAY
FIRST FL
OCCUPANT
LAUNDRY
SUITE 08
BEDROOM "B"
120B
SUITE 08
BEDROOM "A"
120A
SUITE 06
BEDROOM "B"
118B
SUITE 06
BEDROOM "A"
118A
SUITE 04
BEDROOM "B"
116B
UPHMGR / MAA
SECURE MAIL
ROOM
UPH
ADMINISTRATIVE
OFFICE
ENTRY
VESTIBULE &
CHECK-IN
WINDOW
MAIN LOBBY
MAIN TELECOMM.
EQPM RM
SUITE 01
BEDROOM "B"
123B
SUITE 01
BEDROOM "A"
123A
SUITE 02
BEDROOM "B"
127B
SUITE 02
BEDROOM "A"
127A
SOUTH STAIRWAY
SUITE 04
BEDROOM "A"
116A
2 3 4 5 6 7 8 10
A
B
C
D
M401
M101
165B 30B 30B
T
EWH-2
EWH-1
FCU1-1
FCU1-2
FCU1-11
FCU1-3
FCU1-13
FCU1-15
FCU1-16
FCU1-10
FCU1-12 FCU1-14
FCU1-4 FCU1-6
FCU1-5
FCU1-7
FCU1-8
FCU1-9
100D
15B 30B 30B 30B ø4" ø4"
30B 30B30B
8"x8" 8"x8" 6"x6" 6"x6" 4"ø
8"
20"x12"
10"x12"
8"x8" 8"x8" 6"x6" 4"ø
10"x8"
30B
30B
30B
30B 30B
30B 30B 30B 30B
340A
30D
25D
180D
35D
45B
30D
15D
10D
20D
100B
50D 100D
50D
"x1 2"
16"x12"
12"x10"
12"x10"
10"x10" 8"x8" 6"x6"
8"x8" 6"x6"
6"x6"
6"x4"
10"x8"
6"x4"
6"x4"
6"x4"
4"ø 6"x8"
4"ø
6"x6" 6"x8"
10"x8" 6"x6"
6"x4" 4"ø
6"x4"
6"x4" 10"x8"
10"x8"
6"x4"
6"x4"
6"x4" 6"x4"
175D
60B
10B
"x8
18"x8"
"x8
12"x10"
L-2
M301M101
M301M101
70A
90A60A
25B
UPH SUPPLIES
STORAGE
DAC1-1
DAC1-2
M301M101
EF-1
L-1
"x1 0"
36"x12" 8"ø
8"ø
8"x18"
6"x6"
M301M101
CO2
35B
30B
50D 50D
8"x8"
6"x4" 6"x6"
EF-2
L-3
L-4
24"x12"
EUH-1
HR-7
6"ø 6"x8"
8"x8"
480C 12"x10"
90A 60A
60A 60A 60A
90D
6"x6"
8"x8" 10"x8"
HR-9
30B 30B 30B 30B
M M M
EWH-34"ø 6"x6" 4"ø
6"x6"
8"ø 8"ø
6"x4"
6"x4"
6"ø
6"x4"
6"x4" 6"x4"
6"x4"
6"x4"
6"x4" 8"ø 8"ø
8"ø 8"ø 8"ø
8"ø
8"ø
8"x8"
10"x8" 10"x8"
8"x8" 6"x8" 6"x8" 6"ø
6"ø
6"ø
T
The Haskell Company l l l Riverside Avenue Jacksonville, Florida 32202 Phone # (904) 791-4500
S
AT
NU
TS
DE T
E OC
A
DR
UG
TSA
ISSUE
A/E PROJECT NO:
CAD FILE NAME:
DESIGNED BY:
DRAWN BY:
EDITED BY:
CHECKED BY:
SCALE: AS NOTED
CONSULTANTS
REBUILD UPH FACILITY
U.S. COAST GUARD BASE
CAPE COD MA
REVIEWED BY: REVIEWED BY: REVIEWED BY:
PROJECT ENG BRANCH CHIEF TECH. DIRECTOR
COMMANDING OFFICER DATE
PROJECT NUMBER DRAWING NUMBER
DISCIPLINE/SHEET NO.
SHEET OF
01-L00011
MECHANICAL
6601680
XXX
01L00011
A01L00011 .dwg
U. S. COAST GUARD
FACILITIES DESIGN &
CONSTRUCTION CENTER
5505 ROBIN HOOD ROAD SUITE K
NORFOLK, VIRGINIA 23513-2431
UNACCOMPANIED PERSONNEL HOUSING
FINAL DESIGN SUBMISSION
- N
OT FOR CONSTRUCTION -
SEPTEMBER 201
A
B
C
1 2 3 4
1 2 3 4
M101
FIRST FLOORPLAN - DUCT
DLH
DLH
TJT
M101
M101
1/8" = 1'-0"1 FIRST FLOOR PLAN-DUCT
0' 4' 8' 16' 32'
N
Mark Date Description
R
EF
R
EF
R
EF
R
EF
R
EF
R
EF
R
EF
R
EF
FEC
FECFEC
FEC
FEC
FEC
FESUITE 03
BEDROOM "A"
128A
SUITE 03
BEDROOM "B"
128B UPH SUPPLIES
STORAGE
LINEN STORAGE
COMMERCIAL
LAUNDRY
MECHANICAL
EQUIP
ELECTRICAL
EQUIP
RECREATION
ROOM
BLDG MAINT.
OFFICE, SHOP,
STOR.
1ST FL
RECYCLING AREA
113WOMEN'S PUBLIC
TOILET
MEN'S PUBLIC
TOILET
FIRST FLOOR
MAIN CORRIDOR
SUITE 05
BEDROOM "A"
115A
SUITE 05
BEDROOM "B"
115B
SUITE 07
BEDROOM "A"
117A
SUITE 07
BEDROOM "B"
117B
SUITE 09
BEDROOM "A"
119A
SUITE 09
BEDROOM "B"
119B
NORTH STAIRWAY
FIRST FL
OCCUPANT
LAUNDRY
SUITE 08
BEDROOM "B"
120B
SUITE 08
BEDROOM "A"
120A
SUITE 06
BEDROOM "B"
118B
SUITE 06
BEDROOM "A"
118A
SUITE 04
BEDROOM "B"
116B
UPHMGR / MAA
UPH
ADMINISTRATIVE
OFFICE
ENTRY
VESTIBULE &
CHECK-IN
WINDOW
MAIN LOBBY
MAIN TELECOMM.
EQPM RM
SUITE 01
BEDROOM "B"
123B
SUITE 01
BEDROOM "A"
123A
SUITE 02
BEDROOM "B"
127B
SUITE 02
BEDROOM "A"
127A
SOUTH STAIRWAY
SUITE 04
BEDROOM "A"
116A
2 3 4 5 6 7 8 10
A
B
C
D
FCU1-1
FCU1-2
FCU1-11
FCU1-3
FCU1-15
FCU1-16
FCU1-14
FCU1-12
FCU1-13
FCU1-10
FCU1-4
FCU1-6
FCU1-5 FCU1-7
FCU1-8
FCU1-9HR-7
HR-8 HR-9
HR-6
HR-7
SECURE MAIL
ROOM
MAIL PICK-UP
VESTIBULE
DAC1-1
DAC1-2
REFRIGERANT
PIPING SHOWN FOR
ROUTING
PIPE SIZES, NUMBER
OF PIPES AND
VALVING SEE M701
INSTALL PER LG
INSTRUCTIONS
UP TO
2nd FL
The Haskell Company l l l Riverside Avenue Jacksonville, Florida 32202 Phone # (904) 791-4500
S
AT
NU
TS
DE T
E OC
A
DR
UG
TSA
ISSUE
A/E PROJECT NO:
CAD FILE NAME:
DESIGNED BY:
DRAWN BY:
EDITED BY:
CHECKED BY:
SCALE: AS NOTED
CONSULTANTS
REBUILD UPH FACILITY
U.S. COAST GUARD BASE
CAPE COD MA
REVIEWED BY: REVIEWED BY: REVIEWED BY:
PROJECT ENG BRANCH CHIEF TECH. DIRECTOR
COMMANDING OFFICER DATE
PROJECT NUMBER DRAWING NUMBER
DISCIPLINE/SHEET NO.
SHEET OF
01-L00011
MECHANICAL
6601680
XXX
01L00011
A01L00011 .dwg
U. S. COAST GUARD
FACILITIES DESIGN &
CONSTRUCTION CENTER
5505 ROBIN HOOD ROAD SUITE K
NORFOLK, VIRGINIA 23513-2431
UNACCOMPANIED PERSONNEL HOUSING
FINAL DESIGN SUBMISSION
- N
OT FOR CONSTRUCTION -
SEPTEMBER 201
A
B
C
1 2 3 4
1 2 3 4
M102
FIRST FLOORPLAN -
REFRIGERANTPIPING
DLH
DLH
TJT
M102
M102
1/8" = 1'-0"1 FIRST FLOOR PLAN-REFRIGERANT PIPING
0' 4' 8' 16' 32'
R
EF
R
EF
R
EF
R
EF
R
EF
R
EF
R
EF
R
EF
R
EF
R
EF
R
EF
FEC
FEC
FECFEC
SUITE 13
BEDROOM "A"
219A
SUITE 13
BEDROOM "B"
219B
SUITE 12
BEDROOM "A"
217A
SUITE 12
BEDROOM "B"
217B
2ND FL MECH
EQUIP
TV HOME
THEATER
SUITE 15
BEDROOM "A"
209A
SUITE 15
BEDROOM "B"
209B
SUITE 17
BEDROOM "A"
211A
SUITE 17
BEDROOM "B"
211B
SUITE 19
BEDROOM "A"
213A
SUITE 19
BEDROOM "B"
213B
SUITE 21
BEDROOM "A"
215A
SUITE 21
BEDROOM "B"
215B
NORTH STAIRWAY
SUITE 11
BEDROOM "A"
220A
SUITE 11
BEDROOM "B"
220B
SUITE 10
BEDROOM "A"
218A
SUITE 10
BEDROOM "B"
218B
2ND FL TELECOM
OCCUPANT
LAUNDRY
OCCUPANT
CLEANING
CLOSET
CREW
CLEANING
CLOSET
SUITE 14
BEDROOM "A"
210A
SUITE 14
BEDROOM "B"
210B
SUITE 16
BEDROOM "A"
212A
SUITE 16
BEDROOM "B"
212B
SUITE 18
BEDROOM "A"
214A
SUITE 18
BEDROOM "B"
214B
SUITE 20
BEDROOM "A"
216A
SUITE 20
BEDROOM "B"
216B
2 3 4 5 6 7 8 10
A
B
C
D
8"x8" 6"x6" 4"ø
8"x8"
20"x12"
12x12
6"x8" 6"x6" 4"ø
12"x8"
FCU2-1
FCU2-3
FCU2-13
FCU2-14
FCU2-15
FCU2-5
FCU2-6
FCU2-7 FCU2-9
6"x8"
30B 30B 30B 30B
30B 30B 30B 30B 90D 30B 30B 30B 30B 30B 30B 30B 30B
30B 30B 30B 30B 30B 30B 30B
M301M103
HR-2FCU2-2
HR-1
FCU2-4 FCU2-8
HR-4 HR-5
FCU2-12
FCU2-11
6"ø
6"ø
WALL CAP
10"x10"
"x1 2"
14"x8"
10"x8"
14"x8"
12"x8"
12x20DN
8"x8"
10"
DAC2-1
8"ø
8"ø
6"ø
6"x6"
8"x6" 6"x4"
6"x4"
10"x8" 8"x8"
8"x8"
6"x6"
6"x4" 6"x4"
6"x4"
6"x4"
"x1
2"
15D
15D
M301M103
90A60A 60A
60A60A
100A60A 90A
M301M101
165A
6"x8"
CO2
45D
L-5
30B
EUH-2
EF-3
ELEVATOR
CONTROLLER
EQPM CLOSET
DAC2-2
18"x8"
M
60B
SD
SD
8"ø
4"ø
6"x6"
6"x6"
8"x8"
4"ø
8"ø
8"x8"
6"x6"
6"x6"
4"ø
4"x6"4"ø
6"ø 6"x8"
8" x8
18"x8"
8"ø 8"ø
EQUAL
SPLIT
12"x8"
12"x8" 8"x8" 8"x8"
6"x6"
8"ø
4"ø
10"x8" 6"x8" 6"ø 36"x12"
The Haskell Company l l l Riverside Avenue Jacksonville, Florida 32202 Phone # (904) 791-4500
S
AT
NU
TS
DE T
E OC
A
DR
UG
TSA
ISSUE
A/E PROJECT NO:
CAD FILE NAME:
DESIGNED BY:
DRAWN BY:
EDITED BY:
CHECKED BY:
SCALE: AS NOTED
CONSULTANTS
REBUILD UPH FACILITY
U.S. COAST GUARD BASE
CAPE COD MA
REVIEWED BY: REVIEWED BY: REVIEWED BY:
PROJECT ENG BRANCH CHIEF TECH. DIRECTOR
COMMANDING OFFICER DATE
PROJECT NUMBER DRAWING NUMBER
DISCIPLINE/SHEET NO.
