B53 Boiler Ques and Answer v.2_Posted June 28.pdf

PDF 150 KB Posted

Attached to
Steam Boiler Installation at USCG BASE Elizabeth City
Solicitation number
70Z08124Q00000142
Issued by

About this file

This document is a set of Questions and Answers (Q&A) related to a solicitation for the installation of a steam boiler at the USCG Base in Elizabeth City, North Carolina. The key details are:

The solicitation number is 70Z08124Q00000142 for the "B53 Boiler Installation Project" at the USCG Base in Elizabeth City, NC. The contractor will be responsible for providing all labor, supervision, tools, equipment, material, transportation, fees, permits, licenses, and insurance necessary to install the new steam boiler. The solicitation is a 100% Small Business set-aside under NAICS code 238220, with an estimated cost range between $30,000 to $34,000. Quotes must be submitted by noon on 07/03/2024 via email to the Contracting Specialist. The Q&A addresses details related to the startup and warranty of the boiler, the condition of the existing equipment, and the need for a chemical treatment system. The Government reserves the right to cancel the solicitation.

View the file

Other files

File Type Posted
B53 Boiler Q and A v3.pdf PDF
B53 Boiler project Q A.docx DOCX document
DAVIS BACON ACT WD NC20240056.pdf PDF
DAVIS-BACON-ACT.pdf PDF
B53 Install Replacement Steam Boiler SOW.docx DOCX document
Construction clauses less than 35k.docx DOCX document
SF1442-24 70Z08124Q00000142.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USCG Base Elizabeth City, NC Bldg. 53 Boiler Installation Project Q & A Solicitation Number: 70Z08124Q00000142 Date: 6/28/2024

Questions & Responses #2

1. SOW paragraph 18 states:

“Original Equipment Manufacturer Operational testing and start-up shall be conducted to verify proper operation of equipment and commissioning.”

After contacting Weil-McClain, they do not maintain a network of OEM authorized contractors who can conduct a startup, operational check, and full commission.

Would the government consider allowing OEM startup technicians from other boiler manufacturers to perform the work since Weil-McClain does not offer formal training?

1. Answer: This statement merely requires the Contractor to start up the new boiler to test operational performance by a qualified technician.

2. SOW paragraph 19/20 states:

Installation, operation, maintenance manuals and warranty information for the equipment and system components shall be turned over to the COR upon project completion. The Contractor shall provide a one year warranty on the equipment supplied by the Contractor

(including labor) from the startup date of the equipment for any problems that might occur with the new installation.

Please confirm that the contractor will not be held responsible for any issues with the boiler since the contractor was not responsible for assembling it, placing it, and securing it to the courtesy pad.

2. Answer: The Contractor will NOT be required to provide a 1 year warranty on the USCG supplied boiler. The Contractor will need to provide the 1 year warranty on the remainder of the installation and parts supplied by the Contractor.

3. Please confirm insulation on 4” steam supply to building is asbestos free and provide negative test results.

3Answer: No asbestos insulation in this boiler room. The existing pipe insulation is fiberglass type.

4. Please confirm 4” valve on steam supply line to building, tagged as 059, is an ASME rated valve with required documentation so it can be reused.

4. Answer: We have no knowledge of the valve classification and have no documentation. If the

Contractor feels that the valve must be replaced, this should be included in their bid.

5. Is the contractor to assume that the current controls can be reused?

5. Answer: The Contractor should include new pressure controls in their bid.

6. If so, who will conduct the test on the equipment prior to install in order to verify?

6. Answer: The Boiler is new and provided by the USCG. If a problem with the boiler itself is found, it should be brought to the attention of the Contracting Officers Representative (COR).

USCG Base Elizabeth City, NC Bldg. 53 Boiler Installation Project Q & A Solicitation Number: 70Z08124Q00000142 Date: 6/28/2024

Questions & Responses #2

7. Running the boiler without chemical treatment to the water will result in excessive wear and tear.

Is the govt contracting the addition of a chemical treatment system out on a separate contract?

7.Answer: YES

8. The current pumps are overrated for the recommended supply of 1.5 gpm. Is the contractor to assume that throttling controls need to be added to prevent flooding the boiler with make-up water/Condensate/feedwater?

8. Answer: Page 5 of 12, Paragraph C

9. If not, will the contractor need to supply the properly rated pumps to service the new boiler

9. Answer: Page 5 of 12, Paragraph C