Final_Zone_1_Base.xlsx
XLSX spreadsheet 14 KB Posted
- Solicitation number
- 70Z08418RBHQ00500
About this file
This document includes a continuation sheet and federal contract opportunity notice. The continuation sheet outlines estimated costs for overhaul, color change, additional work items, disposal, and transportation of buoys within Zone 1 of District 13 for the base period of November 1, 2018 through October 31, 2019. Services include overhaul, inspection and repair of various buoy types, replacement of plating, battery pocket work, installation of new towers and equipment, modification of serial numbers, outfitting of sound signals, color changes, disposal, and transportation between locations including the contractor's facility and ports in Oregon and Washington. The federal contract opportunity notice seeks proposals for overhaul and maintenance repair of aids to navigation buoys and parts within Zones 1, 2, 3 and 4 corresponding to Districts 13, 11, 1, 5 and 14. The anticipated period of performance is a base year plus four one-year options beginning around October 1, 2018. The contractor must be able to transport, overhaul, upgrade and outfit buoys at their facility. The solicitation package was expected to be available on May 23, 2018. Awards will be made to the responsible offeror with the most advantageous technical, past performance and priced proposal. This is a partial small business set-aside.
ATTACHMENT 1, Schedule - Zone 1, Base
View the file
Other files
Show 40 more
Latest 50 of 116 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| CONTINUATION SHEET FOR: REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE 1 of 15 |
| STANDARD FORM 1449 70Z08418RBHQ00500 (AMENDMENT 0002) ATTACHMENT 1 |
| ZONE 1 |
| BASE PERIOD - 1 NOV 2018 (or date of award) - 31 OCT 2019 |
| CLIN | DESCRIPTION | EST QTY | U/I | UNIT PRICE | TOTAL |
| 0001 | OVERHAUL SERVICES | ||||
| 0001AA | 9X35LWR | 2 | EA | ||
| 0001AB | 9X32LR and 9X32LBR Buoys | 1 | EA | ||
| 0001AC | 9X20BR/GR Buoy | 1 | EA | ||
| 0001AD | 8X26LBR, 8X26LGR, 8X26LR, 8X26LWR Buoy | 13 | EA | ||
| 0001AE | 8X21LBR and 8X21LR Buoy | 2 | EA | ||
| 0001AF | 7X20LI Buoy | 1 | EA | ||
| 0001AG | 7X17LR Buoy | 1 | EA | ||
| 0001AH | 6X20LBR and 6X20LR Buoy | 6 | EA | ||
| 0001AJ | 5X11LNR and 5X11LCR | 1 | EA | ||
| 0001AK | 1NR and 1CR Buoys | 1 | EA | ||
| 0001AL | 2NR and 2CR Buoys | 6 | EA | ||
| 0001AM | 3NR and 3CR Buoys | 1 | EA | ||
| 0001AN | 5NR and 5CR Buoys | 1 | EA | ||
| 0001AP | 3NI and 3CI Buoys | 1 | EA | ||
| 0001AQ | 5NI and 5CI Buoys | 1 | EA | ||
| 0001AR | 5X9LFR | 1 | EA | ||
| 0001AS | 2NFR and 2CFR Buoy | 1 | EA | ||
| 0001AT | 3NFR and 3CFR Buoy | 1 | EA | ||
| 0001AU | 4NFR and 4CFR Buoy | 1 | EA | ||
| 0002 | COLOR CHANGE | ||||
| 0002AA | 9X35LWR | 1 | EA | ||
| 0002AB | 9X32LR and 9X32LBR Buoys | 1 | EA | ||
| 0002AC | 9X20BR/GR Buoy | 1 | EA | ||
| 0002AD | 8X26LBR, 8X26LGR, 8X26LR, 8X26LWR Buoy | 1 | EA | ||
| 0002AE | 8X21LBR and 8X21LR Buoy | 1 | EA | ||
| 0002AF | 7X20LI Buoy | 1 | EA | ||
| 0002AG | 7X17LR Buoy | 1 | EA | ||
| 0002AH | 6X20LBR and 6X20LR Buoy | 1 | EA | ||
