ATT 6 CDR 70Z08420RAA151200 ATC ECITY and CAPE COD.pdf

PDF 161 KB Posted

Attached to
AIR TRAFFIC CONTROL TOWER AND WEATHER OBSERVATION AND AUGMENTATION SERVICES AT USCG AIR STATION ELIZABETH CITY, NC AND USCG AIR STATION CAPE COD, MA
Solicitation number
70Z08420QAA151200
Issued by

About this file

This document contains a contract discrepancy report template and instructions for its completion related to a federal solicitation for air traffic control and weather observation services. The solicitation seeks these services at two U.S. Coast Guard air stations located in Cape Cod, MA and Elizabeth City, NC for a one year base period of performance starting August 1, 2020 through July 31, 2021, with four one-year option periods. The contract will be awarded to the responsible small business bidder whose quote is most advantageous to the government considering price and past performance. This opportunity is reserved as a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses, with a NAICS code of 488111 and size standard of $35.5 million. Quotes must be submitted through www.FedBizOpps.gov by April 21, 2020. The discrepancy report template provides a standard format for documenting any issues with contractor performance under the resulting contract and ensuring proper resolution.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP 70Z08420RAA151200 PAGE 1 OF 3

AIR TRAFFIC CONTROL TOWER SERVICES AND ATTACHMENT #6

WEATHER OBSERVATION AND AUGMENTATION

AT USCG AS BASE CAPE COD & AS CAPE COD, MA

CONTRACT DISCREPANCY REPORT

1. Contract Number 2. Report Serial No. 3. Report # this Discrepancy

4. To: (Contractor and Managers Name) 5. From: (Name of QAE)

DATES

6. Prepared Oral Notification

Returned by Contractor Action Complete

7. Discrepancy or Problem (Describe in detail: include reference to PMS/Directive: attach continuation sheet if needed.

8. Signature of Contracting Officer

9. To: (Contracting Officer) From: (Contractor)

10. Contractor response as to cause, corrective action and actions to prevent recurrence. Attach continuation sheet if needed (Cite applicable QC program procedures(s) or new QC procedures(s).)

11. Signature of Contractor Representative

Date

12. Government Evaluation (Acceptance, rejection: Attach continuation sheet if needed)

13. Government Action (Payment deductions, cure notice, show cause, other)

14. Final Disposition

CLOSE OUT

Name – Title

Signature

Date

Contractor Notified

QAE

Contracting Officer

RFP 70Z08420RAA151200 PAGE 2 OF 3

WEATHER OBSERVATION AND AUGMENTATION

AT USCG AS BASE CAPE COD & AS CAPE COD, MA

PERFORMANCE EVALUATION MEETING RECORD

1. Date of Meeting:_______________________________

2. Persons in Attendance (Representing)

1)_______________________________________ 2)________________________________________

3)_______________________________________ 4)________________________________________

5)_______________________________________ 6)________________________________________

3. Contract Discrepancy Reports Discussed (List):

4. Other Discrepancies, Problems or Topics Discussed (Describe in detail. Attach continuation sheet if needed)

5. Contractor Actions Required. (Attach continuation sheet if needed)

6. Government Actions Required. (Attach continuation sheet if needed)

7. Signature of Contractor’s Project Manager Date

8. Signature of Government Representative Date (Contracting Officer, COTR, or QAE)

RFP 70Z08420RAA151200 PAGE 3 OF 3

WEATHER OBSERVATION AND AUGMENTATION

AT USCG AS BASE CAPE COD & AS CAPE COD, MA

Procedures for Completing the Contract Discrepancy Report (CDR)

1. Contract Number. (Your contract Number)

2. Report Serial Number. Each Contract Discrepancy Report for a particular contract shall be numbered sequentially beginning with the last three digits of your contract number followed by a "-" then 001. Example 029-001

3. Report # this Discrepancy. If this is a reoccurring discrepancy, this is completed by COTR as 1st, 2nd, 3rd, etc.

4. To: (Contractor or Managers Name). Self explanatory.

5. From: (Name of QAE) Contracting Officer's Technical Representative's COTR name or person completing the form.

6. Prepared: The date completed by the COTR.

Oral Notification: The date an oral notification was given.

Returned by Contractor: Date contractor returned form Action Complete: Date Action Complete

7. Discrepancy of Problem: A brief but detailed explanation of the discrepancy bring reported, including references to the section of the Solicitation that is affected. Completed by the COTR.

8. Signature of the Contracting Officer: After COTR completes all required fields, the form is forwarded the MLC-fcp-1 for approval.

9. To: (Contracting Officer) Completed by the Contractor after review of the discrepancy when forwarding back.

From: (Contractor) Name of authorized Contractor Representative

10. Contractor response as to cause, corrective action and actions to prevent recurrence.

A brief but detailed explanation of the Contractor's position including suggested remedies.

Attach a continuation sheet if necessary.

11. Signature of Contractor Representative & Date: Signature of an authorized Contractor representative certifying the Contractor's position with regard to the CDR.

12. Government Evaluation: Comments on the Government's evaluation of the Contractor's recommended course of action. Attach a continuation sheet if necessary.

13. Government Action: Corrective action(s) directed by the government.

14. Final Disposition: To be completed by the Government.

15. Close out: To be completed by the Government.