SHEET OF
01-L00011
MECHANICAL
6601680
XXX
01L00011
A01L00011 .dwg
U. S. COAST GUARD
FACILITIES DESIGN &
CONSTRUCTION CENTER
5505 ROBIN HOOD ROAD SUITE K
NORFOLK, VIRGINIA 23513-2431
UNACCOMPANIED PERSONNEL HOUSING
FINAL DESIGN SUBMISSION
- N
OT FOR CONSTRUCTION -
SEPTEMBER 201
A
B
C
1 2 3 4
1 2 3 4
M103
SECONDFLOORPLAN - DUCT
DLH
DLH
TJT
M103
M103
1/8" = 1'-0"1 SECOND FLOOR PLAN-DUCT
0' 4' 8' 16' 32'
R
EF
R
EF
R
EF
R
EF
R
EF
R
EF
R
EF
R
EF
R
EF
R
EF
R
EF
FEC
FEC
FECFEC
FE
SUITE 13
BEDROOM "A"
219A
SUITE 13
BEDROOM "B"
219B
SUITE 12
BEDROOM "A"
217A
SUITE 12
BEDROOM "B"
217B
2ND FL MECH
EQUIP
TV HOME
THEATER
SUITE 15
BEDROOM "A"
209A
SUITE 15
BEDROOM "B"
209B
SUITE 17
BEDROOM "A"
211A
SUITE 17
BEDROOM "B"
211B
SUITE 19
BEDROOM "A"
213A
SUITE 19
BEDROOM "B"
213B
SUITE 21
BEDROOM "A"
215A
SUITE 21
BEDROOM "B"
215B
NORTH STAIRWAY
SUITE 11
BEDROOM "A"
220A
SUITE 11
BEDROOM "B"
220B
SUITE 10
BEDROOM "A"
218A
SUITE 10
BEDROOM "B"
218B
2ND FL TELECOM
OCCUPANT
LAUNDRY
OCCUPANT
CLEANING
CLOSET
CREW
CLEANING
CLOSET
SUITE 14
BEDROOM "A"
210A
SUITE 14
BEDROOM "B"
210B
SUITE 16
BEDROOM "A"
212A
SUITE 16
BEDROOM "B"
212B
SUITE 18
BEDROOM "A"
214A
SUITE 18
BEDROOM "B"
214B
SUITE 20
BEDROOM "A"
216A
SUITE 20
BEDROOM "B"
216B
2 3 4 5 6 7 8 10
A
B
C
D
FCU2-1
FCU2-2
FCU2-3
FCU2-4
FCU2-14
FCU2-15
FCU2-6
FCU2-7 FCU2-9
FCU2-8
FCU2-11
FCU2-12
FCU2-5
HR-2
HR-1 HR-3
HR-4
HR-5
FCU2-13
HR-1
SOUTH STAIRWAY
FCU2-10
DOWN TO 1st FL
REFRIGERANT
PIPING SHOWN FOR
ROUTING
PIPE SIZES, NUMBER
OF PIPES AND
VALVING SEE M701
INSTALL PER LG
INSTRUCTIONS
The Haskell Company l l l Riverside Avenue Jacksonville, Florida 32202 Phone # (904) 791-4500
S
AT
NU
TS
DE T
E OC
A
DR
UG
TSA
ISSUE
A/E PROJECT NO:
CAD FILE NAME:
DESIGNED BY:
DRAWN BY:
EDITED BY:
CHECKED BY:
SCALE: AS NOTED
CONSULTANTS
REBUILD UPH FACILITY
U.S. COAST GUARD BASE
CAPE COD MA
REVIEWED BY: REVIEWED BY: REVIEWED BY:
PROJECT ENG BRANCH CHIEF TECH. DIRECTOR
COMMANDING OFFICER DATE
PROJECT NUMBER DRAWING NUMBER
DISCIPLINE/SHEET NO.
SHEET OF
01-L00011
MECHANICAL
6601680
XXX
01L00011
A01L00011 .dwg
U. S. COAST GUARD
FACILITIES DESIGN &
CONSTRUCTION CENTER
5505 ROBIN HOOD ROAD SUITE K
NORFOLK, VIRGINIA 23513-2431
UNACCOMPANIED PERSONNEL HOUSING
FINAL DESIGN SUBMISSION
- N
OT FOR CONSTRUCTION -
SEPTEMBER 201
A
B
C
1 2 3 4
1 2 3 4
M104
SECONDFLOORPLAN -
REFRIGERANTPIPING
DLH
DLH
TJT
M104
M104
1/8" = 1'-0"1 SECOND FLOOR PLAN-REFRIGERANT PIPING
0' 4' 8' 16' 32'
2 3 4 5 6 7 8 10
A
B
C
D
M401
M105 911
DCU1-1
DCU1-2
DCU2-1 EH-1
IH-1
DOAS-1
CU-1
IH-2
DCU2-2
M
M
The Haskell Company l l l Riverside Avenue Jacksonville, Florida 32202 Phone # (904) 791-4500
S
AT
NU
TS
DE T
E OC
A
DR
UG
TSA
ISSUE
A/E PROJECT NO:
CAD FILE NAME:
DESIGNED BY:
DRAWN BY:
EDITED BY:
CHECKED BY:
SCALE: AS NOTED
CONSULTANTS
REBUILD UPH FACILITY
U.S. COAST GUARD BASE
CAPE COD MA
REVIEWED BY: REVIEWED BY: REVIEWED BY:
PROJECT ENG BRANCH CHIEF TECH. DIRECTOR
COMMANDING OFFICER DATE
PROJECT NUMBER DRAWING NUMBER
DISCIPLINE/SHEET NO.
SHEET OF
01-L00011
MECHANICAL
6601680
XXX
01L00011
A01L00011 .dwg
U. S. COAST GUARD
FACILITIES DESIGN &
CONSTRUCTION CENTER
5505 ROBIN HOOD ROAD SUITE K
NORFOLK, VIRGINIA 23513-2431
UNACCOMPANIED PERSONNEL HOUSING
FINAL DESIGN SUBMISSION
- N
OT FOR CONSTRUCTION -
SEPTEMBER 201
A
B
C
1 2 3 4
1 2 3 4
M105
ROOFPLAN
DLH
DLH
TJT
M105
M105
1/8" = 1'-0"1 T.O.P.-LOW
0' 4' 8' 16' 32'
T.O.P.-LOW
24' - 10"
8"x18"
SUITE 05
COMMON AREA
115C
SUITE 17
COMMON AREA
211C
SUITE 19
COMMON AREA
213C
SUITE 07
COMMON AREA
117C
SUITE 07 MECH.
EQPM. CLOSET
117E
SUITE 05 MECH.
EQPM. CLOSET
115E
SUITE 17 MECH.
EQPM. CLOSET
211E
SUITE 19 MECH.
EQPM. CLOSET
213E
8"x12"
FCU2-7
165E 18x6TR
165E 18x6TR
165E 18x6TR
165E 18x6TR ø6"
165E 18x6TR
165E 18x6TR
165E 18x6TR
165E 18x6TR
FCU1-4
8"x18"
450E 6x18
450E 6x18
"x1
0"
"x1
0"
8" x1
8"
8" x1
8" ø6"
8"ø
"x1
0"
"x1
0"
8" x1
8"
8" x1
8"
8"ø 8"ø ø6" ø6" 8"ø
T.O.P. HIGH
27' - 1"
T.O.P.-LOW
24' - 10"
B
10"x10"
450E 6x18 18"x8"
18"x8"
FCU1-4
8"x8"
30B
FCU2-7
8"x8"
30B
SUITE 05
BEDROOM "B"
115B
SUITE 17
BEDROOM "B"
211B
10"x10" 8"ø
8"ø
450E 18x8
8"x8"
C 911
FIRST FLOOR
MAIN CORRIDOR
8"ø 120A
165E 18x6TR165E
18x6TR 6"x18" SUITE 06
COMMON AREA
118CSUITE 06
BEDROOM "B"
118B
6"ø 8"ø 6"x8"10"x8" 8"ø
T.O.P. HIGH
27' - 1"
T.O.P.-LOW
24' - 10"
OCCUPANT
LAUNDRY
DCU2-1 IH-1
EH-1
FCU2-15
DAC2-1
DAC2-2
4"ø
CUT GYP
BD BEHIND
DRYER
SEAL ALL SIDES TO
CONTAIN MAKEUP
AIR TO DRYER
1ST FLOOR
100' - 0"
2ND FLOOR
112' - 8"
1ST FLOOR
0' - 0"
SECOND FLOOR
PLAN-DUCT
12' - 8"
FIRST FL
OCCUPANT
LAUNDRY
L-2
WALL CAP
6"ø
12"x24"
25B
4"ø
CUT GYP
BD BEHIND
DRYER
SEAL ALL SIDES TO
CONTAIN MAKEUP
AIR TO DRYER
FIRST FLOOR
PLAN-DUCT
0' - 0"
1ST FLOOR
100' - 0"
2ND FLOOR
112' - 8"
A B
EF-1 8"ø
12"x36"
8"ø
10"x46"
UPH SUPPLIES
STORAGE
126 LINEN STORAGE
COMMERCIAL
LAUNDRY
T.O.P. HIGH
27' - 1"
Level 4 32' - 1"
T.O.P.-LOW
24' - 10"
D
OCCUPANT
LAUNDRY
4"ø
4"ø
4"ø
4"ø
IH-1 EH-1
M
T.O.P. HIGH
27' - 1"
Level 4 32' - 1"
T.O.P.-LOW
24' - 10"
IH-2
CU-1
REG GOOSNECK
12"x20"45D FCU2-14
10"x10"
18"x8"
FCU2-13
20"x12"
12"x20"
HR-6
FCU1-13
12"x20"
12"x10"
M
The Haskell Company l l l Riverside Avenue Jacksonville, Florida 32202 Phone # (904) 791-4500
S
AT
NU
TS
DE T
E OC
A
DR
UG
TSA
ISSUE
A/E PROJECT NO:
CAD FILE NAME:
DESIGNED BY:
DRAWN BY:
EDITED BY:
CHECKED BY:
SCALE: AS NOTED
CONSULTANTS
REBUILD UPH FACILITY
U.S. COAST GUARD BASE
CAPE COD MA
REVIEWED BY: REVIEWED BY: REVIEWED BY:
PROJECT ENG BRANCH CHIEF TECH. DIRECTOR
COMMANDING OFFICER DATE
PROJECT NUMBER DRAWING NUMBER
DISCIPLINE/SHEET NO.