| 0002AJ | 5X11LNR and 5X11LCR | 1 | EA | ||
| 0002AK | 1NR and 1CR Buoys | 1 | EA | ||
| 0002AL | 2NR and 2CR Buoys | 1 | EA | ||
| 0002AM | 3NR and 3CR Buoys | 1 | EA |
| CONTINUATION SHEET FOR: REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE 2 of 15 |
| STANDARD FORM 1449 70Z08418RBHQ00500 (AMENDMENT 0002) ATTACHMENT 1 |
| ZONE 1 |
| BASE PERIOD - 1 NOV 2018 (or date of award) - 31 OCT 2019 |
| 0002AN | 5NR and 5CR Buoys | 1 | EA |
| 0002AP | 3NI and 3CI Buoys | 1 | EA |
| 0002AQ | 5NI and 5CI Buoys | 1 | EA |
| 0003 | ADDITIONAL WORK ITEMS | ||
| 0003AA | REPLACE 1 SQFT BUOY BODY PLATING | 100 | SF |
| 0003AB | INSPECT AND REPAIR BATTERY POCKETS | 6 | EA |
| 0003AC | PERMANENTLY CLOSE BATTERY POCKETS | 10 | EA |
| 0003AD | INSTALL NEW TOWER | 2 | EA |
| 0003AE | 7X20LI CONVERSION TO 7X20LIR | 20 | EA |
| 0003AF | INSTALL LIFTING EYE / MOORING EYE ON LIGHTED BUOY | 1 | EA |
| 0003AG | INSTALL MOORING ARM | 6 | EA |
| 0003AH | INSTALL COUNTERWEIGHT TUBES | 1 | EA |
| 0003AJ | SERIAL NUMBER MODIFICATION | 50 | EA |
| 0003AK | OUTFIT SOUND SIGNAL | 4 | EA |
| 0004 | DISPOSAL | ||
| 0004AA | 9X35LWR | 1 | EA |
| 0004AB | 9X32LR and 9X32LBR Buoys | 1 | EA |
| 0004AC | 9X20BR/GR Buoy | 1 | EA |
| 0004AD | 8X26LBR, 8X26LGR, 8X26LR, 8X26LWR Buoy | 1 | EA |
| 0004AE | 8X21LBR and 8X21LR Buoy | 1 | EA |
| 0004AF | 7X20LI Buoy | 1 | EA |
| 0004AG | 7X17LR Buoy | 1 | EA |
| 0004AH | 6X20LBR and 6X20LR Buoy | 1 | EA |
| 0004AJ | 5X11LNR and 5X11LCR | 1 | EA |
| 0004AK | 1NR and 1CR Buoys | 1 | EA |
| 0004AL | 2NR and 2CR Buoys | 1 | EA |
| 0004AM | 3NR and 3CR Buoys | 1 | EA |
| 0004AN | 5NR and 5CR Buoys | 1 | EA |
| 0004AP | 3NI and 3CI Buoys | 1 | EA |
| 0004AQ | 5NI and 5CI Buoys | 1 | EA |
| 0005 | TRANSPORTATOIN OF BUOYS | ||
| 0005AA | Contractor’s Facility to/from Tongue Point Astoria | 33 | TRIP |
| 0005AB | Contractor’s Facility to/from Naval Station Everett | 21 | TRIP |
| 0005AC | Contractor’s Facility to/from MSU Portland | 7 | TRIP |
| 0005AD | Contractor’s Facility to/from Sector Puget Sound | 1 | TRIP |
| CONTINUATION SHEET FOR: REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE 3 of 15 |
| STANDARD FORM 1449 70Z08418RBHQ00500 (AMENDMENT 0002) ATTACHMENT 1 |
| ZONE 1 |
| BASE PERIOD - 1 NOV 2018 (or date of award) - 31 OCT 2019 |
| 0005AE | Naval Base Everett to/from Tongue Point Astoria | 3 | TRIP |
| 0005AF | MSU Portland to/from Tongue Point Astoria | 1 | TRIP |
| 0005AG | Sector Puget Sound to/from Tongue Point Astoria | 1 | TRIP |
| 0005AH | MSU Portland to/from Naval Station Everett | 1 | TRIP |
| 0005AJ | Sector Puget Sound to/from Naval Station Everett | 1 | TRIP |
| 0005AK | Sector Puget Sound to/from MSU Portland | 1 | TRIP |
| 0005AL | Tongue Point Astoria to/from Port of Astoria | 1 | TRIP |
| 0005AM | Tongue Point Astoria to/from Port of Aberdeen WA | 2 | TRIP |
| 0005AN | Tongue Point Astoria to/from Port of Coos Bay OR | 1 | TRIP |
| 0005AP | Tongue Point Astoria to/from Port of Newport, OR | 1 | TRIP |
| ESTIMATED BASE PERIOD TOTAL - ZONE 1 |
File details come from the government source that posted it. Updated .