Annex_1_to_SSJ_(La_Puntilla)_Drawing_(6_SEP_18).docx.pdf

PDF 339 KB Posted

Attached to
CCTV Security System Services
Solicitation number
70Z08418QBB700800
Issued by

About this file

Revised SSJ Drawing

View the file

Other files

File Type Posted
A0004.docx DOCX document
RBH_CCTV_Drawing_Final_(6_SEP_18)(2).pdf PDF
SSJ_Drawing_Final_(6_SEP_18).pdf PDF
Annex_1_to_RBH_Final_Drawing_(6_SEP_18).pdf PDF
Annex_1_to_SSJ_(La_Puntilla)_Final_Drawing_(6_SEP_18).pdf PDF
A0003.docx DOCX document
RBH_CCTV_Drawing_(6_SEP_18).ppt PPT presentation
Attachment_1_revised_Sector_San_Juan.docx DOCX document
Annex_1_to_RBH_Drawing_(6_SEP_18).pdf PDF
Revised_Pgs_6_and_8_of_RFQ.docx DOCX document
Attachment_2__revised_Rio_Bayamon_Housing.docx DOCX document
SSJ_Drawing_(6_SEP_18).pdf PDF
SSJ_Drawing_rev__(4_SEP_18).pdf PDF
Q_and_R_document_dtd_5_Sept_2018.docx DOCX document
Annex_1_to_RBH_revised_Drawing_(4_SEP_18).pdf PDF
Annex_1_to_SSJ_(La_Puntilla)_revised_Drawing_(4_SEP_18).pdf PDF
RBH_CCTV_revised_Drawing_(4_SEP_18).pdf PDF
Q_and_R_document_dtd_4_Sept_2018.docx DOCX document
A0002.docx DOCX document
Drawings.pdf PDF
A0001.docx DOCX document
Solicitation_dtd_24_August_2018.doc DOC document
Past_Performance_Work_Sheet.docx DOCX document
Attachment_1_Sector_San_Juan.docx DOCX document
Attachment_2__Rio_Bayamon_Housing.docx DOCX document
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Annex 1, to SSJ (La Puntilla) Camera Placement Drawing (6 SEP 18)

One PTZ Camera on Existing pole (Total Cameras = 8ea)

One PTZ Camera mounted in New pole in Pier A (Contractor provides pole and installation)

(Total Camera = 1ea)

One Fixed Camera (Wall Mounted)(Total Cameras = 9ea)

Fixed cameras on existing Pole (1 Camera per pole)(Total Camera = 1ea)

PTZ Wall Mounted (Total Cameras = 2ea)

One PTZ and one fixed camera (Total cameras = 2 PTZ Mini Dome and 2 Fixed Cameras)

Trenching Executed by USCG SSJ Engineering. Contractor required to lay tubing (approximately – 70

Feet, Scheduled 80, PVC. 1 ½” tubing), and cabling approximately – 95’ Feet) from Manhole to Pole.

NVR Installation Location

Projected Wireless Antennas Locations

Total Fixed Cameras (Wall Mounted - Mini Dome) – 9ea

Total Fixed Cameras (Wall Mounted - Box) – 1ea

PTZ Cameras (Wall mounted - Mini Dome) – 2ea

PTZ Cameras (Pole Mounted - Mini Dome) – 11ea

New Poles (2)

SSJ Engineering Division will execute trenching in Pole area Near Q1