SHEET OF
01-L00011
MECHANICAL
6601680
XXX
01L00011
A01L00011 .dwg
U. S. COAST GUARD
FACILITIES DESIGN &
CONSTRUCTION CENTER
5505 ROBIN HOOD ROAD SUITE K
NORFOLK, VIRGINIA 23513-2431
UNACCOMPANIED PERSONNEL HOUSING
FINAL DESIGN SUBMISSION
- N
OT FOR CONSTRUCTION -
SEPTEMBER 201
A
B
C
1 2 3 4
1 2 3 4
M301
SECTIONS
DLH
DLH
TJT
M301
M301
M401M301 1/4" = 1'-0"
1 TYPICAL SUITE
M401M301 1/4" = 1'-0"
2 TYPICAL FCU ROOMS
M101M301 1/4" = 1'-0"
3 FIRST FL AT RM 109
M103M301 1/4" = 1'-0"
4 SECTION AT ROOM 205
M101M301 1/4" = 1'-0"
5 SECTION AT RM 129
M101M301 1/4" = 1'-0"
6 SECTION AT COMMERCIAL LAUNDRY
M103M301 1/4" = 1'-0"
7 SECTION AT OCCUPANT LAUNDRY RM 205 M101M301 1/4" = 1'-0"
8 SECTION AT DUCT DROP TO ISt FL
R
EF
FEC
6 7 8
B 30B 30B
165B165B
45D
8"ø 8"ø
120A
6"ø
M301M401
FCU1-4
FCU1-6
120A
165B165B
30B 30B
165E 18x6TR
165E 18x6TRT
450E 6x18
450E 6x18
6"x4"
18"x8" 18"x8"
M301M401
"x1 0"
"x1
0"
10"x10" 10"x10"
8"ø 8"ø
8"ø 8"ø
WALL CAPWALL CAP
8"x8"
8"x8" 6"x8" 6"x4"6"x4"
12"x10" 10"x8" 8"x8"
45D
HR-9
REFRIGERANT PIPING
ONLY ONE PIPE SHOWN
SEE M701 FOR ALL PIPING
REFRIGERANT PIPING SHOWN FOR
ROUTING
PIPE SIZES, NUMBER OF PIPES AND
VALVING SEE M701
INSTALL PER LG INSTRUCTIONS
165E 18x6
165E 18x6
165E 18x6TR
165E 18x6TR
165E 18x6TR
165E 18x6TR
18"x6" 18"x6" 18"x6" 18"x6"
T
B
C
D
CU-1
DOAS-1
REG GOOSNECK
EH-1
IH-1
DCU1-2
REFRIGERANT PIPING
M301M103
IH-2
DCU1-1
DCU2-2
DCU2-1
M
M
NOTE:
DO NOT CUT OUR DECK EXCEPT WHERE
SUPPLY OF EXHAUST DUCT PENETRATED.
LEAVE AS MUCH DECK IN AS POSSOBLE TO
MINIMIZE SOUND TRANSMISSION
REFRIGERANT PIPING
COPPER 1" PIPE
SUPPORED ON P.T. 4x4
ROUTED TO ROOF
DOWN SPOUT
The Haskell Company l l l Riverside Avenue Jacksonville, Florida 32202 Phone # (904) 791-4500
S
AT
NU
TS
DE T
E OC
A
DR
UG
TSA
ISSUE
A/E PROJECT NO:
CAD FILE NAME:
DESIGNED BY:
DRAWN BY:
EDITED BY:
CHECKED BY:
SCALE: AS NOTED
CONSULTANTS
REBUILD UPH FACILITY
U.S. COAST GUARD BASE
CAPE COD MA
REVIEWED BY: REVIEWED BY: REVIEWED BY:
PROJECT ENG BRANCH CHIEF TECH. DIRECTOR
COMMANDING OFFICER DATE
PROJECT NUMBER DRAWING NUMBER
DISCIPLINE/SHEET NO.
SHEET OF
01-L00011
MECHANICAL
6601680
XXX
01L00011
A01L00011 .dwg
U. S. COAST GUARD
FACILITIES DESIGN &
CONSTRUCTION CENTER
5505 ROBIN HOOD ROAD SUITE K
NORFOLK, VIRGINIA 23513-2431
UNACCOMPANIED PERSONNEL HOUSING
FINAL DESIGN SUBMISSION
- N
OT FOR CONSTRUCTION -
SEPTEMBER 201
A
B
C
1 2 3 4
1 2 3 4
M401
ENLARGEDPLANS
DLH
DLH
TJT
M401
M401
M101M401 1/4" = 1'-0"
1 TYPICAL ENLARGED SUITE PLAN
M105M401 1/4" = 1'-0"
2 ENLARGED ROOF PLAN
CONDENSATE DRAIN PIPING DIMENSIONS:
A = FULL SIZE OF UNIT DRAIN CONNECTION
B > 1 1/2 TIMES FAN SUCTION STATIC PRESSURE
C > FAN DISCHARGE STATIC PRESSURE PLUS 1/2 INCH
COORDINATE MOUNTING/CURB HEIGHT AS REQUIRED TO
PROVIDE PROPER CONDENSATE DRAINAGE.
DRAIN PAN
CASING SLEEVE
COOLING COIL
SLOPE TO
DRAIN
UNION
THREADED CAP,
HAND TIGHTENED
THREADED CAP WITH
HOLE DRILLED IN
TOP, HAND TIGHTENED.
A B
C
LOW VELOCITY
SUPPLY AIR DUCT.
(SEE PLAN)
INSULATE
BACKS & NECKS
OF DIFFUSERS
AIR
DEVICE
SEE
NOTE 2.
SPIN-IN
COLLAR WITH
MANUAL
VOLUME
DAMPER.
UPPER ATTACHMENT PER SMACNA.
SEE STRUCTURAL SYSTEM DETAIL,
HANGER & FASTENER SCHEDULE
FOR ATTACHMENT TO STRUCTURE.
MAX. SAG 1/2'' PER FOOT &
MAX. 5' BETWEEN SUPPORT
POINTS.
SUPPORT DUCT IN
ACCORDANCE
WITH SMACNA.
CONNECT FLEXIBLE
DUCT TO METAL DUCT.
SEE NOTE 4.NOTES
1. FLEXIBLE DUCTS SHALL BE ONE PIECE AND SHALL NOT BE
SPLICED TOGETHER.
2. MINIMUM 1" WIDE 22 GALVANIZED STRAP HANGER WITH HEMMED
EDGES PER SMACNA.
3. FLEXIBLE AIR DUCT SHALL NOT EXCEED 6 FT. WHEN EXTENDED.
ELBOW RADIUS SIZED FOR NO LESS THAN R/D = 1.0.
4. EXTEND FLEXIBLE DUCT INSULATION TO DUCT/DIFFUSER PANEL.
PROVIDE DRAW BAND ON INNER LINER. INSULATE OVER DRAW
BANDS AND SEAL WITH MASTIC.
INSULATED
SHEET METAL
DUCT.
CLASS 1 FLEXIBLE
DUCT. SEE NOTE 1 &
NOTE 3.
MATCH FLEX DUCT SIZE TO AIR DEVICE NECK SIZE
AS INDICATED. SEE NOTE 4.
MANUAL VOLUME
DAMPER.
PLAN
BRACING REQUIRED FOR ALL HVAC
EQUIPMENT GREATER THAN 30 POUNDS
45.00° +/- 15º
1/8" STEEL ROPE
(TYP)
HVAC EQUIPMENT
ELEVATION
1/4" THREADED ROD
(TYP)
45.00° +/- 15º
1/8" STEEL ROPE
(TYP)
HVAC EQUIPMENT
SUPPLY AIR/VENTILATION AIR FLOW
RETURN AIR/EXHAUST AIR FLOW
OR
45° TAKEOFF SHEET METAL BRANCH DUCT
TYPICAL TRANSITION
MAX. 20° ANGLE
NOTE: THE PLAN VIEWS ARE DIAGRAMMATICAL AND SHOW SIMPLE TAPS. PROVIDE 45 DEGREE
TAPS OR BELL MOUTHS FOR EVERY TAP LOCATION. SUPPORT DUCT IN ACCORDANCE
WITH SMACNA.
WHETHER OR NOT IT IS INDICATED ON DRAWINGS, PROVIDE
VOLUME BALANCING DAMPER W/ STANDOFF (INCLUDE INSULATION)
AND LOCKING DEVICE. IN HARD CEILING AREAS ONLY, IF OPPOSED
BLADE DAMPER IS PROVIDED IN THE AIR DEVICE FOR BALANCING,
THE BALANCING DAMPER AND ACCESS PANEL SHALL NOT BE PROVIDED.
PU
LL TORESET
PUSHBUTTON
EMERGENCY
HVACSHUT-DOWN
BOD: KELE ST120-SL-N1-HS
WITH PILCLHCOV1 ACCESSORY COVER
HINGED CLEAR
COVER REQUIRED
LARGE RED PUSH BUTTON
INSULATED SUPPLY DUCT SEE
DRAWINGS FOR LOCATION & SIZES.
FLEXIBLE
CONNECTOR
FULL FRONT
ACCESS PANELS
PROVIDE RETURN PLENUM
UNDER UNIT. SUPPORT
UNIT WITH PLENUM.
PLENUM
NOTE:
1. ROUTE CONDENSATE TO
FLOOR DRAIN IN THE ROOM.
PROVIDE CONDENSATE
TRAP PER MANUFACTURER
RECOMMENDATION.
2. SEAL ALL CONNECTIONS
AIR TIGHT, ESPECIALLY
THE BACK AND THE BOTTOM
OF THE UNIT AND DUCTWORK.
HINGED DOOR FILTER HOUSING
BASED ON ACCOMMODATOR 2 INCH
FILTER HOUSING, MERV 13 FILTERS
INSULATED
RETURN DUCT
SEE DRAWINGS
FOR LOCATION
& SIZES.
FRONT ACCESS
ELECTRICAL
ENCLOSURE
3"x3"x1" NEOPRENE PADS
ALL SIDES
CONDENSATE LINE
WITH P-TRAP135°
24" MIN.
W 2R=
R
W
MIN.
8"
12" MIN.
ANGLE IRON
REINFORCING WHERE
REQUIRED
METAL
SCREEN
FRAME
SCREEN
BOLTS
1/2" BIRDSCREEN
ANGLE RIVETED OR SPOT
WELDED AS REQUIRED
FLASHING
ROOFING
METAL ROOF
DECK
12"x12"
REFRIGERANT PIPING
ELECTRICAL
WIRING
SLOPE 1" IN 7"
SINGLE THICKNESS
TURNING VANES
MAIN DUCTAIR FLOW
SQUARE THROAT ELBOW
MIN 12" DEEP PLENUM
6" DEEP
LOUVER w/
MIN. 50%
FREE AREA.
12 GA
SLEEVE
TYP.
ANGLES
(ALL SIDES)
MAINTAIN SLOPE TO
AVOID WATER
PENETRATION.
AIR INTAKE OR
EXHAUST AIR DUCT.
SEE DRAWING FOR
SIZES AND LOCATION.
M
ALL LOUVERS WITH 300 CFM
OR MORE SHALL BE
PROVIDED WITH A MOTORIZED
DAMPER
NOTE:
VIBRATION
ISOLATORS
(SEE NOTE 2)
SEE STRUCTURAL SYSTEM
DETAIL,
HANGER & FASTENER
SCHEDULE
VIBRATION
ISOLATORS
(SEE NOTE 2)RECTANGULAR DUCT
SEE PLANS FOR
SIZE AND LOCATION
CENTRIFUGAL DUCT FAN/
INLINE CABINET FAN.
ANGLE
SUPPORTFLEXIBLE CONNECTION
NOTES:
1. SUPPORT DUCT AND FAN IN ACCORDANCE WITH HANGER SCHEDULE.
2. PROVIDE VIBRATION ISOLATORS IN ACCORDANCE WITH SPECIFICATIONS.
3. ALIGN DUCT WITH FAN DURING INSTALLATION.
ROOF
SEE ARCH. DWG. FOR
CONSTRUCTION
WALL
SEE ARCH. DWG. FOR
CONSTRUCTION
DRYER
METAL WORM CLAMP
CLEAN OUT BOTTOM OF RISER
2" SCHEDULE 40 STEEL
PIPE, PRIMED & PAINTED
3-1/2"x3-1/2"x1/4"
STEEL ANGLE.
