ATT 5 QASP 70Z08420RAA151200 ATC ECITY and CAPE COD.docx
DOCX document 37 KB Posted
- Solicitation number
- 70Z08420QAA151200
About this file
This document contains a Quality Assurance Surveillance Plan (QASP) for air traffic control and weather observation services at two U.S. Coast Guard air stations. The QASP outlines performance standards and acceptable quality levels for operational errors, record keeping, adherence to instructions, personnel conduct, and weather observation services. It details surveillance methods including direct observation and random sampling to be used by the Contracting Officer's Representative. The QASP also includes templates for documenting acceptable and unacceptable performance.
The related federal contract opportunity is a pre-solicitation notice for air traffic control tower and weather observation and augmentation services at the same two Coast Guard air stations. Services include all labor, equipment, materials, transportation, management and supervision. The base period of performance is one year beginning August 1, 2020 with four one-year options. The solicitation is set aside 100% for Service-Disabled Veteran-Owned Small Businesses with a NAICS code of 488111 and size standard of $35.5 million. The quotation package will be available on FedBizOpps on or about April 21, 2020 with amendments also posted electronically.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| RFQ 70Z08420QAA151200 | ATTACHMENT #5 | |
| QUALITY ASSURANCE SURVEILLANCE PLAN | PAGE 8 OF 8 |
AIR TRAFFIC CONTROL AND WEATHER OBSERVATION SVCS
AT USCG AIR STATION CAPE COD, MA & AIR STATION ELIZABETH CITY, NC
QUALITY ASSURANCE SURVEILLANCE PLAN
For Air Traffic Control and Weather Observation Services, AS Cape Cod and AS Elizabeth City Contract Number: < upon award, enter contract number> Contract Description: Air Traffic Control and Weather Observation Services Contractor’s name: < upon award, enter contractor name > (hereafter referred to as the contractor).
1. PURPOSE.
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
1. What will be monitored.
1. How monitoring will take place.
1. Who will conduct the monitoring.
1. How monitoring efforts and results will be documented.
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance. In addition, the QASP should recognize that unforeseen and uncontrollable situations may occur.
This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor. Updates shall ensure that the QASP remains a valid, useful, and enforceable document. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
The following FAR clauses may apply depending on contract type:
52.246-4 Inspection of Services – Fixed-Price,
2. GOVERNMENT ROLES AND RESPONSIBILITIES.
The following personnel shall oversee and coordinate surveillance activities.
a. Contracting Officer’s Representative (COR) - The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Assigned CO: Danielle Tonsel Organization or Agency: USCG SILC COB2E Telephone: (757) 628-4120 Email: Danielle.e.tonsel@uscg.mil
b. Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. At the conclusion of the contract or when requested by the CO, the COR shall provide documentation to the CO. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. The contractor shall refer any changes they deem may affect contract price, terms, or conditions to the CO for action.
AS Cape Cod Assigned COR: Anthony Hylinski Telephone: 508-968-6674 Email: anthony.p.hylinski@uscg.mil
AS Elizabeth City Assigned COR: Robert Popp Telephone: 252-334-5388 Email: robert.a.popp@uscg.mil
3. CONTRACTOR REPRESENTATIVES:
The following employees of the contractor serve as the contractor’s representatives for this contract.
a. Program Manager - <upon award, enter name> Telephone: <enter number> Email: <enter address>
b. Other Contractor Personnel - <upon award, enter name or delete these lines if not applicable> Title: Air Traffic Manager, ASCC Telephone: <enter number> Email: <enter address>
c. Other Contractor Personnel - <upon award, enter name or delete these lines if not applicable> Title: Air Traffic Manager, ASEC Telephone: <enter number> Email: <enter address>
4. PERFORMANCE STANDARDS.
Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards.
The Performance Requirements Summary, attachment 1 of the Performance Work Statement (PWS) includes performance standards. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the Acceptable Quality Level (AQL).
5. INCENTIVES.
There are currently no incentives applicable to this contract.
6. METHODS OF QUALITY ASSURANCE SURVEILLANCE.
Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.
Regardless of the surveillance method, the COR shall always contact the contractor's on-site representative when a defect is identified and inform the manager of the specifics of the problem. The COR, with assistance from the CO, if needed, shall be responsible for monitoring the contractor’s performance in meeting a specific performance standard/AQL.
a. DIRECT OBSERVATION. 100% surveillance for work performed under section 3 of the Performance Work Statement. This may include direct monitoring of frequencies, recording reviews and feedback from pilots/users.
b. RANDOM SAMPLING. The COR shall perform a periodic review of non-proprietary records and facility inspection for compliance with the PWS; this will be accomplished at least annually at the discretion of the COR.
