Annex_1_to_SSJ_(La_Puntilla)_Final_Drawing_(6_SEP_18).pdf

PDF 339 KB Posted

Attached to
CCTV Security System Services
Solicitation number
70Z08418QBB700800
Issued by

About this file

Annex 1 to SSJ Final Drawing

View the file

Other files

File Type Posted
A0004.docx DOCX document
RBH_CCTV_Drawing_Final_(6_SEP_18)(2).pdf PDF
SSJ_Drawing_Final_(6_SEP_18).pdf PDF
Annex_1_to_RBH_Final_Drawing_(6_SEP_18).pdf PDF
Annex_1_to_SSJ_(La_Puntilla)_Drawing_(6_SEP_18).docx.pdf PDF
A0003.docx DOCX document
RBH_CCTV_Drawing_(6_SEP_18).ppt PPT presentation
Attachment_1_revised_Sector_San_Juan.docx DOCX document
Annex_1_to_RBH_Drawing_(6_SEP_18).pdf PDF
Revised_Pgs_6_and_8_of_RFQ.docx DOCX document
Attachment_2__revised_Rio_Bayamon_Housing.docx DOCX document
SSJ_Drawing_(6_SEP_18).pdf PDF
SSJ_Drawing_rev__(4_SEP_18).pdf PDF
Q_and_R_document_dtd_5_Sept_2018.docx DOCX document
Annex_1_to_RBH_revised_Drawing_(4_SEP_18).pdf PDF
Annex_1_to_SSJ_(La_Puntilla)_revised_Drawing_(4_SEP_18).pdf PDF
RBH_CCTV_revised_Drawing_(4_SEP_18).pdf PDF
Q_and_R_document_dtd_4_Sept_2018.docx DOCX document
A0002.docx DOCX document
Drawings.pdf PDF
A0001.docx DOCX document
Solicitation_dtd_24_August_2018.doc DOC document
Past_Performance_Work_Sheet.docx DOCX document
Attachment_1_Sector_San_Juan.docx DOCX document
Attachment_2__Rio_Bayamon_Housing.docx DOCX document
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Annex 1, to SSJ (La Puntilla) Camera Placement Drawing (6 SEP 18)

One PTZ Camera on Existing pole (Total Cameras = 8ea)

One PTZ Camera mounted in New pole in Pier A (Contractor provides pole and installation)

(Total Camera = 1ea)

One Fixed Camera (Wall Mounted)(Total Cameras = 9ea)

Fixed cameras on existing Pole (1 Camera per pole)(Total Camera = 1ea)

PTZ Wall Mounted (Total Cameras = 2ea)

One PTZ and one fixed camera (Total cameras = 2 PTZ Mini Dome and 2 Fixed Cameras)

Trenching Executed by USCG SSJ Engineering. Contractor required to lay tubing (approximately – 70

Feet, Scheduled 80, PVC. 1 ½” tubing), and cabling approximately – 95’ Feet) from Manhole to Pole.

NVR Installation Location

Projected Wireless Antennas Locations

Total Fixed Cameras (Wall Mounted - Mini Dome) – 9ea

Total Fixed Cameras (Wall Mounted - Box) – 1ea

PTZ Cameras (Wall mounted - Mini Dome) – 2ea

PTZ Cameras (Pole Mounted - Mini Dome) – 11ea

New Poles (2)

SSJ Engineering Division will execute trenching in Pole area Near Q1