CROSS BRACING
ANGLES
WELD 2" STEEL
PIPE TO STRUCTURAL
BEAM/JOIST.
SEE STRUCTURAL.
4"x4"x1/4" STEEL ANGLE
SEE STRUCTURAL
WELD 2" STEEL
PIPE TO ANGLE.
INSTALL FLASHING
PER MFGR'S
INSTRUCTIONS
WELD 2" STEEL
PIPE TO ANGLE
SECURE CONDENSING
UNIT TO ANGLE WITH
(4) 1/4"x3/8" BOLTS
TOP OF ANGLE TO
BE MINIMUM OF
14" ABOVE ROOF
4TH LEG
The Haskell Company l l l Riverside Avenue Jacksonville, Florida 32202 Phone # (904) 791-4500
S
AT
NU
TS
DE T
E OC
A
DR
UG
TSA
ISSUE
A/E PROJECT NO:
CAD FILE NAME:
DESIGNED BY:
DRAWN BY:
EDITED BY:
CHECKED BY:
SCALE: AS NOTED
CONSULTANTS
REBUILD UPH FACILITY
U.S. COAST GUARD BASE
CAPE COD MA
REVIEWED BY: REVIEWED BY: REVIEWED BY:
PROJECT ENG BRANCH CHIEF TECH. DIRECTOR
COMMANDING OFFICER DATE
PROJECT NUMBER DRAWING NUMBER
DISCIPLINE/SHEET NO.
SHEET OF
01-L00011
MECHANICAL
6601680
XXX
01L00011
A01L00011 .dwg
U. S. COAST GUARD
FACILITIES DESIGN &
CONSTRUCTION CENTER
5505 ROBIN HOOD ROAD SUITE K
NORFOLK, VIRGINIA 23513-2431
UNACCOMPANIED PERSONNEL HOUSING
FINAL DESIGN SUBMISSION
- N
OT FOR CONSTRUCTION -
SEPTEMBER 201
A
B
C
1 2 3 4
1 2 3 4
M501
DETAILS
DLH
DLH
TJT
M501
M501
Detail NTSM501
1 AHU CONDENSATE DRAIN PIPE
Detail NTSM501
2 AIR DEVICE DUCTING1
Detail NTSM501
3 ATFP BRACING REQUIREMENTS1
Detail NTSM501
4 DUCT BRANCH TAKEOFF DETAIL
Detail NTSM501
5 EMERGENCY VENTILATION SHUTOFF
Detail NTSM501
6 FAN COIL UNIT
Detail NTSM501
8 RECTANGULAR GOOSENECK THRU ROOF
Detail NTSM501
9 MAIN BRANCH TAKEOFF
Detail NTSM501
7 LOUVER WITH PLENUM & DAMPER
Detail NTSM501
11 INLINE CENTRIFUGAL FAN
Detail NTSM501
12 DRYER VENT FOR COMMERCIAL DRYERS
Detail NTSM501
10 DUCTLESS SPLIT CU MOUNTING DETAIL
DX-DOAS UNIT WITH HEATWHEEL
(SEE SEPARATE HEATWHEEL SCHEDULE)
UNIT ID DOAS-1
GENERAL
LOCATION ROOF
AREA SERVED WHOLE BLDG
SUPPLY AIR, CFM 2275
OUTSIDE AIR, CFM 2275
EXHAUST AIR, CFM 1970
TYPE
MANUFACTURER AAON
MODEL RN-009-3-4-EB19-3F9
FAN DATA
SUPPLY FAN CFM 2275
EXTERNAL STATIC PRESS, IN.W.G. 1
TOTAL STATIC PRESS, IN.W.G. 4.50
FAN TYPE PLENUM
FAN EFFICIENCY HIGH
MOTOR TYPE ODP
MOTOR SIZE, HP 2
ELECTRICAL V-PH-HZ 208-3-60
EXHAUST FAN CFM 1970
EXTERNAL STATIC PRESS, IN.W.G. 1
TOTAL STATIC PRESS, IN.W.G. 0.5
FAN TYPE PLENUM
FAN EFFICIENCY HIGH
MOTOR TYPE ODP
MOTOR SIZE, HP 1
ELECTRICAL V-PH-HZ 208-3-60
COOLING COIL
AIR FLOW THROUGH COIL, CFM 2275
MAX AIR PRESS DROP, IN.W.G. 0.1
ENTERING AIR Fdb 81.0 ENTERING AIR Fwb 71.6 LEAVING AIR, Fdb 55.3 LEAVING AIR, Fwb 55.1
TOTAL SENSIBLE, MBH 62
GRAND TOTAL, MBH 117
MINIMUM ROWS 2
MAX FINS PER IN. 14
CONTROL VALVE PRESS. DROP, FT. 5
HEATING SECTION
AIR FLOW THROUGH COIL, CFM 2275
MAX AIR PRESS DROP, IN.W.G. 0.32
ENTERING AIR Fdb 17.0 LEAVING AIR, Fdb 80.6
GRAND TOTAL, MBH 156
MINIMUM ROWS 2
GAS
INPUT MBH 195
OUTPUT MBH 156
RE-HEAT COIL 2.5
MODULATING GAS REHEAT
INPUT MBH 36
LEAVING AIR, Fdb 70 LEAVING AIR, Fwb 60.7
UNIT ELECTRICAL DATA
UNIT FLA 46
MINIMUM CIRCUIT AMP 50
MAXIMUM OVERCURRENT 60
ELECTRICAL V-PH-HZ 208-3-60
FILTERS
AIR FLOW THROUGH FILTER, CFM 2275
PRE-FILTER TYPE DPF-35
PRE-FILTER EFFICIENCY MERV8
PRE-FILTER CLEAN PRESS DROP 0.5
BANK 1 FILTER TYPE DPF-85
BANK 1 FILTER EFFICIENCY MERV13
BANK 1 FILTER CLEAN PRESS DROP 1
NOTES:
FILTER EFFICIENCIES IN ACCORDANCE WITH ASHRAE STD 52-76
FILTER TYPES:
DPF: DISPOSABLE PANEL FILTER
3 DEA: DISPOSABLE EXTENDED AREA PANEL FILTERS
HEPA: HIGH EFFICIENCY PARTICULATE AIR (HEPA) FILTERS
MOTOR TYPES
4 ODP: OPEN DRIP PROOF
TEFC: TOTALLY ENCLOSED FAN COOLED
FAN TYPES
FC: FORWARD CURVED
5 BI: BACKWARD INCLINED
AF: AIR FOIL
UNIT TYPES
HDT: HORIZONTAL DRAW-THRU
6 VDT: VERTICAL DRAWI - THRU
BT: BLOW THRU
HEAT WHEEL RETURN SIDE: 75 DB/ 67 WB (SUMMER EAT), 70 DB/ 62 WB (WINTER EAT)
HEAT WHEEL INTAKE SIDE: 96 DB/ 82 WB (SUMMER EAT), 20 DB/ 20 WB (WINTER EAT)
SUMMER
WINTER 17.00 11.00 50.80 44.10 1970 36.00 34.00
HEATWHEEL (INTEGRAL TO DOAS-1)
OUTSIDE AIR SUPPLY AIR EXHAUST AIR
CFM FDB FWB CFM FDB FWB CFM FDB FWB
2275 81.00 71.60 2275 77.50 66.80 1970 79.00 68.00 2275 2275
NOTES: Total Effectiveness to be 70% or better
2.50 32,000 750 LSN307HV3 DCU1-1 208-1-60 25 19 137 LG LSU307HV3
0.93 13,300 350 LSN121HSV3 DCU1-2 208-1-60 15 10 79 LG LSU121HSV3
0.93 13,300 350 LSN121HSV3 DCU2-1 208-1-60 15 10 79 LG LSU121HSV3
2.50 32,000 750 LSN307HV3 DCU2-2 208-1-60 25 19 137 LG LSU307HV3
30,000 LG
11,200 LG
11,200 LG
30,000 LG
DUCTLESS SPLIT HEAT PUMP SCHEDULE
INDOOR UNIT OUTDOOR UNIT
TOTAL CAPACITY SUPPLY FAN ELECTRICAL
UNIT AREA COOLING HEATING SUPPLY MFR MODEL UNIT V-PH-HZ MOCP MCA WEIGHT MFR MODEL
DESIGNATION SERVED BTU/HR TONS BTU/HR AIR NUMBER DESIGNATION (LBS) NUMBER
(CFM)
DAC1-1 ELECTRICAL RM 132
DAC1-2 TELECOMM RM 102
DAC2-1 TELECOMM RM 207
DAC2-2 ELEVATOR EQPM 221
REMARKS PROVIDE WITH IQP-KUBE PUMP UPC 0095247142910 AND IQP-KUBE SHROUD KIT UPC 0095247142927.
1/2 1/6 1/6 120-1-60 120-1-60 120-1-60
FAN SCHEDULE
CIF CIF CIF
D,E,F,K D,E,F D,E,F
AXC300B-C 100SQN15D 100SQN15D
700 400 350
0.5 0.5 0.5
DIRECT DIRECT DIRECT
GENERAL
DESIGNATION EF-1 EF-2 EF-3
LOCATION OVER RM 126 MECH RM 131 MECH RM 208
AREA SERVED DRYER IN RM 124 MECH RM 131 MECH RM 208
TYPE
ACCESSORIES
CONTROL INTERLOCK PRESSURE SWITCH EMCS EMCS
MANUFACTURER CONTINENTAL COOK COOK
MODEL NUMBER
PERFORMANCE
AIR QUANTITY, CFM
TOTAL STATIC PRESSURE, IN. WG
MAX LOUDNESS, SONES N/A N/A N/A
DRIVE
DRIVE MOTOR, HORSEPOWER
ELECTRICAL
ACCESSORIES: FAN TYPES FAN TYPES
A BACKDRAFT DAMPER ACF-AIR CURTAIN FAN DSF-DESTRATIFICATION FAN
B BIRD SCREEN CAB-CABINET FAN FRF- FILTERED ROOF INTAKE
C DISCHARGE SAFETY SCREEN CEF-CEILING EXHAUST FAN PRF- PROPELLER ROOF FAN
D DISCONNECT SWITCH CIF- CENTRIFUGAL INLINE FAN PUB- PROPELLER ROOF UPBLAST FAN
E FAN MOUNTED SPEED CONTROL SWITCH CRF- CENTRIFUGAL ROOF FAN PWF- PROPELLER WALL FAN
F FAN SUPPORT BRACKETS CUF- CENTRIFUGAL UPBLAST FAN VAN- VANEAXIAL
G INLET SAFETY SCREEN
H INSULATED HOUSING
I ROOF CAP
J ROOF CURB
K INCLUDE PRESSURE SWITCH
LOUVER SCHEDULE
GENERAL UNIT SIZE
UNIT ID LOCATION CFM MFR MODEL NO. WIDTH (IN) HEIGHT (IN) DEPTH (IN) FREE AREA (SQ FT)
L-1 OVER RM 126 700 RUSKIN EME 520 DD 36 12 8 1.17
L-2 300 RUSKIN EME 520 DD 24 12 8 0.75
L-3 400 RUSKIN EME 520 DD 36 12 8 1.17
L-4 400 RUSKIN EME 520 DD 36 12 8 1.17
L-5 350 RUSKIN EME 520 DD 36 12 8 1.17
REMARKS
A PROVIDE WITH MOTOR OPERATED DAMPERS
B PROVIDE KYNAR FINISH TO MATCH EXTERIOR WALL COLOR
10 45 208-1-60 10 45 208-1-60 10 45 208-1-60 14 350 208-1-60 14 350 208-1-60
VERTICAL 2 2.0 1
VERTICAL 2 2.0 1
VERTICAL 2 2.0 1
VERTICAL 9 3.0 1
VERTICAL 9 3.0 1
ELECTRIC HEATER SCHEDULE
UNIT ID LOCATION ORIENTATION MOUNTING
HEIGHT (ft) THROW (ft)
HEATING
CAPACITY
(KW)