Surveillance results may be used as the basis for actions (to include payment deductions) against the contractor. In such cases, the Inspection of Services clause in the Contract becomes the basis for the CO’s actions.
| RFQ 70Z08420RAA151200 | ATTACHMENT #5 | |
| QUALITY ASSURANCE SURVEILLANCE PLAN | PAGE 2 OF 8 |
AIR TRAFFIC CONTROL AND WEATHER OBSERVATION SVCS
AT USCG AIR STATION CAPE COD, MA & AIR STATION ELIZABETH CITY, NC
PAGE 2/8
7. QUALITY ASSURANCE SURVEILLANCE PLAN TABLE
| Work Requirement — |
| Weight |
| Performance Standard per PWS Sections |
| AQL |
| Method of Surveillance |
| Operational Error Resulting in a Class A,B,C,D, or E Mishap |
| 40% |
| PWS Sec: 4.0 and 5.3 |
| 100% |
| COR |
| Operational Error with no Class A,B,C,D or E Mishap |
| 10% |
| PWS Sec: 4.0, 5.1 and 5.4 |
| 100% |
| COR/Customer Complaint |
| Record Keeping Accuracy |
| 10% |
| FAAH 7210.3 and PWS Sec: 4.2 and 5.5 |
| 95% |
| COR |
| Adherence to USCG, FAA Instructions and Local Operating Procedures |
| 10% |
| PWS Sec: 5.7.1, 5.15.4 and 7.2.7 |
| 95% |
| COR/Customer Complaint |
| Conduct of Personnel |
| 10% |
| PWS Sec: 7.2.6 |
| 95% |
| COR/Customer Complaint |
| Accurate Weather Observation and Augmentation Services |
| 20% |
| PWS Sec: 5.0 |
| 95% |
| COR/Customer Complaint |
8. RATINGS.
Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral, or negative outcome. The following ratings shall be used:
| EXCEPTIONAL: |
| Performance significantly exceeds contract requirements to the Government’s benefit. |
| SATISFACTORY: |
| Performance meets contractual requirements. |
| UNSATISFACTORY: |
| Performance does not meet contractual requirements. |
9. DOCUMENTING PERFORMANCE.
a. ACCEPTABLE PERFORMANCE.
The Government shall document positive performance. A report template is attached. Any report may become a part of the supporting documentation for fixed fee payments, award fee payments, or other contractual actions.
b. UNACCEPTABLE PERFORMANCE.
When unacceptable performance occurs, the COR shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the COR shall document the discussion and place it in the COR file.
When the COR determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR), and present it to the contractor's program manager or on-site representative. A CDR template is attached to this QASP.
The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the COR. The Government shall review the contractor's corrective action plan to determine acceptability.
Any CDRs may become a part of the supporting documentation for contract payment deductions, fixed fee deductions, award fee nonpayment, or other contractual actions deemed necessary by the CO.
10. FREQUENCY OF MEASUREMENT.
a. Frequency of Measurement.
During contract/order performance, the COR will periodically analyze whether the negotiated frequency of surveillance is appropriate for the work being performed.
b. Frequency of Performance Assessment Meetings.
The COR shall meet with the contractor annually to assess performance and shall provide a written assessment.
Contracting Officer’s Representative Date
PERFORMANCE REPORT
1. CONTRACT NUMBER: <insert number>
2. Prepared by: (Name of COR) Heath A. Brown
3. Date and time of observation:
4. Observation:
<Examples of items to include in a report are:
- Method of surveillance.
- How frequently you conducted surveillance.
- Surveillance results.
- Number of observations.>
Prepared by: Heath Brown
| ________________________________________ | ________________ |
| Contracting Officer’s Representative | Date |
CONTRACT DISCREPANCY REPORT (CDR)
1. Contract Number: <insert number>
2. TO: (Contractor Program Manager, Task Manager or on-site representative) <insert name>
3. FROM: (Name of COR) Heath A. Brown
4. Date and time observed discrepancy:
5. DISCREPANCY OR PROBLEM:
<Describe in detail. Identify any attachments.>
6. Corrective action plan:
A written corrective action plan < is / is not > required.
< If a written corrective action plan is required include the following. > The written Corrective Action Plan will be provided to the undersigned not later than < # days after receipt of this
CDR. >
Prepared by: Heath Brown
| _______________________________________ | ________________ |
| Contracting Officer’s Representative | Date |
Received by:
Contractor Program Manager, Task Manager or Date on-site representative
File details come from the government source that posted it. Updated .