Revised_Pgs_6_and_8_of_RFQ.docx

DOCX document 17 KB Posted

Attached to
CCTV Security System Services Federal contract opportunity
Solicitation number
70Z08418QBB700800
Issued by
Department of Homeland Security US Coast Guard

About this file

Revised Pages 6 and 8 of RFQ

View the file

Other files for this federal contract opportunity

Other files attached to CCTV Security System Services, newest first.
File Type Posted
A0004.docx DOCX document
SSJ_Drawing_Final_(6_SEP_18).pdf PDF
Annex_1_to_RBH_Final_Drawing_(6_SEP_18).pdf PDF
Annex_1_to_SSJ_(La_Puntilla)_Final_Drawing_(6_SEP_18).pdf PDF
RBH_CCTV_Drawing_Final_(6_SEP_18)(2).pdf PDF
SSJ_Drawing_(6_SEP_18).pdf PDF
Attachment_2__revised_Rio_Bayamon_Housing.docx DOCX document
RBH_CCTV_Drawing_(6_SEP_18).ppt PPT presentation
Attachment_1_revised_Sector_San_Juan.docx DOCX document
Annex_1_to_RBH_Drawing_(6_SEP_18).pdf PDF
Annex_1_to_SSJ_(La_Puntilla)_Drawing_(6_SEP_18).docx.pdf PDF
A0003.docx DOCX document
Annex_1_to_SSJ_(La_Puntilla)_revised_Drawing_(4_SEP_18).pdf PDF
Annex_1_to_RBH_revised_Drawing_(4_SEP_18).pdf PDF
Q_and_R_document_dtd_5_Sept_2018.docx DOCX document
RBH_CCTV_revised_Drawing_(4_SEP_18).pdf PDF
SSJ_Drawing_rev__(4_SEP_18).pdf PDF
Q_and_R_document_dtd_4_Sept_2018.docx DOCX document
A0002.docx DOCX document
Drawings.pdf PDF
A0001.docx DOCX document
Solicitation_dtd_24_August_2018.doc DOC document
Attachment_2__Rio_Bayamon_Housing.docx DOCX document
Attachment_1_Sector_San_Juan.docx DOCX document
Past_Performance_Work_Sheet.docx DOCX document
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTINUATION SHEET FOR:

STANDARD FORM 1449

REFERENCE NO. OF DOCUMENT BEING CONTINUED
PAGE

70Z08418QBB700800

STATEMENT OF WORK

1.0 GENERAL

1. 1 Background The U.S. Coast Guard (USCG) has identified a requirement for a vendor to provide and install the U.S. Coast Guard IP based wireless Closed Circuit Television (CCTV) systems at Rio Bayamon Housing and Sector San Juan. The existing CCTV system at San Juan was installed by Honeywell and currently is not supported by a Service Maintenance Agreement. The system was severely affected by Hurricane Maria.

1. 2 Scope Work under this order shall consist of the effort required to replace the IP based CCTV system installed at the USCG’s San Juan Base located in San Juan, Puerto Rico and Rio Bayamon Housing located in 500 Road 177, Bayamon, Puerto Rico. The surveillance system and network shall be standalone from the existing base infrastructure and capable of seamless integration with electronic Access Control systems (ACS) and Intrusion Detection systems (IDS) that may be considered for future expansion. Contractor is to provide and install the systems providing goods, equipment, designs, and work covered by this Scope of Work.

2.0 PERIOD OF PERFORMANCE.

A post award meeting will be conducted within five business days of date of award. The Contractor shall provide a list of equipment, systems, circuits, components, piping, and valves that require isolation so that tag-outs/lock outs can be accomplished (see paragraph 5.5.5) within 5 business days following the post award meeting. Installation shall commence within 10 business days following the Government’s confirmation of receipt of the list of items above. The period of performance of the first installation shall be forty-five (45) days from that date for installation of the CCTV system. Testing shall be scheduled at least 14 business days prior to the end of installation and shall occur within 2 business days of completion of installation. The second installation (CLINS 0002) shall be completed within 90 days from date of exercising the CLIN. Should both CLINs be exercised at the same time, the installation of both shall be completed within 120 days from date of exercise.

3.1 Reserved

3.2 Access to Government Facilities and Services.

The Government will provide access to the base facilities for the Contractor as required in the performance of the tasks identified in this SOW to include: restroom use, site and building electrical power as currently available, security response, and fire protection.

4.0 Contractor Furnished Property

The Contractor shall furnish all materials, equipment, and labor, including safety related processes and materials, necessary to fulfill the requirements of this contract.

5.0 REQUIREMENTS.

The installation shall be executed in two parts (Part 1: Main Base, Part 2: Bayamon Housing). Part 1 shall commence upon the award of the contract and Part 2 may be exercised at any point

CONTINUATION SHEET FOR:

STANDARD FORM 1449

REFERENCE NO. OF DOCUMENT BEING CONTINUED
PAGE

70Z08418QBB700800

PMCL655, 55" 1080P LED MONITOR
1
PELCO
VMPL3-B, SANUS 65 INCH CEILING MOUNT
1
SANUS
CAMERA POLES, 20’ 4”X4”, GAUGE 11
2
N/A
PS-5AC, PRISM AC WIRELESS TX/RX
6
UBIQUITI
PRISMAP5, PRISM AP 5 ANTENNA
6
UBIQUITI
LBE-5AC-GEN2, LIGHTBEAM GEN2
12
UBIQUITI
TS-8-PRO, 8 PORT TOUGH SWITCH
10
UBIQUITI
TS-5-CARRIER, 16 PORT TOUGH SWITCH RACK
1
UBIQUITI
FE7319-45-02K, 7’ ENCLOSED RACK MEXH DOOR
1
QUEST
TC-CARRIER, TOUGH OUTDOOR NETWORK CABLE
3
UBIQUITI
CAT5E-DB-POWDER, CAT5E 1000FT DIRECT BURIAL POW
6
N/A
TC-CON-100, 100CT TOUGH NETWORK CONNECTOR
2
UBIQUITI
80’ TUBING, PVC PLASTIC 1½”, SCHEDULE 80
1
N/A
100’ CABLE ELECTRIC, 10 RHW GREEN
1
N/A
100’ CABLE ELECTRIC, 10 RHW WHITE
1
N/A
100’ CABLE ELECTRIC, 10 RHW BLACK
1
N/A
BUCKET TRUCK RENTAL
1
N/A

5.1.3 Equipment upgrades and additions provided and installed by the Contractor shall include:

A. Base supplied power is to be utilized, and the system is backed up by a network monitored UPS system with extended battery pack.

B. The contractor will install tubing and cabling to run power to pole located near Building 1 (Quarters 1) approximately 80”.

C. Equipment shall be housed and located in area designated by the Command Security Officer. A wall mounted equipment enclosure shall secure power supplies and network switches.

D. Contractor shall provide two poles and its installation work to include power hook up for each camera.

E. All cameras will be monitored in the facilities main entrance guardhouse.

F. DVR is ready for network operations for remote access. If connection is required, customer will provide broadband network connection and all required IP addresses, for programming.

G. All items are required a minimum of one (1) year warranty.

H. All new poles require the installation of new bases.

5.1.4 The government will provide:

A. 110 VAC power at each camera location, except for pole located in vicinity Building 1 (Quarters 1). There the government will open a 80’ trench and the contractor will install tubing and cabling to run power. After the tubing and cabling, the government will cover the trench and restore the greens areas, as needed.

B. The government will need to approve, in advance, any work that will require additional expenses.

C. The government will approve, in advance, the procurement and Installation of any additional poles, if required.