STAGES BTU/HR AIR FLOW,
CFM V-PH-HZ BASIS OF
DESIGN MFR MODEL ACCESSORIES
EWH-1 STAIRWAY 130 6826 KING W2020 2
EWH-2 STAIRWAY 100 6826 KING W2020 2
EWH-3 VEST 101 6826 KING W2020 2
EUH-1 MECH RM 131 10239 KING KB2003 1,2
EUH-1 MECH RM 208 10239 KING KB2003 1,2
NOTES
1. PROVIDE WALL MOUNTING BRACKET.
2. PROVIDE WITH BUILT-IN THERMOSTAT, 5/2 DAY ELECTRONIC PROGRAMMABLE LED TOUCH SCREEN.
AIR DISTRIBUTION SCHEDULE
MARK DESCRIPTION
SUPPLY PLAQUE FACE DIFFUSER PRICE ASPD
24 x 24 MODULE ROUND NECK SQUARE NECK CFM RANGE
0-150 151-280
N/A N/A N/A N/A N/A
281-400 401-490 491-640
N/A 641-750
6"ø 8"ø 10"ø 12"ø 14"ø 16"ø
SUPPLY PLAQUE FACE DIFFUSER PRICE ASPD
A
B
12 x 12 MODULE ROUND NECK SQUARE NECK CFM RANGE
41-150N/A6"ø 151-250N/A8"ø
C RETURN EGGCRATE GRILLE PRICE 80
24 x 24 MODULE ROUND NECK SQUARE NECK CFM RANGE
251-420N/A 10 x 10 421-600N/A 12 x 12 601-750N/A 14 x 14 751-960N/A 16 x 16 961-1300N/A 18 x 18 1301-1800N/A 20 x 20
LOUVERED RETURN GRILLE PRICE 620
(SEE PLANS FOR CFM AND SIZES)E
1. 12 x 12 GRILLES INSTALLED IN LAY-IN CELILING SHALL HAVE 24 x 24 ACTIVE FACE.
NOTE:
LOUVERED FACE RETURN AND/OR EXHAUST PRICE 600
12x12 MODULE ROUND NECK SQUARE NECK CFM RANGE
161-240
N/A
10 x 10 241-460
N/A
12 x 12 461-590
N/A
14 x 14 591-800
N/A
16 x 16 801-1040
N/A
20x16 1041-1220
N/A
20 x 18
0-906x6 91-1908x8
24 x 24 MODULE
D
0-40N/A4"ø
The Haskell Company l l l Riverside Avenue Jacksonville, Florida 32202 Phone # (904) 791-4500
S
AT
NU
TS
DE T
E OC
A
DR
UG
TSA
ISSUE
A/E PROJECT NO:
CAD FILE NAME:
DESIGNED BY:
DRAWN BY:
EDITED BY:
CHECKED BY:
SCALE: AS NOTED
CONSULTANTS
REBUILD UPH FACILITY
U.S. COAST GUARD BASE
CAPE COD MA
REVIEWED BY: REVIEWED BY: REVIEWED BY:
PROJECT ENG BRANCH CHIEF TECH. DIRECTOR
COMMANDING OFFICER DATE
PROJECT NUMBER DRAWING NUMBER
DISCIPLINE/SHEET NO.
SHEET OF
01-L00011
MECHANICAL
6601680
XXX
01L00011
A01L00011 .dwg
U. S. COAST GUARD
FACILITIES DESIGN &
CONSTRUCTION CENTER
5505 ROBIN HOOD ROAD SUITE K
NORFOLK, VIRGINIA 23513-2431
UNACCOMPANIED PERSONNEL HOUSING
FINAL DESIGN SUBMISSION
- N
OT FOR CONSTRUCTION -
SEPTEMBER 201
A
B
C
1 2 3 4
1 2 3 4
M601
SCHEDULES
DLH
DLH
TJT
M601
M601
Multi V Indoor Unit Equipment Schedule
Mark Model Number
Type Quantity Cooling Capacity (BTU/h)
Total Cooling Sensible Cooling Heating Capacity (BTU/h)
Fan Airflow (CFM) Piping Connections (in.)
Liquid Gas
Power Volts Phase Hz RLA
ARNU123NJA2 Vertical AHU 1 12000.0 10200.0 13500.0 530/480/380 1/4 1/2 220~240V 1Ph 50Hz/60Hz 0.39 ARNU123NJA2 Vertical AHU 1 12000.0 10200.0 13500.0 530/480/380 1/4 1/2 220~240V 1Ph 50Hz/60Hz 0.39 ARNU123NJA2 Vertical AHU 1 12000.0 10200.0 13500.0 530/480/380 1/4 1/2 220~240V 1Ph 50Hz/60Hz 0.39 ARNU123NJA2 Vertical AHU 1 12000.0 10200.0 13500.0 530/480/380 1/4 1/2 220~240V 1Ph 50Hz/60Hz 0.39 ARNU183NJA2 Vertical AHU 1 18000.0 12800.0 20000.0 580/530/480 1/4 1/2 220~240V 1Ph 50Hz/60Hz 0.39 ARNU073TRC2 CASSETTE_4WAY 1 7500.0 5400.0 8500.0 265 / 247 / 212 1/4 1/2 220~240V 1Ph 50Hz/60Hz 0.2 ARNU123NJA2 Vertical AHU 1 12000.0 10200.0 13500.0 530/480/380 1/4 1/2 220~240V 1Ph 50Hz/60Hz 0.39 ARNU123NJA2 Vertical AHU 1 12000.0 10200.0 13500.0 530/480/380 1/4 1/2 220~240V 1Ph 50Hz/60Hz 0.39 ARNU123NJA2 Vertical AHU 1 12000.0 10200.0 13500.0 530/480/380 1/4 1/2 220~240V 1Ph 50Hz/60Hz 0.39 ARNU123NJA2 Vertical AHU 1 12000.0 10200.0 13500.0 530/480/380 1/4 1/2 220~240V 1Ph 50Hz/60Hz 0.39 ARNU123NJA2 Vertical AHU 1 12000.0 10200.0 13500.0 530/480/380 1/4 1/2 220~240V 1Ph 50Hz/60Hz 0.39 ARNU123NJA2 Vertical AHU 1 12000.0 10200.0 13500.0 530/480/380 1/4 1/2 220~240V 1Ph 50Hz/60Hz 0.39 ARNU123NJA2 Vertical AHU 1 12000.0 10200.0 13500.0 530/480/380 1/4 1/2 220~240V 1Ph 50Hz/60Hz 0.39 ARNU123NJA2 Vertical AHU 1 12000.0 10200.0 13500.0 530/480/380 1/4 1/2 220~240V 1Ph 50Hz/60Hz 0.39 ARNU053TRC2 CASSETTE_4WAY 1 5500.0 3900.0 6100.0 265 / 247 / 212 1/4 1/2 220~240V 1Ph 50Hz/60Hz 0.2 ARNU123NJA2 Vertical AHU 1 12000.0 10200.0 13500.0 530/480/380 1/4 1/2 220~240V 1Ph 50Hz/60Hz 0.39 ARNU123NJA2 Vertical AHU 1 12000.0 10200.0 13500.0 530/480/380 1/4 1/2 220~240V 1Ph 50Hz/60Hz 0.39 ARNU053TRC2 CASSETTE_4WAY 1 5500.0 3900.0 6100.0 265 / 247 / 212 1/4 1/2 220~240V 1Ph 50Hz/60Hz 0.2 ARNU123NJA2 Vertical AHU 1 12000.0 10200.0 13500.0 530/480/380 1/4 1/2 220~240V 1Ph 50Hz/60Hz 0.39 ARNU183NJA2 Vertical AHU 1 18000.0 12800.0 20000.0 580/530/480 1/4 1/2 220~240V 1Ph 50Hz/60Hz 0.39 ARNU053TRC2 CASSETTE_4WAY 1 5500.0 3900.0 6100.0 265 / 247 / 212 1/4 1/2 220~240V 1Ph 50Hz/60Hz 0.2 ARNU053TRC2 CASSETTE_4WAY 1 5500.0 3900.0 6100.0 265 / 247 / 212 1/4 1/2 220~240V 1Ph 50Hz/60Hz 0.2 ARNU053TRC2 CASSETTE_4WAY 1 5500.0 3900.0 6100.0 265 / 247 / 212 1/4 1/2 220~240V 1Ph 50Hz/60Hz 0.2 ARNU123NJA2 Vertical AHU 1 12000.0 10200.0 13500.0 530/480/380 1/4 1/2 220~240V 1Ph 50Hz/60Hz 0.39 ARNU123NJA2 Vertical AHU 1 12000.0 10200.0 13500.0 530/480/380 1/4 1/2 220~240V 1Ph 50Hz/60Hz 0.39 ARNU123NJA2 Vertical AHU 1 12000.0 10200.0 13500.0 530/480/380 1/4 1/2 220~240V 1Ph 50Hz/60Hz 0.39 ARNU123NJA2 Vertical AHU 1 12000.0 10200.0 13500.0 530/480/380 1/4 1/2 220~240V 1Ph 50Hz/60Hz 0.39 ARNU123NJA2 Vertical AHU 1 12000.0 10200.0 13500.0 530/480/380 1/4 1/2 220~240V 1Ph 50Hz/60Hz 0.39 ARNU123NJA2 Vertical AHU 1 12000.0 10200.0 13500.0 530/480/380 1/4 1/2 220~240V 1Ph 50Hz/60Hz 0.39 ARNU053TRC2 CASSETTE_4WAY 1 5500.0 3900.0 6100.0 265 / 247 / 212 1/4 1/2 220~240V 1Ph 50Hz/60Hz 0.2 ARNU073TJC2 CASSETTE_1WAY 1 7500.0 5300.0 8500.0 265/229/212 1/4 1/2 220~240V 1Ph 50Hz/60Hz 0.18
Multi V Outdoor Unit Equipment Schedule
Mark Model Number
Type Quantity Cooling Capacity (BTU/h)
Total Cooling Heating Cooling Fan
Airflow (CFM) Quantity Refrigerant
Piping Connections (in.)
Liquid LP Gas HP Gas
Power Volts Phase Hz MCA
ARUB264BTE4 HR_Multi V IV 1 264000.0 297000.0 10,200×2 2 R410A 3/4 1+1/8 1+3/8 208V/230V 3Ph 60Hz 48.8+40.3
Multi V HR Boxes
Mark Model Number
Quantity Power
Volts Phase Hz RLA PRHR041A 1 208 / 230V 1Ph 60Hz 0.2 PRHR021A 1 208 / 230V 1Ph 60Hz 0.1 PRHR031A 1 208 / 230V 1Ph 60Hz 0.15 PRHR041A 1 208 / 230V 1Ph 60Hz 0.2 PRHR021A 1 208 / 230V 1Ph 60Hz 0.1 PRHR041A 1 208 / 230V 1Ph 60Hz 0.2 PRHR041A 1 208 / 230V 1Ph 60Hz 0.2 PRHR041A 1 208 / 230V 1Ph 60Hz 0.2 PRHR041A 1 208 / 230V 1Ph 60Hz 0.2
HR-1
HR-2
HR-3
HR-4
HR-5
HR-6
HR-7
HR-8
HR-9
CU-1
FCU2-1
FCU2-2
FCU2-3
FCU2-4
FCU2-13
FCU2-14
FCU2-12
FCU2-11
FCU2-10
FCU2-9
FCU2-8
FCU2-7
FCU2-6
FCU2-5
FCU2-15
FCU1-1
FCU1-2
FCU1-11
FCU1-3
FCU1-10
FCU1-12
FCU1-13
FCU1-14
FCU1-9
FCU1-8
FCU1-7
FCU1-5
FCU1-4
FCU1-6
FCU1-15
FCU1-16
INTAKE AND EXHAUST HOOD SCHEDULE
UNIT DESIGNATION EH-1 IH-1 IH-2
LOCATION ROOF ROOF ROOF
SERVICE DRYERS DRYERS RM 208
CFM 800 800 350
LxW (IN.) 36x12 36x12 12x12
HEIGHT (IN.) 9 9 9
SP (IN. OF W.G.) 0.1 0.1 0.1
BASIS OF DESIGN
MANUFACTURER COOK COOK COOK
MODEL 36x12x2TREE 36x12x2TREE 12x12x2TREE
NOTES 1,2 1,2 1,2
NOTES:
1. PROVIDE MANUFACTURER'S ROOF CURB.
2. PROVIDE MANUFACTURER'S BIRD SCREEN.
The Haskell Company l l l Riverside Avenue Jacksonville, Florida 32202 Phone # (904) 791-4500
S
AT
NU
TS
DE T
E OC
A
DR
UG
TSA
ISSUE
A/E PROJECT NO:
CAD FILE NAME:
DESIGNED BY:
DRAWN BY:
EDITED BY:
CHECKED BY:
SCALE: AS NOTED
CONSULTANTS
REBUILD UPH FACILITY
U.S. COAST GUARD BASE
CAPE COD MA
REVIEWED BY: REVIEWED BY: REVIEWED BY:
PROJECT ENG BRANCH CHIEF TECH. DIRECTOR
COMMANDING OFFICER DATE
PROJECT NUMBER DRAWING NUMBER
DISCIPLINE/SHEET NO.
