Annex 1, to SSJ (La Puntilla) Camera Placement Drawing (6 SEP 18)
One PTZ Camera on Existing pole (Total Cameras = 8ea)
One PTZ Camera mounted in New pole in Pier A (Contractor provides pole and installation)
(Total Camera = 1ea)
One Fixed Camera (Wall Mounted)(Total Cameras = 9ea)
Fixed cameras on existing Pole (1 Camera per pole)(Total Camera = 1ea)
PTZ Wall Mounted (Total Cameras = 2ea)
One PTZ and one fixed camera (Total cameras = 2 PTZ Mini Dome and 2 Fixed Cameras)
Trenching Executed by USCG SSJ Engineering. Contractor required to lay tubing (approximately – 70
Feet, Scheduled 80, PVC. 1 ½” tubing), and cabling approximately – 95’ Feet) from Manhole to Pole.
NVR Installation Location
Projected Wireless Antennas Locations
Total Fixed Cameras (Wall Mounted - Mini Dome) – 9ea
Total Fixed Cameras (Wall Mounted - Box) – 1ea
PTZ Cameras (Wall mounted - Mini Dome) – 2ea
PTZ Cameras (Pole Mounted - Mini Dome) – 11ea
New Poles (2)
SSJ Engineering Division will execute trenching in Pole area Near Q1