SHEET OF
01-L00011
MECHANICAL
6601680
XXX
01L00011
A01L00011 .dwg
U. S. COAST GUARD
FACILITIES DESIGN &
CONSTRUCTION CENTER
5505 ROBIN HOOD ROAD SUITE K
NORFOLK, VIRGINIA 23513-2431
UNACCOMPANIED PERSONNEL HOUSING
FINAL DESIGN SUBMISSION
- N
OT FOR CONSTRUCTION -
SEPTEMBER 201
A
B
C
1 2 3 4
1 2 3 4
M602
SCHEDULES
DLH
DLH
TJT
M602
M602
Communication Line
# Note :
Power wiring, breaker size, and disconnects shall follow local code or NEC Multi-frame outdoor unit models require a separate power connection for each frame.
Refer to the most current submittal sheets for applicable electrical data.
40.3MCA :
60MOP :
3/208,230V/60HzV,Hz :
48.8
ARUB264BTE4
Combi. : ARUB121BTE4,ARUB144BTE4
Additional refrigerant : 79.82 lbs
PRHR021A
RLA : 0.08
ARNU123NJA2
PREMTB10U
RLA : 0.39
ARNU123NJA2
PREMTB10U
RLA : 0.39
PRHR041A
RLA : 0.16
ARNU123NJA2
PREMTB10U
RLA : 0.39
ARNU123NJA2
PREMTB10U
RLA : 0.39
ARNU183NJA2
PREMTB10U
RLA : 0.39
ARNU073TRC2
PREMTB10U
RLA : 0.20
PRHR021A
RLA : 0.08
ARNU123NJA2
PREMTB10U
RLA : 0.39
ARNU123NJA2
PREMTB10U
RLA : 0.39
PRHR041A
RLA : 0.16
ARNU123NJA2
PREMTB10U
RLA : 0.39
ARNU123NJA2
PREMTB10U
RLA : 0.39
ARNU123NJA2
PREMTB10U
RLA : 0.39
ARNU123NJA2
PREMTB10U
RLA : 0.39
PRHR031A
RLA : 0.12
ARNU123NJA2
PREMTB10U
RLA : 0.39
ARNU123NJA2
PREMTB10U
RLA : 0.39
ARNU053TRC2
PREMTB10U
RLA : 0.20
PRHR041A
RLA : 0.16
ARNU123NJA2
PREMTB10U
RLA : 0.39
ARNU123NJA2
PREMTB10U
RLA : 0.39
ARNU053TRC2
PREMTB10U
RLA : 0.20
ARNU123NJA2
PREMTB10U
RLA : 0.39
PRHR041A
RLA : 0.16
ARNU183NJA2
PREMTB10U
RLA : 0.39
ARNU053TRC2
PREMTB10U
RLA : 0.20
ARNU053TRC2
PREMTB10U
RLA : 0.20
ARNU053TRC2
PREMTB10U
RLA : 0.20
PRHR041A
RLA : 0.16
ARNU123NJA2
PREMTB10U
RLA : 0.39
ARNU123NJA2
PREMTB10U
RLA : 0.39
ARNU123NJA2
PREMTB10U
RLA : 0.39
ARNU123NJA2
PREMTB10U
RLA : 0.39
PRHR041A
RLA : 0.16
ARNU123NJA2
PREMTB10U
RLA : 0.39
ARNU123NJA2
PREMTB10U
RLA : 0.39
ARNU053TRC2
PREMTB10U
RLA : 0.20
ARNU073TJC2
PREMTB10U
RLA : 0.18
Total RLA : 11.79
CU-1
HR-2
HR-1
HR-5
HR-4
HR-3
HR-7
HR-6
HR-9
HR-8
FCU2-1
FCU2-2
FCU2-3
FCU2-4
FCU2-13
FCU2-14
FCU2-12
FCU2-11
FCU2-10
FCU2-9
FCU2-8
FCU2-7
FCU2-6
FCU2-5
FCU2-15
FCU1-1
FCU1-2
FCU1-11
FCU1-3
FCU1-10
FCU1-12
FCU1-13
FCU1-14
FCU1-9
FCU1-8
FCU1-7
FCU1-5
FCU1-4
FCU1-6
FCU1-15
FCU1-16
ARNU123NJA2
( 264.35 kBtu/h )
(12.03 / 10.21 kBtu/h) -- ( 0 %) / -- ( 0 %) kBtu/h
(12.03 / 10.21 kBtu/h) -- ( 0 %) / -- ( 0 %) kBtu/h
(12.03 / 10.21 kBtu/h) -- ( 0 %) / -- ( 0 %) kBtu/h
(12.03 / 10.21 kBtu/h) -- ( 0 %) / -- ( 0 %) kBtu/h
(18.04 / 12.81 kBtu/h) -- ( 0 %) / -- ( 0 %) kBtu/h
(7.52 / 5.40 kBtu/h) -- ( 0 %) / -- ( 0 %) kBtu/h
(12.03 / 10.21 kBtu/h) -- ( 0 %) / -- ( 0 %) kBtu/h
(12.03 / 10.21 kBtu/h) -- ( 0 %) / -- ( 0 %) kBtu/h
(12.03 / 10.21 kBtu/h) -- ( 0 %) / -- ( 0 %) kBtu/h
(12.03 / 10.21 kBtu/h) -- ( 0 %) / -- ( 0 %) kBtu/h
(12.03 / 10.21 kBtu/h) -- ( 0 %) / -- ( 0 %) kBtu/h
(12.03 / 10.21 kBtu/h) -- ( 0 %) / -- ( 0 %) kBtu/h
(12.03 / 10.21 kBtu/h) -- ( 0 %) / -- ( 0 %) kBtu/h
(12.03 / 10.21 kBtu/h) -- ( 0 %) / -- ( 0 %) kBtu/h
(5.51 / 3.90 kBtu/h) -- ( 0 %) / -- ( 0 %) kBtu/h
(12.03 / 10.21 kBtu/h) -- ( 0 %) / -- ( 0 %) kBtu/h
(12.03 / 10.21 kBtu/h) -- ( 0 %) / -- ( 0 %) kBtu/h
(5.51 / 3.90 kBtu/h) -- ( 0 %) / -- ( 0 %) kBtu/h
(12.03 / 10.21 kBtu/h) -- ( 0 %) / -- ( 0 %) kBtu/h
(18.04 / 12.81 kBtu/h) -- ( 0 %) / -- ( 0 %) kBtu/h
(5.51 / 3.90 kBtu/h) -- ( 0 %) / -- ( 0 %) kBtu/h
(5.51 / 3.90 kBtu/h) -- ( 0 %) / -- ( 0 %) kBtu/h
(5.51 / 3.90 kBtu/h) -- ( 0 %) / -- ( 0 %) kBtu/h
(12.03 / 10.21 kBtu/h) -- ( 0 %) / -- ( 0 %) kBtu/h
(12.03 / 10.21 kBtu/h) -- ( 0 %) / -- ( 0 %) kBtu/h
(12.03 / 10.21 kBtu/h) -- ( 0 %) / -- ( 0 %) kBtu/h
(12.03 / 10.21 kBtu/h) -- ( 0 %) / -- ( 0 %) kBtu/h
(12.03 / 10.21 kBtu/h) -- ( 0 %) / -- ( 0 %) kBtu/h
(12.03 / 10.21 kBtu/h) -- ( 0 %) / -- ( 0 %) kBtu/h
(5.51 / 3.90 kBtu/h) -- ( 0 %) / -- ( 0 %) kBtu/h
(7.52 / 5.30 kBtu/h) -- ( 0 %) / -- ( 0 %) kBtu/h
ARUB264BTE4
Additional refrigerant : 79.82 lbs Connection branch pipe : ARCNB21 Combi. : ARUB121BTE4,ARUB144BTE4
ARBLB145213/4:1+1/8:1+3/8
25.0 ft(4)
ARBLB071213/4:7/8:1+1/8
15.0 ft **(4)
PRHR041A3/8:5/8:3/4
20.0 ft(2)
PRHR021A3/8:1/2:5/8
50.0 ft(4)
1/4:1/2
30.0 ft(3)
FCU 2-1
ARNU123NJA21/4:1/2
30.0 ft(3)
FCU 2-2
ARNU123NJA21/4:1/2
30.0 ft(3)
FCU 2-3
ARNU123NJA21/4:1/2
30.0 ft(3)
FCU 2-4
ARNU183NJA21/4:1/2
30.0 ft(3)
FCU 2-13
ARNU073TRC21/4:1/2
25.0 ft(3)
FCU 2-14
PRHR031A1/2:7/8:7/8
14.0 ft **(2)
PRHR041A1/2:3/4:7/8
40.0 ft **(2)
PRHR021A1/2:5/8:3/4
48.0 ft **(4)
ARNU123NJA21/4:1/2
30.0 ft(3)
FCU 2-12
ARNU123NJA21/4:1/2
30.0 ft(3)
FCU 2-11
ARNU123NJA21/4:1/2
30.0 ft(3)
FCU 2-10
ARNU123NJA21/4:1/2
30.0 ft(3)
FCU 2-9
ARNU123NJA21/4:1/2
30.0 ft(3)
FCU 2-8
ARNU123NJA21/4:1/2
30.0 ft(3)
FCU 2-7
ARNU123NJA21/4:1/2
30.0 ft(3)
FCU 2-6
ARNU123NJA21/4:1/2
30.0 ft(3)
FCU 2-5
ARNU053TRC21/4:1/2
30.0 ft(3)
FCU 2-15
ARBLB071215/8:7/8:1+1/8
25.0 ft **(4)
PRHR041A3/8:5/8:3/4
16.0 ft(3)
PRHR041A3/8:1/2:5/8
32.0 ft(2)
ARNU123NJA21/4:1/2
30.0 ft(3)
FCU 1-1
ARNU123NJA21/4:1/2
30.0 ft(3)
FCU 1-2
ARNU053TRC21/4:1/2
15.0 ft(3)
FCU 1-11
ARNU123NJA21/4:1/2
30.0 ft(3)
FCU 1-3
ARNU183NJA21/4:1/2
30.0 ft(3)
FCU 1-10
ARNU053TRC21/4:1/2
50.0 ft(3)
FCU 1-12
ARNU053TRC21/4:1/2
15.0 ft(3)
FCU 1-13
ARNU053TRC21/4:1/2
50.0 ft(3)
FCU 1-14
PRHR041A1/2:7/8:7/8
30.0 ft **(3)
PRHR041A1/2:5/8:3/4
50.0 ft **(2)
ARNU123NJA21/4:1/2
30.0 ft(3)
FCU 1-9
ARNU123NJA21/4:1/2
30.0 ft(3)
FCU 1-8
ARNU123NJA21/4:1/2
30.0 ft(3)
FCU 1-7
ARNU123NJA21/4:1/2
30.0 ft(3)
FCU 1-5
ARNU123NJA21/4:1/2
30.0 ft(3)
FCU 1-4
ARNU123NJA21/4:1/2
30.0 ft(3)
FCU 1-6
ARNU053TRC21/4:1/2
20.0 ft(3)
FCU 1-15
ARNU073TJC21/4:1/2
20.0 ft(3)
FCU 1-16
CU-1
HR-1 HR-2
HR-3 HR-4 HR-5
HR-6 HR-7
HR-8 HR-9
The Haskell Company l l l Riverside Avenue Jacksonville, Florida 32202 Phone # (904) 791-4500
S
AT
NU
TS
DE T
E OC
A
DR
UG
TSA
ISSUE
A/E PROJECT NO:
CAD FILE NAME:
DESIGNED BY:
DRAWN BY:
EDITED BY:
CHECKED BY:
SCALE: AS NOTED
CONSULTANTS
REBUILD UPH FACILITY
U.S. COAST GUARD BASE
CAPE COD MA
REVIEWED BY: REVIEWED BY: REVIEWED BY:
PROJECT ENG BRANCH CHIEF TECH. DIRECTOR
COMMANDING OFFICER DATE
PROJECT NUMBER DRAWING NUMBER
DISCIPLINE/SHEET NO.
SHEET OF
01-L00011
MECHANICAL
6601680
XXX
01L00011
A01L00011 .dwg
U. S. COAST GUARD
FACILITIES DESIGN &
CONSTRUCTION CENTER
5505 ROBIN HOOD ROAD SUITE K
NORFOLK, VIRGINIA 23513-2431
UNACCOMPANIED PERSONNEL HOUSING
FINAL DESIGN SUBMISSION
- N
OT FOR CONSTRUCTION -
SEPTEMBER 201
A
B
C
1 2 3 4
1 2 3 4
M701
VRFSYSTEM
DLH
DLH
TJT
M701
M701
CT
ECM DP
CLG
COIL
SD
M P T H
COIL
DIFFERENTIAL PRESSURE SENSOR
FILTER
FAN
SMOKE DETECTOR
MOTORIZED DAMPER
PRESSURE SENSOR
TEMPERATURE SENSOR
HUMIDITY SENSOR
ELECTRONICALLY COMMUTATED MOTOR
CURRENT SENSOR
LEGEND
M MOTOR
Whole Building Electric Meter.
Enercept Meter H8035
Whole Building Water Meter.
Recordall Disk Meter by Badger Meter
CU-1 Meter.
Enercept Meter H8035
AcquiSuite Data Acquisition Server
OBVIUS
"OBVIUS" OFF-SITE
SERVER
OBVIUS
MODHOPPER
OBVIUS
MODHOPPER
OBVIUS
MODHOPPER
OBVIUS
MODHOPPER
WHOLE BUILDING
GAS METER
OBVIUS
MODHOPPER
POINTS LIST -DOAU UNIT WITH HEAT WHEEL
PHYSICAL POINTS VIRTUAL POINTS
POINT DESCRIPTION
ANALOG
INPUT
BINARY
INPUT
ANALOG
OUTPUT
BINARY
OUTPUT
ALARM
POINT
DISPLAY
ON USER
INTERFACE
CALC'D
VALUE TREND
SUPPLY FAN STATUS X X X
SUPPLY FAN FAN SPEED X
DISCHARGE AIR TEMP LVG COIL X X X
RELIEF AIR HUMIDITY X
DISCHARGE AIR TEMP LVG HGR COIL X X X
OUTSIDE AIR HUMIDITY X X X
FILTER STATUS (3)X X
OA DAMPER END SWITCH X
RELIEF AIR DAMPER X X
OUTSIDE AIR FLOW CFM X X
RELIEF FAN STATUS X X
RELIEF FAN SPEED X X X
PHYSICAL POINTS TOTAL 8 8 2 2
X X
DUCT PRESSURE XX
X
RELIEF TEMP X X X
HEAT WHEEL ON/OFF X X
X
X
X
MM
M
T
OUTSIDE AIR DAMPER X X
RELIEF DAMPER END SWITCH X
X
X
T T
The controls contractor shall provide and install indicated meters, wiring and "Obvius" "ModHopper" trancievers necessary to log the utility usage indicated. All metered data to be transmitted to the Data Acquisition Server over RS-485 network using Modbus (DOAS) protocol.
1. CONTROLS CONTRACTOR TO PROVIDE COMPLETE DIRECT DIGITAL CONTROL (DDC) BUILDING
AUTOMATION SYSTEM (BAS), INTERNET ACCESSIBLE WITH PASSWORD PROTECTION, INCLUDING ALL
HARDWARE, SOFTWARE, AND PROGRAMMING AS REQUIRED TO ACHIEVE HVAC SEQUENCE OF
OPERATION.
2. CONTROLS CONTRACTOR SHALL, THROUGH THE BAS WORKSTATION, PROVIDE A COMPLETE
GRAPHICS PACKAGE DEPICTING BUILDING SYSTEMS INCLUDING EQUIPMENT COMPONENTS, CONTROL POINTS, ALARM STATUS, INTERLOCKS, ETC AS DEFINED BY THE CONTROL DIAGRAMS, POINTS LIST, SEQUENCE OF OPERATION NARRATIVES AND EQUIPMENT INTERLOCK SCHEDULES.
3. UNLESS NOTED OTHERWISE CONTROLS CONTRACTOR PROVIDES ALL CONTROL DEVICES, LINE AND
LOW VOLTAGE WIRING AND CONDUIT ASSOCIATED WITH CONTROL SYSTEM.
4. CONTROLS CONTRACTOR SHALL PROVIDE LOW VOLTAGE WIRING BETWEEN REMOTE VARIABLE SPEED
DRIVES AND EQUIPMENT MOUNTED DISCONNECT SWITCHES. COORDINATE SPECIFIC UNIT
REQUIREMENTS WITH MECHANICAL EQUIPMENT SCHEDULES.
5. ALL EQUIPMENT AND DEVICES SHALL BE INSTALLED PER MANUFACTURER'S UL-LISTED INSTALLATION
INSTRUCTIONS.
6. CONTROLS CONTRACTOR TO COORDINATE WITH TEST AND BALANCE CONTRACTOR AND ESTABLISH
CALIBRATED READINGS FOR ALL AIR MEASUREMENT DEVICES, TEMPERATURE/HUMIDITY AND
PRESSURE DEVICES AND VARIABLE SPEED DRIVES.
7. CONTROLS CONTRACTOR TO COORDINATE WITH EQUIPMENT VENDORS AND PROVIDE REQUIRED
INTERFACING CONTROL DEVICES TO ACHIEVE SEQUENCE OF OPERATION.
8. CONTROLS CONTRACTOR TO PROVIDE ALL ACTUATORS FOR MOTORIZED DAMPERS AND POWER
REQUIRED TO OPERATE. ALL ACTUATORS SHALL BE 24 VAC.
9. CONTROLS CONTRACTOR TO PROVIDE EBTRON GOLD SERIES AIRFLOW MEASURING STATIONS IN
DOAU-1 AND AS INDICATED ON THE CONTROL DIAGRAMS.
10. CONTROLS CONTRACTOR SHALL MAKE AVAILABLE ALL NECESSARY RELATED WORK FORCES AS DIRECTED BY HASKELL FOR THE PURPOSE OF MECHANICAL SYSTEMS START-UP AND COMMISSIONING.
SAID WORK FORCES SHALL COOPERATE FULLY WITH HASKELL, OTHER TRADE PERSONNEL, AND
PROJECT COMMISSIONING AGENTS AND UNTIL SUCH TIME AS THE MECHANICAL SYSTEMS ARE
PROVEN, TO THE SATISFACTION OF HASKELL, TO BE FUNCTIONING IN ACCORDANCE WITH THE
PROJECT DOCUMENTS. CONTROLS CONTRACTOR SHALL PROVIDE FURTHER ASSISTANCE WITH
BUILDING COMMISSIONING WORK BY PROVIDING REQUESTED DOCUMENTATION INCLUDING AS-BUILT
BUILDING AUTOMATION CONTROL SYSTEM SHOP DRAWINGS AND SUBMITTALS, AND OTHER
DOCUMENTATION INCLUDING LEED COMPLIANCE AS DEFINED BY THE PROJECT DOCUMENTS.
11. ALL SET-POINTS SHALL BE ADJUSTABLE FROM THE USER INTERFACE
12. ALL ANALOG OUTPUTS INVOLVED IN THE MODULATION OR VARYING OF SPEED SHALL BE DONE BY PROPORTIONAL-INTEGRAL-DIFFERENTIAL PROGRAM AND SET UP TO BE ABLE TO RESPOND QUICKLY
AND IN A STABLE MANNER TO ACHIEVE THE DESIRED SET-POINT.
13. UNLESS STATED OTHERWISE, ALL SEQUENCES ARE TO DO THE OPPOSITE ACTION WHEN THE INPUT PARAMETER THAT CONTROLS THE DEVICE IS OPPOSITE OR REVERSED. (FOR EXAMPLE, A FAN THAT IS STATED TO TURN ON WHEN THE SPACE TEMPERATURE IS ABOVE 80F, SHALL TURN OFF WHEN THE SPACE TEMPERATURE IS BELOW 80F). WHEN DOING THE OPPOSITE, THERE SHALL BE AN ADJUSTABLE
DEADBAND OF THE INPUT PARAMETERS TO AVOID EXCESSIVE CYCLING.
14. ALL INPUT SIGNALS INDICATED ON THE SEQUENCES OF OPERATION SHALL BE ABLE TO BE
OVERRIDDEN THROUGH THE USER INTERFACE AND DISPLAYED AS OVERRIDDEN WHEN THEY ARE.
15. ALL POINTS INDICATED IN THE SEQUENCE OF OPERATION SHALL BE CAPABLE OF BEING TRENDED
THROUGH THE USER INTERFACE.
16. FOR EACH SEQUENCE OF OPERATION INDICATED WITH A POINTS LIST, SET UP A TREND LOG REPORT
IN BOTH GRAPHICAL AND TABULAR FORMATS FOR EACH POINT INDICATED TO BE TRENDED.
17. THE DDC SYSTEM SHALL BE CAPABLE OF RESTARTING ITSELF, AND RESTORING NORMAL OPERATION
UPON RESTORATION OF POWER, WITHOUT HUMAN INTERVENTION.
18. THE CONTROLS CONTRACTOR SHALL MAP INTO THE MAIN DDC SYSTEM, FROM THE VRF SYSTEM, ALL AVAILABLE POINTS THAT HELP THE OPERATOR UNDERSTAND THE CONDITIONS OF THE SPACES SERVED
AND THE STATE OF THE EQUIPMENT IN THE BUILDING.
19. CONTROLS CONTRACTOR SHALL PROVIDE AND INSTALL ALL CONDUIT FOR CONTROL WIRING.
GENERAL CONTROL NOTES
Supply Fan The supply fan shall modulate to maintain scheduled outside air flowrate as scheduled.
An airflow monitoring station shall be installed in the outside air duct to the unit and an alarm will be generated at the workstation if the reported airflow varies more than 15% from the scheduled outside airflow.
Exhaust/Relief Fan The exhaust fan shall run at constant speed adjusted to meet exhaust and relief rate indicated on drawings.
Cooling Mode When the outside air temp exceeds 55°F, the compressor shall, under its own control, stage as necessary to meet the cooling supply air temperature setpoint of 55F.
Hot Gas Reheat Modulating Hot Gas Reheat shall maintain 70°F. Temperature setpoint shall decreases to 60°F when ambient temperature rises to 75°F.
Heating Mode When the outside air temperature drops below 50°F, the gas heat shall be enabled.
Under the units control, the gas controller shall modulate to maintain a leaving air temperature of 70°F
Heat Wheel Operation When outside air temperatures are between 60°F and 80°F, the wheel shall de-energize to cease heat transfer.
Wheel is not in use bypass dampers shall open.
Alarms Smoke Detection: The DOAS fans shall stop and relief and outside air dampers shall close upon detection of smoke by smoke detector .
ATFP switch: Upon activation of an Emergency Ventilation Shutoff Switch, the unit shall de-energize and outside air and relief dampers shall close. An alarm shall be generated at the workstation.
Dirty Filter: In the event that the pressure drop across any of the three filter banks indicate that the filters are dirty (based on published data for that filter), an alarm will be generated and communicated to the base central workstation.
Freeze protection: In the event that freezing temperatures are detected downstream of the heat wheel on the supply side, the unit shall shut down and outside air and relief dampers shall close. An alarm shall be generated at the workstation.
DOAU-1
A BACnet interface shall be provided to communicate unit points to the BAS.
The controls contractor shall coordinate with the unit manufacturer to ensure all sequences can be met. Whether a function is performed by the BAS system or the Aaon controller is up to the controls contractor.
The unit shall be capable of remote monitoring and control.
In addition to stated sequences, controls contractor shall ensure that all required functionality required to meet ASHRAE 90.1 "mandatory" sections are included
ADVANCED METERING DIAGRAM
OA
PRE FILTER
SUPPLY
AIR
BY
DIV. 26
FINAL
FILTER
SD
RA
SD
DOAS-1 CONTROL DIAGRAM
DX
COIL
LOW LEAKAGE DAMPER TO CLOSE
WHEN EMERGENCY VENTILATION
SHUTOFF SWITCH IS ACTIVATED.
MAXIMUM LEAKAGE TO BE 3
CFM/SQUAREE FOOT @1" DELTA P
ACROSS DAMPER
TO
CONDENSING
UNIT
GAS
HEAT
CT BI-STATUS
BI-FILTER DIFFERENTIAL PRESSURE
H L
BI-FILTER DIFFERENTIAL PRESSURE
BO-OA DAMPER COMMAND
BI-END SWITCH
AI-AIRFLOW MONITORING STATION
T
AI-OUTDOOR AIR TEMPERATURE
H
AI-OUTDOOR AIR HUMIDITY
BY
DIV. 26
H L
BI-FILTER DIFFERENTIAL PRESSURE
BO-OA DAMPER COMMAND
BI-END SWITCH
AI-COIL ENTERING TEMPERATURE
ECM AO-SUPPLY FAN SPEED
M BO-"Bypass Control"
M
CT
ECM
BI-STATUS
AO-EXHAUST/RELIEF FAN SPEED
Ductless Split DAC1-1, DAC1-2, DCA2-1 Unit shall cycle to maintain space temperature setpoint of 75°F
Electric Wall Heaters.
Wall heater shall modulate to maintain space septpoint using unit mounted t-stat.
AI-RELIEF/EXHAUST AIR TEMPERATURE
AI-RELIEF/EXHAUST AIR HUMIDITY
HT
AI-DISCHARGE AIR TEMPERATURE
AI-DUCT PRESSURE(LOCATE 2/3 DOWN DUCT)
H L
AI-LAT
HOT GAS
REHEAT
AI-LAT HGR
The Haskell Company l l l Riverside Avenue Jacksonville, Florida 32202 Phone # (904) 791-4500
S
AT
NU
TS
DE T
E OC
A
DR
UG
TSA
ISSUE
A/E PROJECT NO:
CAD FILE NAME:
DESIGNED BY:
DRAWN BY:
EDITED BY:
CHECKED BY:
SCALE: AS NOTED
CONSULTANTS
REBUILD UPH FACILITY
U.S. COAST GUARD BASE
CAPE COD MA
REVIEWED BY: REVIEWED BY: REVIEWED BY:
PROJECT ENG BRANCH CHIEF TECH. DIRECTOR
COMMANDING OFFICER DATE
PROJECT NUMBER DRAWING NUMBER
DISCIPLINE/SHEET NO.
SHEET OF
01-L00011
MECHANICAL
6601680
XXX
01L00011
A01L00011 .dwg
U. S. COAST GUARD
FACILITIES DESIGN &
CONSTRUCTION CENTER
5505 ROBIN HOOD ROAD SUITE K
NORFOLK, VIRGINIA 23513-2431
UNACCOMPANIED PERSONNEL HOUSING
FINAL DESIGN SUBMISSION
- N
OT FOR CONSTRUCTION -
SEPTEMBER 201
A
B
C
1 2 3 4
1 2 3 4
M702
CONTROLS
DLH
DLH
TJT
M702
M702
Ai rs id e
D riv e, M oo n
To w ns hi p, P en ns yl va ni a
SC
AL
E:
SC
AL
E:
D ig ita lly s ig ne d by
JA
CO
BS
.A
LF
RE
D .A
.JR
.1
D at e:
6.
.0
:3
9:
-0 4'
VALVES AND ACCESSORIES DUCTWORK
PIPING
GENERAL
LEGEND GENERAL NOTES
FDB %RH FDB FWB FDB %RH FDB FWB
70 N/A 13 N/A N/A N/A 81.8 71.1
55 N/A 13 N/A 80 N/A 81.8 71.1
72 N/A 13 N/A 76 50 81.8 71.1
72 N/A 13 N/A 72 N/A 81.8 71.1
72 50 13 N/A 78 50 76.6 73.8
NOTES: 1. OUTDOOR DESIGN CONDITIONS BASED ON ASHRAE'S 99% VALUES FOR OTIS ANGB, MA.
2. ACCEPTABLE RANGE FOR SUMMER AND WINTER INDOOR TEMPERATURE IS +/- 2 FDB.
3. ACCEPTABLE RANGE FOR SUMMER INDOOR RH IS +/- 2% RH.
DESIGN CONDITIONS
HANGAR BAY
SPACE TYPE
WINTER INDOOR WINTER OUTDOOR SUMMER INDOOR
STORAGE ROOMS, JANITOR'S CLOSET,
MECHANICAL ROOM, ELECTRICAL ROOM,
EQUIPMENT ROOMS
PARACUTE DRYING TOWER, GEAR DRYING AREA
TELECOMM
OFFICES, CORRIDORS, RESTROOMS, LOCKER
ROOMS, SHOPS, LUNCH MESS, LAUNDRY, BERTHING
ROOMS, LOBBY
SUMMER OUTDOOR
RECT. ROUND
EF'S - -1.0" W.G. A 6 3
SF'S +2.0"W.G. - A 6 3
GSHP'S, OAHP'S, D'S +2.0"W.G. -1.0" W.G. A 6 3
NOTES: 1. ALL DUCTS TEST PRESSURES SHALL BE 100% OF DUCT PRESSURE CLASS OR AS
LISTED IN SPEC SECTION, "TESTING, ADJUSTING AND BALANCING HVAC SYSTEMS".
DUCT CONSTRUCTION AND LEAK DETECTION SCHEDULE
SUPPLY
DUCT
SYSTEM RETURN/EXHAUST
DUCT
DUCT LEAKAGE CLASSIFICATIONDUCT
SEAL
CLASS.
DUCT PRESSURE CLASS (IN WG)
MOTOR MAX NEMA STARTER
VOLTAGE/PHASE HP SIZE
120/1 1 & LOWER 0
208/1 1 0
208/3 1 0
208/3 3 0
208/3 7.5 1
460/3 5 0
460/3 10 1
460/3 25 2
NOTE: SEE ELECTRICAL PLANS FOR ACTUAL VOLTAGE USED.
MOTOR STARTER SCHEDULE
GENERAL NOTES
GRAPHIC SCALE
MECHANICAL SITE PLAN GEOTHERMAL WELL FIELD PLAN
TYPICAL 8-BOREHOLE CLOSE HEADER DETAIL
NOTES
KEY PLAN
A
B C D F G E
1ST FLR - AREA 'A'
1ST FLR - AREA 'B'
KEY PLAN
A
B C D F G E
ROOM SCHEDULE - AREA B
PLAN NOTES
1ST FLR - AREA 'C'
KEY PLAN
A
B C D F G E
ROOM SCHEDULE - AREA C
1ST FLR - AREA 'D'
KEY PLAN
A
B C D F G E
ROOM SCHEDULE - AREA D
1ST FLR - AREA 'E'
2ND FLR - AREA 'E'
KEY PLAN
A
B C D F G E
A2
1ST FLR - AREA 'F'
KEY PLAN
A
B C D F G E
ROOM SCHEDULE - AREA F
1ST FLR - AREA 'G'
KEY PLAN
A
B C D F G E
ROOM SCHEDULE - AREA G
D
2ND FLR
GRAPHIC SCALE
KEY PLAN
A
B C D F G E
ROOM SCHEDULE - SECOND FOOR AREA B
KEY PLAN
A
B C D F G E
1ST FLR - AREA 'A'
ROOM SCHEDULE - AREA A
1ST FLR - AREA 'B'
KEY PLAN
A
B C D F G E
ROOM SCHEDULE - AREA B
1ST FLR - AREA 'C'
KEY PLAN
A
B C D F G E
ROOM SCHEDULE - AREA C
1ST FLR - AREA 'D'
KEY PLAN
A
B C D F G E
ROOM SCHEDULE - AREA D
DN
1ST FLR - AREA 'E'
GRAPHIC SCALE
2ND FLR - AREA 'E'
KEY PLAN
A
B C D F G E
ROOM SCHEDULE - FIRST FLOOR AND MEZZANINE - AREA E
A2
1ST FLR - AREA 'F'
KEY PLAN
A
B C D F G E
ROOM SCHEDULE - AREA F PLAN NOTES
1ST FLOOR - AREA 'G'
KEY PLAN
A
B C D F G E
ROOM SCHEDULE - AREA G PLAN NOTES
D
SECOND FLOOR PLAN - AREA B
GRAPHIC SCALE
KEY PLAN
A
B C D F G E
ROOM SCHEDULE - SECOND FOOR AREA B
SECTION
DRYING TOWER
SECTION - PARACHUTE
SECTION
SECTION SECTION
GRAPHIC SCALES
ENLARGED PLANS - ROOMS 184, 185, 186 AND 187
ROOM SCHEDULE - FIRST FLOOR AREA E
GRAPHIC SCALE
ENLARGED PLAN - FIRE PUMP BUILDING
DRYING TOWER
ENLARGED PLAN - PARACHUTE
GROUND-SOURCE HEAT PUMP DETAILPIPING DETAIL
HOT WATER UNIT HEATER
HOT WATER COIL PIPING DETAIL
BASE MOUNTED PUMP PIPING DETAIL
PIPE SLEEVE THRU FIRE RATED WALL/PARTITION DETAILEMERGENCY GENERATOR LOUVER
BACK DRAFT DAMPERS AT
ROOM 186 RELIEF LOUVER
BACK DRAFT DAMPERS AT
OAHP-2 AND SF-3 INTAKE LOUVER
MOTORIZED DAMPERS AT
INLINE PUMP PIPING DETAIL
INLINE CENTRIFUGAL FAN MOUNTING DETAIL
TYPICAL BRANCH DUCT
CONNECTION DETAIL
DUCT PENETRATION DETAIL
FLEXIBLE DUCT CONNECTION DETAIL
RETURN GRILLE DETAIL
FILTER/GRILLE DUCT CONNECTION DETAIL
INLINE CENTRIFUGAL CABINET FAN DETAILWALL EXHAUST FAN DETAIL
EXHAUST PIPE THRU FIRE PUMP
BUILDING WALL DETAIL
EXHAUST PIPE THRU WALL DETAIL
SECURITY PENETRATION DETAIL
GAS APPLIANCE/EQUIPMENT…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .